As-Built Construction Documents - Indian Health Services Hospital Renovation

This file comprises comprehensive as-built construction documentation for the 1st and 3rd floor interior renovations at Albuquerque Indian Hospital (801 Vassar Drive N.E., Albuquerque, NM 87106). The project scope includes approximately 1,500 square feet on the first floor covering renovation of four clinical rooms, conversion of a janitor's closet and mail room to a toilet room and office, relocation and replacement of one heat pump unit, and replacement of floor finishes and east entrance doors. The third floor renovation encompasses approximately 1,400 square feet including renovation of the Nurse's Station, reconfiguration of Exam Room 310 with new storage closet, demolition of Rooms 310A, 311A, and 312 to create a new office, reconfiguration of Toilet Room 318B with new ADA restroom and janitor's closet, and installation of a new electric water cooler. The as-built documents are dated July 1, 2021, with various revision dates through May 2021.

The documentation package includes detailed architectural, structural, mechanical, plumbing, electrical, and fire alarm drawings prepared by QA Engineering LLC (Jon Anthony, P.E.), Huitt-Zollars Inc. (Jose Zelaya, AIA), Chavez-Grieves (George H. Bradley, P.E.), and Sound & Signal Systems of New Mexico (Ted Aragon). The drawings contain demolition and new work plans, reflected ceiling plans, enlarged floor plans with interior elevations, mechanical and HVAC systems layouts with equipment schedules, complete plumbing and waste/vent systems documentation, electrical power and lighting plans with panel schedules, and fire alarm system plans with riser diagrams and battery calculations. All work was performed in compliance with applicable codes including IBC-2015, UPC, UMC, NFPA standards, and ADA requirements. The project also includes specifications for asbestos abatement, coordination of mechanical equipment relocation, and integration of new utility systems with existing infrastructure.

View the file

Other files

File Type Posted
RFI Log 75H70727Q00003 Fire Door Insp_Assessmnt_Maint.xlsx XLSX spreadsheet
SCA WD 2015-5443 Bernalillo County.pdf PDF
SCA WD 2015-5451 Taos County.pdf PDF
SCA WD 2015-5449 Santa Fe County.pdf PDF
SCA WD 2015-5445 Otero County.pdf PDF
Sol_75H70727Q00003_Amd_0002.pdf PDF
APPENDIX A.docx DOCX document
Attachment A- Fire Door Photographs.pdf PDF
MSU-A4_Door Schedule Types.pdf PDF
TPSU A9 2 Door Window Schedule.pdf PDF
MES_LS-1_Life Safety_rev 03-01-19.pdf PDF
Attachment C-TPSU Fire Door Photographs.pdf PDF
RFI Log 75H70726Q00003 Fire Door Insp_Assessmnt_Maint.xlsx XLSX spreadsheet
SFSU_Architectural Door Schedule Door Types A-20.2.pdf PDF
SFSU_Architectural Door Schedule A-19.2.pdf PDF
SFSU_F A Special System Diagram E-13 1.pdf PDF
Attachment B-MSU Fire Door Photographs.pdf PDF
Sol_75H70727Q00003_Amd_0001.pdf PDF
TPSU_E4 Special Systems Plan.pdf PDF
Sol_75H70727Q00003.pdf PDF
Attachment E- WD.pdf PDF
Albuquerque Service Unit Building 21 Lead Report.pdf PDF
Santa Fe Lead Inspection Report.pdf PDF
2025 Firecheck Inspection Report ABQ Indian Health Center.pdf PDF
Santa Fe Asbestos Inspection Report.pdf PDF
Sol_75H70727Q00003.pdf PDF
Albuquerque Service Unit Building 21 Asbestos Report.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .