Attachment_J-10_-_EHIP_Water_Supply_Drawing_Sheets_Addendum.pdf
PDF 4 MB Posted
- Attached to
- Water Supply for 11 New Health Centers Activity under USAID/Ethiopia Health Infrastructure Program
- Solicitation number
- 72066318R00001
About this file
EHIP Water Supply Drawing Sheets Addendum
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_J.5-5_-_EHIP_Water_Supply_BoQ_Maksegnit.xls | XLS spreadsheet | |
| Attachment_J-8_-_Pre-proposal_Conference_Presentation.ppt | PPT presentation | |
| Attachment_J.5-7_-_EHIP_Water_Supply_BoQ_Agumamit.xls | XLS spreadsheet | |
| Attachment_J.5-9_--_EHIP_Water_Supply_BoQ_Gulem_Dejen_(GD).xls | XLS spreadsheet | |
| Attachment_J.5-10_-_EHIP_Water_Supply_BoQ_KG.xls | XLS spreadsheet | |
| Attachment_J.5-6_-_EHIP_Water_Supply_BoQ_Gult.xls | XLS spreadsheet | |
| Attachment_J.5-12_-_EHIP_Water_Supply_BoQ_Summary_Table.xls | XLS spreadsheet | |
| Attachment_J-9_-_Pre-proposal_Conference_Meeting_Minutes.docx | DOCX document | |
| Amendment_0001_-_72066318R00001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET
REFERENCE
NUMBER
ISSUE
STATUS
DATE OF
ISSUE
DRAWING TITLE
GENERAL DRAWINGS
G-000 COVER PAGE
SHEET
REFERENCE
NUMBER
ISSUE
STATUS
DATE OF
ISSUE
DRAWING TITLE
ELECTRICAL DRAWINGS
G-001 INDEX OF DRAWINGS
E-501 TYPICAL ELECTRICAL TRENCH DETAILS
INDEX OF DRAWINGS
EHIP WATER SUPPLY
CIVIL/SITE DRAWINGS CONTINUED
CE-000 GENERAL NOTES, SYMBOLS AND
ABBREVATIONS
CE-101
FINAL
FINAL
FINAL
WATER SUPPLY CIVIL & ELECTRICAL PLAN
SITE: ADDIS BETECHIRISTIAN
CE-102A
WATER SUPPLY CIVIL & ELECTRICAL PLAN
SITE: AGUMAMIT
CE-103
CE-107
CE-108A
WATER SUPPLY CIVIL & ELECTRICAL PLAN
SITE: GELSHA
CE-109
WATER SUPPLY CIVIL & ELECTRICAL PLAN
SITE: HARO
CE-110
WATER SUPPLY CIVIL & ELECTRICAL PLAN
SITE: KUNI
WATER SUPPLY CIVIL & ELECTRICAL PLAN
SITE: LIDETA
C-501 WELL CIVIL DETAILS
CE-502 FINAL
WATER SUPPLY & ELECTRICAL RISER
LINE DIAGRAM
C-503 TRENCH DETAILS
C-504 THRUST BLOCK DETAILS
E-601 ELECTRICAL ONE LINE DIAGRAM
(VARIOUS OPTIONS)
SHEET
REFERENCE
NUMBER
ISSUE
STATUS
DATE OF
ISSUE
DRAWING TITLE
PHOTOVOLTAIC (PV) SYSTEM DRAWINGS
PV 703
ELECTRICAL SITE PLAN, PV
SITE: KUNI
PV 901 PV SYSTEM MAIN CONNECTION POINT
PV 902
ELECTRICAL LIGHTING LAYOUT
POWERED BY PV SYSTEM
PV 903
ELECTRICAL SOCKET OUTLET LAYOUT
POWERED BY PV SYSTEM
PV 904A
PV CONNECTION POINTS
IN DISTRIBUTION BOARDS
PV 905 PV SYSTEM DETAIL
