This document is Amendment A00002 for Solicitation 75H701-25-R-00037, a roof replacement and fall protection project for the Taos-Picuris Pueblos Indian Health Center (TPPIHC). The amendment extends the proposal due date from March 20, 2025, to March 26, 2025, at 2:00 PM MST, and modifies the work hours to 7:00 AM - 5:00 PM, Monday through Friday. The amendment includes two sign-in sheets from a site visit held on March 5, 2025, and provides pre-proposal inquiries and responses covering topics such as roof conditions, existing infrastructure, installation requirements, and project-specific details.
The solicitation is a 100% Indian Small Business Economic Enterprise (ISBEE) set-aside under NAICS code 236220, with an anticipated project magnitude between $1,000,000 and $5,000,000. The project involves replacing the roof and fall protection at the TPPIHC located at 1090 Goat Springs Road, Taos, NM 87571. The contract period of performance is 180 calendar days from the notice to proceed, and the Indian Health Service intends to award a Firm Fixed Price (FFP) contract using a Lowest Price Technically Acceptable (LPTA) evaluation method.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
A00002
Jennifer J. Scroggins
See the following SF30 continuation page.
Indian Health Service Division of Engineering Services (DES) - Seattle 701 5th Ave, Suite 1600 Seattle, WA 98104
Indian Health Service Division of Engineering Services (DES) - Seattle 701 5th Ave, Suite 1600 Seattle, WA 98104
75H701-25-R-00037
1 2
03/19/2025
02/19/2025
SF30 CONTINUATION OF BOX 14.
Solicitation 75H701-25-R-00037 Amendment A00002 TPPIHC Roof Replacement and Fall Protection
SUMMARY OF CHANGES:
Amendment A00002 to solicitation 75H701-25-R-00037 hereby addresses the following:
1. Provides:
a. The two (2) sign-in sheets (4 pages total) from the site visit that was held on March 05, 2025;
b. Pre-Proposal Inquiries 1 through 72; 6 pages.
c. Please note there are Pre-Proposal Inquiries still pending that will be answered in a forthcoming amendment.
2. Revises:
a. SF-1442, extending the proposal due date until March 26, 2025, by 2:00 PM MST;
b. At clause H.1. WORK HOURS, first sentence only, as follows:
i. Normal business hours are 8:00 AM 7:00 AM – 5:00 PM, Monday through Friday (excluding Federal holidays).
3. Extends the proposal due date/time from March 20, 2025, at 2:00 PM MST to March 26, 2025, at 2:00 PM MST.
NOTICE TO OFFERORS: Offerors must acknowledge receipt of any and all amendments by number and date on their cover letter in their offer or by submitting a signed copy of the SF30. All other terms and conditions remain unchanged.
END SUMMARY OF CHANGES
Amendment A00002 under Solicitation 75H701-25-R-00037 TPPIHC Roof Replacement and Fall Protection
INDIAN HEALTH SERVICE
DIVISION OF ENGINEERING
SERVICE
PRE-PROPOSAL INQUIRIES
Solicitation 75H701-25-R-00037
TPPIHC Roof Replacement and Fall Protection
Item No. COMMENTS IHS Approved Response
1. Is there a recent core sample of the existing roof available to review?
No.
2. Can you confirm the presence of lead or asbestos on the existing roof structure?
The reports will be provided for Informational Purposes Only for both the Asbestos and Lead Based Paint Survey. (Attachment Taos Lead Inspection Report)
3. Can you provide any as-builts or historical drawings of the existing roof?
Yes, the roof is original and drawings will be provided for Informational Purposes Only.
(Attachment IHS Taos Roof Plan)
4. Can you confirm the gauge of the existing metal deck?
Roof deck gauges are indicated on original construction drawings but has not been confirmed by BWS, the AOR.
5. If the existing structural slope is less than than the minimum 3/8” per foot will a full tapered insulation assembly be required to increase the overall slope of the finished roof assembly?
If necessary, Contractor may propose strategy to meet 3/8” per foot slope requirement of final installation.
6. Is there fireproofing on the underside of the existing metal roof In the limited areas that we were able to access (Mechanical Room), BWS did not observe fireproofing on underside of existing roof deck.
7. Will you require the Bid Bond be delivered to the Dallas office of IHS prior to the Proposal due date or will you allow a copy of the Bid Bond in our electronic submission?
