Amendment 0003 - IFB 70Z08825B0000088-Dredging MSU-RFIs 4-7.pdf
PDF 258 KB Posted
- Attached to
- MAINTENANCE DREDGING AT USCG SECTOR COLUMBIA RIVER [FORMERLY MARINE SECURITY UNIT (MSU)] PORTLAND, OR
- Solicitation number
- 70Z08825B0000088
About this file
This document is an Amendment (No. 0003) to Invitation for Bid (IFB) 70Z08825B0000088 for Maintenance Dredging at USCG Sector Columbia River in Portland, Oregon. The amendment provides responses to Request for Information (RFI) Questions 4-7, addressing critical operational details for the dredging project including USCG Cutter Bluebell's schedule, confirmation testing requirements, and temporary storage and moorage facilities.
Key project details include maintenance dredging of up to 600 cubic yards, with an approved in-water work window from July 1, 2025 through October 31, 2025. The procurement estimate ranges between $500,000 and $1,000,000, and the project will result in a single Firm Fixed Price (FFP) contract. Bidders are required to submit documentation including SF 1442, schedule of prices, representations and certifications, and bid bond. Bids will be uploaded via DOD Safe from April 8, 2025 through April 18, 2025, with the US Coast Guard (Department of Homeland Security) serving as the contracting agency.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1 3
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0003 31Mar2024 51290PR250000088 21030930
6. ISSUED BY CODE 70Z088 7. ADMINISTERED BY (If other than Item 6)
CODE 70Z088
Commanding Officer
CG CEU OAKLAND (CN)
1301 Clay Street 7th Floor, Suite 700N Oakland, CA 94612-5203
Commanding Officer
CG CEU OAKLAND (CN)
1301 Clay Street 7th Floor, Suite 700N Oakland, CA 94612-5203
8. NAME AND ADDRESS OF CONTRACTOR (No. Street, county, State and ZIP: Code) () 9A. AMENDMENT OF SOLICITATION NO.
ISC BioExpress
X 70Z08825B0000088
9B. DATED (SEE ITEM 11)
Kaysville, UT. 84037
19Mar2025
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning one (1) copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATA SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and data specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
() A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.)
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
MAINTENANCE DREDGING AT USCG SECTOR COLUMBIA RIVER [FORMERLY MARINE SECURITY UNIT (MSU)]
PORTLAND, OR
The purpose of this RFP Amendment No. 0002 is to provide answers to RFI Question Numbers 4-7 on following pages.
- All other Terms & Conditions remain unchanged.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Guiljohn Alcantara Contracting Officer
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of person authorized to sign)
BY ___________________________________________
(Signature of Contracting Officer)
STANDARD FORM 30 (REV. 11-2016)
PREVIOUS EDITION UNUSABLE COMPUTER GENERATED Prescribed by FAR (48 CFR) 53.243
IFB 70Z08825B0000088
MAINTENANCE DREDGING AT USCG SECTOR COLUMBIA RIVER, PORTLAND, OR
RFI No’s 4-7
Question 4:
Specification 35 20 23 Dredging, Section 1.01 outlines that USCG Cutter Bluebell is homeported at Sector Columbia River and may be present during dredging operations and that dredging operations must be conducted while the vessel is underway. Can the USCG provide any information regarding Cutter Bluebell's schedule to determine allowable work windows within the specified performance period?
Response 4:
Unfortunately, the cutter schedule changes regularly based on missions, but they do tentatively have plans to be away from their mooring during the last half of September. Upon contract award, we can facilitate communication with the cutter to accommodate the dredge event during a time when the cutter can move away from their mooring and does not necessarily have to be during their September voyage.
Question 5:
Specification 01 10 00 Section 1.02-4 Pre-Dredge Conference Call with Regulators states: "Dredging, sequencing, positioning, post-dredge confirmation testing, PDS management, cover material testing, and disposal will all need to be addressed as needed to assure the agencies...". The project requirements do not contain any information regarding necessary Post-Dredge confirmation testing or cover materials testing. Please confirm that Post-Dredge Confirmation Testing and Cover Materials Testing are not part of the scope of this project.
Response 5:
Pre-dredge conference call will be limited to discussing what the dredge operations plan is and mitigation measures for ensuring the material that is not suitable for in-water placement (all the material) is managed properly. We have confirmed with PSET that there is no need to cover the post-dredge area so long as the desired depth is reached and not exceeded (must be -12 feet). So long as these requirements are met, testing/cover will not be required.
Question 6:
Specification 01 10 00 Section 1.15 outlines that temporary storage facilities will be provided, if needed, in a location determined by the contracting officer. Please advise the approximate location and size of the region which will be set aside for temporary Contractor storage.
Response 6:
A small trailer may be accommodated on base if needed. The location will be determined after award as it may change based on base operations. The pier adjacent to the Bluebell mooring will not be available for any storage.
Question 7:
Will the contractor be allowed to utilize the floats adjacent to the dredge area for temporary moorage of a work skiff during project execution to facilitate personnel access to/from the dredge and to facilitate the collection of Water Quality readings?
Response 7:
A skiff may use the small boat piers if needed, typically 2-3 slips are open regularly. The contractor will need to communicate use of the pier to the Construction Manager so they can notify base of who is using the piers.
- END -