B01 Attachment J01 IHS BFSU Project A CT - Issued for BD - Drawings.pdf
PDF 10 MB Posted
- Attached to
- BLACKFEET HOSPITAL CT ROOM RENOVATION
- Solicitation number
- 75H70125R00016
About this file
This is an architectural and engineering drawing set for the IHS Blackfeet Service Unit CT room renovation project located at 760 Blackweasel Road in Browning, Montana. The drawings detail the renovation of the existing CT scan room and associated spaces, including a control room, changing room, and family consultation room.
The drawing set includes architectural, structural, mechanical, electrical and plumbing plans that specify demolition and new construction requirements. Key elements include lead-lined walls for radiation protection, new HVAC and electrical systems to support the CT equipment, floor trenching for equipment connections, and security upgrades. The plans show installation details for the CT scanner gantry, operator console, power distribution unit, and associated support equipment. Construction phasing is outlined to maintain hospital operations during renovation. The project team includes Seven Generations Architecture & Engineering as the prime architect, with Steelhead Engineering and Nehil-Sivak providing MEP and structural engineering services respectively.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
600 E. Michigan Ave., Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
ARCHITECTURE + ENGINEERING
SEVEN
GENERATIONS
THE REPRODUCTION, COPYING OR OTHER USE OF THIS
DRAWING WITHOUT WRITTEN AUTHORIZATION IS PROHIBITED.
c SEVEN GENERATIONS ARCHITECTURE & ENGINEERING, LLC
SHEET NO.
SHEET TITLE
JOB NUMBER:
ISSUE DATES:
KEYPLAN
NORTH
LOCATION MAP
PROJECT TEAM DRAWING SHEET INDEXPROJECT INFORMATION
BUILDING OCCUPANCY:
CONSTRUCTION TYPE:
BUILDING HEIGHT:
BUILDING AREA SQUARE FOOTAGE:
FIRST FLOOR:
BID DOCUMENTS
222112
IH
S B
F S U
M U
LT
IP
LE
P
R O
J E C
T D
E S
IG
N
IH
S B
LA
C
K F E E T
S E R
V
IC
E U
N
IT
B
LA
C K
W E A
S E L
R O
A D
B R
O W
N
IN
G M
O N
TA
N
A
G001.1
COVER SHEET - BP 01
IHS BLACKFEET SERVICE UNIT
SEVEN GENERATIONS A+E
600 E. MICHIGAN AVENUE, Ste B
KALAMAZOO, MI 49007
PHONE: 269.927.0144
WEB: 7GENAE.COM
760 BLACKWEASEL ROAD
BROWNING, MONTANA, 59417
STEELHEAD ENGINEERING
NEHIL-SIVAK STRUCTURAL ENGINEERS
414 S BURDICK STREET, STE 300
KALAMAZOO, MI 49007
269.383.3111
WEB: NEHILSIVAK.COM
ENGINEERING
STRUCTURAL
259 E. MICHIGAN AVENUE, Ste 407
KALAMAZOO, MICHIGAN 49007
PHONE: 269.585.2255
WEB: STEELHEADMEP.COM
IHS BLACKFEET SERVICE UNIT
IHS BFSU MULTIPLE PROJECT DESIGN
BROWNING, MONTANA
BROWNING, MONTANA
ARCHITECTURE:
II
15'-4"
B, I-2
BID DOCUMENTS02/16/24
EXISTING:
ADDITION:
RENOVATION:
107,718 SF
0 SF
BP1
PROJECT A
SHEET DESCRIPTION
GENERAL
G001.1 COVER SHEET - BP 01
G002.1 GENERAL INFORMATION & SYMBOL LEGEND
STRUCTURAL
S700.1 DETAILS
GENERAL
G201.1 FIRST FLOOR CODE COMPLIANCE PLAN
GC101.1 FIRST FLOOR INFECTION CONTROL PLAN
ARCHITECTURAL
AD101.1 FIRST FLOOR DEMOLITION PLAN
A001.1 WALL TYPES
A101.1 FIRST FLOOR PLAN
A121.1 FIRST FLOOR REFLECTED CEILING PLAN
A420.1 INTERIOR ELEVATIONS AND DOOR SCHEDULE
A520.1 CASEWORK DETAILS
A701.1 FIRST FLOOR FINISH PLAN
A801.1 FIRST FLOOR SIGNAGE PLAN
FIRE PROTECTION
FP001.1 FIRE PROTECTION GENERAL
FP101.1 FIRE PROTECTION PLAN
PLUMBING
P001.1 PLUMBING GENERAL INFO & SYMBOL LEGEND
PD101.1 FIRST FLOOR PLUMBING DEMOLITION PLAN
P101.1 FIRST FLOOR SANITARY AND VENT PLAN
P201.1 FIRST FLOOR DOMESTIC WATER AND GAS PLAN
P500.1 PLUMBING DETAILS AND SCHEDULES
MECHANICAL
M001.1 MECHANICAL GENERAL INFO & SYMBOL LEGEND
MD101.1 FIRST FLOOR MECHANICAL DEMOLITION PLAN
MD201.1 FIRST FLOOR MECHANICAL PIPING DEMOLITION PLAN
M101.1 FIRST FLOOR MECHANICAL PLAN
M201.1 FIRST FLOOR MECHANICAL PIPING PLAN
M301.1 MECHANICAL REFLECTED CEILING PLANS
M500.1 MECHANICAL DETAILS
M600.1 MECHANICAL SCHEDULES
ELECTRICAL
E001.1 ELECTRICAL GENERAL INFO & SYMBOL LEGEND
ED001.1 FIRST FLOOR ELECTRICAL DEMOLITION PLAN
E101.1 FIRST FLOOR LIGHTING PLAN
E201.1 FIRST FLOOR POWER PLAN
E500.1 ELECTRICAL DETAILS
E600.1 ELECTRICAL SCHEDULES
932 SF
A300
A320
ARCHITECTURAL SYMBOLS & PLAN INDICATORSBARRIER-FREE DESIGN INFORMATION
ROOMNAME
XXX
A
A
A
A
8'-0"
TOP OF STEEL
ELEV. 10'-0"
A200
TITLE
SCALE X" = 1'-0"
OBSTRUCTED APPROACH
UNOBSTRUCTED APPROACH
ELEVATION INDICATION
SHEET NO.
ELEVATION NUMBER
SECTION INDICATOR
ENLARGED PLAN OR
ELEVATION
PROPOSED SPOT
EXISTING SPOT
ELEVATION
100.57'
100.57'
STRUCTURAL SPAN
ROOF TRUSSES
FLOOR JOIST OR
RAMP
@ 16" O.C.
2 x 12
1" per 12"
SLOPE UP
REVISION TAG W/
REVISION NUMBER
KEYNOTE TAG
WINDOW TAG W/
WINDOW TYPE
INDICATOR
WALL SECTION CUT
COLUMN LINE
WALL TYPES
ELEVATION
BUILDING SECTION CUT
SHEET LOCATION
DETAIL NUMBER
TYPICAL
DIMENSIONING
SET-BACK LINE
PROPERTY LINE
EXISTING
CONTOUR
TOPOGRAPHY
CONTOUR
100'
100'
TOPOGRAPHY
PROPOSED
SECTIONS & DETAILS
TYPICAL TITLE FOR
DOOR NUMBER
DOOR TAG W/
ROOM NUMBER
ROOM NAME/
NORTH ARROW
60" DIAMETER CLEAR
WHEELCHAIR TURNING
SPACE - REFER TO PLAN
- REFER TO PLAN
AND GROUND SPACE
30" x 48" CLEAR FLOOR
CEILING HEIGHT TAG
GENERAL NOTES:
ACCESSIBLE CONTROLS, OPERATING
MECHANISMS & HARDWARE SHALL COMPLY
WITH SECTIONS 1109.13 OF THE IBC AND
SECTION 309 OF ICC/ANSI A117.1.
ACCESSIBLE SIGNAGE FURNISHED BY OWNER,
SHALL COMPLY WITH SECTIONS 1110 OF THE
MBC AND SECTION 703 OF ICC/ANSI A117.1.
PORTABLE FIRE EXTINGUISHERS TO BE
PROVIDED IN ACCORDANCE WITH THE 2000
ICC INTERNATIONAL FIRE CODE. IBC (906.1).
REFER TO FLOOR PLAN SHEETS FOR
LOCATIONS OF FIRE EXTINGUISHER CABINETS
(FEC)
4'-4"
MOUNTING HEIGHT GENERAL NOTES:
1. REFER TO SHEET A101.1 FOR EQUIPMENT
ABBREVIATIONS AND LOCATIONS.
2. REFER TO INTERIOR ELEVATIONS FOR
ADDITIONAL INFORMATION.
3. ITEMS ON THIS SHEET ARE NOT NECESSARILY
INCLUDED IN THIS PROJECT.
4. CONTRACTOR TO VERIFY ALL EQUIPMENT
MOUNTING HEIGHTS WITH OWNER/AE
PRIOR TO INSTALLATION.
5. REFER TO MECHANICAL/ELECTRICAL
DRAWINGS FOR DEVICE MOUNTING
HEIGHTS.
