J.2 Deliverable Schedule.docx

DOCX document 59 KB Posted

Attached to
Part A/B Medicare Administrative Contractor, Jurisdiction E
Solicitation number
75FCMC19R0023
Issued by

About this file

This document outlines a deliverables schedule for a Medicare Administrative Contractor (MAC) in Jurisdiction E. The MAC will provide Medicare claims processing, payment services, and other administrative functions. Required deliverables include project plans, risk assessments, audit reports, correspondence, and status updates. Deliverables are due on a recurring basis, such as monthly, quarterly, or annually, with many due 20-30 days after the reporting period. The MAC must submit deliverables to the Contracting Officer's Representative and various CMS business owners on time and in the specified format. This deliverables schedule defines the reporting requirements the MAC must fulfill to properly administer the Medicare program in its jurisdiction.

RFP Attachment

View the file

Other files

File Type Posted
75FCMC19R0023_Amendment_2.pdf PDF
Amendment_2,_Attachment_1_-_RFP_Question_Responses.xlsx XLSX spreadsheet
JE_Amendment_1_CLEAN_Attachments_UPDATED.zip ZIP file
Amendment_1,_Attachment_1_REDLINE_Backpages.pdf PDF
JE_Amendment_1_REDLINED_Attachments_UPDATED.zip ZIP file
JE_RFP_Questions_and_Responses_Amendment_1.xlsx XLSX spreadsheet
75FCMC19R0023_Amendment_1.pdf PDF
J.23 Government Provided Proposal Assumptions —
J.39 CLIN 0006 Cost Proposal Template - Option Year 2 —
J.1.G AB MAC Performance Requirements Summary.docx DOCX document
J.22 Basis of Estimate.xlsx XLSX spreadsheet
J.42 CLIN 0009 Cost Proposal Template - Option Year 3 —
J.34 CLIN 0001 Cost Proposal Template - Implementation.xlsx XLSX spreadsheet
J.1 Statement of Work —
J.40 CLIN 0007 Cost Proposal Template - Option Year 2 —
J.28 Product Accessibility Template.docx DOCX document
J.1.C Fee-For-Service Shared System Base Functions.docx DOCX document
J.5 Government Systems Provided For Use.docx DOCX document
J.46 CLIN 0013 Cost Proposal Template - Option Year 5 —
J.37 CLIN 0004 Cost Proposal Template - Option Year 1 —
J.45 CLIN 0012 Cost Proposal Template - Option Year 5 —
J.49 CLIN 0016 Cost Proposal Template - Outgoing Contractor Workload Transition Activities.xlsx XLSX spreadsheet
J.10 Contractor Business Ethics COI and Compliance Program Requirements.docx DOCX document
J.1.A List of Key Definitions.docx DOCX document
J.23.A Government Provided Proposal Assumptions Audit and Reimbursement Tables.xlsx XLSX spreadsheet
J.33 Cost Template Summary Sheet.xlsx XLSX spreadsheet
J.23.B Government Provided Proposal Assumptions CSR-Handled Telephone Inquiries Tables.docx DOCX document
75FCMC19R0023.pdf PDF
J.11 Personal Conflicts of Interest Financial Disclosure.docx DOCX document
J.1.D Cash Collections Worksheet For HIGLAS Users.xlsx XLSX spreadsheet
J.44 CLIN 0011 Cost Proposal Template - Option Year 4 —
J.24 Attestations.docx DOCX document
J.47 CLIN 0014 Cost Proposal Template - Option Year 6 —
J.3 Small Business Subcontracting Plan Template.docx DOCX document
J.35 CLIN 0002 Cost Proposal Template - Base Year —
J.32 Systems of Records.docx DOCX document
J.48 CLIN 0015 Cost Proposal Template - Option Year 6 —
J.7 AB MAC Award Fee Plan and Self Assessment Template.docx DOCX document
J.25 Past Performance Questionnaire.docx DOCX document
J.4 HHS Contracting Guide for Contract of Government Property.docx DOCX document
J.41 CLIN 0008 Cost Proposal Template - Option Year 3 —
J.43 CLIN 0010 Cost Proposal Template - Option Year 4 —
J.9 Non-Disclosure Statement.docx DOCX document
J.1.B List of Key Acronyms.docx DOCX document
J.36 CLIN 0003 Cost Proposal Template - Base Year —
J.38 CLIN 0005 Cost Proposal Template - Option Year 1 —
J.8 MAC Security Incident and Reportable Event Reporting and Response.docx DOCX document
J.6 Contractor Furnished Property.docx DOCX document
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP # 75FCMC19R0023

