APPENDIX A.docx

DOCX document 22 KB Posted

Attached to
Fire Door Inspection, Assessment, and Maintenance at the Albuquerque Area IHS Healthcare Facilities
Solicitation number
75H70727Q00003
Issued by

About this file

This file is Appendix A of a Performance Work Statement, providing a mandatory decision framework for fire door repair or replacement determinations.

The framework requires contractors to evaluate each fire door assembly at four Albuquerque Area Indian Health Service facilities (Albuquerque Indian Health Center, Mescalero Indian Health Center, Santa Fe Indian Health Center, and Taos-Picuris Indian Health Center) and document findings against established criteria during the comprehensive inspection and verification phase. For each door system evaluated, contractors must make one of four determinations: New Install, Repair/Upgrade, Partial Replacement, or Full Replacement. Full Replacement is mandatory when: the door or frame cannot achieve NFPA 80 compliance through adjustment or minor repair; unlisted modifications or field alterations void the fire rating; required components are missing, incompatible, or cannot be verified as listed; the door is warped, delaminated, or excessively damaged; repair costs approach or exceed replacement costs; the assembly cannot reliably meet operational requirements after repair; or compliance would require extensive modifications not permitted under NFPA 80. All determinations must be documented with detailed rationale and submitted as Task 1 deliverables. The Government will review and respond to determinations within fifteen business days of receipt on a facility-by-facility basis, and approved determinations may proceed independently without awaiting approval of all facilities. Installation, upgrade, or replacement work shall not commence until Government review and approval is obtained. The framework prioritizes repair and maintenance over replacement, with replacement only recommended when repair cannot achieve compliance.

View the file

Other files

File Type Posted
RFI Log 75H70727Q00003 Fire Door Insp_Assessmnt_Maint.xlsx XLSX spreadsheet
SCA WD 2015-5443 Bernalillo County.pdf PDF
SCA WD 2015-5451 Taos County.pdf PDF
SCA WD 2015-5449 Santa Fe County.pdf PDF
SCA WD 2015-5445 Otero County.pdf PDF
Sol_75H70727Q00003_Amd_0002.pdf PDF
Attachment A- Fire Door Photographs.pdf PDF
MSU-A4_Door Schedule Types.pdf PDF
TPSU A9 2 Door Window Schedule.pdf PDF
MES_LS-1_Life Safety_rev 03-01-19.pdf PDF
Attachment C-TPSU Fire Door Photographs.pdf PDF
RFI Log 75H70726Q00003 Fire Door Insp_Assessmnt_Maint.xlsx XLSX spreadsheet
SFSU_Architectural Door Schedule Door Types A-20.2.pdf PDF
SFSU_Architectural Door Schedule A-19.2.pdf PDF
AIHC 1st 3rd Floor_AS-BUILTS 7-01-2021.pdf PDF
SFSU_F A Special System Diagram E-13 1.pdf PDF
Attachment B-MSU Fire Door Photographs.pdf PDF
Sol_75H70727Q00003_Amd_0001.pdf PDF
TPSU_E4 Special Systems Plan.pdf PDF
Sol_75H70727Q00003.pdf PDF
Attachment E- WD.pdf PDF
Albuquerque Service Unit Building 21 Lead Report.pdf PDF
Santa Fe Lead Inspection Report.pdf PDF
2025 Firecheck Inspection Report ABQ Indian Health Center.pdf PDF
Santa Fe Asbestos Inspection Report.pdf PDF
Sol_75H70727Q00003.pdf PDF
Albuquerque Service Unit Building 21 Asbestos Report.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX A – Fire Door Repair or Replacement Decision Framework This appendix provides the required decision framework to be used by the Contractor during performance requirement ‘3.1 Comprehensive Inspection and Verification’. The decision framework is intended to prioritize repair and maintenance over replacement. Replacement shall only be recommended when repair cannot achieve compliance. The purpose of this matrix is to ensure consistent, documented, and auditable determination of whether existing fire doors and components can be upgraded and reused or whether replacement is technically required to achieve compliance with this PWS.

The Contractor shall complete this matrix for each fire door under Task 1 and submit it as part of the Task 1 deliverables.

i. Decision Criteria

a. For each door and system evaluated, the Contractor shall assess the criteria below and document findings. Replacement shall be recommended only when upgrade or configuration is not technically feasible or would not achieve required compliance, functionality, or auditability.

ii. Determination Summary

a. Based on the evaluation above, the Contractor shall make one of the following determinations for each door or system:

i. New Install – There is no existing system/components to meet the requirements.

ii. Repair/Upgrade – Existing system/components can be repaired, upgraded or configured to meet all requirements.

iii. Partial Replacement – Limited components must be replaced while reusing the remaining system.

iv. Full Replacement – Existing system cannot be feasibly upgraded to meet requirements.

b. The determination shall be clearly stated and supported by the documented criteria above.

Mandatory Replacement Conditions The Contractor shall recommend Full Replacement of a fire door assembly or component when any of the following conditions exist:

· The fire door or frame cannot be brought into compliance with NFPA 80 through adjustment or minor repair

· The assembly has unlisted modifications, field alterations, or damage that voids the fire rating

· Required components (e.g., labels, closers, latching hardware, seals) are missing, incompatible, or cannot be verified as listed/labeled

· The door or frame is warped, delaminated, excessively damaged, or deteriorated beyond repair

· The cost of repair or upgrade approaches or exceeds replacement cost, as determined and justified by the Contractor

· The assembly cannot reliably meet operational or functional requirements (self-closing, latching, clearances, etc.) after repair

· Compliance would require extensive modification not permitted under NFPA 80

Repair or upgrade shall only be recommended where the Contractor can demonstrate that full compliance can be achieved without compromising the listing, labeling, or long-term performance of the fire door assembly.

All repair determinations shall be justified with documented rationale and are subject to Government review and approval.

iii. Government Review and Approval

a. All new installations, upgrades, and replacement determinations documented in Appendix A are subject to Government review and approval. Installation, upgrade, or replacement work shall not proceed until determinations have been reviewed and approved by the Government in accordance with Task 1 acceptance requirements.

b. The Government will review and respond to documented new installation, upgrade, partial replacement, or full replacement determinations within fifteen (15) business days of receipt. Determinations may be reviewed and approved on a facility-by-facility basis. Approved determinations may proceed independently without requiring completion or approval of all facilities.

End of Appendix A