Proposals, to include bonds, are to be submitted electronically; please see and review all of solicitation section ***L.10. PROPOSAL PREPARATION INSTRUCTIONS*** and specifically subsection (a) “The offeror’s proposal package shall be submitted electronically in PDF format only. No facsimile or other alternate method of submission will be accepted. Each electronic file submitted as an attachment to an email transmission.”
8. Can you identify the manufacturer of the existing lightning protection system?
Classic Lightning Protection
9. Is it the intent to recertify the existing lightning system up to current standards which may require modifications or to recertify the standard in which it was installed? There may not be a difference depending on when it was installed.
The intent is to recertify the lightning protection system; installation was performed in 2021.
10. When was the current lightning protection system installed and to what standard?
Installation was completed in 2021, warranty period began on April 13, 2021.
11. Is there a design and as built associated with the existing lightning protection system available for the engineer that is required to recertify the existing system?
Yes, the information is being provided for Informational Purposes Only. (Attachments TPPIHC Lightning Protection Inspection Report; TPSU_E6 Lightning Protection Plan)
INDIAN HEALTH SERVICE
DIVISION OF ENGINEERING
SERVICE
PRE-PROPOSAL INQUIRIES
Solicitation 75H701-25-R-00037
TPPIHC Roof Replacement and Fall Protection
12. Detail 2 on Sheet A4.3 and Detail 2 on Sheet A4.5 both indicate an existing vapor barrier over the existing steel deck under the new roof assembly.
Existing vapor barrier has not been confirmed.
13. Is it the intent to salvage any existing vapor barrier? Existing vapor barrier has not been confirmed and, if existing, is not required to be salvaged.
14. Is a new vapor barrier required as part of the new roof assembly? No.
15. Key note 30 on Roof Plan A4.1 calls out a Loop Top Anchor Point. Are these items existing or to be installed as part of this project?
Loop top anchor points are new and to be installed as part of this project.
16. Is the existing roof hatch to be replaced or just upgraded to include a new safety rail?
Just upgraded to include new safety rail.
17. Would the designers provide an estimated footage of stucco repair? This involves GC means and methods so we are not able to provide estimated footage. It is the bidders responsibility to estimate quantities.
18. Please clarify extent of stucco repair needed so we may most accurately and competitively provide pricing for that scope of work.
This involves GC means and methods so we are not able to provide estimated footage. It is the bidders responsibility to estimate quantities.
19. Would the owner contemplate changing this item of work from Lump Sum to SF?
The government advises offerors to review FAR Clause 52.236-3, Site Investigations and Conditions Affecting the Work and that any changes to scope, or additional work discovered as a result of differing site conditions, will be handled as a modification to the contract after award. The offeror proposal costs may be based on SF, but offerors must follow solicitation instructions and submit IAW Volume II: PRICE (both sections L and M) as a lump sum.
20. Could some of these qualified vendors that were unable to attend yesterdays site visit conduct a site visit with hospital maintenance staff to see first hand the extent of repair required?
No, per solicitation section L.7. FAR 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995), individual requests for site visits will not be granted.
21. Detail 4 on A4.6 calls out new reglet and counterflashing. If we saw-cut and remove stucco/reglet to mount new reglet do we risk damaging the Stucco weep screed.
Detail 2/A4.4 calls out removal of existing reglet and counterflashing. If there is an additional weep screed component, assumption is that it will also be removed and stucco will be patched/repaired to new flashing components.
22. Will the new reglet/counterflashing called out in Detail 4 on A4.6 need to be painted to match the existing walls or remain bare galvanized?
Any flashing and other sheet metal work that is only visible from the roof may be galvanized. All metal work visible from the ground must be prefinished.
23. Can As-Builts confirm there is an existing nailer under the domed stucco cap on top of all parapet walls as shown in Details 1 and 2 on A4.4?
We have very limited as-built drawings but what we have indicates wood nailer at top of parapet walls, on top of metal track.
24. Is the intent to “adhere” all layers of roofing to avoid penetrating the metal deck and conduit beneath? This may not be possible depending on the required Wind Speed rating.
See specification section 075400. Insulation and cover board may be mechanically fastened if necessary for wind speed rating. Balance PVC roofing system is specified as adhered.