Attachment J.2 – A/B MAC Deliverable Schedule Jurisdiction E V.6.0

RFP/SOW WBS #
Related SOW Requirement Name
Deliverable Name
Deliverable Description
Deliver to
Deliverable Due Date
Frequency
CMS Business Owner Functional Area
C.5.1.1
Jurisdiction Implementation Project Plan
Jurisdiction Implementation Project Plan
A detailed description of all activities required to transfer all Medicare operations from each carrier and intermediary in the contractor’s jurisdiction.
Contracting Officer's Representative and/or Designees
Baseline due within 30 days of the jurisdiction kickoff meeting, unless otherwise directed by the COR
Once
Center for Medicare (CM) / Medicare Contractor Management Group (MCMG) / Division of Medicare Administrative Contractor (MAC) Program Management (DMPM)
C.5.1.3
Risk Management Plan
Risk Management Plan
Identifies the jurisdiction wide as well as segment specific risks, mitigation strategies, and maintenance process for the risks associated with the contractor’s segment workload transition
Contracting Officer's Representative and/or Designees
Due within 30 calendar days of the kickoff meeting.
Once
CM / MCMG / DMPM
C.5.1.4
Cutover Plans
Part A Cutover Plan; Part B Cutover Plan
An expanded part of the Jurisdiction Implementation Project Plan that contain the day by day activities and procedures, some of which may be detailed to the hour, that the contractor will follow during the cutover period to ensure a successful cutover of a Part A or Part B workload.
Contracting Officer's Representative and/or Designees
Initial at least 45 calendar days prior to the Part A or Part B cutover date contained in the Jurisdiction Implementation Project Plan
Once
CM / MCMG / DMPM
C.5.1.5
Test Plan
Test Plan
A plan to identify the approach to testing, types of tests, schedule, and progress for the implementation.
Contracting Officer's Representative and/or Designees
Initial within 30 calendar days after kickoff meeting
Once
CM / MCMG / DMPM
C.5.1.6
Lessons Learned Documentation
Lessons-Learned Document Regarding Implementation Activities
Identifies the lessons learned during the implementation.
Contracting Officer's Representative and/or Designees
Within 40 calendar days after the final Part A /Part B cutover.
Once
CM / MCMG / DMPM
C.5.1.7
Accounts Receivable Reconciliation
Receipt of Accounts Receivable Transmittal Document
Certifies receipt of transmittal document that describes the total amounts and counts of the accounts receivables of the outgoing contractor.
Contracting Officer's Representative and/or Designees
Due within 10 calendar days after receipt of the Accounts Receivable Transmittal Document.
Once
CM / MCMG / DMPM and OFM/DFRP
C.5.1.9
Implementation Stakeholder Communication
Communications Plan
Identifies the processes and procedures the contractor will follow to ensure that all transition stakeholders are informed of the transition and its progress.
Contracting Officer's Representative and/or Designees
Due within 30 calendar days after contract award date.
Once
CM / MCMG / DMPM
C.5.2.1
Workload Closeout Project Plan (Option that may be exercised at the End of the Contract)
Workload Closeout Project Plan
Describes the outgoing contractor’s plan for the transfer of Medicare functions and the closeout of operations at contract end.
Contracting Officer's Representative and/or Designees
Due 15 calendar days after the jurisdiction kickoff meeting.
Once
CM / MCMG / DMPM
C.5.2.3
Workload Closeout Risk Management Plan (Option that may be exercised at the End of the Contract)
Workload Closeout Risk Management Plan
Includes a periodic assessment of new risks and mitigation and contingency planning where appropriate.
Contracting Officer's Representative and/or Designees
Initial Due within 30 calendar days of replacement contractor kickoff meeting
Once
CM / MCMG / DMPM
C.5.2.4
Accounts Receivable Transmittal Document
Accounts Receivable Transmittal Document
Describes the total amounts and counts of the accounts receivables of the outgoing contractor.
Contracting Officer's Representative and/or Designees
60 days prior to the effective date of the transfer.
Once
CM / MCMG / DMPM and OFM/DFRP
C.5.2.5
Cost Accounting/Audit (Option that may be exercised at the End of the Contract)
Financial Audit Supporting Documentation
Describes the details to support the post-cutover financial activities of the outgoing contractor.
Contracting Officer's Representative and/or Designees
Within 30 calendar days after closeout end
Once
CM / MCMG / DMPM
C.5.4.3
Security
Information Technology Systems Contingency Plan Report
Information Technology (IT) Systems Contingency Plan (See BPSSM Table 3.1 Planning Table, for 3.4)
Contracting Officer's Representative and/or Designees and CMS Business Owner
Initial within 90 days prior to the first segment cutover date and annually thereafter
Annually
CM/MCMG/DMSSOO
C.5.4.3
Security
IT Security Tests And Reports
Contractor conducted or any other independent IT evaluation
Contracting Officer's Representative and/or Designees
10 business days after conducted
As required
CM/MCMG/DMSSOO
C.5.4.3
Security
Risk Assessment Report
Risk Assessment (See BPSSM Table 3.1 Planning Table, for 3.2)
Contracting Officer's Representative and/or Designees
Initial within 90 days prior to making AB payments under the contract and annually thereafter
Annually
CM/MCMG/DMSSOO
C.5.4.3
Security
Statement of Security Compliance
Annual certification (See BPSSM Table 3.1 Planning Table, for 3.3)
Contracting Officer's Representative and/or Designees
In accordance with BPSSM
Annually
CM/MCMG/DMSSOO
C.5.4.3
Security
Systems Security Plan
Systems Security Plan (SSP) (See BPSSM Table 3.1 Planning Table, for 3.1)
Contracting Officer's Representative and/or Designees
Initial within 90 days prior to making AB payments under the contract and annually thereafter
Annually
CM/MCMG/DMSSOO
C.5.4.3
Security
Systems Security Profile Documentation