XXXNORTH
SIDE FRONT
M
A X
M
A X
20" - 25"
M
A X
FRONT
M
A X
20" MAX
SIDE
SIDE FRONT
M
IN
M
A X
M
IN
M
A X
A420
A320
M
A X
M
A X
10" MAX 10"-24" MAX
ABBREVIATIONS
TYP. CODE REGULATED MOUNTING HEIGHTS
SCALE: NONE
TYP. EQUIPMENT MOUNTING HEIGHTS
SCALE: NONE
RECEPTACLE
LIGHT
SWITCH
HVAC
CONTROLS
FIRE
ALARM
FEC
LESS THAN 40#
FEC
GREATER THAN 40#
TEL
PUSH PAD
RH/CH
GBX
SH1
CL
OT
SPH
CRK SND
PT
SD
HS
XR COM4 MR
CRBG
WP
TP SNR
TV
M A
X
M
IN
" 5
M
A X
@ AT
A/C AIR CONDITIONING/AIR CONDITIONER
ACOUS ACOUSTICAL
ACT ACOUSTICAL CEILING
AD AREA DRAIN, AUTOMATIC DAMPER
ADJ ADJUST, ADJUSTABLE
ALUM ALUMINUM
AP ACCESS PANEL
AR1 APRON RACK
B BASE
BAR BARRIER
BD BOARD
BF BARRIER FREE
BKT BRACKET
BLDG BUILDING
BLKG BLOCKING
BOTT BOTTOM
BW BLANKET WARMER
C TO C CENTER TO CENTER
CAB CABINET
CB CODE BLUE CALL BUTTON
CE COLUMN ENCLOSURE
CG1 CORNER GUARD
CH1 TASK CHAIR
CIR CIRCLE
CIR CIRCUIT
CL CENTER LINE, CLEARANCES
CL1 BARIATRIC PATIENT CEILING LIFT
CLK1 CLOCK
CLG CEILING
CJ CONTROL JOINT
CLKG CAULKING
CLO CLOSET
CMT CERAMIC MOSAIC TILE
CMU CONCRETE MASONRY UNIT
CO CLEANOUT
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
CORR CORRIDOR
CPT CARPET
CSS CLINICAL SERVICE SINK
CT CERAMIC TILE
CTR CENTER
CUH CABINET UNIT HEATER
DE1 OPTIMA DESK
DEMO DEMOLITION, DEMOLISH
DEPT DEPARTMENT
DF DRINKING FOUNTAIN
DIA, D DIAMETER
DIM DIMENSION
DN DOWN
DR DRAIN
DS DOWNSPOUT
ELECT ELECTRICAL
ELEV ELEVATION
ENTR ENTRANCE
EQ EQUAL
EP ELECTRICAL PANEL
EXH EXHAUST
EXP EXPOSED
EXIST EXISTING, EXSIST'G
EXT EXTERIOR
EW EACH WAY
FA FIRE ALARM
FD FIRE DAMPER OR FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FIN FINISH
FL, FLR FLOOR FINISH
FLG, FLRG FLOORING, FLOOR'G
FURN FURNITURE, FURNACE
FWC FABRIC WALL COVERING
FT FEET, FOOT
GALV GALVANIZE(D)
GL GLASS
GLB1 GLOVE BOX
GSB GYPSUM SHEATHING BOARD
GWB GYPSUM WALLBOARD
GYP. BD GYPSUM BOARD
HS1 HAND SANITIZER
ID INSIDE DIAMETER
INSUL INSULATION
IN INCH(ES)
ILSM INTERMITTENT LIFE SAFETY MEASURES
ICRA INFECTION CONTROL RISK ASSESSMENT
JAN JANITOR'S CLOSET
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HANDRAIL
HT HEIGHT
HW HEADWALL
LAM LAMINATED
LF LINEAL FEET
LKR LOCKER
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MDC1 MAIN DISCONNECT CONTROL
MECH MECHANICAL
MANUF MANUFACTURED, MANUFACTURER
MIN MINIMUM
MIR MIRROR
MLD'G MOLDING
MTL METAL
N NORTH
NAT NATURAL
NIC NOT IN CONTRACT
NORM NORMAL
NTS NOT TO SCALE
O.C. ON CENTER
OPN'G OPENING
O, O2 OXYGEN
PB1 PATIENT TRANSFER BOARD
PDU1 POWER DISTRIBUTION UNIT
PLAST PLASTIC
PLYWD PLYWOOD, PLYW'D
PNT PAINT
PP BARRIER FREE PUSH PLATE
PREFAB PREFABRICATED
PTD1 PAPER TOWEL DISPENSER
R RADIUS
RA RETURN AIR
REQ'D REQUIRED
RH1 ROBE HOOK
RM ROOM
S SINK, SOUTH, SHINGLE
SA SUPPLY AIR
SAN SANITARY
SD1 SOAP DISPENSER
SMKD SMOKE DAMPER
SECT SECTION
SH1 SHARPS CONTAINER
SHWR SHOWER
SIM SIMILAR
SPEC SPECIFICATION
SQ SQUARE
SS SERVICE SINK, STAINLESS STEEL
ST1 STRETCHER
STD STANDARD
STOR STORAGE
SUSP SUSPEND(ED)
SYM SYMBOL, SYMMETRICAL
TOIL TOILET
TYP TYPICAL
UNFIN UNFINISHED
UTIL UTILITY
VAC VACUUM
VAV VARIABLE AIR VOLUME
VCT VINYL COMPOSITION TILE
VD VOLUME DAMPER
VERT VERTICAL
V.I.F. VERIFY IN FIELD
VT VINYL TILE
VWC VINYL WALL COVERING
W/ WITH
WC WATER CLOSET
WD WOOD
WNDW WINDOW
W. HTR WATER HEATER
W/O WITHOUT
WP WALL PROTECTION
IF
B A
R R
IE
R
F R
E E
600 E. Michigan Ave., Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
ARCHITECTURE + ENGINEERING
SEVEN
GENERATIONS
THE REPRODUCTION, COPYING OR OTHER USE OF THIS
DRAWING WITHOUT WRITTEN AUTHORIZATION IS PROHIBITED.
c SEVEN GENERATIONS ARCHITECTURE & ENGINEERING, LLC
SHEET NO.
SHEET TITLE
JOB NUMBER:
ISSUE DATES:
KEYPLAN
BID DOCUMENTS
222112
IH
S B
F S U
M U
LT
IP
LE
P
R O
J E C
T D
E S
IG
N
IH
S B
LA
C
K F E E T
S E R
V
IC
E U
N
IT
B
LA
C K
W E A
S E L
R O
A D
B R
O W
N
IN
G M
O N
TA
N
A
G002.1
GENERAL INFORMATION
& SYMBOL LEGEND
BID DOCUMENTS02/16/24
PROJECT A
FRAMING SECTION
SCALE: 3/4" = 1'-0"
S700.1 DA11
S700.1
4"
EXISTING METAL
DECK
2" DIA. ALL
THREAD ROD
L21 2"x21
2"x1 4"
BRACE, SEE DETAIL 9/S700.1
FOR TOP CONNECTION
EXISTING CEILING
PLATE BY
SKYTRON
EXISTING STEEL JOIST
4'-0"
V.I.F
S700.1
FIE
LD
V
ER
IFY
6.31"
C4x5.4
TYP
3/16" 2"
STIFFENER PLATE
NOTE: VERIFY ALL
DIMENSIONS WITH SKYTRON
EXISTING
GYPSUM
BOARD
STIFFENER PLATE DETAIL
SCALE: 1-1/2" = 1'-0"
S700.1 DA4
STIFFENER
PLATE
10"
6.
6.31"
2" DIAMETER ALL THREAD
ROD WITH NUT TOP AND
BOTTOM OF PLATES, TYP
2"x21
2"x1 4"
ANGLE SWAY
BRACING 90°
APART - 4 EACH 5"x5" CUT OUT
NOTE: VERIFY ALL
DIMENSIONS WITH SKYTRON
CONNECTION DETAIL
S700.1 DA3
2" DIAMETER
ALL THREAD
ROD
MC6x12
PL 14"x1'-0"x1'-81 2"
TYP
3/16" 3"
MC6x12
1"
6.31"
BRACE TOP CONNECTION
SCALE: 3" = 1'-0"
S700.1 DA1
EXISTING JOIST
L21
2x21 2x1
4 BRACE
1/8" 1-1/2"
BRACING PLAN
SCALE: 1/2" = 1'-0"
S700.1 DA2
EX
IST
IN
G
JO
IST
EX
IST
IN
G
JO
IST
45°±15°
S700.1
TYP
SLOPED
L21
2x21 2x1
BRACE, TYP
4'-0" V.I.F.
NOTE: C4 CHANNELS NOT
SHOWN FOR CLARITY
STIFFENER PLATE
S700.1 DA101
HSS 2 12" x 2 12" x 14"
3/16" 2"
2"
MC 6x12
3/16"
16" THICK MOUNTING
PLATE. COORDINATE
SIZE AND BOLT HOLES
WITH LIFT SUPPLIER
VERIFY WITH
BARIATRIC LIFT SUPPLIER
PL 14" x 4" x 4"
L2 12" x 2 12" BRACE
UP TO MC6, SEE
DETAIL 3/S700.1
TOP &
BOTTOM
L2 12" x 2 12" BRACE UP TO EXISTING
JOIST OR NEW CHANNEL, SKEW
HORIZONTALLY AS REQUIRED,
SEE DETAIL 9/S700.1
3/16" 2"
EXISTING JOIST
P1
CEILING MOUNTED
INJECTOR
P1 P1 P1 P1P1
RAIL BY
BARIATRIC
LIFT SUPPLIER
RAIL BY
BARIATRIC
LIFT SUPPLIER
NORTH
CT SCAN ROOM LIFT SUPPORT FRAMING PLAN
SCALE: 1/4" = 1'-0"
NOTES
1. P1 INDICATES HSS 21
2"x21
2"x1
4" HANGER
SUPPORT.
2. CONTRACTOR TO FIELD VERIFY
LOCATIONS OF EXISTING ROOF
JOISTS.
3. CONTRACTOR TO VERIFY LOCATIONS
OF P1 SUPPORTS WITH BARIATRIC LIFT
SUPPLIER.
4. B REPRESENTS BRACE, SEE INDIVIDUAL
DETAILS FOR SIZE.
5. BRACING FOR CEILING MOUNTED
INJECTOR, SEE DETAIL 5/S700.1.
6. PROVIDE COLD-FORMED HEADER
AND JAMB STUDS FOR NEW WALL
OPENING. SEE ARCH DRAWINGS FOR
OPENING AND LOADING. SEE
SPECIFICATIONS FOR MORE
INFORMATION.
B
EX
IS
TIN
G
B
EA
M
EXISTING JOIST
EXISTING JOIST
EXISTING JOIST
B B
B
B
M C
6X
M C
6X
M C
6X
M C
6X
M C
6X
2' -3
4'
-0
4' -0
4'
-0
COLD-FORMED
HEADER, SEE NOTE 6
S700.1
TYP6
S700.1
M C
6X
M C
6X 12 B
B
B B
B
MC6X12
B
S700.1
TYP
B
B
S700.1
TYP
S700.1 DA106
3/16" 2"
MC 6x12
L2 12" x 2 12" BRACE
S700.1 DA102
MC6 x 12 1/8" 1 1/2"
EXISTING JOIST
EXISTING ROOF
S700.1 DA108
3/16" 2"
MC 6x12
L2 12 x 2 12 BRACE
0 2' 4' 8'
600 E. Michigan Ave., Suite B Kalamazoo, MI 49007 P: 269.927.0144 www.7GenAE.com
ARCHITECTURE + ENGINEERING
SEVEN
GENERATIONS
THE REPRODUCTION, COPYING OR OTHER USE OF THIS
DRAWING WITHOUT WRITTEN AUTHORIZATION IS PROHIBITED.
c SEVEN GENERATIONS ARCHITECTURE & ENGINEERING, LLC
SHEET NO.