PV 906 PV SYSTEM GROUNDING DETAIL
G-002 SITES LOCATION MAP
FINAL
FINAL
FINAL
FINAL
FINAL
FINAL
FINALFINAL
FINAL
FINAL
FINAL
FINAL
FINAL
FINAL
FINAL
FINAL
FINAL
FINAL
FINAL
FINAL
FINAL
FINAL
PV 907 PANEL SUPPORT DETAIL &
SOLAR EQUIPMENT RATING
FINAL
PV 907A FINAL
PV 908 RACEWAYS DETAILFINAL
PANEL SUPPORT DETAIL &
SOLAR EQUIPMENT RATING
OCT 2017
OCT 2017
OCT 2017
OCT 2017
OCT 2017
OCT 2017
OCT 2017
OCT 2017
OCT 2017
OCT 2017
OCT 2017
OCT 2017
OCT 2017
OCT 2017
OCT 2017
OCT 2017
OCT 2017
OCT 2017
OCT 2017
OCT 2017
OCT 2017
OCT 2017
OCT 2017
OCT 2017
OCT 2017
OCT 2017
OCT 2017
PV 909 ON SITE PV ONE LINE DIAGRAMFINAL OCT 2017
CE-104
WATER SUPPLY CIVIL & ELECTRICAL PLAN
SITE: GERBICHO
FINALFINAL OCT 2017
FINALFINAL OCT 2017CE-105
WATER SUPPLY CIVL & ELECTRICAL PLAN
SITE: GULEM DEJEN
CE-111A
WATER SUPPLY CIVIL & ELECTRICAL PLAN
SITE: MAKSEGNIT
FINAL OCT 2017
CE-106A
WATER SUPPLY CIVIL & ELECTRICAL PLAN
SITE: GULTFINALFINAL OCT 2017
C-505 GROUND WATER TANK DETAILSFINAL OCT 2017
C-506A COMMUNITY WATER POINT DETAILSFINAL OCT 2017
PV 701
ELECTRICAL SITE PLAN, PV
SITE: GERBICHO
FINAL OCT 2017
PV 702
ELECTRICAL SITE PLAN, PV
SITE: GULTFINAL OCT 2017
PV 705
ELECTRICAL SITE PLAN, PV
SITE: GULEM DEJENFINAL OCT 2017
CIVIL/SITE DRAWINGS
C-507
BATTERIES ROOM/GUARD HOUSE
FINAL OCT 2017
C-508
FENCE DETAILS
FINAL OCT 2017
BATTERIES ROOM/GUARD HOUSE
STRUCTURAL DETAILS
C-509 FINAL OCT 2017
CE-106B FINALFINAL OCT 2017
PV 907B FINAL PANEL SUPPORT DETAILOCT 2017
PV 904B
PV CONNECTION POINTS
IN DISTRIBUTION BOARDSFINAL OCT 2017
C-506B CATTLE TROUGH DETAILSFINAL OCT 2017
PV 704
ELECTRICAL SITE PLAN, PV
SITE: MAKSEGNITFINAL OCT 2017
CE-111B
OFFSITE WELL & PRELIMINARY COMMUNITY
WATER POINTS & CATTLE TROUGH LAYOUT
SITE: MASEGNIT
FINAL OCT 2017
CE-108B
WATER SUPPLY CIVIL & ELECTRICAL PLAN
SITE: KACHANA GUDIE
FINAL OCT 2017
CE-102B FINAL OCT 2017
OFFSITE WELL & PRELIMINARY COMMUNITY
WATER POINTS & CATTLE TROUGH LAYOUT
SITE: GULT
PRELIMINARY COMMUNITY WATER POINTS
& CATTLE TROUGH LAYOUT
SITE: KACHANA GUDIE
PRELIMINARY COMMUNITY WATER POINTS
& CATTLE TROUGH LAYOUT
SITE: AGUMAMIT
ELEVATED WATER TANK & STAND DETAILSC-510A FINAL OCT 2017
ELEVATED WATER TANK & STAND DETAILSC-510B FINAL OCT 2017
FINAL
1997.00
1996.00
R3.60
R5.10 x
.6
EMERGENCY AND OPDPARKING AREA
E N
TR
Y
FO
R
IN
FEC
TIO
U S
D
IS
EA
S E
C
EM
EN
T TILE O
N R
C
SLA
B
CEMENT TILE
C
EM
EN
T TILE
A
A
B
B x
6.