Systems Security Profile (See BPSSM Table 3.1 Planning Table, for 3.7)
Contracting Officer's Representative and/or Designees
Consistent with frequency
As required
CM/MCMG/DMSSOO
C.5.4.3.2
Administer Security Program
Corrective Action Management Process Report
Report progress in correcting deficiencies or findings identified by audits, reviews, etc. in accordance with guidance provided by the BPSSM and other CMS guidance.
Contracting Officer's Representative and/or Designees
In accordance with BPSSM or as requested by CMS (Corrective Action Plans for findings identified in Section 912 Evaluations must be remedied prior to making payments).
Monthly
CM/MCMG/DMSSOO
C.5.4.3.4
Correct Deficiencies
Incident Reporting and Responses Report
Incident Reporting and Response (See BPSSM Table 3.1 Planning Table, for 3.6)
Contracting Officer's Representative and/or Designees
As required by the CMS Incident Handling & Breach Notification Handbook, RMH Vol. III 7-1. Incidents involving individually identifiable information must be reported within 1 hour.
Monthly and As required
CM/MCMG/DMSSOO
C.5.4.3.5
Security Review and Verification
FISMA Assessment
Contractor will examine and analyze implemented security safeguards to provide evidence of compliance with applicable laws, regulations, and requirements.
Contracting Officer's Representative and/or Designees
As part of the May 1st POA&M submission
Annually
CM/MCMG/DSSOO
C.5.4.3.5
Security Review and Verification
FISMA Compliance
Any FISMA Compliance evidence to CMS (See H.26- FEDERAL INFORMATION SECURITY MANAGEMENT ACT (FISMA)) on completed and current CMS contracts
Contracting Officer's Representative and/or Designees
As requested by CMS
As requested
CM/MCMG/DMSSOO
C.5.4.4.1
Quality Control Program
Quality Control Plan (QCP)
Specifies the procedures and resources applied to ensure services meet contract performance requirements.
Contracting Officer's Representative and/or Designees and CMS Business Owner
The QCP shall be submitted into the CMS ART 45 calendar days prior to the start of each contract period and within 30 calendar days of any substantive changes in the MAC's quality operations. A courtesy copy of the QCP deliverable shall be sent to CMS's QCP Mailbox at QCP@cms.hhs.gov when submitting the QCP deliverable to CMS ART. Both redlined and clean copies should be submitted.
Prior to start of base operational period; prior to start of each subsequent contract year; and when substantive changes occur in quality operations.
CM/MCMG
C.5.4.5
Public Relations
Public Relations Plan-Implementation Deliverable
Describes the contractor’s plans for managing the programs public relations.
Contracting Officer's Representative and/or Designees
Initial within 30 calendar days of contract award
One month after contract award
CM/MCMG
C.5.4.5.3.3
Review Written Responses for Reading Level (Fogging) Accuracy and Timeliness
Readability Attestation for Beneficiary Appeals Correspondence
Contractors are required to attest that they are issuing correspondence that satisfies the readability requirements outlined in the Federal Register. This attestation should include how contractors ensure that this requirement is being met (e.g., software programs, quality reviews, etc.). Additional information regarding the readability requirements is in IOM 100-04, Chapter 29, Section 290.3.2 -- Reading Levels.
Contracting Officer's Representative and/or Designees and CMS Business Owner
Within 30 days after cutover
Annual
CPC/MEAG/DAO
C.5.4.6.1
Responses to Congressional Inquiries
Responses to Congressional Inquiries Report
Describes a summary of the congressional inquiry responses
Contracting Officer's Representative and/or Designees
Within 7 calendar days of month end
Monthly
OBIS/CMS
C.5.4.8.3
Successful Implementation of Change Requests
Change Request Implementation Report (CRIR)
Describes the Change Requests (CRs) that the contractor has implemented in the quarterly period.
This information shall be submitted electronically to CR_IMPL_REPORTS@cms.hhs.gov. These deliverables must also be delivered concurrently to the COR in accordance with CMS technical direction regarding the contract deliverable process.
The due dates for the Change Request Implementation Report are as follows, per the IOM: Quarter 1-Oct, Nov, Dec (report due no later than February 28th); Quarter 2- Jan, Feb, Mar (report due no later than May 28th); Quarter 3- April, May, June (report due no later than August 28th); Quarter 4-Jul, Aug, Sep (report due no later than November 28th).
Quarterly
CM/MCMG/Division of Change and Operations Management (DCOM) CM/MCMG/ DCM; CM/Provider Billing Group (PBG)/Division of Supplier Processing (DSCP)
C.5.4.8.3
Successful Implementation of Technical Direction Letters
Technical Direction Letter (TDL) Compliance Report (TCR)
Describes the Technical Direction Letters (TDLs) that the contractor has implemented in the quarterly period.
This information shall be submitted electronically to CR_IMPL_REPORTS@cms.hhs.gov. These deliverables must also be delivered concurrently to the COR in accordance with CMS technical direction regarding the contract deliverable process.
The due dates for the TCR are as follows, per the IOM: Quarter 1-Oct, Nov, Dec (report due no later than February 28th); Quarter 2-Jan, Feb, Mar (report due no later than May 28th); Quarter 3-April, May, June (report due no later than August 28th); Quarter 4- Jul, Aug, Sep (report due no later than November 28th).
Quarterly
CM/MCMG/Division of Change and Operations Management (DCOM)
C.5.4.9
Business Continuity Planning and Disaster Recovery
Comprehensive Continuity of Operations (COOP) Plan
Describes the Contractor’s policies and procedures to ensure that essential business functions continue during a disaster. The COOP plan elements include protection of physical infrastructure, IT disaster recovery, business continuity (with or without system availability), and other topics
