A214 - BUILDING ELEVATIONS (1).pdf

PDF 395 KB Posted

Attached to
75H701-20-Q-00014, Pharmacy Windows at Fort Yuma Health Care Center
Solicitation number
75H701-20-Q-00014
Issued by

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C

B

A

D

E

C1

FINISH FLOOR

7 000

TOP OF PARAPET

10 000

TOP OF ROOF

7 600

TOP OF PARAPET

5 200

T.O. PARAPET

FINISH FLOOR

5 200

T.O. PARAPET

7 600

T.O. PARAPET

D1

07 24 00.01

07 24 00.20

08 44 23.01

07 24 00.01

07 24 00.20

07 24 00.01

07 24 00.20

08 41 13.01

08 41 13.01

08 11 13.01

A5

SIM

SIM

D2

A326

07 54 23.31

5 200

TOP OF PARAPET

05 50 00.08

D3

A422

D1 NORTH ELEVATION

1:100A101E A214

C1 NORTH ELEVATION

1:100A101D A214

A5 SOUTH ELEVATION

1:100A101A A214

A1

5 200

SILL

7 600

TO PARAPET

5 200

SILL

7 000

TO PARAPET

5 200

SILL

7 600

TO PARAPET

07 71 13.01

07 24 00.01

08 41 13.01

07 71 13.01

07 24 00.01

08 41 13.01

07 71 13.01

07 24 00.01

08 41 13.01

A1

A1

A1

A1

A2

B1

A1

07 54 23.02

07 54 23.02

07 54 23.02

07 54 23.02

07 54 23.02

07 54 23.02

A1 NORTH ELEVATION

1:100A103C A103 LIGHT MONITOR - AREA B, C AND D

A2 NORTH ELEVATION

1:100A103E A214 LIGHT MONITOR - AREA E

B1 NORTH ELEVATION

1:100A103A A214 LIGHT MONITOR - AREA A

26 00 00.01

26 00 00.01

26 00 00.01

8 900

TOP OF PARAPET

GENERAL SHEET NOTES

KEY PLAN

A. ALL UNITS ARE IN MILLIMETERS UNLESS OTHERWISE

NOTED.

REFERENCE KEYNOTES

1 1

SHEET KEYNOTES

1. SEE C4/A524 FOR DETAIL AT BEAM

04 25 05.01

07 42 43.01

FINISH FLOOR

FINISH FLOOR

0 4 300

3 650

B2 SOUTH ELEVATION

1:100A103C A214 LIGHT MONITOR - AREA B, C AND D

7 600

TO PARAPET

07 24 00.01

07 54 23.02

07 54 23.22

07 54 23.22

07 54 23.22

07 54 23.22

B4 EAST ELEVATION

1:100A103B A214 LIGHT MONITOR - AREA B, C AND D

07 62 00.03

07 54 23.02

07 54 23.22

B4

B4

B4

B4

07 24 00.01

07 62 00.03

B5 WEST ELEVATION

1:100A103B A214 LIGHT MONITOR - AREA B, C AND D

07 24 00.01

07 62 00.09

07 54 23.22

07 24 00.01

05 12 00.09

05 12 00.09

04 25 05.01 - RAMMED EARTH WALL WITH FIELD APPLIED SEALANT

05 12 00.09 - BRACED FRAMING

05 50 00.08 - METAL LADDER AND SAFETY CAGE

07 24 00.01 - 50 EXTERIOR INSULATION AND FINISH SYSTEM

07 24 00.20 - ARCHITECTURAL REVEAL

07 62 00.03 - 765x765 GALVANIZED METAL SCUPPER/SERVICE

OPENING

07 42 43.01 - ALUMINUM COMPOSITE WALL PANEL- DRY JOINT

SYSTEM

07 54 23.02 - THERMOPLASTIC POLYOLEFIN MEMBRANE

07 54 23.22 - REGLET AND COUNTER FLASHING

07 54 23.31 - SEE D2/A523 FOR OVERFLOW SCUPPER

07 62 00.08 - GALVANIZED METAL SCUPPER SLEEVE, 200MM X

200MM X 300 MM DEEP WITH 100MM INTEGRAL

FLASHING

07 71 13.01 - MANUFACTURED ROOF COPING

08 11 13.01 - STEEL DOOR AND FRAME

08 41 13.01 - ALUMINUM FRAMED STOREFRONT SYSTEM

08 44 23.01 - STRUCTURAL-SEALANT-GLAZED CURTAIN WALL

SYSTEM

26 00 00.01 - BUILDING MOUNTED LUMINAIRE

A214

BUILDING ELEVATIONS

AGOYO

PARRILL

REV

ISSUE: 10.15.15 - Submittal 3

PROJECT NO: 08-0110.001

CAD DWG FILE: 08-0110-A214.dwg

DRAWN BY:

CHECKED BY:

SHEET TITLE

DATE DESCRIPTION

CONSULTANTS

U. S. DEPARTMENT

OF HEALTH AND

HUMAN SERVICES

E

21 3 4 5 6

D

C

B

A

D

C

B

A

21 3 4 5 6

A M

VOLUME 2: Sheet 37 of 111

File details come from the government source that posted it. Updated .