Attachment_J.5-6_-_EHIP_Water_Supply_BoQ_Gult.xls
XLS spreadsheet 107 KB Posted
- Attached to
- Water Supply for 11 New Health Centers Activity under USAID/Ethiopia Health Infrastructure Program
- Solicitation number
- 72066318R00001
About this file
EHIP Water Supply Bill of Quantity (BoQ)_Gult
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_J-10_-_EHIP_Water_Supply_Drawing_Sheets_Addendum.pdf | ||
| Attachment_J.5-5_-_EHIP_Water_Supply_BoQ_Maksegnit.xls | XLS spreadsheet | |
| Attachment_J-8_-_Pre-proposal_Conference_Presentation.ppt | PPT presentation | |
| Attachment_J.5-7_-_EHIP_Water_Supply_BoQ_Agumamit.xls | XLS spreadsheet | |
| Attachment_J.5-9_--_EHIP_Water_Supply_BoQ_Gulem_Dejen_(GD).xls | XLS spreadsheet | |
| Attachment_J.5-10_-_EHIP_Water_Supply_BoQ_KG.xls | XLS spreadsheet | |
| Attachment_J.5-12_-_EHIP_Water_Supply_BoQ_Summary_Table.xls | XLS spreadsheet | |
| Attachment_J-9_-_Pre-proposal_Conference_Meeting_Minutes.docx | DOCX document | |
| Amendment_0001_-_72066318R00001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cover
| Ethiopia Health Infrastructure Program |
| (EHIP) |
| Health Centers Water Supply |
| Bill of Quantities |
| Prepared for USAID/Ethiopia |
| Date: October 2017 |
&L&"Arial,Bold"Disclaimer&"Arial,Regular": &"Arial,Italic"This Bill of Quantities (BOQ) is intended for use only as specifically defined in the Procurement and Contract documents. No other use is intended or implied.
Sum
| PROJECT | EHIP Water Supply | |
| SITE | Gult | |
| DATE | October 2017 | |
| Description | Contractor's Cost Offer (USD) | |
| SECTION I - MOBILIZATION & DEMOBILIZATION | ||
| 1.00 | Mobilization | - 0 |
| 2.00 | Demobilization | - 0 |
| SUB TOTAL of Section I | - 0 | |
| SECTION II - OFFSITE GROUNDWATER WELL DRILLING & TESTING | ||
| 3.00 | Borehole Drilling | - 0 |
| 4.00 | Well Pumping Tests | - 0 |
| 5.00 | Miscellaneous | - 0 |
| SUB TOTAL of Section II | - 0 | |
| SECTION III - OFFSITE GROUNDWATER WELL COMPLETION & CONNECTION | ||
| 6.00 | Well Construction | - 0 |
| 7.00 | Borehole Mechanical (Pumps, Pipes, Valves, & Fittings) | - 0 |
| 8.00 | Borehole Electrical (Control Panel, Cables, & Accessories) | - 0 |
| 9.00 | Transmission/Transfer Main | - 0 |
| SUB TOTAL of Section III | - 0 | |
| SECTION IV - COMMUNITY WATER POINTS & CATTLE TROUGH | ||
| 10.00 | Community Water Points & Cattle Trough | - 0 |
| SUB TOTAL of Section IV | - 0 | |
| SECTION V - QUARTERLY WATER QUALITY TESTING | ||
| 11.00 | Quarterly Water Quality Testing | - 0 |
| SUB TOTAL of Section V | - 0 | |
| SECTION VI - PROVISIONAL SUM | ||
| 1.00 | Access Road | - 0 |
| 2.00 | Well Abandonment | - 0 |
| 3.00 | Photovoltaic (PV) | - 0 |
| SUB TOTAL of Section VI | - 0 | |
| TOTAL COST (SECTIONS I + II + III + IV + V + VI) | - 0 | |
| GRAND TOTAL | - 0 |
&L&"Arial,Bold"Disclaimer&"Arial,Regular": &"Arial,Italic"This Bill of Quantities (BOQ) is intended for use only as specifically defined in the Procurement and Contract documents. No other use is intended or implied.&R&P of 4
Main Contract
| PROJECT | EHIP Water Supply | ||||||
| SITE | Gult | ||||||
| DATE | October 2017 | ||||||
| Bid Section | Bid Item | Description | Bill of Quantities | ||||
| Specific Division | Quantity | Unit | Unit Price (USD) | Extension (USD) | |||
| SECTION I - MOBILIZATION & DEMOBILIZATION | |||||||
| 1.00 | Mobilization | Div 011000 | |||||
| 1.01 | Mobilization of manpower, drilling rig(s), equipment, tools and accessories to the site. | 1 | LS | - 0 | |||
| Sub-Total | - 0 | ||||||
| 2.00 | Demobilization | Div 011000 | |||||
| 2.01 | Demobilization of manpower, drilling rig(s), equipment, tools and accessories from the site. | 1 | LS | - 0 | |||
| Sub-Total | - 0 | ||||||
| SECTION II - OFFSITE GROUNDWATER WELL DRILLING & TESTING | |||||||
| 3.00 | Borehole Drilling | Div 332100 | |||||
| 3.01 | Drilling of 180m deep borehole in all formations. The borehole is envisaged to be a typical multiple casing well in unstable condition above and in the aquifer. It shall have larger diameter through the overburden for surface casing and a reduced diameter thereafter. Price shall including site clearing, site preparation, casing recovery, sub-strata sampling and testing, water supply for drilling, environmental protection and other associated works as indicted in the technical specification and drawings. Price shall also include all quality assurance works such as checking the vertical alignment of the well. Borehole diameter shall be proposed by the contractor and approved by USAID based on field conditions before the works commence. Price shall include land acquisition facilitation effort and any potential compensation required for produce and structures on the land. | 1 | LS | - 0 | |||