Contracting Officer's Representative and/or Designees
Initial 60 calendar days prior to cutover, thereafter annually as requested by CMS.
Once, then Annually
CM/MCMG/DMSSOO
C.5.4.10.2
Self-Assessment Process for Internal Controls
Certification Package for Internal Controls (CPIC) Report
Attestation and documentation of the adequacy of the internal controls.
Contracting Officer's Representative and/or Designees. CPIC should also be delivered to CMS internalcontrols@cms.hhs.gov.
Initial is due within 15 business days after June 30. Update is due 5 business days after September 30.
Annually
OFM/ Accounting Management Group (AMG)/ Division of Financial Reporting, Policy & Oversight (DFRPO)
C.5.4.10.3
Correcting Internal Control Deficiencies – CAP process
Corrective Action Plan (CAP)
Describes a plan of action to correct weaknesses, findings, gaps, or other deficiencies.
Contracting Officer's Representative and/or Designees. CAP reports should also be delivered to CMS CAPS@cms.hhs.gov.
Initial CAP reports are due within 45 calendar days of receiving a final audit report or after discovery of a material weakness; thereafter 30 calendar days form quarter end
Within 45 calendar days after discovery of material weakness, and quarterly
OIS and OFM/AMG/DFRPO
C.5.4.11
Compliance Program
Compliance Documents
Position Description for the Compliance Officer and other members of the Compliance Department
Contracting Officer's Representative and/or Designees
Initial 30 calendar days after contract award and annually thereafter
Annually- End of Period of Performance/ Contract Year
OAGM
C.5.4.11
Compliance Program
Compliance Documents
Code of Conduct
Contracting Officer's Representative and/or Designees
Initial 30 calendar days after contract award and annually thereafter
Annually -End of Period of Performance/ Contract Year
OAGM
C.5.4.11
Compliance Program
Compliance Documents
Written compliance policies and procedures
Contracting Officer's Representative and/or Designees
Initial 30 calendar days after contract award and annually thereafter
Annually- End of Period of Performance/ Contract Year
OAGM
C.5.4.11
Compliance Program
Compliance Documents
Compliance training materials used or developed in the last year
Contracting Officer's Representative and/or Designees
Initial 30 calendar days after contract award and annually thereafter
Annually- End of Period of Performance/ Contract Year
OAGM
C.5.4.11
Compliance Program
Compliance Documents
Names and positions of the Board of Directors and/or Compliance Committee members charged with oversight of the compliance program
Contracting Officer's Representative and/or Designees
Initial 30 calendar days after contract award and annually thereafter
Annually- End of Period of Performance/ Contract Year
OAGM
C.5.4.11
Compliance Program
Compliance Documents
Charters for the Board and/or Executive Compliance Committees
Contracting Officer's Representative and/or Designees
Initial 30 calendar days after contract award and annually thereafter
Annually- End of Period of Performance/ Contract Year
OAGM
C.5.4.11
Compliance Program
Compliance Documents
Conflict of interest questionnaire(s) that are completed by employees, managers, officers and Board members
Contracting Officer's Representative and/or Designees
Initial 30 calendar days after contract award and annually thereafter
Annually- End of Period of Performance/ Contract Year
OAGM
C.5.4.11
Compliance Program
Compliance Documents
Risk assessment protocol(s) developed by the Compliance Department
Contracting Officer's Representative and/or Designees
Initial 30 calendar days after contract award and annually thereafter
Annually- End of Period of Performance/ Contract Year
OAGM
C.5.4.11
Compliance Program
Compliance Documents
Internal audit plan
Contracting Officer's Representative and/or Designees
Initial 30 calendar days after contract award and annually thereafter
Annually- End of Period of Performance/ Contract Year
OAGM
C.5.4.11
Compliance Program
Compliance Documents
Any reportable events to CMS (See H.18- Reportable Events) on completed and current CMS contracts
Contracting Officer's Representative and/or Designees
Initial 30 calendar days after contract award and annually thereafter
Annually- End of Period of Performance/ Contract Year
OAGM
C.5.7.1.7
Provider Service Plan
Provider Service Plan (PSP)
Describes the strategies, project activities, efforts, and approaches the contractor will use throughout the duration of its contract.
Contracting Officer's Representative and/or Designees and mailbox ProviderServices@cms.hhs.gov
By the last day of the first month of the first year of the contract.
One Time
CM/PCG/DCPC
C.5.7.1.8
Provider Customer Service Program (PSCP) Activity Report
Provider Customer Service Program (PCSP) Activity Report (PAR)
Summarizes and recounts the contractor's PCSP activities, process improvements, and best practices during the reporting period.
Contracting Officer's Representative and/or Designees and mailbox ProviderServices@cms.hhs.gov
First report due on the 30th day after the first 6 months of the contract year; second report due 30 days after the last day of the contract year.
Semiannual
CM/PCG/DCPC
C.5.7.2.1
Telephone Inquiries
Disaster Recovery Plan
Plan describing how the Medicare provider telecommunications operations will be maintained or continued in event of natural or manmade disaster
Contracting Officer's Representative and/or Designees and mailbox ServiceReports@cms.hhs.gov
End of third month of contract year
Annual
CM/PCG/DCPC
C.5.7.3.2
Web Technology
Website Attestation statement
Statement by contractor attesting that CMS contractor website guidelines have been followed in accordance with IOM Pub. 100-9, Chapter 6, Section 50.2.2
Contracting Officer's Representative and/or Designees and mailbox ProviderServices@cms.hhs.gov
Within 30 calendar days after cutover; thereafter, by the end of the sixth month of the contract year.
