Attachment_J.5-9_--_EHIP_Water_Supply_BoQ_Gulem_Dejen_(GD).xls

XLS spreadsheet 101 KB Posted

Attached to
Water Supply for 11 New Health Centers Activity under USAID/Ethiopia Health Infrastructure Program
Solicitation number
72066318R00001
Issued by

About this file

EHIP Water Supply Bill of Quantity (BoQ)_Gulem Dejen (GD)

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cover

Ethiopia Health Infrastructure Program
(EHIP)
Health Centers Water Supply
Bill of Quantities
Prepared for USAID/Ethiopia
Date: October 2017

&L&"Arial,Bold"Disclaimer&"Arial,Regular": &"Arial,Italic"This Bill of Quantities (BOQ) is intended for use only as specifically defined in the Procurement and Contract documents. No other use is intended or implied.

Sum

PROJECTEHIP Water Supply
SITEGulem Dejen
DATEOctober 2017
DescriptionContractor's Cost Offer (USD)
SECTION I - MOBILIZATION & DEMOBILIZATION
1.00Mobilization- 0
2.00Demobilization- 0
SUB TOTAL of Section I- 0
SECTION II - ONSITE GROUNDWATER WELL DRILLING & TESTING
3.00Borehole Drilling- 0
4.00Well Pumping Tests- 0
5.00Miscellaneous- 0
SUB TOTAL of Section II- 0
SECTION III - ONSITE GROUNDWATER WELL COMPLETION & CONNECTION
6.00Well Construction- 0
7.00Borehole Mechanical (Pumps, Pipes, Valves, & Fittings)- 0
8.00Borehole Electrical (Control Panel, Cables, & Accessories)- 0
9.00Transmission/Transfer Main- 0
SUB TOTAL of Section III- 0
SECTION IV - QUARTERLY WATER QUALITY TESTING
10.00Quarterly Water Quality Testing- 0
SUB TOTAL of Section IV- 0
SECTION V - PROVISIONAL SUM
1.00Access Road- 0
2.00Well Abandonment- 0
3.00Photovoltaic (PV)- 0
SUB TOTAL of Section V- 0
TOTAL COST (SECTIONS I + II + III + IV + V)- 0
GRAND TOTAL- 0

&L&"Arial,Bold"Disclaimer&"Arial,Regular": &"Arial,Italic"This Bill of Quantities (BOQ) is intended for use only as specifically defined in the Procurement and Contract documents. No other use is intended or implied.&R&P of 4

