This is Amendment 2 (P00002) to Federal Solicitation 75H70126Q00019 issued by the Indian Health Service (IHS) – DES Seattle for the Rosebud Quarters Security Fence project. The amendment, effective April 1, 2026, incorporates responses to 13 Requests for Information (RFI) previously submitted by potential contractors. The offer due date and time remain unchanged at 2:00 PM Pacific on April 9, 2026, and all other terms and conditions of the original solicitation remain in effect.

The RFI responses clarify critical project scope details for a security fence installation at Rosebud Service Unit. Key specifications include: one 12-foot double swing gate with location and size details provided; contractor responsibility for tree clearing and grubbing along the fence line where necessary; fence set-backs of 10-20 feet from airport roads and compliance with Federal and Tribal standards along BIA roads; a minimum 5-foot offset from existing barbed wire fencing; contractor responsibility for site preparation including removal of concrete pipes and maintenance equipment along the fence alignment; access to hospital restrooms (basement location adjacent to Maintenance Office), water connections (back parking lot hose and fire hydrants within leased property), and staging areas for equipment storage; permission to place excess soil in an existing dirt pile; and coordination with the Facility Manager for any work outside normal business hours. The contracting officer is Thupten Tsering of the Indian Health Service.

View the file

Other files for this federal contract opportunity

Other files attached to Rosebud Quarters Fencing, newest first.
File Type Posted
B03 Site Visit Roster.pdf PDF
Amendment 1.pdf PDF
5_APP_D_M-11_CHAIN_LINK_FNCING_Details.pdf PDF
5_APP_B_Fence_Location.pdf PDF
5_APP_A_Bid_Schedule.pdf PDF
5_SOW_GP26RB600Q03_Quarters_Security_Fence.pdf PDF
5_APP_C_02821 Chain Link Fencing(Conc).pdf PDF
Attachment 1 Wage Determination SD20260018.pdf PDF
B01 26Q00019.pdf PDF
Attachment 2 SOW.pdf PDF
Attachment 3 IHS IEE Representation Form.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

2. AMENDMENT/MODIFICATION NUMBER

P00002

Thupten Tsering, Contracting Officer

The purpose of amendment 2 to solicitation 75H70126Q00019 is the following:

1. Incorporate RFI responses 1-13.

2. The offer due date and time is unchanged at 2pm Pacific on 4/9/2026.

3. All other terms and conditions remain unchanged.

4. See continuation page(s).

Indian Health Service - DES Seattle 701 5th Avenue, Suite 1600 Seattle, WA 98104

See Item 6

75H70126Q00019

GP26RB600Q03

1 3

04/01/2026

03/09/2026

Number RFI Response

Please provide clarification on gate size and location?

Is it the contractor's responsibility to do the grubbing and tree removal for shrubs, bushes, trees, etc that are in the path of the fence line?

What are the fence set-backs off of roads/property or lease line?

Existing Barbed Wire Fence Please confirm whether the new fence is to be installed offset from the existing barbed wire fence, or if the existing barbed wire fence will be removed as part of the project. If it will remain, please clarify the intended relationship and spacing between the existing fence and proposed fence alignment.

Gate Quantity and Configuration During the site visit, only one double gate was confirmed in the field.

Please confirm whether the contract documents still require only one gate, or if any additional gates are included in the final scope.

Work Hours / Weekend Work Can the contractor be permitted to work extended daily hours and/or weekends in order to complete the project efficiently, subject to coordination with the facility?

Fence Alignment at Concrete Culverts There are two concrete culverts along the proposed fence line. One appears to have a temporary fence installed above and around it, and the existing barbed wire fence runs over the end of it. Please clarify the required fence path and treatment at these culvert locations.

Concrete Pipes Along Fence Layout There were concrete pipes laying in an area along the proposed fence layout. Will these be removed by the owner prior to fence installation, or should the contractor include removal and disposal in its scope?

4/1/2026 75H70126Q00019 Rosebud Quarters Security Fence

Attachment included (12’ double gate, see details) with size and location

The intent is to follow a path that will allow the preservation as many trees as possible, however in the occurrence that trees must be cleared and grubbed the responsibility is on the contractor.

Fence set-backs along the BIA road must comply with all applicable Federal (BIA), and Tribal Standards.

Fence set-back along the airport road is 10’-20’. Fence is to not run in ditches along roads.Fence shall run inside existing fences along property/lease line.

The new fence is to be offset 5’ minimum from the existing fence.

The Rosebud Service Unit has requested only 1-12’ double swing gate

Any work outside of working days/hours is to be coordinated and approved by the Facility Manager/Service Unit.

Proposal should consider no work outside of normal business hours.

The proposed fenceline shall be set-back off enough to avoid conflicting with existing fence and culvert locations.

The service unit or existing contractors of the hospital shall be responsible for removal of their respective items along the fence alignment

Staging / Storage Area Availability The enclosed area near the apparent starting point is currently occupied by a construction company. Will that area be made available to the fence contractor for staging and material storage, or should the contractor plan to establish its own laydown/storage area elsewhere?

If separate staging is required, please identify the approved location.

There are currently two areas that are being used for contractor equipment storage (see image below). It is the intent that either of these two areas shall be used. The fenced in area is secure, however it may not be available at the time of project start. The secondary area is anticipated to be utilized (not-secured). In the occurrence that the 2nd area is still being utilized due to project delay a 3rd area shall be located.

Restroom Access Portable toilet vendors appear to have limited service availability in Rosebud, SD. Will construction personnel be permitted access to facility restrooms during performance, or must the contractor provide its own temporary sanitation facilities regardless of vendor limitations?

Spoils / Dirt Pile Along Fence Line There is an existing pile of dirt along the proposed fence area. Can the contractor place excess soil from drilled fence post holes onto that pile, or is all spoils material required to be hauled off site?

Water Access Please confirm whether water access will be available on site for construction use, and if so, where the contractor may connect or obtain water.

Maintenance Department Equipment in Fence Area There is maintenance department equipment currently located along portions of the proposed fence area. Will all such equipment and obstructions be cleared by the government prior to the contractor’s start date?

The hospital has a hose connection in the back parking lot of the hospital. Additionally, contractors can connect to existing fire hydrants located around the hospital compound. Please only utilize fire hydrants within the Indian Health Services Leased Property.

The service unit or existing contractors of the hospital shall be responsible for removal of their respective items along the fence alignment.

Contractors may use the restrooms in the basement of the hospital adjacent to the hospital Maintenance Office.

Contractor can place excess soil into existing dirt pile.

Amendment 2
RFI