SHEET TITLE
JOB NUMBER:
ISSUE DATES:
KEYPLAN
100% CONSTRUCTION DOCUMENTS
222112
IH
S
BF
SU
M
UL
TIP
LE
P
RO
JE
C
T D
ES
IG
N
IH
S
BL
A C
KF
EE
T
SE
RV
IC
E
UN
IT
BL
A C
KW
EA
SE
L
RO
A
D
BR
O W
N
IN
G , M
O N
TA
N
A
PROJECT A
02-13-2024 100% BID DOCUMENTS
02-13-2024
414 S Burdick Street - Suite 300 Kalamazoo MI 49007
269/383.3111 - nehilsivak.com
S700.1
DETAILS
CODE COMPLIANCE LEGEND
1-HOUR FIRE RATED PARTITION - UL DES U419
2-HOUR FIRE RATED BARRIER - UL DES U419
SMOKE BARRIER - NFPA 101 - 8.3
ROOM NAME
XXX SF
ROOM NAME
ROOM NUMBER
ROOM AREA
CODE ROOM TAG INFORMATION
PATH OF EGRESS
EXIT
OCCUPANT LOAD PER EXIT
OCCUPANT LOAD
EGRESS CORRIDOR
ROOM OCCUPANT LOADXX
AREA NOT IN SCOPE
1/2 HOUR FIRE RESISTIVE WALL
519 SF
CT SCAN
92 SF
SECURITY
58 SF
1556B
CHANGING
83 SF
1556A
CONTROL ROOM
114 SF
FAMILY CONSULT
AREA NOT IN SCOPE
CODES & REGULATIONS
AUTHORITY
HAVING
JURISDICTION
CODES AND REGULATIONS
• INTERNATIONAL BUILDING CODE - 2021 EDITION
• NFPA 10, STANDARD FOR THE PORTABLE FIRE
EXTINGUISHERS - 2022 EDITION
• NFPA 13, STANDARD FOR THE INSTALLATION OF
SPRINKLER SYSTEMS - 2022 EDITION
• NFPA 70, NATIONAL ELECTRIC CODE - 2020
EDITION
• NFPA 72, NATIONAL FIRE ALARM CODE - 2022
EDITION
• NFPA 80, STANDARD FOR FIRE DOORS AND OTHER
OPENING PROTECTIVES - 2022 EDITION
• NFPA 101, LIFE SAFETY CODE - 2021 EDITION
• NFPA 90A, STANDARD FOR THE INSTALLATION OF
AIR-CONDITIONING AND VENTILATING SYSTEMS -
2021 EDITION
• NFPA 99, HEALTH CARE FACILITIES CODE - 2021
EDITION
• NFPA 220, STANDARD ON TYPES OF BUILDING
CONSTRUCTION - 2021 EDITION
GENERAL BUILDING LIMITATIONS
CODE/REGULATED
ITEM
IBC
OCCUPANCY
CONSTRUCTION
TYPE
AUTOMATIC FIRE
SPRINKLER
NFPA 101
I-2, B
II
YES YES
ACTUAL
BUILDING HEIGHT
15' 4" EXISTING NO CHANGE
1 STORY NO CHANGESTORIES
DEAD END
CORRIDOR
COMMON PATH
OF TRAVEL
100' 18.2.5.3
EXISTING
HEALTHCARE, BUSINESS
LIFE SAFETY CODE ANALYSIS
GENERAL PROJECT DESCRIPTION
1. THE PROJECT SCOPE CONSISTS OF UPGRADING CURRENT
ROOM FINISHES AND EQUIPMENT
INTERNATIONAL BUILDING CODE - 2021
OCCUPANCY CLASSIFICATION
1. EXISTING HEALTHCARE AREA, EXISTING BUSINESS
ALLOWABLE HEIGHT
1. TABULAR HEIGHT - UNLIMITED [TABLE 504.3]
2. TABULAR NUMBER OF STORIES - UNLIMITED [TABLE 504.4]
ALLOWABLE AREA
1. TABULAR AREA - UNLIMITED [TABLE 506.2]
STRUCTURAL FIRE RESISTIVE
RATING OF BUILDING ELEMENTS
1. REQUIRED FIRE RESISTANCE RATINGS STRUCTURAL
ELEMENTS BASED ON
IBC TYPE IA CONSTRUCTION [TABLE 601 & TABLE 602]
STRUCTURAL ELEMENT FIRE RESISTANCE
RATING (HOURS)
BEARING WALLS EXTERIOR 3
INTERIOR 3
FIRE BARRIERS EXIT STAIRWAYS CONNECTING
FEWER THAN FOUR STORIES
EXIT STAIRWAYS CONNECTING
FOUR OR MORE STORIES
SHAFTS (OTHER THAN EXITS) AND
ELEVATOR HOISTWAY
NON-LOAD
BEARING
WALLS
EXTERIOR ( < 30 FT. SEPARATION) 1
0 ( ≥ 30 FT. SEPARATION)
INTERIOR 0
PRIMARY STRUCTURAL MEMBERS 3
FLOOR CONSTRUCTION (INCLUDING BEAMS) 2
ROOF
CONSTRUCTION
(INCLUDING BEAMS,
TRUSSES, ARCHES
AND ROOF DECK)
LESS THAN 20 FT. IN HEIGHT
TO LOWEST MEMBER
1-1/2
20 FT. OR MORE IN HEIGHT
TO LOWEST MEMBER
a, b c c a
NOT LESS THAN THE FIRE SEPARATION DISTANCE (IBC TABLE 602)
b
NOT LESS THAN FIRE RESISTANCE RATING OF THE WALL SUPPORTED
c
RATING MAY BE REDUCED BY 1-HOUR IF SUPPORTING ROOF ONLY
NFPA 101, LIFE SAFETY CODE - 2021
OCCUPANT USE LOAD FACTORS [TABLE 7.3.1.2]
1. ASSEMBLY USE (LESS CONCENTRATED): 15 SF/PERSON
2. BUSINESS USE: 100 SF/PERSON
3. BUSINESS USE (CONCENTRATED): 50 SF/PERSON
TRAVEL DISTANCE WITH AUTOMATIC
FIRE SPRINKLER PROTECTION
1. MAXIMUM TRAVEL DISTANCE
1.1. NEW BUSINESS: 300 FT. [§38.2.6.3]
1.2. EXISTING BUSINESS: 300 FT. [§39.2.6.3]
2. MAXIMUM COMMON PATH OF TRAVEL
2.1. NEW BUSINESS: 100 FT. [§38.2.5.3.1]
2.2. EXISTING BUSINESS: 100 FT. [§39.2.5.3.1]
3. MAXIMUM DEAD END CORRIDOR DISTANCE
3.1. NEW BUSINESS: 50 FT. [§38.2.5.2.1]
3.2. EXISTING BUSINESS: 50 FT. [§39.2.5.2.1]
OCCUPANCY SEPARATION
1. SEPARATED OCCUPANCY (BUSINESS AND HEALTHCARE)
1.1. EACH PART OF THE BUILDING COMPRISING OF A DISTINCT
OCCUPANCY SHALL BE COMPLETELY SEPARATED FROM OTHER
OCCUPANCIES BY FIRE-RESISTIVE CONSTRUCTION [§6.1.14.4.1]
HAZARDOUS AREA PROTECTION
1. PROTECTION FROM ANY AREA HAVING A DEGREE OF HAZARD
GREATER THAN THAT NORMAL TO THE GENERAL OCCUPANCY OF THE
BUILDING OR STRUCTURE SHALL BE PROVIDED BY ONE OF THE
FOLLOWING MEANS [§8.7.1.1]
1.1. 1-HOUR FIRE BARRIER
1.2. AUTOMATIC SPRINKLER SYSTEM
1.3. APPLYING BOTH WHEN HAZARD IS SEVERE
2. IN NEW CONSTRUCTION, WHERE PROTECTION IS PROVIDED WITH
AUTOMATIC SPRINKLERS WITHOUT FIRE-RESISTIVE SEPARATION, THE
SPACE SHALL BE ENCLOSED WITH SMOKE PARTITIONS [§8.7.1.2]
3. SMOKE PARTITION - CONTINUOUS MEMBRANE THAT IS DESIGNED TO
FORM A BARRIER TO LIMIT THE TRANSFER OF SMOKE. IT IS NOT
REQUIRED TO HAVE A FIRE RESISTANCE RATING [§3.3.256]
4. NO SEVERE HAZARDS ARE ANTICIPATED WITHIN THE SCOPE OF THE
PROJECT
FIRE RESISTANCE RATED SEPARATION
1. CORRIDOR WALL
1.1. 0-HOUR [ §38.3.6.1, §39.3.6.1]
2. HAZARDOUS AREA (GENERAL STORAGE, BOILER, FURNACE ROOM)
2.1. NEW BUSINESS: SMOKE PARTITION [§38.3.2.1, §8.7.1.2]
2.2. EXISTING BUSINESS: 0-HOUR [ §39.3.2.1, §8.7.1.2]
3. HIGH HAZARD CONTENTS
3.1. 1-HOUR [§38.3.2.1, §39.3.2.1, §8.7.1.1]
OPENING PROTECTIVE
1. BARRIER WALLS - 1-HOUR
1.1. 3/4-HOUR [TABLE 8.3.4.2]
2. BARRIER WALLS - 2-HOUR
2.1. 1 1/2-HOUR [TABLE 8.3.4.2]
3. SMOKE PARTITIONS - 1/2-HOUR
3.1. 1/3-HOUR [TABLE 8.3.4.2]
REQUIRED FIRE RESISTANCE RATING
1. ENCLOSURES CONNECTING ≥ 4 STORIES
1.1. 2-HOUR
2. OTHER ENCLOSURES
1.2. 1-HOUR
INTERIOR FINISH WITH AUTOMATIC
SPRINKLER PROTECTION
1. EXIT ACCESS CORRIDORS AND OTHER EXIT WAYS
1.1. EXISTING HEALTHCARE: CLASS A or B [§19.3.3.2]
1.2. EXISTING BUSINESS: CLASS C [§39.3.3.2.1]
2. ROOMS AND ENCLOSED SPACES
2.1. EXISTING HEALTHCARE:
2.2. EXISTING BUSINESS: CLASS C [§39.3.3.2.2]
3. FLOOR FINISH
3.1. EXISTING HEALTHCARE: CLASS II [§38.3.3.3.2]
3.2. EXISTING BUSINESS: CLASS II [§39.3.3.3.2]
FIRE AND SMOKE DAMPERS
1. FIRE DAMPERS
1.1. FIRE DAMPERS SHALL BE PROVIDED WHERE DUCTS PENETRATE
OR TERMINATE AT OPENINGS IN WALLS OR PARTITIONS REQUIRED
TO HAVE A FIRRESISTANCE RATING OF 2-HOURS OR MORE [NFPA
90A §5.3.1.1]
1.2. FIRE DAMPERS SHALL BE INSTALLED AT EACH DIRECT OR
DUCTED OPENING INTO AND OUT OF SHAFT ENCLOSURES [NFPA
90A §5.3.4.6]
2. SMOKE DAMPERS
2.1. SMOKE DAMPERS SHALL BE INSTALLED IN SYSTEMS WITH
CAPACITY GREATER THAN 15,000 CFM TO ISOLATE THE AIR-
HANDLING EQUIPMENT FROM THE REMAINDER OF THE SYSTEM
ON BOTH THE BUILDING SUPPLY SIDE AND THE RETURN SIDE
[NFPA 90A §4.3.10.2]
MEANS OF EGRESS COMPONENTS
1. DOORS
1.1. MINIMUM CLEAR WIDTH: 32 INCHES [§7.2.1.2.4]
1.2. SWING IN THE DIRECTION OF EGRESS WHEN SERVING AN
OCCUPANT LOAD GREATER THAN 50 OCCUPANTS [§7.2.1.4.2]
1.3. SWING IN DIRECTION OF EGRESS TRAVEL WHEN USED IN AN
EXIT ENCLOSURE OR WHERE SERVING A HIGH HAZARD
CONTENTS AREA [§7.2.1.4.2]
2. MARKING OF MEANS OF EGRESS
2.1. EXITS SHALL BE MARKED BY AN APPROVED SIGN READILY
VISIBLE FROM ANY DIRECTION OF EXIT ACCESS [§7.10.1.2.1]
2.2. SIGN PLACEMENT SHALL BE SUCH THAT NO POINT IN AN EXIT
ACCESS CORRIDOR IS IN EXCESS OF THE RATED VIEWING
DISTANCE OR 100 FT, WHICHEVER IS LESS, FROM THE NEAREST
SIGN [§7.10.1.5.2]
2.3. A DIRECTIONAL SIGN READING "EXIT" WITH A DIRECTIONAL
INDICATOR (CHEVRON STYLE) SHOWING THE DIRECTION OF
TRAVEL SHALL BE PLACED IN EVERY LOCATION WHERE THE
DIRECTION OF TRAVEL TO REACH THE NEAREST EXIT IS NOT
APPARENT [§7.10.2.1/7.10.3.1]
2.4. NEW SIGN PLACEMENT SHALL BE SUCH THAT NO POINT IN
AN EXIT ACCESS CORRIDOR IS IN EXCESS OF THE RATED
VIEWING DISTANCE OR 100 FT. TO THENEAREST SIGN [§
7.10.1.5.2]
3. EXIT SIGN ILLUMINATION
3.1. EVERY EXIT SIGN SHALL BE SUITABLY ILLUMINATED BY A
RELIABLE LIGHT
SOURCE. EXTERNALLY AND INTERNALLY ILLUMINATED SIGNS
SHALL BE LEGIBLE IN BOTH THE NORMAL AND EMERGENCY
LIGHTING MODE [§7.10.5.1]
3.2. THE ILLUMINATION SHALL BE FOR 90 MINUTES IN THE CASE OF
PRIMARY POWER LOSS [§7.9.2.1]
3.3. EXIT SIGNS THAT ARE EXTERNALLY ILLUMINATED SHALL HAVE
AN INTENSITY NOT LESS THAN 5 FT-CANDLES [§7.10.6.3]
4. NUMBER AND ARRANGEMENT OF MEANS OF EGRESS
4.2. OCCUPANT LOAD OF 501 - 1,000: 3 EXITS [§7.4.1.2]
4.3. OCCUPANT LOAD OF MORE THAN 1,000: 4 EXITS [§7.4.1.2]
5. ARRANGEMENT OF EXITS
5.1. WHERE TWO OR MORE EXITS ARE REQUIRED, THEY MUST BE
SPACED APART A MINIMUM OF 1/3 THE LENGTH OF THE MAXIMUM
DIAGONAL OF THE BUILDING OR AREA BEING SERVED [§7.5.1.3.3]
4.1. OCCUPANT LOAD OF 1 - 500: 2 EXITS [§7.4.1.1]
4. HEALTH CARE USE (INPATIENT TREATMENT): 240 SF/PERSON
5. HEALTH CARE USE AMBULATORY): 150 SF/PERSON
6. STORAGE, MECH. AND ELEC. AREAS: 500 SF/PERSON
30' 18.2.5.3
BUILDING AREA EXISTING BLDG
MAIN LEVEL = 90,000 S.F.