Annual
CM/PCG/DCPC
C.5.7.3.2
Web Technology
Website Attestation statement-- Current Procedural Terminology (CPT) usage
Statement by contractor attesting whether website adheres to requirements in IOM Pub 100-4, Chapter 23, Section 20.7
Contracting Officer's Representative and/or Designees and mailbox ProviderServices@cms.hhs.gov
Within 30 calendar days after cutover; thereafter, by the end of the sixth month of the contract year.
Annual
CM/PCG/DCPC
C.5.8
Claims Processing
Social Security Number Removal Initiative (SSNRI) Status Report
A status report of the progress of MAC systems and non-systems changes for the SSNRI project, including dates of completion for each task milestone.
FFS_SSNRI@cms.hhs.gov with copy to Contracting Officer's Representative
Due by the 5th day of each month, August 2017 through April 2018
Monthly
CM/MCMG/DCOM
C.5.8.2.5
Payment of Claims Outside Common Working File
Workload Report for Payment of Claims Outside Common Working File
Workload Report for Payment of Claims Outside Common Working File
Contracting Officer's Representative and/or Designees
Within 20 calendar days of the month end.
Monthly
CM/MCMG
C.5.8.4.4
The Do Not Forward Initiative
Do-Not-Forward (DNF) Initiative Report
Describes the Medicare checks and payments for professional claims returned or held to the contractor thru the DNF initiative.
Contracting Officer's Representative and/or Designees
Within 15 calendar days of quarter end
Quarterly
CM/PBG
C.5.10.1.9
Conduct and Notice of the Redetermination
Readability Attestation for Beneficiary Appeals Correspondence and/or Medicare Redetermination Notices
Contractors are required to attest that they are issuing correspondence that satisfies the readability requirements outlined in the Federal Register. This attestation should include how contractors ensure that this requirement is being met (e.g., software programs, quality reviews, etc.). Additional information regarding the readability requirements is found in IOM 100-04, Chapter 29, Section 290.3, How to Establish Reading Level.
Contracting Officer's Representative and/or Designees and CMS Business Owner
Within 30 days after cutover, as applicable, and annually, thereafter.
Annual
CPC/MEAG/DAO
C.5.11.2
Banking Relations
Copy of Tripartite Agreement
Describes the agreement between CMS, the contractor and its bank.
Contracting Officer's Representative and/or Designees
Upon initiation
Once
OFM / Financial Services Group (FSG)
C.5.11.2.3
Contractor Monthly Bank Reconciliation Worksheet
CMBRW
Bank reconciliation
Contracting Officer's Representative, CMS Business Owner, and mailbox higlasbankrecon@cms.hhs.gov
On or before the 15th of the month
Monthly
OFM/AMG/DFRPO
C.5.11.2.3.1
Cash Collection Worksheet
Cash Collection Worksheet
Reconciles the cash balance
Contracting Officer's Representative, CMS Business Owner, and mailbox
On the 15th of the month
Monthly
OFM/AMG/DFRPO
C.5.11.2.3.2
Estimated Allowance for Uncollectible Accounts
Allowance Matrix
Calculates the allowance percentage of receivable
Contracting Officer's Representative, CMS Business Owner, and mailbox
HIGLAS Contractors: 5 business days after month end
HIGLAS Contractors: Monthly
OFM/AMG/DFRPO
C.5.11.2.4
Letter-of-Credit Limitation
Letter of Credit Limitation Change Request
Written requests for changes to the monthly letter-of-credit limitation.
Contracting Officer's Representative and/or Designees
Consistent with frequency
As required
OFM / Financial Services Group (FSG)
C.5.11.3.2.5.2
Audit Plan
Audit Plan
The audit plan identifies each cost report selected for an audit (in-house or field.) The audit plan lists each provider’s name, provider #, cost reporting period, issues selected for audit, and an explanation as to why the provider was chosen for an audit.
Contracting Officer's Representative and/or Designees
Initial within 30 calendar days after the cutover date; thereafter within 30 calendar days prior to the annual period end
Annually
OFM/FSG
C.5.11.4.2
Applications for Extended Schedule
Extended Repayment Schedule (ERS) Report
In Excel format, this report identifies providers who have requested an ERS and identifies those requests that have been approved and denied and pending.
Contracting Officer's Representative and/or Designees
Within 15 calendar days of quarter end
Quarterly
OFM / FSG / Division of Medicare Overpayments (DMO)
C.5.11.7.1
Unsolicited/Voluntary Refunds
Unsolicited/Voluntary Refund Check Summary Report
Describes a summary of the unsolicited/voluntary refund checks.
Contracting Officer's Representative and/or Designees
Upon request
Upon Request
OFM / Program Integrity Group (PIG)
C.5.11.8.1
Administrative Freeze Payments
Provider Overpayment Referral Checklist
Describes summary of overpayment information for a Provider in bankruptcy.
Contracting Officer's Representative and/or Designees
Consistent with frequency
As required
OFM / AMG / DFO
C.5.11.8.2
Closed Bankruptcy Case
Quarterly Bankruptcy Tracking Report
Describes the status of the discharge of bankruptcy proceedings. Builds on the information contained in the summary of detailed underpayment and overpayment information for a Provider in bankruptcy.
Contracting Officer's Representative and/or Designees
Quarterly
As required
OFM / AMG / DFO
C.5.11.9.1
Accounts Receivable Trend Analyses
Accounts Receivable Trend Analysis Reports
Describes the results of accounts receivable trend analyses.
Contracting Officer's Representative and/or Designees
On or before January 22, April 22, July 22, and October 22. (The third and fourth quarter due dates may change due to the accelerated time periods. Medicare contractors will be notified of these changes by a Technical Direction Letter (TDL)
Quarterly
OFM / AMG / DFRP
C.5.12.1
Development of Improper Payment Reduction Strategy (IPRS)
IPRS
Describes the operational plan for how the contractor will evaluate data and address program vulnerabilities throughout the year.