EMERGENCY AND OPDPARKING AREA
E N
TR
Y F
O R
INF
EC
TIO
U S
D
IS
E A S E
C
EM
EN
T TILE O
N
RC
SLA
B
CEMENT TILE
C
EM
EN
T TILE
A
A
B
B
W
WELL DATA
HEALTH CENTER SITE
APPROXIMATE
37P UTM X (M)
APPROXIMATE
37P UTM Y (M)
ELEVATION
(M)
ANTICIPATED
WELL DEPTH
(M)
ADDIS BETECHRISTIAN 373828 1324668 1871.0 150
AGUMAMIT 296300 1179721 1921.0 190
GELSHA 560225 1215584 2965.0 170
GERBICHO 438303 723734 2069.0 180
GULEM DEJEN 292430 1170870 1984.0 150
GULT 373114 1257952 2348.0 180
HARO 405622 678238 2018.0 120
KACHENA GUDIE 241267 1234551 1834.5 120
KUNI 304027 1193590 2258.5 170
LIDETA 267457 1210328 2517.0 150
MAKSEGNIT 379576 1250038 2158.0 200
E E E E
INLET
PIPE
GSP
OVERFLOW
OUTLET
INLET
PIPE
OUTLET
PIPE OUTLET
PIPE
2000 LT
WATER
TANK
MSB OR PV SYSTEM
PROPOSED PUMP
CONTROL PANEL
(WEATHER PROOF &
MOUNTED ON STAND)
PROPOSED LEVEL
SWITCH (TO START
AND SHUT OFF
PUMP)
PROPOSED RUN
DRY SWITCH
E E E
PROPOSED
FLEXIBLE
COUPLING
PROPOSED
PRESSURE
GAUGE
PROPOSED
CHECK
VALVE
PROPOSED
GATE
VALVES
GS PUMP
DISCHARGE
LINE
PROPOSED ELECTRIC LINE
IN 50MM DIAMETER
WEATHER PROOF UPVC
PIPE
PROPOSED
ELECTRIC LINE
(SCREW MOUNT
GALVANIZED STEEL CLUMP
AT 1 M INTERVAL & AT ALL
TURNS & JUNCTIONS)
PROPOSED ELECTRIC
CABLE
(CABLE CLIP/TIE AT 1 M
INTERVAL. CABLE TIE
SHALL BE FUNGUS INERT,
SELF-EXTINGUSHING, &
SELF-LOCKING)
E
E
E
E
E
E
E
E
PROPOSED
LOCK
PROPOSED ELECTRIC
CABLE IN 50MM
DIAMETER WEATHER
PROOF UPVC PIPE
PROPOSED
CONNECTION TO
ELEVATED TANK
INLET PIPE
STEEL HOOK,
ANCHOR TO
TANK
CORD TYPE
FLOAT
PVC COATED
WEIGHT, 5 KG
STEEL
CLAMP
ELECTRIC
LINE
PUMP ON AT
20% FULL OR
800MM FROM
TANK CAMBER
PUMP OFF AT
95% FULL OR
200MM FROM
TANK CAMBER
ADJUSTABLE
FLOAT LEVELS
ELECTRIC LINE
LEGEND:
WATER
TANK
TANK CAMBER
0.0 m
E
DISTANCE TO SUIT SITE CONDITIONS
STAINLESS STEEL HOOK
& EYE TURNBUCKLE, ATTACH
TO SLAB W/ 150X150X3MM
STL PLATE, TYP
HOLD-DOWN
STRAP
INLET PIPE FROM EWT
C
-5
C-505
25MM DISCHARGE PIPE, GSP
FOUNDATION CONCRETE
C-505
STONE MASONRY WALL
BELOW, ALL AROUND
2% SLOPE
2% SLOPE
2% SLOPE
2000LTR FIBERGLASS
WATER TANK SUPPLIED
BY OTHERS
50MM HDPE FROM ELEVATED
WATER TANK (EWT),