CLASS A or B [§19.3.3.2]
SEISMIC
SEISMIC RISK CATEGORY: III
0 8' 16' 32'
600 E. Michigan Ave., Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
ARCHITECTURE + ENGINEERING
SEVEN
GENERATIONS
THE REPRODUCTION, COPYING OR OTHER USE OF THIS
DRAWING WITHOUT WRITTEN AUTHORIZATION IS PROHIBITED.
c SEVEN GENERATIONS ARCHITECTURE & ENGINEERING, LLC
SHEET NO.
SHEET TITLE
JOB NUMBER:
ISSUE DATES:
KEYPLAN
BID DOCUMENTS
222112
IH
S B
F S U
M U
LT
IP
LE
P
R O
J E C
T D
E S
IG
N
IH
S B
LA
C
K F E E T
S E R
V
IC
E U
N
IT
B
LA
C K
W E A
S E L
R O
A D
B R
O W
N
IN
G M
O N
TA
N
A
G201.1
FIRST FLOOR CODE
COMPLIANCE PLAN
BID DOCUMENTS02/16/24
PROJECT A
NORTH
SCALE: 1/16" = 1'-0"
FIRST FLOOR CODE
COMPLIANCE PLAN
WAITING
SECURITY
1556A
CONTROL 1556
CT SCAN
ORTHO
CORRIDOR
CORRIDOR
CORRIDOR
PROVIDE SEPARATES NEGATIVE AIR
MONITORING AND MACHINES.
PHASE 2: CONTRACTOR TO ASSUME
THAT THIS RUNS CONCURRENT WITH
PHASE 1
DURING PHASE CONSTRUCTION,
DOORS SHALL BE TAPED SHUT TO
ENSURE NO PARTICULATE IS
LEAKED INTO WAITING AREA.
MODULAR TEMPORARY WALL
DURING CONSTRUCTION. BASIS OF
DESIGN EDGE GUARD/ STARC
WALL SYSTEM.
PHASE 1
THIS PHASE OF WORK TO BE OFF
HOURS AND WILL NEED TO BE
CONDENSED TO ENSURE A TIMELY
TURNOVER AS IT IS THE MAIN
CORRIDOR ACCESS FROM
EMERGENCY DEPARTMENT TO
HOSPITAL. CONTRACTOR TO
ASSUME CORRIDOR IS TURNED
OVER TO HOSPITAL FUNCTIONS
WHILE NOT IN WORK
PROVIDE SEPARATE NEGATIVE AIR
MONITORING AND MACHINES
MODULAR TEMPORARY WALL
DURING CONSTRUCTION. BASIS OF
DESIGN EDGE GUARD/ STARC
WALL SYSTEM.
5'-0"
MAINTAIN 5'0" CLEAR FOR
STRETCHER CLEARANCE
MODULAR TEMPORARY WALLS TO
CREATE AN ANTE ROOM DURING
CONSTRUCTION WITH A LOCKABLE
DOOR. BASIS OF DESIGN EDGE
GUARD/ STARC WALL SYSTEM
MAINTAIN 5'0" CLEAR FOR
STRETCHER CLEARANCE
MODULAR TEMPORARY WALLS
TO CREATE AN ANTE ROOM
DURING CONSTRUCTION WITH
A LOCKABLE DOOR. BASIS OF
DESIGN EDGE GUARD/ STARC
WALL SYSTEM
ED.7D.2D
NOTE: ELEVATOR TO REMAIN
IN SERVICE AT ALL TIME
COORDINATE SEQUENCE OF
WALL PLACEMENT W/ OWNER
COORDINATE TEMP. WALL
AND EXISTING DOOR SWING
WITH ED DEPARTMENT
A
B
A B
AA
B
1) PATCH AND REPAIR ALL AREAS AFFECTED BY DEMO AND / OR
CONSTRUCTION TO MATCH EXISTING. PATCHED AREAS ARE TO
RECEIVE FINISHES AND TRIM TO MATCH ADJACENT AREA,
EXCEPT AS NOTED IN THE ROOM FINISH SCHEDULE. PATCH
CEILINGS AND FLOORS TO ACHIEVE A CONTINUOUS FINISHED
APPEARANCE.
2) ALL EQUIPMENT TO BE DISCONNECTED AND REMOVED BY
CONTRACTOR. OWNER TO BE NOTIFIED WHEN EQUIPMENT IS
AVAILABLE AND BE GIVEN THE OPTION TO TAKE POSSESSION OF
ALL EQUIPMENT. CONTRACTOR TO DISPOSE OF ALL EQUIPMENT
THE OWNER DOES NOT WANT AND REMOVE ALL ITEMS WITH
EXTREME CARE.
3) REMOVE, RELOCATE, STORE AND REINSTALL PORTABLE
EQUIPMENT, FURNITURE, SHELVES, CURTAIN RODS, DRAPERY,
BULLETIN BOARDS, WHICH WOULD INTERFERE WITH
DEMOLITION WORK.
4) REFER TO SPECIFICATIONS FOR SHORING REQUIREMENTS
WHERE DEMOLITION WORK AFFECTS THE STRUCTURAL INTEGRITY
OF WALLS OR FLOORS. IF NOT SO INDICATED IN
SPECIFICATIONS. CONTRACTOR SHALL SUBMIT SHORING PLAN
AND SHOP DRAWINGS SIGNED BY AN ENGINEER FOR VA
APPROVAL. ALL SHORING IS CONTRACTOR'S RESPONSIBILITY.
5) PROTECT ALL EXISTING SURFACES FROM DAMAGE. ANY
DAMAGE SURFACES SHALL BE REPLACED TO MATCH ORIGINAL
ITEM OR REPAIRED THIS CONTRACTOR FROM PERFORMING THE
WORK REQUIRED UNDER THE CONTRACT.
6) VERIFY EXISTING CONDITIONS AND LOCATIONS IN FIELD
PRIOR TO SUBMITTING PROPOSAL. FAILURE TO DO SO SHALL NOT
RELIEVE THIS CONTRACTOR FROM PERFORMING THE WORK
REQUIRED UNDER THIS CONTACT.
7) ALL SUB-CONTRACTORS ARE ENCOURAGED TO VISIT AND
ATTEND A PRE-BID WALK THRU TO INSPECT THE EXISTING AREA
AND THOROUGHLY FAMILIARIZE THEMSELVES WITH THE ACTUAL
JOB CONDITIONS BEFORE SUBMITTING BID.
8) WHILE THE SIZE AND LOCATION OF NEW WORK AND
EQUIPMENT IN THE EXISTING AREA HAS BEEN INDICATED ON THE
DRAWINGS AS ACCURATELY AS POSSIBLE, CONTRACTOR SHALL
ADJUST HIS WORK AS REQUIRED TO AVOID EXISTING UTILITIES,
GAS LINES, SEWER, FIRE ALARM, ROOF DRAINS, ACCESS
COVERS, AND OTHER STRUCTURES NOT PARTICULARLY SHOWN
ON THE PLAN AT NO ADDITIONAL COST. BEFORE
CONSTRUCTION, INSPECT PREMISES MAKE A DETAILES
EXAMINATION OF ALL LOCATIONS WHERE NEW WORK IS TO BE
INSTALLED. EXAMINE EXISTING PIPING, CONDUITS, STRUCTURAL
SUPPORTING BEAMS, AND OTHER CONDITIONS.
9) DISCONNECT AT SOURCE AND REMOVE EXISTING
MECHANICAL AND ELECTRICAL MATERIALS AND EQUIPMENT
WHICH ARE RENDERED OBSOLETE BY THESE ALTERATIONS AND
ADDITIONS. OWNER TO BE GIVEN THE OPTION TO TAKE
POSSESSION OF REMOVED EQUIPMENT AND MATERIALS. ANY
EQUIPMENT THAT THE OWNER DOES NOT WANT ARE THE
PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED
FROM THE SITE, NO MECHANICAL, ELECTRICAL, PLUMBING
EQUIPMENT, ETC. SHALL BE ABANDONED IN PLACE.
10)DISCONNECT, REMOVE AND RELOCATE EXISTING
MECHANICAL AND ELECTRICAL MATERIALS AND EQUIPMENT
WHICH INTERFERE OR INTERFERED WITH OBSTRUCT OR ARE
CONSTRUCTED BY THESE ALTERATIONS AND ADDITIONS,
PERMANENTLY INSTALL SUCH ITEMS IN NEW LOCATIONS AS
DIRECTED, RECONNECT SUCH ITEMS IN PROPER OPERATING
CONDITION AT NEW LOCATIONS.
11) DO NOT INTERFERE WITH EXISTING BUILDING'S MECHANICAL,
ELECTRICAL AND SECURITY SYSTEMS OPERATIONS. IF IT IS
ABSOLUTELY NECESSARY TO SHUT DOWN FACILITY SYSTEMS AT
ANY TIME CONSULT THE COR TO MAKE ARRANGEMENTS TO DO
SO ON OFF WORKING HOUR PERIODS AT THE OWNER'S
CONVENIENCE. PRIOR NOTICE SHALL BE GIVEN TO THE COR (14)
DAYS IN ADVANCE OF THE DESIRED SHUT-DOWN TIME. ANY
PREMIUM OR OVERTIME COSTS NECESSARY TO ACCOMPLISH
THE ABOVE SHALL BE INCLUDED IN THIS BID.FAILURE TO
PROCEED WITHOUT PROPER PRIOR NOTIFICATION MAY RESULT
IN THE ASSESSMENT OF A CREDIT TO THE CONTACT.