Main Contract

PROJECTEHIP Water Supply
SITEGulem Dejen
DATEOctober 2017
Bid SectionBid ItemDescriptionBill of Quantities
Specific DivisionQuantityUnitUnit Price (USD)Extension (USD)
SECTION I - MOBILIZATION & DEMOBILIZATION
1.00MobilizationDiv 011000
1.01Mobilization of manpower, drilling rig(s), equipment, tools and accessories to the site.1LS- 0
Sub-Total- 0
2.00DemobilizationDiv 011000
2.01Demobilization of manpower, drilling rig(s), equipment, tools and accessories from the site.1LS- 0
Sub-Total- 0
SECTION II - ONSITE GROUNDWATER WELL DRILLING & TESTING
3.00Borehole DrillingDiv 332100
3.01Drilling of 150m deep borehole in all formations. The borehole is envisaged to be a typical multiple casing well in unstable condition above and in the aquifer. It shall have larger diameter through the overburden for surface casing and a reduced diameter thereafter. Price shall including site clearing, site preparation, casing recovery, sub-strata sampling and testing, water supply for drilling, environmental protection and other associated works as indicted in the technical specification and drawings. Price shall also include all quality assurance works such as checking the vertical alignment of the well. Borehole diameter shall be proposed by the contractor and approved by USAID based on field conditions before the works commence.1LS- 0
Sub-Total- 0
4.00Well Pumping TestsDiv 332100
4.01Well pumping tests (stepped-drawdown, continuous, & recovery) as indicated in the technical specification. The details of the well pumping tests shall be presented to USAID for approval before the works commence.1LS- 0
Sub-Total- 0
5.00MiscellaneousDiv 332100
5.01Preparation of drilling and well testing report including well logging (confirmed by geophysical resistivity testing) and other associated works.1LS- 0
5.02Water quality testing, at least the following parameters tested: bacteriological (total coliform, fecal coliform, & e. coli.), physical (colour, odor, taste, turbidity), and chemical analyses (total dissolved solids, electrical conductivity, pH, ammonia, sodium, potassium, calcium, magnesium, total hardness, total iron, manganese, fluoride, chloride, nitrate, nitrite, sulfate, aluminum, copper, chromium, zinc, boron, and arsenic). The water quality sampling, transport, and testing shall be done in the presence of USAID's representative and USAID selected laboratories.1LS- 0
Sub-Total- 0
SECTION III - ONSITE GROUNDWATER WELL COMPLETION & CONNECTION
6.00Well ConstructionDiv 322100
6.01Construction and completion of the successful well including installation of casings (also surface casing), screens, observation pipe, gravel packing, grouting, well development, and other associated works as indicated in the technical specification and drawings. Further, it includes installation and construction of wellhead and apron including remaining works after the borehole electro-mechanical equipment and piping are installed. The choice of casing and screen material (PVC or steel) shall be proposed to USAID for approval before the works commence.1LS- 0
Sub-Total- 0
7.00Borehole Mechanical (Pumps, Pipes, Valves, & Fittings)Div 332100
7.01Supply and installation of electric submersible pump, complete with non-return valve, threaded outlet, drop-down power cable, dry-run control cable & all other accessories required for installation in borehole as indicated in the technical specification. The submersible pump shall have minimum discharge capacity of Q = 0.30 lt/s and total head between the determined pump depth and the inlet to the elevated tanks. The submersible pump shall be from manufacturers such as Grundfos, Franklin, or Dayliff. The selected submersible pump shall be proposed to USAID for approval.1No.- 0
7.02Supply and installation of pipes, fittings, valves and other equipment between the submersible pump and the wellhead including heavy grade GS riser pipe, bends, tees, gate valves, non-return valve, pressure gauges, dismantling joints, pipe supports and other fittings necessary for complete connection of the submersible pump with the wellhead piping as indicated in the technical specification and drawings. Price shall include pipes/puddles, bolts, nuts, and gaskets necessary for connection between the various components of the system. A line diagram of the pipes, valves, and fittings arrangement shall be proposed to USAID for approval.1LS- 0
Sub-Total- 0
8.00Borehole Electrical (Control Panel, Cables, & Accessories)
8.01Supply and install weather resistant submersible pump motor control panel, including starter, all protection relays, phase sequence relay, metering relay, controls, surge-diverters, glands, contactors, etc… including hand-off-auto 3-position selector switch. Price shall include control panel protection box/enclosure and stand.Div 2605001No.- 0
8.02Supply, install, and testing of power cable between pump control panel and power supply point with all required splicing, terminations, junction box, etc as indicated in the technical specification and drawings. Price shall include excavation and backfilling of cable trench, warning tap laying, 50mm diameter PVC conduit laying as indicated in the technical specification and drawings. Price shall also include electrical manholes every 30m complete as per the drawing.Div 2605001LS- 0
8.03Supply, installation and testing of low/high level water sensors in elevated water tank including signal cables, conduits, fixing accessories, etc…1LS- 0
Sub-Total- 0
9.00Transmission/Transfer Main
9.01Supply, laying and jointing of transmission/transfer main between the wellhead and elevated tanks. Price shall include trench excavation, excavation outside of trench (if necessary) bedding and blanket selected materials backfilling, warning tap laying, disposal of excess excavated materials and reinforced concrete thrust blocks (at all bends, tees, and other fittings) as indicated in the technical specification and drawings. Diameter of the transmission/transfer main shall be determined following site requirements. Price shall also include complete set of bolts, nuts, gaskets, other fittings necessary for complete connection of the well head with the tanks. The price shall include transmission/transfer main pressure testing.Div 2211131LS- 0
9.02Clean and disinfect borehole, transmission/transfer main and all pipe works as specified in the technical specification.Div 3221001LS- 0
Sub-Total- 0
SECTION IV - QUARTERLY WATER QUALITY TESTING
10.00Quarterly Water Quality TestingDiv 322100
10.01Quarterly water quality testing during warranty period as specified in the Water Quality Assurance Plan (WQAP), at least the following parameters tested: bacteriological (total coliform, fecal coliform, & e. coli.), physical (colour, odor, taste, turbidity), and chemical analyses (total dissolved solids, electrical conductivity, pH, ammonia, sodium, potassium, calcium, magnesium, total hardness, total iron, manganese, fluoride, chloride, nitrate, nitrite, sulfate, aluminum, copper, chromium, zinc, boron, and arsenic). The water quality sampling, transport, and testing shall be done in the presence of USAID's representative and USAID selected laboratories.1LS- 0
Sub-Total- 0