CONNECTED TO EWT OUTLET
PIPE
2000 LTR FIBER GLASS
WATER TANK
(EXISTING BUT RELOCATED
FROM ELEVATED WATER
TOWER)
LOCKABLE COVER WITH PADLOCK
OVERFLOW PIPE 25MMGSP
50MM SHUT OFF VALVE
MECHANICAL FLOAT
VALVE
STAINLESS STEEL HOOK
& EYE TURNBUCKLE, ATTACH
TO SLAB W/ 150X150X3MM STL
PLATE, TYP
25MM GSP
GATE VALVE
HEAVY DUTY PLUG VALVE FOR
WATER DISPENSING FAUCET
0 12MMX150MM CONCRETE
WEDGE ANCHORS, TYPICAL MIN
TWO FOR EACH PLATE
50MM GSP ABOVE
GROUND
SELECTED FILL MATERIAL
COMPACTED TO 95%
FOUNDATION SLAB
50MM LEAN CONCRETE, TYP
STONE MASONRY WALL
M
IN
50 170 50
Ø8 BAR C/C 20 CM, TYP
FG
FOUNDATION SLAB FOR WATER TANK
2% 2%
Ø8 BAR C/C
200, TYPICAL
5CM LEAN
CONCRETE
MASONRY WALL/ LEAN
CONCRETE ALL AROUND
12MM THICK EXPANSION JOINT
GROUND WATER TANK PLAN1
SCALE: 1:20
GROUND WATER TANK SIDE ELEVATION2
C-505 SCALE 1:15
FOUNDATION SLAB SECTION3
C-505 SCALE 1:15
NOTES:
1) THE 2 M3 FIBER GLASS GROUND TANK IS SUPPLIED BY OTHERS. HOWEVER, FOUNDATION WORKS, CONCRETE WORKS, INSTALLATION OF TANK, AND OTHER ACCESSORIES IS PART OF THIS CONTRACT.
2) THE GROUND TANK INLET PIPE SHALL BE CONNECTED TO THE OUTLET PIPE OF THE ELEVATED WATER
TANK.
3) A MECHANICAL FLOAT SWITCH SHALL BE USED TO CONTROL FLOW INTO THE GROUND TANK.
4) ALL FINISHED GRADING SHALL BE MINIMUM OF 2% AWAY FROM THE WATER POINT AND TANK PAD.
5) ALL ABOVE GROUND PIPING SHALL BE GALVANIZED STEEL. HDPE MAY BE USED IN TRENCHES WITH
APPROPRIATE BEDDING AND DEPTH OF COVER AT LEAST 80CM.
6) LOCATION OF TRENCH MAY BE ADJUSTED TO SUIT SITE CONDITIONS, INCLUDING ROCK, AS APPROVED
AND AT NO ADDITIONAL COST TO THE OWNER.
7) FOR NON-EXPANSIVE SOIL SITES, 30CM OF NATURAL SOIL SHALL BE CUT BEFORE LEAN CONCRETE IS
PLACED.
8) FOUNDATION PAD SHALL BE PLACED ON WELL COMPACTED SOIL IN ACCORDANCE WITH THE
SPECIFICATION FOR COMPACTION.
9) FOR EXPANSIVE SOIL SITES, 0.5M OF THE EXPANSIVE SOIL SHALL BE EXCAVATED BELOW THE LEAN
CONCRETE LEVEL AND BACKFILLED WITH COMPACTED SELECT FILL MATERIAL.
10) 0.3M MINIMUM SELECT MATERIALS SHALL BE PLACED AROUND ALL SLABS.
11) REFER TO SPECIFICATIONS FOR SELECT FILL MATERIALS AND COMPACTION REQUIREMENTS.
