The document is a Lightning Protection Inspection Report for the Taos Picuris Indian Health Center (TPPIHC) prepared by BLP, LLC on December 6, 2018. The inspection identified multiple required modifications to the facility's lightning protection system, including installing new systems on two stack units, reshaping cables at 30 locations to meet an 8" radius standard, bonding 11 vents and 18 roof drains, adding four down conductors, and addressing surge protection deficiencies. Specific recommendations include installing a new ground at the main electrical entrance, adding a 277/480-volt surge protector with surge counter, and ensuring proper grounding in the server room and cable trays.
The related federal contract opportunity is a solicitation (75H70125R00037) for a roof replacement and fall protection project at the same health center. The project is a 100% Indian Small Business Economic Enterprise (ISBEE) set-aside under NAICS code 238160, with an anticipated project magnitude between $1-5 million. The Indian Health Service intends to award a Firm Fixed Price contract with a 180-calendar day performance period. The solicitation will be procured as a Request for Proposal using Lowest Price Technically Acceptable evaluation criteria, with all documents to be posted online for download by interested parties.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PO Box 91208 Email: Lightning@blpllc.net
Albuquerque, NM 87199 Website: www.blpllc.net
Fed Tax ID: 81-5354345
CRS#: 03-374293-006
Inspection Report
Date: 12/6/2018
BLP, LLC dba Baca Lightning Protection is pleased to provide an inspection report for the following project:
Project: Taos Picuris Indian Health Center
After a site visit with Mr. Dodge we found that the lightning protection system is not up to current NFPA-780 and UL-96A Lightning Protection Standards. Items found during the site visit are as followed:
1. New system is required on 2 stack units.
2. New cable is required to avoid bends that have more than an 8" radius at 15 d own conductor locations.
3. Reshape cable at 30 locations to have an 8" radius.
4. Bond 11vents with #6 cable.
5. Add additional strapping on approximately 250' of cable.
6. Bond 18 roof drains.
7. Add four r additional down conductors at required locations.
8. Five thru wall applications are required.
9. Bond one satellite dish.
10. Add one additional cross run cable.
We also performed an inspection o n t h e s u r g e protection and found that there are i t e m s t h a t need to be addressed.
1. New ground should be installed outside at main electrical entrance.
2. One new 277/480-volt 3/0 4 wire surge protector with surge counter be installed. One 30 amp disconnect will be required at the same location Rm. 702.
3. Provider of new Kohler Power System Unit should include surge protectors on new unit.
4. Server Room 1304 requires the attachment of a #6 ground wire to t h e buss bar.
5. All cable trays require bonding to the buss bar.
Note: If awarded this project, BLP, LLC will issue a letter of compliance assuring that the lightning protection system meets the current lightning protection standards.
Antonio Ortega Operations Manager
FOR INFORMATIONAL PURPOSES ONLY
mailto:Lightning@blpllc.net http://www.blpllc.net/
AMO
Typewritten Text 12/6/18