&L&"Arial,Bold"Disclaimer&"Arial,Regular": &"Arial,Italic"This Bill of Quantities (BOQ) is intended for use only as specifically defined in the Procurement and Contract documents. No other use is intended or implied.&R&P of 4

Provisional Sum

PROJECTEHIP Water Supply
SITEGulem Dejen
DATEOctober 2017
Bid SectionBid ItemDescriptionBill of Quantities
Specific DivisionQuantityUnitUnit Price (USD)Extension (USD)
SECTION V - PROVISIONAL SUM
1.00Access Road
1.01Construction of access road (if required) from main or auxiliary road to drilling site.1LS- 0
Sub-Total- 0
2.00Well AbandonmentDiv 332100
2.01Well abandonment including recovery of equipment, materials and tools from the hole and sealing it as specified in the technical specification.1LS- 0
Sub-Total- 0
3.00Photovoltaic (PV)Div 481400
Supply and install a photovoltaic (PV) system that will provide power to selected lighting fixtures and socket outlets in Blocks A, B, C, D, E, & G and the well submersible pump as shown in the drawings. The PV panels shall be installed on Block B roofing as shown in the drawings. Price shall include a metal support framework and accessories for complete installation and fixing of the PV panels on the roofing. Also, price shall include inverter, charge controller, batteries, battery rack, exhaust fan, and other accessories as required and indicated below
3.01Polycrystalline PV panel array (quantity and rating to meet demand of 4KW peak wattage and 12KWH daily energy usage for the health center's facility and quantity and rating to meet power demand of selected pump based on well testing)Div 4814101LS- 0
3.02Inverter, 5Kw for health centerDiv 4814251Pcs.- 0
3.03Mounting structure for HC and bore hole pump PV panels, double coated with fixing accessories complete1LS- 0
3.045kw charge controller for health center, and controller sized as per selected pump rating for bore hole pump power supply1Pcs.- 0
3.05Deep cycle VRLA battery of 1.5 Day autonomy for HC and 1 day autonomy for solar pumpDiv 4814301LS- 0
3.06Battery rack, double coated1Pcs.- 0
3.07DC Disconnect1Pcs.- 0
3.08AC Disconnect1Pcs.- 0
3.09Exhaust fan1Pcs.- 0
3.10Air intake volume damper1Pcs.- 0
3.11IP 65 Distribution board, surface mount with lockable door and complete with required circuit breakers1Pcs.- 0
3.12PV system installation price with ground rods, cables, wires, accessories etc1LS- 0
3.13Battery room (in Block B and separate block for offsite wells) front wall and door installation1LS- 0
Sub-Total- 0

&L&"Arial,Bold"Disclaimer&"Arial,Regular": &"Arial,Italic"This Bill of Quantities (BOQ) is intended for use only as specifically defined in the Procurement and Contract documents. No other use is intended or implied.&R&P of 4

File details come from the government source that posted it.