12) SECOND EXISTING 2M³ WATER TANK TO BE LEFT ON SITE FOR FUTURE USE BY HEALTH CENTER,.
Ø8 C/C 200 BOTH WAYS
15 30 15
1% SLOPE
S L O
P E
1% SLOPE
2% SLOPE
2% SLOPE
5M MAX 1MX1MX1M DEPTH
SOAK AWAY PIT
LOCATION TO SUIT
FIELD CONDITIONS
1% SLOPE
1% SLOPE
2% SLOPE
S L O
P E
1% SLOPE2% SLOPE
2% SLOPE
HEAVY DUTY PLUG VALVE FOR
WATER DISPENSING FAUCET
APPROVED BY ENGINEER
TROWEL FINISH
PLATFORM FOR
WATER JERRYCAN
1% SLOPE
DRAINAGE
VALVE BOX
Ø50 HDPE PIPE
SCREED FLOOR
15 30 370 30 15
60 15 200 45 115 60 20 60 115 45
Ø25 HDPE PIPE
2%
5CM LEAN
CONCRETE
DRAINAGE
12MM THICK
EXPANSION JOINT
2%
HANDLE
WITH
PADLOCK3MM RIBBED SHEET
METAL MANHOLE DOOR
GROUND LEVEL
Ø10 C/C 200MM
CONCRETE SUPPORT, TYP
LEAN CONCRETE
REINFORCED CONCRETE
VALVE BOX, USE Ø10 C/C 150MM
HEAVY DUTY PLUG VALVE FOR
WATER DISPENSING FAUCET
APPROVED BY ENGINEER
TROWEL FINISH
PLATFORM FOR
WATER JERRYCAN
DRAINAGE
1%1%
STONE MASONRY
SCREED FLOOR
10CM REINFORCED
CONCRETE FLOOR
Ø8@200MM
SELECTED FILL
60 340 60
50 50
1MX1MX1M DEPTH
SOAK AWAY PIT
LOCATION TO SUIT
FIELD CONDITIONS
20CM SOIL FILL
OVER
GEOMEMBRANE
Ø50 GATE VALVE
U-CHANNEL DETAIL2
SCALE 1:5
FINAL
PUBLIC WATER STAND PLAN (FOUR TAPS)1
SCALE: 1:20
PUBLIC WATER STAND SECTION3
SCALE: 1:20
GATE VALVE
Ø50 HDPE PIPE
10CM REINFORCED
CONCRETE SLAB
Ø25 HDPE PIPE
OUTLET
1% SLOPE
Ø50 HDPE PIPE
WIPE OUT
Ø50 HDPE PIPE
WIPE OUT
1% SLOPE
Ø50 HDPE FROM WELL
90 695
0 2
10CM REINFORCED
CONCRETE SLAB
25CM HARD CORE
COMPACTED FILL
Ø25 HDPE PIPE
Ø50 HDPE WIPEOUT
1% SLOPE1% SLOPE
50 645
270 25
Ø50 GATE VALVE
Ø8 C/C 200 Ø10 C/C 200
Ø50 GATE VALVE
10CM REINFORCED
CONCRETE SLAB
Ø10 C/C 200
COMPACTED FILL
SCREED FINISHED
THROUGH
40 40 40
Ø8 C/C 200
25CM HARD CORE
FINAL
SECTION 12
SCALE: 1:20
CATTLE TROUGH PLAN1
SCALE: 1:20
SECTION 22
SCALE 1:20
100 50
50 100
100 100 100 100
LADDER
CAGE
C-510B
7500LTR FIBER
GLASS WATER TANK
LOCATION OF 7500 LTR WATER
TANK TO SUIT EXISTING
STRUCTURE
R
M
M
ORIENT LADDER TO ALLOW SAFE ACCESS TO TANK AND CONTROL
STAINLESS STEEL HOOK
& EYE TURNBUCKLE, ATTACH TO DECK
W/ 150X70X10MM STL PLATE, TYP
10000
EXISTING WATER TOWER
PLATFORM AN LEGS, BEAMS,
CONNECTOR PLATES
SHS 80x3
PROVIDE SPACER OF EQUAL THICKNESS TO PLATFORM
DECK. WELD NEW RHS SECTION TO SPACER AND TO
EXISTING PLATFORM BEAM BELOW. MINIMUM WELD
LENGTH=2X25CM ,TYP
PROPOSED RHS 80x40x3.5 S235BEAMS (4 LOCATIONS)
25CM
MINIMUM
CUT EXISTING PLATFORM
DECK TO ALLOW WELDING
100 40 100 40 100
100 90 90
90 60 90 75
TANK LEG RUNNERS
(REF 9/CX-141& NOTES)
SHS 80X3 BEAM
SHS 50X3 BEAM
LADDER CAGE:
RINGS FL 60X4, RAIL BARS FL 40X2
PLATE CA. 350X400X5 WELDED
DEPENDING ON TANK FOOTING SIZE
RHS 80x40x3.5MM S235 BEAMS, TYPICAL
ADJUST AS NECESSARY
TO MATCH TANK
100100
SEE DETAIL
FINAL
WATER TANK PLATFORM PLAN1
SCALE: 1:15
E L
E V
A T
E D
A T
R
T
N
K
A
N
S
A
T
A I L
C-510A
S C
A L
E
I
M
T
E R
S m m m m m m
LOAD TRANSFER T FRAME CONNECTION2
SCALE: 1:5
NOTES:
1. TANK SIZE TO BE VERIFIED IN SHOP DRAWING
2. ALL BOLTS AND ANCHORS: M12 4.6 OR HIGHER, GALVANIZED