INDIAN HEALTH SERVICE
DIVISION OF ENGINEERING
SERVICE
PRE-PROPOSAL INQUIRIES
Solicitation 75H701-25-R-00037
TPPIHC Roof Replacement and Fall Protection
25. There is a smaller Building with a single-ply roof adjacent the Main Health Center, is this to be included in our scope of work?
No, the smaller building is not included in the construction documents.
26. Are site screen walls to be included for removal of stucco cap and installation of new coping?
See sheet A5.1 for site wall details and scope of work. Site walls get stucco cap, not metal coping cap.
27. There are shade structures over exterior windows on three sides of the building. Are modifications to these structures included as part of this proposal?
No, the shade structures are not included in the construction documents.
28. Detail 5 on A4.3 Air Terminal, indicates terminals set on splice tape and covered with single ply sealant with a note to reinstall conductor fasteners.
Is the intent to secure the terminals through the roof with fasteners? This may void the long term warranty.
No. No mechanical fasteners through roofing are shown.
29. Will a core be taken and results be available for all interested bidders, the designers/engineers and for the owner?
No, due to limitations on purchased items there will be no core samples taken at this time.
30. Solicitation, Page 7 of 59, Section IV.D: Contractor to develop a phasing plan of Construction and obtain concurrence from the owner. Is there a minimum number of phases the owner is looking for?
There is no minimum phases to be done; as little minimum impact to patients, staff and visitors to the health center.
31. Solicitation, Page 17 of 59, Section H.6.2(b) key personnel are listed as Project Manager, Superintendent and Safety Officer. Can Quality Control requirements be part of the Superintendent and/or SSHO roles or will a separate QCM be required.
Yes, if proper experience and time is presented for all positions.
32. Solicitation, Page 19 of 59, Section H.14: Document Control. Please confirm that construction management software such as Procore or Submittal Exchange will be a requirement for this project (Additional cost).
Confirmed
33. Specifications, Page 9 of 131; Digital Photographs. Please confirm a professional photographer will not be required.
Confirmed
34. Specifications, Page 22 of 131, Section 4.i (17 (18) mentions asbestos abatement and lead abatement. Page 78 of 131, Section 1.6. E States: No hazardous materials are known to exist within roofing system. Please confirm if asbestos/lead may be encountered on this project.
There is none found on the roof; Asbestos Survey Report and Lead Based Paint report is being made available for Informational Purposes Only. (Attachments Taos Asbestos Inspection Report; Taos Lead Inspection Report)
INDIAN HEALTH SERVICE
DIVISION OF ENGINEERING
SERVICE
PRE-PROPOSAL INQUIRIES
Solicitation 75H701-25-R-00037
TPPIHC Roof Replacement and Fall Protection
35. Specifications, Page 26 of 131, Section 1.8.F Safety briefing for all workers shall include Government Medical Center safety guidelines, and use of Government Medical Center equipment. Please provide Government Medical Center Safety Guidelines. What Government Medical Center equipment would workers be using?
Medical Center Safety Guidelines are specific to the facility and the safety briefing will be performed by the facility safety officer prior to work commencing on site. Equipment refers to any and all government supplied equipment; there are none planned for this project.
36. Specifications, Page 37 of 131, Section 3.4.C Site enclosure fence. Please confirm that no site enclosure fence will be required.
Contractor to propose and provide any necessary fencing to secure their work site.
37. Specifications, Page 45 of 131, Section 3.5.C.3 Maintain Infection Control measures at all times. Please clarify what Infection control measures are required for roofing and stucco.
The protection for the project will be determined by the Pre-Construction Risk Assessment and the Infection Control Risk Assessment; given at the Pre-Construction conference.
38. Specifications, Page 53 of 131, Section 1.E.6 Submit a final liquidated damages settlement statement (as applicable). What are the liquidated damages?
Liquidated damages are not included in the solicitation or planned contract.
39. Specifications, Page 77- of 131, Section1.6.A.2 If structurally impaired areas of deck are discovered, notify COR. This cannot be quantified for bidding purposes. Will this be address by contract modification? Or should we use a percentage for bidding?
If there are differing conditions, they will be handled pursuant to FAR clause 52.236-2 (Differing Site Conditions).
40. Drawing A4.1, Page 2 of 9: There is a Keynote 15 just plan north of the roof hatch. What is keynote 15?
Keynote 15 should read “Rooftop sleeper-mounted conduit. Protect in place. Furnish and install pipe support blocks, size and spacing as required. See detail 1/A4.3.”