12)EXISTING FLOOR HEIGHTS, COLUMNS AND FLOOR BEAMS
SHOULD BE VERIFIED BY THE CONTRACTOR IN THE FIELD.
13) IN ALL CONSTRUCTION ZONES AND AREAS. CONTRACTOR
RESPONSIBLE FOR MAINTAINING AN ACTIVE STROBE SPEAKER
SYSTEM AT ALL TIMES TYPICAL FOR ALL CONSTRUCTION ZONES
FOR ALL BUILDINGS.
GENERAL CONSTRUCTION NOTES
HATCH LEGEND
PHASE 2
(TYPE: C
CLASS: III)
PHASE 1
(TYPE: D
CLASS: III)
PHASE 3
(TYPE: C
CLASS: III)
IFC PLAN KEY NOTES
A PROVIDE SIMILAR OR EQUAL TO 'EDGE-GUARD'
TEMPORARY 1 HR-RATED WALL
CONSTRUCTION - REFER TO MANUFACTURER
SPECIFICATION AND INSTALLATION INSTRUCTIONS
1) MAINTAINING THE INTEGRITY OF THE FIRE AND SAFETY
SYSTEMS IN PLACE IN THE MEDICAL CENTER AND ALL OF ITS OUT
BUILDINGS DURING CONSTRUCTION SHALL BE THE
RESPONSIBILITY OF THE GENERAL CONTRACTOR.
2) IN ADDITION TO ALL MEDICAL CENTER POLICIES, ALL
NATIONAL STATE AND LOCAL CODES AND ORDINANCES SHALL
APPLY TO ALL OF THEIR CONTRACTORS AND SUB-
CONTRACTORS.
3) THE CONTRACTOR SHALL BE RESPONSIBLE FOR MEETING ALL
PERTINENT OSHA SAFETY REQUIREMENTS.
4) PROVIDE LOCKOUT- TAGOUT AND CONFINED SPACE ENTRY
POLICIES AS APPLICABLE AND AS REQUIRED BY OSHA. THESE
POLICIES SHALL BE SUBMITTED FOR PRIOR APPROVAL BY THE
SAFETY OFFICER/ COR.
5) SUBMIT APPROPRIATE INTERIM LIFE SAFETY MEASURES. REFER
TO SPECIFICATION FOR MORE INFORMATION
6) CONSTRUCT TEMPORARY CONSTRUCTION PARTITIONS OF
NON-COMBUSTIBLE MATERIALS WHICH PROVIDE A SMOKE TIGHT
SERRATION BETWEEN THE CONSTRUCTION AREAS AND ALL
OTHER OCCUPIED AREAS. MAINTAIN INTEGRITY OF THE
ENCLOSURE DURING THE CONSTRUCTION. REFER TO
SPECIFICATIONS.
7) EXISTING FIRE PROTECTION SYSTEMS, INCLUDING FIRE ALARM
SYSTEMS, SMOKE DETECTION SYSTEMS, AND SPRINKLER SYSTEMS
SHALL NOT BE IMPAIRED DURING CONSTRUCTION. SMOKE
DETECTOR DISABLE REQUESTS: OUTAGE REQUESTS TO BE
SUBMITTED TO FM ENGINEER FOR APPROVAL FOR SPECIFIC DATE
AND TIME. ALARMS WILL ONLY BE TURNED OFF FOR SPECIFIC
SHIFTS REQUESTED AND WHEN CONTRACTORS ARE IN THE
CONSTRUCTION AREA. ALARMS WILL BE RESTORED AT THE END
OF THE WORK DAY BY CALLING THE SAME EXTENSION. AT NO
TIME WILL ALARMS REMAIN OFF OVERNIGHT. SMOKE DETECTORS
AND OR SPRINKLERS HEADS DO NOT COVER BY BAGS, TAPE,
AND PLASTIC OR IN ANY OTHER MANNER THAT WILL DEFEAT
THEIR ABILITY TO SENSE SMOKE OR HEAT AND OPERATE AS
DESIGNED.
8) DAILY ACCUMULATIONS OF TRASH, COMBUSTIBLES
MATERIALS, PACKAGING AND DEBRIS SHALL BE REMOVED FROM
THE CONSTRUCTION AREA ON A DAILY BASIS. FLAMMABLE
MATERIALS MAY BE STORED ON SITE IN AN APPROVED AND
APPROPRIATELY MARKED FLAMMABLE MATERIALS CABINET
FIRE AND SAFETY NOTES
1. NO TOOLS OR EQUIPMENT TO BE LEFT UNATTENDED
2. CONTRACTOR TO PROVIDE TEMPORARY SECURITY WALLS IN
HIGH SECURITY AREAS.
3. CONTRACTOR IDENTIFICATION TO BE DISPLAYED AT ALL TIMES
ON PERSON.
4. TOOLS AND EQUIPMENT NOT NEEDED FOR TASKS AT HAND TO BE
STORED OFF SITE.
SECURITY NOTES INFECTION CONTROL RISK ASSESSMENT NOTES - CLASS III
DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT
1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST
DISPERSION INTO THE OCCUPIED AREAS.
2. MEANS FOR CONTROLLING MINIMAL DUST DISPERSION MAY
INCLUDE HAND-HELD HEPA VACUUM DEVICES,
POLYETHYLENE PLASTIC CONTAINMENT, OR ISOLATION OF
WORK AREA BY CLOSING ROOM DOOR.
3. REMOVE OR ISOLATE RETURN AIR DIFFUSERS TO AVOID DUST
FROM ENTERING THE HVAC SYSTEM.
4. REMOVE OR ISOLATE THE SUPPLY AIR DIFFUSERS TO AVOID
POSITIVE PRESSURIZATION OF THE SPACE,
5. IF WORK AREA IS CONTAINED, THEN IT MUST BE NEGATIVELY
PRESSURIZED AT ALL TIMES.
6. SEAL ALL DOORS WITH TAPE THAT WILL NOT LEAVE RESIDUE.
7. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA.
8. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH
A HARD LID) MUST BE USED TO TRANSPORT TRASH AND DEBRIS
FROM THE CONSTRUCTION AREAS. THESE CONTAINERS MUST
BE DAMP-WIPED CLEANED AND FREE OF VISIBLE DUST/DEBRIS
BEFORE LEAVING THE CONTAINED WORK AREA.
9. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF
CONTAINED WORK AREA BASED ON FACILITY POLICY. STICKY
MATS MUST BE CHANGED ROUTINELY AND WHEN VISIBLY
SOILED.
10. MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS NOT
CONTAINED BY DAMP MOPPING OR HEPA VACUUMING
SURFACES.
CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION
PREVENTIONIST OR DESIGNEE AND ENGINEERING
REPRESENTATIVE FOR DISCONTINUATION OR DOWNGRADING OF
ICRA PRECAUTIONS.
WORK AREA CLEANING:
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL
SURFACES, HIGH HORIZONTAL SURFACES AND FLOORING
MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST
ACCUMULATION ON UPPER SURFACES AS WELL AS AIR
DIFFUSER SURFACES.
REMOVAL OF CRITICAL BARRIERS:
1. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL
WORK INVOLVING DRYWALL REMOVAL, CREATION OF
DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK.
THE BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA
CLEANING HAS BEEN PERFORMED.
2. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES
MUST BE COMPLETED IN A MANNER THAT PREVENTS DUST
RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN
REMOVING HARD BARRIERS:
3. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.
4. IF DUST WILL BE GENERATED DURING SCREW REMOVAL,
USE HAND-HELD HEPA VACUUM.
5. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL
PROCESS.
6. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE
REMOVING OUTER HARD BARRIER.
7. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD
BE GENERATED.
NEGATIVE AIR REQUIREMENTS:
1. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE
CONTAMINATES FROM THE WORK AREA.
2. NEGATIVE AIR DEVICES MUST REMAIN OPERATIONAL AT
ALL TIMES AND IN PLACE FOR A PERIOD AFTER
COMPLETION OF DUST CREATING ACTIVITIES TO REMOVE
CONTAMINANTS FROM THE WORK AREA AND BEFORE
REMOVAL OF CRITICAL BARRIERS.
3. MAINTAIN MINIMUM NEGATIVE AIR PRESSURE, 0.01 INCHES
OF WATER GAUGE WITHIN WORK SITE UTILIZING HEPA
EQUIPPED AIR FILTRATION UNITS AND CONTINUOUSLY
MONITORED WITH A DIGITAL DISPLAY, RECORDING AND
ALARM INSTRUMENT, WHICH MUST BE CALIBRATED ON
INSTALLATION, MAINTAINED WITH PERIODIC CALIBRATION,
AND MONITORED.
HVAC SYSTEMS:
1. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE
ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS
BEING PERFORMED.
2. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND
OPERATIONAL.
3. VERIFY THE HVAC SYSTEMS MEETS ORIGINAL AIRFLOW AND
AIR EXCHANGE DESIGN SPECIFICATIONS.
IFC PLAN KEY NOTES
PROVIDE TEMPORARY INFECTION CONTROL
CONSTRUCTION WALLS (BASIS OF DESIGN OF EDGE
GUARD OR STARC WALL SYSTEMS) & 4'-0" DOOR WITH
CONTRACTOR PROVIDED HARDWARE WITH A DIGITAL
CODE LOCKSET WITH KEY OVERIDE. REFER TO MANUF.
SPECIFICATION AND INSTALLATION INSTRUCTIONS
A
B
PROVIDE TEMPORARY INFECTION CONTROL
CONSTRUCTION WALLS (BASIS OF DESIGN OF EDGE
GUARD OR STARC WALL SYSTEMS). REFER TO MANUF
SPECIFICATION AND INSTALLATION INSTRUCTIONS
PROVIDE MOBILE DUST CONTAINMENT (BASIS OF DESIGN
HEPACART) TO SUPPORT ALL ABOVE CEILING WORK
OUTSIDE OF THE OPERATING ROOMS.
C
1. CONTRACTOR IS RESPONSIBLE FOR COORDINATION AND
SEQUENCING OF CONSTRUCTION PHASING WITH THE VA'S
SCHEDULE, INFECTION CONTROL, AND INTERIM LIFE SAFETY
REQUIREMENTS.
2. PROVIDE PHASING PLAN AS NEEDED TO COMPLETE WORK.
REFER TO SECTION 01 00 00 ITEM 1.6H FOR GENERAL PHASING
REQUIREMENTS. NOTE THAT SOME PHASES MAY BE
CONCURRENT. ENSURE SCHEDULE CLEARLY SHOWS
CONCURRENT PHASES, FLOAT AND CRITICAL PATH.
3. TEMPORARY CONSTRUCTION WALL AND INFECTION
CONTROL (IC) WALL REQUIREMENTS ARE NOT INCLUDED IN
THE DRAWINGS. GC SHALL SHOW IC/CN BARRIERS ON THEIR
IC/WORKPLANS TO MEET REQUIREMENTS OF SPECIFICATIONS
& THE IC MATRIX ON THIS SHEET.
4. MAINTAIN EGRESS TO ALL STAIRWELLS.
5. MAINTAIN PUBLIC ACCESS TO ELEVATORS.
6. WORK WILL BE COMPLETED DURING NORMAL WORKING
HOURS FOR THE HOSPITAL FROM 7:30 AM TO 5:00 PM,
MONDAY THROUGH FRIDAY. ROUTER ROOM AND CORRIDOR
WORK SHALL BE COMPLETED OUTSIDE OF THESE HOURS. SEE
PHASING NARRATIVE AND GENERAL REQUIREMENTS
SPECIFICATIONS.