| Sub-Total | - 0 | ||||||
| 4.00 | Well Pumping Tests | Div 332100 | |||||
| 4.01 | Well pumping tests (stepped-drawdown, continuous, & recovery) as indicated in the technical specification. The details of the well pumping tests shall be presented to USAID for approval before the works commence. | 1 | LS | - 0 | |||
| Sub-Total | - 0 | ||||||
| 5.00 | Miscellaneous | Div 332100 | |||||
| 5.01 | Preparation of drilling and well testing report including well logging (confirmed by geophysical resistivity testing) and other associated works. | 1 | LS | - 0 | |||
| 5.02 | Water quality testing, at least the following parameters tested: bacteriological (total coliform, fecal coliform, & e. coli.), physical (colour, odor, taste, turbidity), and chemical analyses (total dissolved solids, electrical conductivity, pH, ammonia, sodium, potassium, calcium, magnesium, total hardness, total iron, manganese, fluoride, chloride, nitrate, nitrite, sulfate, aluminum, copper, chromium, zinc, boron, and arsenic). The water quality sampling, transport, and testing shall be done in the presence of USAID's representative and USAID selected laboratories. | 1 | LS | - 0 | |||
| Sub-Total | - 0 | ||||||
| SECTION III - OFFSITE GROUNDWATER WELL COMPLETION & CONNECTION | |||||||
| 6.00 | Well Construction | Div 322100 | |||||
| 6.01 | Construction and completion of the successful well including installation of casings (also surface casing), screens, observation pipe, gravel packing, grouting, well development, and other associated works as indicated in the technical specification and drawings. Further, it includes installation and construction of wellhead and apron including remaining works after the borehole electro-mechanical equipment and piping are installed. The choice of casing and screen material (PVC or steel) shall be proposed to USAID for approval before the works commence. | 1 | LS | - 0 | |||
| Sub-Total | - 0 | ||||||
| 7.00 | Borehole Mechanical (Pumps, Pipes, Valves, & Fittings) | Div 332100 | |||||
| 7.01 | Supply and installation of electric submersible pump, complete with non-return valve, threaded outlet, drop-down power cable, dry-run control cable & all other accessories required for installation in borehole as indicated in the technical specification. The submersible pump shall have minimum discharge capacity of Q = 1.20 lt/s and total head between the determined pump depth and the inlet to the elevated tanks. The submersible pump shall be from manufacturers such as Grundfos, Franklin, or Dayliff. The selected submersible pump shall be proposed to USAID for approval. | 1 | No. | - 0 | |||
| 7.02 | Supply and installation of pipes, fittings, valves and other equipment between the submersible pump and the wellhead including heavy grade GS riser pipe, bends, tees, gate valves, non-return valve, pressure gauges, dismantling joints, pipe supports and other fittings necessary for complete connection of the submersible pump with the wellhead piping as indicated in the technical specification and drawings. Price shall include pipes/puddles, bolts, nuts, and gaskets necessary for connection between the various components of the system. A line diagram of the pipes, valves, and fittings arrangement shall be proposed to USAID for approval. | 1 | LS | - 0 | |||
| Sub-Total | - 0 | ||||||
| 8.00 | Borehole Electrical (Control Panel, Cables, & Accessories) | ||||||
| 8.01 | Supply and install weather resistant submersible pump motor control panel, including starter, all protection relays, phase sequence relay, metering relay, controls, surge-diverters, glands, contactors, etc… including hand-off-auto 3-position selector switch. Price shall include control panel protection box/enclosure and stand. | Div 260500 | 1 | No. | - 0 | ||
| 8.02 | Supply, install, and testing of power cable between pump control panel and power supply point with all required splicing, terminations, junction box, etc as indicated in the technical specification and drawings. Price shall include excavation and backfilling of cable trench, warning tap laying, 50mm diameter PVC conduit laying as indicated in the technical specification and drawings. Price shall also include electrical manholes every 30m complete as per the drawing. | Div 260500 | 1 | LS | - 0 | ||