See PIM 100-08 Chapter 7.

Contracting Officer's Representative and/or Designees and in CMS ART.
The Initial strategy is due after contract award no less than 30 calendar days prior to first claims cutover date even if there are multiple cutover dates. Thereafter the strategy is due no less than 45 calendar days prior to start of each option year. If a major revision is needed to the MSR, notify the COR and MR BFL to determine if a revised strategy is required. See PIM 100-08 Chapter 7.
Annually
OFM/ Provider Compliance Group (PCG)/ Division of Medical Review and Education (DMRE)
C.5.12.1
Development of Improper Payment Reduction Strategy (IPRS)
Strategy Analysis Report (SAR)
A once annual update to the MR Strategy Report that describes progress towards goals as defined in the strategy and any changes that need to be made to the strategy. See PIM 100-08 Chapter 7.
Contracting Officer's Representative and/or Designees and in CMS ART
The SAR is due within 14 calendar days after final cutover date and 7.5 months after option year starts.

Where the initial SAR and Option year strategy would be due within 60 calendar days of each other the contractor shall inform the Contracting Officer's Representative of this occurrence, to address on a case by case basis.

Annually
OFM/PIG/DMRE
C.5.12.1.6.1
Defending Medical Review Decisions at ALJ Hearings-Coordination
OMHA Contact Information
Level 1 appeals contact information
Contracting officer's Representative and Lynnsie.Doty@cms.hhs.gov
Shall provide updated contact information via email using the template provided under TDL-150507 if there are changes to any pertinent contact information (e.g., fax numbers, addresses, telephone numbers). Send all emails to the CMS contact, Lynnsie Doty, at Lynnsie.Doty@cms.hhs.gov, and copy the Contracting Officer’s Representatives (CORs).
When contact information changes
CPC/MEAG/DAO
C.5.12.2.19
Monthly Reporting of Medical Review Savings
Medical Review Savings Report
Financial savings to the Trust Fund that result from performing Medical Review. Calculated as denials minus reversals. See PIM 100-8 Chapter 7.
CMS ART
Due the 20th day of every month
Monthly
OFM/PCG/DMRE
C.5.13.2
Support of Comprehensive Error Rate Testing
Comprehensive Error Rate Testing (CERT) Program: Medicare Administrative Contractor