7. NOISE AND VIBRATION OPERATIONS ARE RESTRICTED TO OFF-
SHIFT HOURS. CONTRACTOR SHALL ALSO SCHEDULE SERVICE
INTERRUPTIONS OFF-SHIFT. TWO WEEK MINIMUM NOTICE IS
REQUIRED ON ALL OUTAGE REQUESTS.
8. CONTRACTOR IS RESPONSIBLE FOR ENSURING ILSM AND ICRA
PERMITS ARE ALWAYS CURRENT AND POSTED DURING
CONSTRUCTION.
PHASING GENERAL NOTES
PHASE 1:
CONTTRATOR'S OVERALL SCHEDULE IS RESTRICTED TO THE
DURATION OF THE TEMPORARY MOBILE CT UNIT.
CONTRACTOR IS TO PROVIDE DETAILED TRACKING OF ALL
PROJECT MATERIALS TO ENSURE THEY COMPLY WITH THE
OVERALL SCHEDULE BEFORE COMMENCEMENT OF WORK.
COORDINATE WITH COR ON TIMING AND DURATION OF
MOBIL CT UNIT. CONTRACTOR IS TO COMPLETE, AT A
MINIMUM THE CT SCAN ROOM, CONTROL ROOM AND
CHANGING ROOM WHILE MOBIL CT UNIT IS ON SITE. THIS IS
TO INCLUDE A MINIMUM OF TWO WEEKS TO USE THE MOBIL
UNIT PRIOR TO DEMOLTION/ REMOVAL OF EXISTING CT AND
A MINIMUM OF THREE WEEKS PRIOR TRMPORARY MOBILE CT
UNIT BEING REMOVED.
ONCE RELEASED, CONTRACTOR IS TO COORDINATE CT UNIT
REMOVAL. ENSURE ALL PATIENT DATA IS SCRUBBED FROM
THE UNIT PRIOR TO POWER REMOVAL.
ONCE THE UNIT IS REMOVED, ESTABLISH INFECTION
CONTROL BARRIER(S). COORDINATE PLAN WITH ICRA
MEASURES WITH OWNER PRIOR TO COMSTRUCTION
COMMENCING.
COORDINATE WITH OWNER ON ALL SALVAGED EQUIPMENT.
PROVIDE TEMPORARY HEAT DETECTION ONCE CEILINGS ARE
REMOVED
PRIOR TO SLAB REMOVAL FOR TRENCH, COORDINATE AN
ONSITE LAYOUT REVIEW MEETING WITH EQUIPMENT VENDOR
LAYING OUT THE ISO CENTER, LAYOUT OF EQUIPMENT AND
TRENCH.
ONCE ROUGH IN IS COMPLETE AND SHIELDING IS PATCHED,
CONTRACTOR IS TO COORDINATE A SHIELDING
VERIFICATION CONFIRMATION, THIS SHOULD INCLUDE THE
FOOR AS WELL.
PRIOR TO CT INSTALLATION, CONTRACTORS SHALL INSTALL
FLOORING, LAYOUT OF TRENCH FLOORING SHOULD
COORDINATE WITH FLOOR PATTERN OF FIELD MATERIAL.
TRENCH MATERIAL IS TO NOT BE GLUED UNTIL AFTER NEW CT
INSTALLATION IS COMPLETE BUT PRIOR TO FINAL CLEANING.
CONTRACTOR TO COORDINATE TIMING WITH EQUIPMENT
VENDOR.
PRIOR TO FINAL TURN OVER, CONTRACTOR IS TO
COORDINATE A FINAL SHIELDING VERIFICATION
CONFIRMATION OPERATIONAL INTENT WITH FULLY
FUNCTIONING CT, THIS SHOULD INCLUDE THE DOOR AS
WELL.
PHASING OVERVIEW:
PHASE 2:
TO RUN CONCURRENT WITH PHASE 1 ONCE COODINATED
WITH OWNER AND FACILITY SECURITY OFFICE WILL REQUIRE
RELOCATION OF EXISTING PERSONNEL AND REQUIRE
ADDITIONAL TIME TO PLAN/ COORDINATE. CONTRACTOR
SHALL MAKE APPROPRIATE ACCOMODATIONS IN THE
SCHEDULE TO ENSURE A TIMELY TRANSITION.
COORDINATE ICRA PLAN AND MEASURES WITH COR PRIOR TO
CONSTRUCTION COMMENCING.
CONTRACTOR SHALL PROVIDE TEMPORARY ADJUSTMENTS
WITH THE EXIT SIGNAGE
CONTRACTOR SHALL PROVIDE A EXPEDITED SCHEDULE TO
COMPLETE THE CORRIDOR WORK TO MINIMIZE IMPACTS TO
EGRESS AND ACCESS TO HELIPAD ELEVATOR.
PHASE 3:
TO RUN CONCURRENT WITH PHASE 1 ONCE COORDINATED
WITH OWNER AND FACILITY. ED CORRIDOR WALL WILL
REQUIRE LIMITING OR RESTRICTED ACCESS TO EXISTING
ROOMS THAT WILL REQUIRE LIMITING OR RESTRICTED ACCESS
TO EXISTING ROOMS THAT WILL REQUIRE A SEQUENED
APPROACH COMPLETE AND REQUIRE ADDITIONAL TIME TO
PLAN COORDINATE. CONTRACTOR SHALL MAKE
APPROPRIATE ACCOMMODATIONS IN THE SCHEDULE TO
ENSURE A TIMELY TRANSITION.
COORDINATE ICRA PLAN AND MEASURES WITH COR PRIOR
TO CONSTRUCTION COMMENCING.
CONTRACTOE SHALL PROVIDE TEMPORARY ADJUSTMENTS
WITH THE EXIT SIGNAGE.
CONTRACTOR SHALL PROVIDE A EXPEDITED SCHEDULE TO
COMPLETE THE CORRIDOR WORK TO MINIMIZE IMPACTS TO
EGRESS AND ACCESS TO HELIPAD ELEVATOR.
6 MIL POLY
EQUIPMENT OR
FURNISHING
6 MIL POLY
WALL OPENING
CRITICAL BARRIER
WALL PROTRUSION
SEAL WITH DUCT TAPE
ALL SIDES.
CEILING
6 MIL POLY CRITICAL
BARRIER CEILING
PENETRATION
NOTE: ALL CORNERS TO
FORM 90 DEGREE ANGLE
WITH NO RADIUS
SEAL WITH DUCT TAPE.
ALL SIDES
WINDOWDOOR
BEYOND
SEAL ALL CRACKS WITH
DUCT 6 MIL POLY
CRITICAL BARRIER
OVER WINDOWS.
CONSTRUCTION SIDE FLOOR
SEAL ALL EDGES
WITH TAPE
REFER TO TEMPORARY
BARRIER TYPE FOR
REQUIRED CONDITION TO
STRUCTURE ABOVE.
CEILING
DOOR AND FRAME WITH
SEALS, CARD READER
HARDWARE AND
CLOSER
HAND SANITIZER
PUBLIC SIDE
MONITOR
0 2' 4' 8'
600 E. Michigan Ave., Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
ARCHITECTURE + ENGINEERING
SEVEN
GENERATIONS
THE REPRODUCTION, COPYING OR OTHER USE OF THIS
DRAWING WITHOUT WRITTEN AUTHORIZATION IS PROHIBITED.
c SEVEN GENERATIONS ARCHITECTURE & ENGINEERING, LLC
SHEET NO.
SHEET TITLE
JOB NUMBER:
ISSUE DATES:
KEYPLAN
BID DOCUMENTS
222112
IH
S B
F S U
M U
LT
IP
LE
P
R O
J E C
T D
E S
IG
N
IH
S B
LA
C
K F E E T
S E R
V
IC
E U
N
IT
B
LA
C K
W E A
S E L
R O
A D
B R
O W
N
IN
G M
O N
TA
N
A
GC101.1
FIRST FLOOR INFECTION
CONTROL PLAN
BID DOCUMENTS02/16/24
PROJECT A
NORTH
SCALE: 1/4" = 1'-0"
FIRST FLOOR ICRA PLAN
SCALE: 3/8" = 1'-0"GC101.1
CRITICAL BARRIER PREP INSTALLATION B12
SCALE: 3/8" = 1'-0"GC101.1
CRITICAL BARRIER PUBLIC SIDE B13
DEMOLITION KEY NOTES
REMOVE EXISTING WALL CONSTRUCTION
COMPLETE AS SHOWN. INCLUDING WALL
PROTECTION, WALL BASE, AND ALL ITEMS ATTACHED
TO THE WALLS (NOT ALL ITEMS ATTACHED TO THE
WALLS ARE SHOWN ON THIS PLAN). PATCH &
REPAIR ADJACENT SURFACES TO REMAIN AS
NECESSARY TO PREPARE FOR NEW CONSTRUCTION
AND / OR NEW FINISHES.
REMOVE EXISTING WALL CONSTRUCTION AND LEAD
LINED GYPSUM BOARD AS SHOWN. PATCH &
REPAIR ADJACENT SURFACES TO REMAIN AS
NECESSARY TO PREPARE FOR NEW CONSTRUCTION
AND/OR NEW FINISHES.
REMOVE & SALVAGE EXISTING DOORS(S), FRAME(S),
HARDWARE, ETC. TURN OVER TO COR. AND NOTIFY
COR UNLESS DIRECTED OTHERWISE.
REMOVE & SALVAGE EXISTING DOORS(S), FRAME(S),
HARDWARE, ETC FOR REINSTALLATION.
REMOVE WINDOW FRAME AND LEADED GLASS.
REMOVE EXISTING WALL FINISHES, WALL BASE, AND
ALL ITEMS ATTACHED TO WALLS. PATCH & REPAIR
EXPOSED SURFACES TO REMAIN AS REQUIRED FOR
NEW CONSTRUCTION AND/OR NEW FINISHES.
REMOVE EXISTING FLOORING AND FLOOR FINISHES
INCLUDING ALL ADHESIVES, SETTING MATERIALS
DOWN TO EXISTING SUBSTRATE. PREPARE CONCRETE
FLOORS AS REQUIRED TO PROVIDE A SMOOTH AND
UNIFORM SURFACE FOR NEW FINISHES.
REMOVE EXISTING CEILING TILE AND GRID SYSTEM.
REMOVE EXISTING CEILING MOUNTED LIGHT
FIXTURES (UNLESS NOTED IN CONJUNCTION),
SPEAKERS CAMERAS, FIRE ALARMS, MECHANICAL
DEVICES, SMOKE DETECTORS, SENSORS, WIRELESS
ACCESS POINT, EXIT SIGNAGE, SAFETY MIRRORS,
ETC. TURN OVER TO THE COR. OR SALVAGE TILE FOR
RECYCLING UNLESS DIRECTED OTHERWISE.
REMOVE EXISTING CASEWORK & COUNTERTOP
WITH WALL MOUNTED EQUIPMENT. SALVAGE
EQUIPMENT & TURN OVER TO COR. UNLESS
DIRECTED OTHERWISE. PATCH & REPAIR EXPOSED
SURFACES TO REMAIN AS REQUIRED TO RECEIVE
NEW CONSTRUCTION AND FINISHES.