| 8.03 | Supply, installation and testing of low/high level water sensors in elevated water tank including signal cables,sound and light alarm, conduits, trench, manhole, fixing accessories, etc… | 1 | LS | - 0 | |||
| Sub-Total | - 0 | ||||||
| 9.00 | Transmission/Transfer Main | ||||||
| 9.01 | Supply, laying and jointing of transmission/transfer main between the wellhead and elevated tanks. Price shall include trench excavation, excavation outside of trench (if necessary) bedding and blanket selected materials backfilling, warning tap laying, disposal of excess excavated materials and reinforced concrete thrust blocks (at all bends, tees, and other fittings) as indicated in the technical specification and drawings. Diameter of the transmission/transfer main shall be determined following site requirements. Price shall also include complete set of bolts, nuts, gaskets, other fittings necessary for complete connection of the well head with the tanks. The price shall include transmission/transfer main pressure testing. Price shall include land acquisition facilitation effort and any potential compensation required for produce and structures on the land. | Div 221113 | 1 | LS | - 0 | ||
| 9.02 | Clean and disinfect borehole, transmission/transfer main and all pipe works as specified in the technical specification. | Div 322100 | 1 | LS | - 0 | ||
| Sub-Total | - 0 | ||||||
| SECTION IV - COMMUNITY WATER POINTS & CATTLE TROUGH | |||||||
| 10.00 | Community Water Points & Cattle Trough | Div 332101 | |||||
| 10.01 | Construct and install community water points (maximum of 3) and a cattle trough including excavation and earthworks for foundation, masonry and concrete foundation works, and pipeline connection between the elevated water tank and the water points & cattle trough including trench excavation and backfilling, as indicated in the drawing. Price shall include connection of the elevated water tank to the water points and cattle trough through pipe networks as indicated in the drawing. All trench excavation, pipe purchase and supply, pipe laying, backfilling, trust blocks, anchor blocks, valves and valve chambers, & other related items/tasks shall be included as indicated in the technical specifications and drawings. Soak-away pits shall be provided for the water points to contain and percolate splashed water. Price shall include automatic water level control switch and other accessories required to regulate the elevated water tank operation. Price also, shall include all accessories for complete construction, installation, and connection of the elevated water tank to the water points and cattle trough. | 1 | LS | - 0 | |||
| 10.02 | Replace the two existing 2 m3 fiber glass elevated tanks with a 7.5 m3 fiber glass tank. Price shall include supply and installation of 7.5 m3 stand pipe fiber glass tank as shown in the drawing, removing of the existing fiber glass tanks, metal works that are required to remove the existing tank seats and prepare new tank seat as shown in the drawing, and installation of all pipelines (inlet, outlet, & overflow) as indicated in the drawing. | 1 | LS | - 0 | |||
| 10.03 | Construct and install a ground water tank for supplementary storage within the health center's compound including excavation and earthworks for foundation, masonry and concrete foundation works, existing but relocated 2 m3 fiber glass ground water tank installation, and pipeline connections between the elevated water tank and the ground water tank including trench excavation and backfilling, as indicated in the drawing. The inlet pipe of the ground water tank shall be connected with the outlet pipe of the elevated water tank. A short pipe and faucet shall be connected with the groundwater tank. Further, a water filling platform shall be provided under the faucet. Price shall include mechanical float valve and other accessories required to regulate tank operation. Price also, shall include all accesories for complete construction, installation, and connection of the ground water tank to the elevated water tank. | 1 | LS | - 0 | |||
| Sub-Total | - 0 | ||||||
| SECTION V - QUARTERLY WATER QUALITY TESTING | |||||||
| 11.00 | Quarterly Water Quality Testing | Div 322100 | |||||