Certification

MACs shall submit a certification that all required information has been completely and accurately entered on the CERT Claims Status website. The MAC's Certifying Official shall sign the certification and submit it to CMS via CMS ART.
Contracting Officer's Representative and/or Designees
October 15th
Annually
Office of Financial Management (OFM) / Payment Accuracy & Reporting Group (PARG)
C.5.14.2
Electronic Correspondence Referral System Status Inquiries
Number of ECRS request submitted to the BCRC
Provides the number of MSP prepay ECRS Requests by category (Inquiries and CWF Assistance Requests) sent to the BCRC each month.
Contracting Officer's Representative and/or Designees
Last business day of the following month
Monthly
Division of Medicare Secondary Payer Operations (DMPO)-MSP Pre-Pay
C.5.14.3
Identification and Adjudication of Medicare Secondary Payer Claims and Application of Benefits and Processing Formula
Number of MSP claims processed
Provides the number of MSP claims processed during the given month including the number of claims processed, rejected, adjusted and denied.
Contracting Officer's Representative and/or Designees
Last business day of the following month
Monthly
OFM/FSG/ Division of Medicare Secondary Payer Operations (DMPO)-MSP Pre-Pay
C.5.14.3.3
Medicare Secondary Payer Claims Inquiries
The number of inquiries and documentation received and responded to.
The number of inquiries and documentation the Contractor responded to from insurers and other interested parties (e.g., attorneys and/or beneficiaries, etc.) on MSP billing requirements to assist with resolving claims inquiries accurately, timely, and responsively.
Contracting Officer's Representative and/or Designees
Last business day of the following month
Monthly
OFM/FSG/ Division of Medicare Secondary Payer Operations (DMPO)-MSP Pre-Pay
C.5.14.4
Transfer of Documentation and Phone Calls to the Benefits Coordination and Recovery Center
Number of phone calls and documentation transferred to the BCRC
Number of phone calls and documentation transferred to the BCRC
Contracting Officer's Representative and/or Designees
Last business day of the following month
Monthly
OFM/FSG/ Division of Medicare Secondary Payer Operations (DMPO)-MSP Pre-Pay
C.5.14.5
Medicare Secondary Payer Hospital Audits
Hospital Audit Report
Describes the results of hospital audits and reviews for Medicare Secondary Payer hospitals.
Contracting Officer's Representative and/or Designees
Within 30 calendar days after each hospital audit is completed
Annually
OFM/FSG/ Division of Medicare Secondary Payer Operations (DMPO)-MSP Pre-Pay
C.5.14.6.1
Duplicate Primary Payments
Unsolicited/Voluntary MSP Posted Checks Status Report (identifying associated vs. not associated with a known debt) & ECRS entry required vs. NO ECRS needed but NO A/R has been established yet)
Provides a listing of all Posted Provider, Physician, or Other Supplier MSP Unsolicited/Voluntary Refund Checks (identifying each entry as (1) associated to a known debt vs. (2) NOT associated to a known debt and ECRS entry required) (3) No ECRS needed But No A/R has been established yet) received by the MAC Contractor
Contracting Officer's Representative and/or Designees
Last business day of the following month
Monthly
OFM/FSG/Division of Medicare Secondary Payer Operations (DMPO)-MSP Post-Pay
C.5.14.6.2
Inquiries Specific to Debt Collection Efforts for Providers, Physicians, and other Suppliers
MSP Pending Correspondence Report
Provides a listing of all pending MSP correspondence.
Contracting Officer's Representative and/or Designees
Last business day of the following month
Monthly
OFM/FSG/ Division of Medicare Secondary Payer Operations (DMPO) - MSP Post-Pay
C.5.14.6.5
Misrouted Benefits Coordination and Recovery Center Medicare Secondary Payer Recovery Checks (Non-GHP checks) and/or Misrouted Commercial Repayment Center MSP Recovery Checks (GHP Checks)
Medicare Secondary Payer (MSP) Misrouted Recovery Checks (and Associated Correspondence) (Non-GHP = BCRC and GHP = CRC)
Provides a listing of all misrouted MSP - GHP or NON-GHP- checks either transferred to the BCRC for Non-GHP checks only and /or transferred to the Commercial Repayment Center (CRC) for GHP checks only (broken down by where sent - BCRC or CRC).
Contracting Officer's Representative and/or Designees
Last business day of the following month
Monthly
OFM/FSG/ Division of Medicare Secondary Payer Operations (DMPO) - MSP Post-Pay
C.5.14.6.6
Misrouted Benefits Coordination and Recovery Center MSP Recovery Correspondence (Non-GHP) and/or Misrouted Commercial Repayment Center MSP Recovery Correspondence (GHP)
Medicare Secondary Payer (MSP) Misrouted Recovery Correspondence (Non-GHP = BCRC and GHP = CRC)
Provides a listing of all misrouted MSP-GHP or Non-GHP-correspondence that was either transferred to the Medicare Secondary Payer Recovery Contractor (MSPRC)-Non-GHP correspondence only and /or either transferred to the Commercial Repayment Center (CRC)-GHP correspondence only (broken down by where sent-MSPRC or CRC).
Contracting Officer's Representative and/or Designees
Last business day of the following month
Monthly
OFM/FSG/ Division of Medicare Secondary Payer Operations (DMPO) - MSP Post-Pay
C.5.15.2
Review of Comprehensive Outpatient Rehabilitation Facility Billing Records
Aberrant Billing Practices Notification
Immediate written notification whenever aberrant billing practices are discovered
Contracting Officer's Representative and/or Designees
Consistent with Frequency
As required
CMSO/SCG/DCCP
C.5.15.3
Review of Inpatient Rehabilitation Facilities and Critical Access Hospitals’ Rehabilitation Distinct Part Units (DPU)
Written Report of the Applicable Calculated Compliance Percentage
Written report of the applicable calculated compliance percentage attained by the IRF or a provider attempting to be classified as an IRF, within the contractor's jurisdiction. The contractor must determine each IRFs applicable compliance percentage prior to the start of each IRF's next cost reporting period and include the most current information for all IRFs within the contractor's jurisdiction in the written report.
Contracting Officer's Representative, CMS Business Owner, and the RO responsible for the geographic area where the IRF is located, and, if appropriate, to the appropriate ROs involved with the administration of the MAC contract.
On or before the 15th of each month.
Monthly
CM/ Chronic Care Policy Group (CCPG)/ Division of Institutional Post Acute Care (DIPC)
C.5.18.1
Education Materials
Rural Health Clinic (RHC) Education Materials
The Contractor is encouraged to use CMS-created national education materials when training RHCs.
Contracting Officer's Representative and/or Designees
Six weeks prior to the intended use of the education materials
As required
CM / MCMG/ DMPM
C.5.19.1
Education Materials