3. ALL CONNECTION PLATES: T=10 MM S235
4. ALL WELDS: FILLET 3 MM
5. SEAL OPEN TUBE ENDS WITH END PLATES T=2 MM
6. ALL PIPES Ø50 GSP UNLESS OTHERWISE NOTED
7. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD
8. PROVIDE 2 EACH STAINLESS STEEL HOLDDOWN STRAPS
FOR TANK. ATTACH TO TANK PLATFORM UP WELDED PLATE
AND EYE BOLT
WATER TANK PLATFORM LOAD TRANSFER FRAME3
SCALE: 1:15
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text G
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text H
AutoCAD SHX Text
USAID ETHIOPIA HEALTH INFRASTRUCTURE PROGRAM (EHIP)
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APR
AutoCAD SHX Text
SYMB
AutoCAD SHX Text I
AutoCAD SHX Text
HEALTH CENTERS WATER SUPPLY PROJECT
AutoCAD SHX Text
NOTE: A3 SIZE SHEET REDUCED TO HALF SCALE
AutoCAD SHX Text This project was made possible by the United States Agency for project was made possible by the United States Agency for project was made possible by the United States Agency for was made possible by the United States Agency for was made possible by the United States Agency for made possible by the United States Agency for made possible by the United States Agency for possible by the United States Agency for possible by the United States Agency for by the United States Agency for by the United States Agency for the United States Agency for the United States Agency for United States Agency for United States Agency for States Agency for States Agency for Agency for Agency for for for International Development and the generous support of the American Development and the generous support of the American Development and the generous support of the American and the generous support of the American and the generous support of the American the generous support of the American the generous support of the American generous support of the American generous support of the American support of the American support of the American of the American of the American the American the American American American People through USAID Global Architecture and Engineering IQC Contracts.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
SHEET REFERENCE NUMBER:
AutoCAD SHX Text Tetra Tech 100 Nickerson Road Marlborough, MA 01752 www.tetratech.com
AutoCAD SHX Text
COPYRIGHT:
AutoCAD SHX Text
UNO, ALL DIMENSIONS SHOWN ARE IN METERS
AutoCAD SHX Text
SK
AutoCAD SHX Text
SK
AutoCAD SHX Text
TM
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
OCT 2017
AutoCAD SHX Text
TETRA TECH
TIES (LONG SIDES)
SHS 40X2.5 S235
SHS COLUMNS
80X3 S235
PLAT FORM BEAMS
RHS 80X40X3 S235
50MM LEAN
CONCRETE
FINISHED GRADE
LEVEL 3:1 SLOPE
UNO
TIES SHS 40X2.5
S235
7500 LTR FIBER
GLASS WATER TANK
OVER
FLOW PIPE
OUTLET
PIPE
INLET PIPE
DETAIL SEE
C-510A/2
ACTUAL PIPING CONNECTIONS TO
BE CONFIRMED IN THE FIELD
RHS 80x40x3.5MM S235 BEAMS
TYPICAL
OUTLET PIPE
7500 LTR FIBER GLASS WATER TANK
OVER FLOW PIPE
OUTLET PIPE
INLET PIPE