41. Clarification on the safety rail around the skylight. Who’s installing? Contractor to furnish and install per drawings and keynotes.
42. Roof drains.- who is making the repairs after the roof is removed on the roof drains if there are any issues plumber or roofer.
Assignment of scope of work is responsibility of the contractor.
43. Who is the low-voltage provider for the Wi-Fi antenna? Health Systems Informatics, Steve Generazo, 844-474-2677, ext. 702.
44. Who is the low-voltage provider for the camera system? Summit Fire & Security, Michael Martinez, 505-2574-9798.
45. Do the light fixtures on the exterior of the building need to be removed for the stucco to be installed Yes, remove and reinstall fixtures for proper stucco repair and coating installation.
46. Is the detached building getting new stucco No, the smaller building is not included in the construction documents.
47. Location of laydown yard, dumpster, toilet, contractor parking. The location of laydown will be provided with a map of the facility; map will be provided.
48. We noticed electrical conduits installed in the upper and lower portions of the roof deck in the mechanical room ( underside of roof) this poses an issue for an entire screw down roof system. Potential of electrical conduits will have screws through them / damage
Roofing system may be fully adhered as indicated in Spec Section 075400. Confirm wind speed rating requirements.
49. Can we get a core sample to determine how many roofs are installed? No, due to limitations on purchased items there will be no core samples taken at this time.
INDIAN HEALTH SERVICE
DIVISION OF ENGINEERING
SERVICE
PRE-PROPOSAL INQUIRIES
Solicitation 75H701-25-R-00037
TPPIHC Roof Replacement and Fall Protection
50. Confirmation on re-stucco of the entire building ?color and method preferred
See specification section 092410. Color will be selected during construction submittal process.
51. Start date - completion date Work is expected to commence in early spring, once the weather permits. For the period of performance, reference clause F.2. FAR 52.211-10 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK (APR 1984)
52. How long can the exhaust fans be down -non-operational during the re roof process - this determines how many trips the electrical contractor needs to make
Exhaust fans do not collect fresh air needed for ventilation requirements of ASHRAE 170.
Supply air handlers can be shut and recirculate air for 8 hours maximum; but fresh air exchanges must be done after.
53. Will the cameras need to be removed for the stucco to be installed or can we stucco around the cameras
Yes, remove and reinstall fixtures for proper stucco repair and coating installation.
54. Who installed the existing lightning protection system on that facility in Taos NM - could we get there contact information?
Classic Lighting Protection, Inc., 928-474-1727
55. Do they want to remove & replace drains or work with existing? Roof drains are existing to remain as shown in details.
56. Can we get core cut results? No, due to limitations on purchased items there will be no core samples taken at this time.
57. Insulation requirements (R-Values)? See spec 075400 for roof insulation thickness requirement. 4” polyiso to be R-28.
58. The conduit lines are attached directly below the metal roof deck, making a mechanical fastened system impossible without the possibility of damaging those lines with screws... Are they aware of this issue and will the roof need to be fully adhered to avoid these issues?
Roofing system may be fully adhered as indicated in Spec Section 075400. Confirm wind speed rating requirements.
59. Please clarify potential On-Site working hour restrictions as mentioned in section V.B of the RFP.
Working hours are limited to business hours of the facility, 7 am – 5pm. (See solicitation Amendment A00002 at clause H.1. WORK HOURS)
60. Please provide clarification of existing structure as applies to roof slope, in the structure slopes for drainage or will the insulation need to be tapered?
Roof slope is generally provided by sloping roof structure. Tapered insulation may be required for proper slope around roof drains and sumps.
61. Has an asbestos survey been completed on the existing materials, and if so, is there a report available?
No; Asbestos Survey Report and Lead Based Paint report will be made available for Informational Purposes Only. (Attachments Taos Asbestos Inspection Report; Taos Lead Inspection Report)
62. RFP section V.D. referenced noise, vibration and odor disruptions.
Demolition, roofing and stucco activities all create these to some degree, please clarify acceptable levels.
The protection for the project will be determined by the Pre-Construction Risk Assessment and the Infection Control Risk Assessment; given at the Pre-Construction conference.