Federally Qualified Health Center Education Materials
The Contractor is encouraged to use CMS-created national education materials when training FQHCs.
Contracting Officer's Representative and/or Designees
Six weeks prior to the intended use of the education materials
As required
CM / MCMG/ DMPM
C.5.23.1
Post-Award Meeting
Post-Award Meeting Minutes
Describes the results of the Post-Award meeting conducted.
Contracting Officer's Representative and/or Designees
Within 3 business days of the Post-Award meeting
Once
CM/MCMG
C.5.23.2
Project Management Plan-Implementation Deliverable
Project Management Plan
Describes the plan for overall management of the program.
Contracting Officer's Representative and/or Designees
Initial within 30 business days after contract award, updates within 15 calendar days after quarter end
Quarterly
CM/MCMG
C.5.23.4
Monthly Status Report (MSR)
Monthly Status Report (MSR)
Describes the monthly status of the program through a report. This deliverable is comprised of both the narrative MSR Word document and the Monthly A/B MAC Supplied Data Excel document. Please include in the file name the jurisdiction number, the MAC Name, and the month for which you are reporting.
Contracting Officer's Representative and/or Designees
Within 20 calendar days after month end.
Monthly
CM/MCMG
C.5.23.5
Ad Hoc Reporting
Estimate At Completion (EAC) Report
Provides monthly estimate of total contract costs to be expended, by SLIN, and includes the MAC Project Manager's cost estimation of all operational changes/impacts throughout the contract year. The MAC is to use the EAC Report spreadsheet template and accompanying instructions provided by the Contracting Officer at contract modification.
Contracting Officer, Contracting Specialist, COR, and designees as determined by the COR
Monthly EAC Reports are due into CMS ART no later than 30 calendar days after the end of the reporting month. In addition to submittal to CMS ART, the MAC will send an electronic copy to the CO, CS, COR, and others as directed by the COR.
Monthly
OAGM/MCMG
C.5.23.6
Voucher/Financial Management System
Monthly Cost Report
Submit a monthly cost report to the CMS ART System in accordance with the work breakdown structure (WBS) schedule instructions. In addition, submit a statement to the Contracting Officer's Representative via the deliverable mailbox indicating that this action has been completed.
Contracting Officer's Representative and/or Designees
Monthly cost reports are due into CMS ART no later than 30 calendar days after the end of the reporting month
Monthly
CM/MCMG
C.5.23.6
Voucher/Financial Management System
Final Estimated Cost Proposal
The contractor shall submit the final estimated cost proposal into CMS ART once contract estimated costs have been negotiated, and a subsequent modification has been executed by the CO. For new contract awards, CMS will notify contractors when CMS ART is available for final estimated cost proposal entry and the date that submission is due. With respect to change orders, once the change order has been definitized, the contractor shall submit the final estimated cost proposal into CMS ART. In addition, the contractor shall submit a statement to the Contracting Officer's Representative via the deliverable mailbox indicating that this action has been completed.
Contracting Officer's Representative and/or Designees
For new contract awards, CMS will notify contractors when CMS ART is available for final estimated cost proposal entry and the date that submission is due. The final estimated cost proposal shall be entered into CMS ART no later than 5 business days after the contract modification has been executed. With respect to change orders, once the change order has been definitized, the contractor shall submit the final estimated cost proposal into CMS ART. In addition, the contractor shall submit a statement to the Contracting Officer's Representative via the deliverable mailbox indicating that this action has been completed.
As required
CM/MCMG
C.5.23.11
Operational Productivity Report (OPR)
Operational Productivity Report (OPR)
The Contractor shall prepare and upload the OPR into the CMS-ART system. An electronic version in excel form should also be sent via email to the Contracting Officer's Representative (COR) and Contracting Officer (CO)/Contracting Specialist (CS) on the contract.
Contracting Officer's Representative, Contracting Officer/Contracting Specialist, and/or Designees
Monthly OPRs are due into CMS-ART no later than 30 calendar days after the end of the reporting month
Monthly
CM/MCMG
C.6.1
Joint Operating Agreements
Initial Joint Operating Agreement (JOA)
The initial JOA defines roles and responsibilities of a mutually agreed upon methods to work with and support CMS’ mission—with each of the following parties: Unified Program Integrity Contractors (UPICs); Qualified Independent Contractors (QICs); Administrative Qualified Independent Contractors (AdQICs); Quality Improvement Organizations (QIOs); Recovery Audit Contractors (RACs); Cost Report Appeals Support Contractor; Benefits Recovery and Coordination Center (BCRC); Commercial Repayment Center (CRC); Call Center Operations (CCO); Virtual Data Center (VDC); and Supplemental Medical Review Contractor (SMRC).
Contracting Officer's Representative and/or Designees
30 calendar days prior to cutover
Once
Office of Acquisitions and Grants Management (OAGM)
C.6.1
Joint Operating Agreements
Updated Joint Operating Agreement
The updated JOA defines any updates to the roles and responsibilities of a mutually agreed upon methods to work with and support CMS’ mission—with each of the following parties: UPICs; Cost Report Appeals Support Contractor; QICs; AdQICs; QIOs; RACs; VDC, CCO, BCRC, CRC and SMRC.
Contracting Officer's Representative and/or Designees
Consistent with frequency updates: By January 15th, April 15th, July 15th, and October 15th.
First Year Quarterly; Subsequent Years Semiannually
OAGM
C.6.1.1.1
Referrals to Quality Improvement Organization
Quality Improvement Organization Referrals
Describes the referrals to the QIO for quality of health care determinations.
Contracting Officer's Representative and/or Designees
Consistent with frequency
Every 6 months due January 1 & July 1
Center for Clinical Standards and Quality (CCSQ)
C.6.2.1
State Agencies Responsible for Licensing Institutional Providers (e.g., Survey and Certification, Licensing Authorities)
Health Insurance Benefits Agreement, Provider-Based Determination, or Other Institutional Provider Information
The Health Insurance Benefits Agreement, Provider-Based Determination, or Other Institutional Provider Information is provided in the format requested to state agencies with a copy to CMS.
Contracting Officer's Representative and/or Designees
Consistent with frequency
As required
CMSO/SCG/DACS

01/17/2019 2

File details come from the government source that posted it. Updated .