DETAIL SEE C-510A/2
ACTUAL PIPING CONNECTIONS TO BE CONFIRMED IN THE FIELD
RHS 80x40x3.5MM S235 BEAMS TYPICAL
LADDER
SHS 30X2.5 S235
150X150X10MM STEEL PLATE
WITH 4PC 10MM BOLTS WITH
WASHERS @ EACH LEG, TYPICAL
30X30X2.5MM
SHS LADDER
30X30X2.5MM
SHS LADDER
MEMBER
E L
E V
A T
T
R
N
K
A
S
A
T
A I L
S
C-510B
S C
A L
E
I
M
T
E R
S m m m m m m
FINAL
EWT SECT AND FRONT ELEV
SCALE: 1:30
ENLARGED ELEV
SCALE: 1:10
LADDER FOR WATER TANK ACCESS3
C-014B
SCALE 1:20
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text G
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text H
AutoCAD SHX Text
USAID ETHIOPIA HEALTH INFRASTRUCTURE PROGRAM (EHIP)
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APR
AutoCAD SHX Text
SYMB
AutoCAD SHX Text I
AutoCAD SHX Text
HEALTH CENTERS WATER SUPPLY PROJECT
AutoCAD SHX Text
NOTE: A3 SIZE SHEET REDUCED TO HALF SCALE
AutoCAD SHX Text This project was made possible by the United States Agency for project was made possible by the United States Agency for project was made possible by the United States Agency for was made possible by the United States Agency for was made possible by the United States Agency for made possible by the United States Agency for made possible by the United States Agency for possible by the United States Agency for possible by the United States Agency for by the United States Agency for by the United States Agency for the United States Agency for the United States Agency for United States Agency for United States Agency for States Agency for States Agency for Agency for Agency for for for International Development and the generous support of the American Development and the generous support of the American Development and the generous support of the American and the generous support of the American and the generous support of the American the generous support of the American the generous support of the American generous support of the American generous support of the American support of the American support of the American of the American of the American the American the American American American People through USAID Global Architecture and Engineering IQC Contracts.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
SHEET REFERENCE NUMBER:
AutoCAD SHX Text Tetra Tech 100 Nickerson Road Marlborough, MA 01752 www.tetratech.com
AutoCAD SHX Text
COPYRIGHT:
AutoCAD SHX Text
UNO, ALL DIMENSIONS SHOWN ARE IN METERS
AutoCAD SHX Text
SK
AutoCAD SHX Text
SK
AutoCAD SHX Text
TM
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
OCT 2017
AutoCAD SHX Text
TETRA TECH
16x2400mm Earth Rod
LPP-E
LPP-C LPP-B
LPP-F
LPP-A
Earthing Manhole, 700x700x700mm
LPP-D
Concrete Plinth
ELECTRICAL SITE PLAN, PV1
SCALE: 1:75
LPP-E
LPP-C LPP-B
LPP-F
LPP-A
Earth Manhole, 700 x700x700mm
16x2400mm Earth Rod
LPP-D
Concrete Plinth
Manhole 600x600x700mm(TYP)
ELECTRICAL SITE PLAN, PV1
SCALE: 1:75
| Sheets and Views |
| C-510A |
| Sheets and Views |
| C-510B |