REMOVE EXISTING MECHANICAL, PLUMBING &
ELECTRICAL ITEMS - REFER TO MECHANICAL,
PLUMBING & ELECTRICAL DEMOLITION PLANS FOR
FURTHER INFORMATIONS. PATCH AND REPAIR
EXPOSED SURFACES TO REMAIN AS REQUIRED TO
RECEIVE NEW CONSTRUCTION AND FINISHES.
THE AWARDED CT VENDOR WILL DISASSEMBLE AND
REMOVE THE EXISTING CT EQUIPMENT AND
ASSOCIATED EQUIPMENT (GANTRY, CONSOLT DESK,
PATIENT TABLE, POWER DISTRIBUTION UNIT, SERVICE
CABINET, PARTIAL UPS, REAR CABLE COVER).
REMOVE EPOXY PAD, CUT AND GRIND THE EXISTING
ANCHORS FLUSH WITH THE EXISTING FLOOR.
REMOVE EXISTING ISOLATION PODS. SALVAGE
EQUIPMENT & TURN OVER TO COR. REFER TO
MECHANICAL AND ELECTRICAL DEMOLITION
PLANS.
EXISTING WALL FRAMING TO REMAIN. REMOVE
GYPSUM BOARD AND PREPARE FOR NEW FINISHES.
EXISTING WALL FRAMING TO REMAIN. REMOVE
LEAD LINING AND GYPSUM BOARD AS NEEDED TO
PREPARE FOR NEW FINISHES AND NEW WORK.
CONTRACTOR TO ASSUME EXISTING LEAD
SHIELDING EXTENDS ABOVE 7'-0" ABOVE FINISH
FLOOR AND IS ALSO CONTINUOUSLY LAMINATED
TO UNDERSIDE OF BAR JOIST. CONTRACTOR TO
PATCH AND INFILL ALL WALL AND CEILING LEAD
LINING INCLUDING AT UNDERSIDE OF EXISTING
STRUCTURE ABOVE.
REMOVE EXISTING HANDRAILS. PROVIDE BLOCKING
AS NEEDED FOR NEW HANDRAILS.
INJECTOR, HEAD END MONITOR, CONTROL ARM
AND BRACING. CONTRACTOR IS TO REMOVE ALL
ELEMENTS AND SALVAGE FOR REINSTALLATION IN
NEW LAYOUT, INCLUDING CABLING.
REMOVE ALL WALL MOUNTED ITEMS (SUCH AS PIN
BOARDS, HAND SANDITIZERS, TVS, CLOCKS ETC.)
TURN OVER ALL ITEMS TO THE COR. PATCH AND
REPAIR EXPOSED SURFACES TO REMAIN AS
REQUIRED TO RECIEVE NEW CONSTRUCTION AND
FINISHES.
REMOVE ALL LOOSE AND WALL MOUNTED
FURNITURE. TURN OVER ALL ITEMS TO COR. PATCH &
REPAIR ADJACENT SURFACES TO REMAIN AS
NECESSARY TO PREPARE FOR NEW CONSTRUCTION
AND/OR NEW FINISHES.
SAWCUT AND REMOVE A PORTION OF EXISTING
CONCRETE SLAB AND GRADE BASE IN PREPARATION
FOR NEW ELECTRICAL CONDUIT TRENCH.
AREA NOT IN SCOPE
LINE OF EXISITNG FOUNDATION WALLS
1A
WAITING
SECURITY
1556A
CONTROL 1556
CT SCAN
ORTHO
CORRIDOR
CORRIDOR
CORRIDOR
1A
1A
6 7
PORTION OF CEILING
TO BE REMOVED
AND REPLACED.
EXTENT OF CEILING
DEMOLITION ABOVE
TRENCH
10" 2'-2"
/2
/2
/8
8'-9 1/4"
/8
10" 2'-9 1/2"
/8
EXACT DIMENSIONS TO BE COORDINATED IN FIELD W/ CT VENDOR
30'-10 5/8" +/-
/4
14 13
6 76
ED.7D.2D
8 8
REMOVE DECORATIVE
COLUMN
REMOVE GLASS
BLOCK WALL
REMOVE COAT
HANGER ON BACK
OF DOOR, DOOR TO
REMAIN
REMOVE
ROOM SIGN
17 18
17 18
REMOVE ROOM
SIGN & ACCESS
BUTTON
/8
EXISTING MED GAS TO REMAIN.
CONTRACTOR TO REMOVE COVER
PLATES (STORE FOR REINSTALLATION)
TO FACILITATE GYP BOARD
DEMOLITION.
SLAB ON GRADE
EXISTING CRAWLSPACE
SLAB ON GRADE EXISTING CRAWLSPACE
SLAB ON GRADE
EXISTING CRAWLSPACE
EXISTING CEILING TO REMAIN
REWORK EXISTING GRID AND
TILES AS REQUIRED TO
ACCOMODATE NEW CEILING
REMOVE EXISTING
WALL PAPER BORDER
REMOVE "X-RAY
IN USE" LIGHT
NOTE SLAB IS NOT MONLITHIC,
AS ASPHALT WAS HERE PRIOR
PROTECT EXISTING ADJACENT
WALL TILE TO REMAIN
REMOVE EXISTING COILING
SECURITY WINDOW COMPLE TE
INCLUDING ALL TRACKS,
BRACKETS, WALL SUPPORT AND
HEADER
GENERAL DEMO NOTES
1. ALL DEMOLITION WORK REQUIRED IS NOT NECESSARILY LIMITED
TO WHAT IS SHOWN ON THE DEMOLITION PLANS. THE INTENT IS
TO REMOVE ALL MATERIALS AND ITEMS AS REQUIRED TO
FACILITATE NEW CONSTRUCTION.
2. CONTRACTORS ARE TO VERIFY FIELD CONDITIONS, IF
CONDITIONS DO NOT REFLECT WHAT IS NOTED IN THE
CONTRACT DOCUMENTS, THE CONTRACTOR IS TO NOTIFY THE
ARCHITECT.
3. THIS PLAN IS TO BE USED IN CONJUNCTION WITH THE ENTIRE SET
OF CONSTRUCTION DOCUMENTS. DO NOT REMOVE ANY ITEMS
WITHOUT VERIFYING AND COORDINATING WITH ALL GENERAL
TRADES AS TO HOW THEY RELATE TO THE OVERALL PROJECT.
4. CONTRACTOR IS RESPONSIBLE FOR PROVIDING DUMPSTERS.
LOCATION OF DUMPSTERS TO BE DETERMINED BY COR. WITH
CONTRACTORS INPUT.
5. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL
DEMOLISHED MATERIALS. DO NOT ALLOW MATERIALS AND
DEBRIS GENERATED BY DEMOLITION ACTIVITIES TO
ACCUMULATE ON THE JOBSITE. REMOVE DAILY AND DISPOSE
OF IN A LEGAL MANNER. NO ONSITE SALE OR BURNING OR
REMOVED ITEMS IS PERMITTED.
6. THE CONTRACTOR MUST TAKE ALL NECESSARY PRECAUTIONS
TO ENSURE THE SAFETY OF THE PUBLIC AND/OR WORKMEN ON
THE SITE TO PREVENT ACCIDENTS OR INJURY TO ANY PERSON
ON, ABOUT OR ADJACENT TO THE PREMISES. THE CONTRACTOR
SHALL COMPLY WITH ALL LAWS, ORDINANCES, CODES AND
REGULATIONS PERTAINING TO SAFETY AND THE PREVENTION OF
ACCIDENTS.
7. THE CONTRACTOR MUST MAINTAIN ADEQUATE SUPPORT,
INSULATION, WATERPROOFING, EMERGENCY LIGHTING,
SECURITY, ALARMS, ETC. FOR ALL OR PART OF ITEMS WHICH
ARE TO REMAIN.
8. THE COR. RESERVES THE RIGHTS TO ANY REMOVED MATERIALS
OR ITEMS. CONTRACTOR TO COORDINATE WITH COR.
9. DO NOT CUT AND/OR PATCH STRUCTURAL ELEMENTS IN A
MANNER THAT COULD CHANGE THEIR LOAD-CARRYING
CAPACITY OR LOAD-DEFLECTION RATIO.
10. PATCH/REPAIR OR REPLACE ALL AREAS DAMAGED BY
DEMOLITION, REWORK AS REQUIRED, PREPARE FOR NEW
CONSTRUCTION AS REQUIRED. BRICK OR BLOCK PATCHING
SHALL BE TOOTHED-IN TO MATCH EXISTING COURSING
PATTERN.
11. WHERE WALLS & CEILINGS ARE TO BE REMOVED, ALL ITEMS
THAT FALL WITH THE WALLS &/OR CEILINGS ARE TO BE
REMOVED OR REROUTED. REFER TO MECHANICAL, ELECTRICAL,
AND PLUMBING PLANS FOR ADDITIONAL DEMOLITION NOT
SHOWN ON THIS SHEET.
12. CONSTRUCTION AREAS TO BE COMPLETELY SEPARATED FROM
OCCUPIED AREAS WITH A ONE-HOUR FIRE RATED ASSEMBLY,
AND WITH SUITABLE DUST BARRIER. TEMPORARILY SEAL OFF ALL
RETURN & SUPPLY AIR DIFFUSERS IN CONSTRUCTION AREA.
PROVIDE RECIRCULATING HEPA FILTER IN CONSTRUCTION
AREA. ALL DEMOLISHED MATERIAL IS TO BE REMOVED FROM
SITE IN A COVERED CONTAINER. NEGATIVE AIR PRESSURE TO BE
MAINTAINED WITHIN CONSTRUCTION ZONE.
13. IF HAZARDOUS MATERIALS ARE ENCOUNTERED DURING
DEMOLITION, CONTRACTOR SHALL CONTACT COR. FOR
ABATEMENT. (LEAD GYP. BACKING IS TO BE REMOVED BY
CONTRACTOR AND DOES NOT REQURE COR. ABATEMENT).
14. REMOVE, REPLACE, PATCH, AND REPAIR MATERIALS AND
SURFACES CUT OR DAMAGED DURING DEMOLITION, BY
METHODS AND WITH MATERIALS SO AS NOT TO VOID EXISTING
WARRANTIES.
15. CLEAN AREAS AND SPACES WHERE CUTTING AND PATCHING
ARE PERFORMED.
16. CONTRACTOR SHALL PATCH, REPAIR, AND INFILL ALL APPLIED
FIREPROOFING MATERIAL IN AREAS LEFT UNPROTECTED DUE TO
REMOVAL OF EXISTING ELEMENTS OR AREAS DAMAGED
DURING NEW WORK AND DEMOLITION. MATCH EXISTING
FIREPROOFING MATERIAL TYPE AND THICKNESS TO MAINTAIN
REQUIRED LEVEL OR PROTECTION.
0 2' 4' 8'
600 E. Michigan Ave., Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
ARCHITECTURE + ENGINEERING
SEVEN
GENERATIONS
THE REPRODUCTION, COPYING OR OTHER USE OF THIS
DRAWING WITHOUT WRITTEN AUTHORIZATION IS PROHIBITED.
c SEVEN GENERATIONS ARCHITECTURE & ENGINEERING, LLC
SHEET NO.