63. To maintain the specified schedule, we will need to stage both roofing and stucco equipment and materials along with site services, please clarify extents of allowable staging areas for contractor use during course of construction.
The location of laydown will be provided with a map of the facility; map will be provided.
INDIAN HEALTH SERVICE
DIVISION OF ENGINEERING
SERVICE
PRE-PROPOSAL INQUIRIES
Solicitation 75H701-25-R-00037
TPPIHC Roof Replacement and Fall Protection
Item No. COMMENTS IHS Approved Response
64. What is meant by phasing as referenced in Section IV.D of the RFP? There is no minimum phases to be done; as little minimum impact to patients, staff and visitors to the health center.
65. In addition to clarification regarding tapered insulation, is there a minimum required RValue or will it be calculated as an average?
R-28
66. Specification 07 5400 omits the layer of underlayment, please confirm roofing scope is as follows: 1. Demolish existing to structural metal deck.
2. Furnish/Install underlayment (1/2" DensDeck or similar) 3.
Furnish/Install Insulation (Tapered Requirement TBD) 4. Furnish/Install 60 MIL PVC Roofing.
75400 does not specify underlayment. Order of installation per 075400 is insulation, cover board, PVC roofing.
67. Is the decking structurally sloped? Steel roof deck is sloped
68. Is the electrical conduit near the ceiling going to be detached before mechanically installing the new roof to avoid screws from penetrating the electrical wiring?
Roofing system may be fully or partially adhered. Contractor’s means and methods will dictate coordination of roofing system requirements and installation with existing conditions.
69. Is the metal deck structurally sloped or is it sloped with tapered iso? Steel roof deck is sloped
70. FACTOR 2: Example Construction Schedule and Narrative:
Submittal Requirements: This submission requires two parts: The Offeror shall provide a narrative and an example construction schedule for one of the projects submitted under Factor 1 Specialized Experience.
Please confirm that we are not to provide narrative and schedule for the proposed project (Solicitation No.: 75H70125R00037 - TPPIHC Roof Replacement and Fall Protection), rather a narrative and a schedule that was created for a previously completed project that we are providing in Factor 1.
Confirmed. As stated in Factor 2 in Section L and M, “The Offeror shall provide a narrative and an example construction schedule for one of the projects submitted under Factor 1 Specialized Experience [emphasis added].”
71. Does this project @ Taos and the following project @ Santa Fe fall under the state of New Mexico gross receipts tax? If so what is the percentage of the bid?
The calculation of taxes is the responsibility of the firm proposing firm.
72. Will this FAR be incorporated into the contract or any exemption? 52.229- 10 State of New Mexico Gross Receipts and Compensating Tax
No, it will not be included in the contract.
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR
INFORMATION CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
INVITATION FOR BID
NEGOTIATED (RFP)
REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE OF PAGES
75H70125R00037
Indian Health Service Division of Engineering Services (DES) - Seattle 701 5th Ave, Suite 1600 Seattle, WA 98104
Project: AQ22TS003, Taos-Picuris Pueblos Indian Health Center (TPPIHC) Roof Replacement and Fall Protection
Location: 1090 Goat Springs Road, Taos, NM 87571
See Section L for Proposal Submittal Instructions and Site Visit Information.
This project will be procured as a 100% Indian Small Business Economic Enterprise (ISBEE) set-aside under North American Industry Classification System (NAICS) code 236220 - Commercial and Institutional Building Construction. The associated size standard for this procurement is $45 million.
CONSTRUCTION MAGNITUDE: The magnitude of this construction project is anticipated to be between $1,000,000 and $5,000,000 in accordance with FAR 36.204.
Indian Health Service Division of Engineering Services (DES) - Dallas Attn: Jenny Scroggins 1301 Young St., Suite 840 Dallas, TX 75201-5433
Joshua VanSkike (240) 485-7526 or joshua.vanskike@ihs.gov
AQ22TS003
1 5802/19/2025 local time 3/26/2025
2:00PM
10 Days after award
F.2 FAR 52.211-10
AWARD (To be completed by Government)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES
CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
B.3
Indian Health Service, DES - Seattle 701 5th Ave, Suite 1600 Seattle, WA 98104
IHS Albuquerque Area Attn: Finanace Office 4101 Indian School Rd NE, Suite 225 Albuquerque, NM 87110-3988
Jennifer J. Scroggins
LUMP SUM TOTAL $______________________