| 11.01 | Quarterly water quality testing during warranty period as specified in the Water Quality Assurance Plan (WQAP), at least the following parameters tested: bacteriological (total coliform, fecal coliform, & e. coli.), physical (colour, odor, taste, turbidity), and chemical analyses (total dissolved solids, electrical conductivity, pH, ammonia, sodium, potassium, calcium, magnesium, total hardness, total iron, manganese, fluoride, chloride, nitrate, nitrite, sulfate, aluminum, copper, chromium, zinc, boron, and arsenic). The water quality sampling, transport, and testing shall be done in the presence of USAID's representative and USAID selected laboratories. | 1 | LS | - 0 | |||
| Sub-Total | - 0 |
&L&"Arial,Bold"Disclaimer&"Arial,Regular": &"Arial,Italic"This Bill of Quantities (BOQ) is intended for use only as specifically defined in the Procurement and Contract documents. No other use is intended or implied.&R&P of 4
Provisional Sum
| PROJECT | EHIP Water Supply | ||||||
| SITE | Gult | ||||||
| DATE | October 2017 | ||||||
| Bid Section | Bid Item | Description | Bill of Quantities | ||||
| Specific Division | Quantity | Unit | Unit Price (USD) | Extension (USD) | |||
| SECTION VI - PROVISIONAL SUM | |||||||
| 1.00 | Access Road | ||||||
| 1.01 | Construction of access road (if required) from main or auxiliary road to drilling site. | 1 | LS | - 0 | |||
| Sub-Total | - 0 | ||||||
| 2.00 | Well Abandonment | Div 332100 | |||||
| 2.01 | Well abandonment including recovery of equipment, materials and tools from the hole and sealing it as specified in the technical specification. | 1 | LS | - 0 | |||
| Sub-Total | - 0 | ||||||
| 3.00 | Photovoltaic (PV) | Div 481400 | |||||
| Supply and install a photovoltaic (PV) system that will provide power to selected lighting fixtures and socket outlets in Blocks A, B, C, D, E, & G and the well submersible pump as shown in the drawings. The PV panels shall be installed on Block B roofing and using a separate mounting structure for offsite wells as shown in the drawings. Price shall include a metal support framework and accessories for complete installation and fixing of the PV panels on the roofing and mounting structure. Also, price shall include inverter, charge controller, batteries, battery rack, exhaust fan, and other accessories as required and indicated below | |||||||
| 3.01 | Polycrystalline PV panel array (quantity and rating to meet demand of 4KW peak wattage and 12KWH daily energy usage for the health center's facility and quantity and rating to meet power demand of selected pump based on well testing) | Div 481410 | 1 | LS | - 0 | ||
| 3.02 | Inverter, 5Kw for health center | Div 481425 | 1 | Pcs. | - 0 | ||
| 3.03 | Mounting structure for HC and bore hole pump PV panels, double coated with fixing accessories complete | 1 | LS | - 0 | |||
| 3.04 | 5kw charge controller for health center, and controller sized as per selected pump rating for bore hole pump power supply | 1 | Pcs. | - 0 | |||
| 3.05 | Deep cycle VRLA battery of 1.5 Day autonomy for HC and 1 day autonomy for solar pump | Div 481430 | 1 | LS | |||
| 3.06 | Battery rack, double coated | 1 | Pcs. | - 0 | |||
| 3.07 | DC Disconnect | 1 | Pcs. | - 0 | |||
| 3.08 | AC Disconnect | 1 | Pcs. | - 0 | |||
| 3.09 | Exhaust fan | 1 | Pcs. | - 0 | |||
| 3.10 | Air intake volume damper | 1 | Pcs. | - 0 | |||
| 3.11 | IP 65 Distribution board, surface mount with lockable door and complete with required circuit breakers | 1 | Pcs. | - 0 | |||
| 3.12 | PV system installation price with ground rods, cables, wires, accessories etc. | 1 | LS | - 0 | |||
| 3.13 | Battery room (in Block B and separate block for offsite wells) front wall and door installation | 1 | LS | - 0 | |||
| 3.14 | Construct a batteries room/guard house at the location of offsite well as indicated in the drawing. Price shall include all materials and labor necessary for complete construction of the batteries room/guard house. | 1 | LS | - 0 | |||
| 3.15 | Construct fence to protect the offsite well, PV panels, and the batteries room/guard house at the location of the offsite well. Price shall include all materials and labor necessary for complete installation of the fence as per the design drawing. | 1 | LS | - 0 | |||
| Sub-Total | - 0 |
&L&"Arial,Bold"Disclaimer&"Arial,Regular": &"Arial,Italic"This Bill of Quantities (BOQ) is intended for use only as specifically defined in the Procurement and Contract documents. No other use is intended or implied.&R&P of 4