SHEET TITLE
JOB NUMBER:
ISSUE DATES:
KEYPLAN
BID DOCUMENTS
222112
IH
S B
F S U
M U
LT
IP
LE
P
R O
J E C
T D
E S
IG
N
IH
S B
LA
C
K F E E T
S E R
V
IC
E U
N
IT
B
LA
C K
W E A
S E L
R O
A D
B R
O W
N
IN
G M
O N
TA
N
A
AD101.1
FIRST FLOOR DEMOLITION
PLAN
BID DOCUMENTS02/16/24
PROJECT A
NORTH
SCALE: 1/4" = 1'-0"
FIRST FLOOR DEMOLITION PLAN
WALL TYPE NOTES
A. LEAD LINING TO BE 1/16" IN THICKNESS AND INSTALLED
CONTINUOUS FROM FLOOR TO 7'-0" ABOVE FINISH FLOOR.
SHEET LEAD BACKING SHALL ALSO BE PROVIDED AT
PENETRATIONS WITHIN THE WALL PARTITION.
(1) LAYER OF 5/8" TYPE GYP. BD.
ON COLD FORMED METAL STUDS
@ 16" O.C. (MAX.); WRAP GYP. BD.
AROUND ENDS/ CORNERS WHERE
EXPOSED
CEILING LINE
FLOOR LINE
UNDERSIDE OF DECK
STEEL STUD DEFLECTION
TRACK ANCHORED TO DECK
REFERENCE FINISH SCHEDULE
FOR BASE MATERIAL
STEEL STUD CHANNEL
RUNNER FASTENED TO FLOOR
/2
PLAN
TYPE STUD SIZE
PARTITION
WIDTH
FIRE RATING
SOUND
ATTENUATION
BACKER ROD AND ACOUSTICAL
SEALANT BOTH SIDES
BACKER ROD AND ACOUSTICAL
SEALANT BOTH SIDES
FILL ENTIRE CAVITY WITH
SOUND BATT INSULATION
6" 7-1/4"
BATTS
STC 49 MINA6
3-5/8" 4-7/8" -A4
BATTS
STC 45 MIN
(1) LAYER OF 5/8" TYPE GYP. BD.
ON COLD FORMED METAL STUDS
@ 16" O.C. (MAX.); WRAP GYP. BD.
AROUND ENDS/ CORNERS WHERE
EXPOSED
CEILING LINE
FLOOR LINE
UNDERSIDE OF DECK
STEEL STUD DEFLECTION
TRACK ANCHORED TO DECK
REFERENCE FINISH SCHEDULE
FOR BASE MATERIAL
STEEL STUD CHANNEL
RUNNER FASTENED TO FLOOR
/2
PLAN
TYPE STUD SIZE
PARTITION
WIDTH
FIRE RATING
SOUND
ATTENUATION
BACKER ROD AND ACOUSTICAL
SEALANT BOTH SIDES
BACKER ROD AND ACOUSTICAL
SEALANT BOTH SIDES
FILL ENTIRE CAVITY WITH
SOUND BATT INSULATION
6" 7-1/4"
1/2 HR SMOKE
BARRIER
BATTS
STC 49 MINB6
(1) LAYER OF 5/8" TYPE GYP. BD.
ADD 1/16" LEAD LINING ON FACE
OF GYP. BD. EXTEND 7'-0" ABOVE
FLOOR. COLD FORMED METAL
STUDS @ 16" O.C. (MAX.); WRAP
GYP. BD. AROUND ENDS/
CORNERS WHERE EXPOSED
CEILING LINE
FLOOR LINE
UNDERSIDE OF DECK
STEEL STUD DEFLECTION
TRACK ANCHORED TO DECK
REFERENCE FINISH SCHEDULE
FOR BASE MATERIAL
STEEL STUD CHANNEL
RUNNER FASTENED TO FLOOR
/2
PLAN
TYPE STUD SIZE
PARTITION
WIDTH
FIRE RATING
SOUND
ATTENUATION
BACKER ROD AND ACOUSTICAL
SEALANT BOTH SIDES
FILL ENTIRE CAVITY WITH
SOUND BATT INSULATION
3-5/8" 4-7/8" -C4
BATTS
STC 45 MIN
BACKER ROD AND ACOUSTICAL
SEALANT BOTH SIDES
WHERE THE NEW WALL RUNS PERPENDICULAR
TO THE DECK, COPE GYPSUM BOARD TO
MATCH DECKING PROFILE (DASHED LINE)
AND PROVIDE CONTINUOUS BACKER ROD
AND ACOUSTICAL SEALANT BOTH SIDES
RADIATION
ROOM SIDE
NOTES
A
(1) LAYER OF 5/8" TYPE GYP. BD.
ON COLD FORMED METAL STUDS
@ 16" O.C. (MAX.); WRAP GYP. BD.
AROUND ENDS/ CORNERS WHERE
EXPOSED
CEILING LINE
FLOOR LINE
UNDERSIDE OF DECK
STEEL STUD DEFLECTION
TRACK ANCHORED TO DECK
REFERENCE FINISH SCHEDULE
FOR BASE MATERIAL
STEEL STUD CHANNEL
RUNNER FASTENED TO FLOOR
/2
PLAN
TYPE STUD SIZE
PARTITION
WIDTH
FIRE RATING
SOUND
ATTENUATION
BACKER ROD AND ACOUSTICAL
SEALANT BOTH SIDES
BACKER ROD AND
ACOUSTICAL SEALANT
BOTH SIDES
FILL ENTIRE CAVITY WITH
SOUND BATT INSULATION
3-5/8" 4-7/8"
1/2 HR FIRE
RESISTIVED4
BATTS
STC 45 MIN
(2) LAYER OF 5/8" TYPE X GYP. BD.
WITH 1/16" LEAD LINING BACKING.
EXTEND SHIELDING 7'-0" ABOVE
FLOOR. HEAVY GAUGE COLD
FORMED METAL STUDS @ 16" O.C.
(MAX.); WRAP GYP. BD. AROUND
ENDS/ CORNERS WHERE EXPOSED
CEILING LINE
FLOOR LINE
UNDERSIDE OF DECK STEEL STUD DEFLECTION
TRACK ANCHORED TO DECK
REFERENCE FINISH SCHEDULE
FOR BASE MATERIAL
STEEL STUD CHANNEL
RUNNER FASTENED TO FLOOR
/2
PLAN
TYPE STUD SIZE
PARTITION
WIDTH
FIRE RATING
SOUND
ATTENUATION
STUD SIZE TO
MATCH
ADJACENT
(VIF)
2 HR
BATTS
STC 52 MIN.
E6
BACKER ROD AND
ACOUSTICAL SEALANT BOTH
SIDES
FILL ENTIRE CAVITY WITH
SOUND BATT INSULATION
EXISTING FIRE SAFING INSULATION BEYOND
EXISTING FIRE RATED COMPOUND BEYOND
RADIATION
ROOM SIDE
NOTES
A
(2) LAYER OF 5/8" TYPE X GYP. BD.
ON HEAVY GAUGE COLD
FORMED METAL STUD FRAMING
(REFER TO STRUCTURAL)
(VIF)
FLOOR LINE
REFERENCE FINISH SCHEDULE
FOR BASE MATERIAL
TYPE WYTHE SIZE
PARTITION
WIDTH
FIRE RATING
SOUND
ATTENUATION
12" EXISTING - -
EXISTING CONCRETE MASONRY
UNIT WALL
PLAN
F12
UNDERSIDE OF DECK
REFER TO STRUCTURAL FOR
HEAD OF WALL CONSTRUCTION
CEILING LINE
(1) LAYER OF 5/8" TYPE GYP. BD.
WITH 1/16" LEAD BACKING.
EXTEND SHIELDING 7'-0" ABOVE
FLOOR. WRAP GYP. BD. AROUND
ENDS/ CORNERS WHERE EXPOSED
RADIATION
ROOM SIDE
BACKER ROD AND
ACOUSTICAL SEALANT
NOTES
A
(1) LAYER OF 5/8" TYPE GYP. BD.
WITH 1/16" LEAD BACKING.
EXTEND SHIELDING 7'-0" ABOVE
FLOOR. WRAP GYP. BD. AROUND
ENDS/ CORNERS WHERE EXPOSED
CEILING LINE
FLOOR LINE
UNDERSIDE OF DECK
REFERENCE FINISH SCHEDULE
FOR BASE MATERIAL
/2
PLAN
TYPE STUD SIZE
PARTITION
WIDTH
FIRE RATING
SOUND
ATTENUATION
BACKER ROD AND ACOUSTICAL
SEALANT BOTH SIDES
BACKER ROD AND SEALANT
FILL ENTIRE CAVITY WITH
SOUND BATT INSULATION
EXISTING EXISTING -G4
EXISTING WALL CONSTRUCTION
EXISTING EXISTING -G6 -
RADIATION
ROOM SIDE
NOTES
A
A
(1) LAYER OF 5/8" TYPE GYP. BD.
CEILING LINE
FLOOR LINE
UNDERSIDE OF DECK
REFERENCE FINISH SCHEDULE
FOR BASE MATERIAL
/2
PLAN
TYPE STUD SIZE
PARTITION
WIDTH
FIRE RATING
SOUND
ATTENUATION
BACKER ROD AND ACOUSTICAL
SEALANT BOTH SIDES
BACKER ROD AND SEALANT
FILL ENTIRE CAVITY WITH
SOUND BATT INSULATION
EXISTING EXISTING -H4
EXISTING WALL CONSTRUCTION
EXISTING EXISTING -H6 -
RADIATION
ROOM SIDE
GENERAL NOTES
1. INTERSECTION BETWEEN ALL RATED WALL SYSTEM AND
DECK SYSTEM TO BE SEALED WITH APPROVED UL FIRE
SPRAY MATERIAL.
2. REFER TO CODE COMPLIANCE FOR RATED WALL
LOCATED.
3. PROVIDE WOOD BLOCKING WITHIN WALL CAVITY AS
REQUIRED FOR WALL MOUNTED EQUIPMENT.
4. WHERE FIRE RATED SEPARATIONS ARE SHOWN IN CODE
PLANS PROVIDE STENCILING EVERY 20'-0" HORIZONTALLY
WITHIN THE CEILING PLENUM SPACE WITH THE
FOLLOWING TEXT:
FIRE BARRIER - PROTECT ALL OPENINGS AND
PENETRATIONS.
PROVIDE RADIATION SIGNAGE PER RADIATION
PROTECTION SPECIFICATION AT ALL WALLS CONTAINING
LEAD.
600 E. Michigan Ave., Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
ARCHITECTURE + ENGINEERING
SEVEN
GENERATIONS
THE REPRODUCTION, COPYING OR OTHER USE OF THIS
DRAWING WITHOUT WRITTEN AUTHORIZATION IS PROHIBITED.
c SEVEN GENERATIONS ARCHITECTURE & ENGINEERING, LLC
SHEET NO.
SHEET TITLE
JOB NUMBER:
ISSUE DATES:
KEYPLAN
BID DOCUMENTS
222112
IH
S B
F S U
M U
LT
IP
LE
P
R O
J E C
T D
E S
IG
N
IH
S B
LA
C
K F E E T
S E R
V
IC
E U
N
IT
B
LA
C K
W E A
S E L
R O
A D
B R
O W
N
IN
G M
O N
TA
N
A
A001.1
WALL TYPES
35% SCHEMATIC DESIGN04/21/23
08/18/23
10/24/23
65% DESIGN DEVELOPMENT
100% CONSTRUCTION DOCUMENTS
100% BID DOCUMENTS02/16/24
PROJECT A
SECURITY
13'-4"
FAMILY CONSULT
1556A
CONTROL ROOM
1556B
CHANGING
CT…
This is the start of the file's text. The full file is on GovTribe.