This document is Amendment 0001 to Request for Proposal (RFP) 70Z08726RMISC13611688 for the construction of Seward Housing, issued by the U.S. Coast Guard (USCG) Civil Engineering Unit in Juneau, Alaska. The amendment corrects the proposal due date to April 21, 2022, at 1:00 p.m. local time in Juneau, Alaska, and provides answers to seven solicitation questions submitted by prospective contractors. The contracting officer is John W. Wright, and the project number is 13611688. Contractors are required to sign and return a copy of this amendment with their proposal.
The amendment addresses key clarifications regarding the project scope and design specifications. Notable responses include confirmation that the entire roof must be covered with a Self-Adhering Rubberized Membrane (SAM); acceptance of 22 gauge galvalume sheet steel with Kynar 500 coating for metal roofing; confirmation that the foundation waterproofing design basis shall be Bituthene 3000 by Grace Construction Products or equivalent, with 2-inch rigid insulation per project specification Section 07 21 13; clarification that contractors must use the 100% Drawing set for bidding purposes rather than the 95% set; and correction of an interior elevation reference from non-existent page A-402 to sheet I-203. Past Performance Questionnaires from previous solicitations are acceptable for meeting past performance requirements. The amendment incorporates four attachments: USCG Seward Housing Site Visit Photos, SF25 Performance Bond, SF25 Payment Bond, and SF24 Bid Bond.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMEND 0001 RFP 70Z08726RMISC13611688
Construct Seward Housing
Project No. 13611688
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO.
3/12/2026 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
13611688
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
CONTRACT SPECIALIST
USCG, CIVIL ENGINEERING UNIT JUNEAU
709 WEST 9TH STREET, ROOM 817
JUNEAU, AK 99801
CONTRACTING OFFICER
USCG, CIVIL ENGINEERING UNIT JUNEAU
709 WEST 9TH STREET, ROOM 817
JUNEAU, AK 99801
8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTY, STATE AND ZIP CODE) 9A. AMENDMENT OF SOLICITATION NO.
70Z08726RMISC13611688
9B. DATED (SEE ITEM 11)
03/05/2026
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (SPECIFY TYPE OF MODIFICATION AND AUTHORITY)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (ORGANIZED BY UCF SECTION HEADINGS, INCLUDING SOLICITATION/CONTRACT SUBJECT MATTER WHERE FEASIBLE.)
REQUEST FOR PROPOSAL NO. 70Z08726RMISC13611688, Construct Seward Housing.
A. This amendment is issued to provide answers to Solicitation Questions 1-7 submitted by prospective contractors.
B. Incorporated additional attachments.
C. PROPOSAL DUE DATE IS CORRECTED TO APRIL 21, 2022, AT 1:00 P.M. LOCAL TIME JUNEAU, AK.
D. PLEASE RETURN A SIGNED COPY OF THIS AMENDMENT WITH YOUR PROPOSAL.
15A. NAME AND TITLE OF SIGNER (Type or Print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
JOHN W. WRIGHT, CONTRACTING OFFICER, USCG
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
AMEND 0001 RFP 70Z08726RMISC13611688
Construct Seward Housing
Project No. 13611688
Attachments:
Attach 1 USCG Seward Housing Site Visit Photos Attach 2 SF25 Performance Bond Attach 3 SF25 Payment Bond Attach 4 SF24 Bid Bond
Amend 0001: Answers RFI Questions 1-7.
1) Question – clarify RFP due date.
a. Block 13A on SF1442 hereby change to 21 APRIL 2026 1PM AST.
2) Would PPQ’s obtained for a previous solicitation be acceptable for the past performance requirement?
a. Yes, PPQ (Past Performance Questionnaires) used by the offeror on other solicitations may be submitted in response to this solicitation.
3) Sheet A-106 Details H1, H2, & H5, is the intent for the entire roof to be covered with the Rubberized Membrane?
a. Yes, the intent is for the entire roof to be covered with a Self-Adhering Rubberized Membrane (SAM).
4) Spec Section 07 60 00, para 2.2.2 & 2.2.3. Would 22ga steel sheet metal with Kynar 500 coating be acceptable?
a. Yes, a 22 gauge galvalume sheet steel with Kynar 500 coating is acceptable. Kynar coating shall be custom color selectable by customer.
5) Division 7. Can you provide a foundation insulation and waterproofing specification?
a. The Design Basis of the foundation waterproofing membrane system shall be Bituthene 3000 by Grace Construciton Products (GPC) or equivalent. The 2” rigid insulation indicated in the drawings for foundations shall follow the Block or Board Insulation listed in project specification Section 07 21 13.
6) Page A-106 in the Master Bath references to page A-402. This sheet does not exist.
a. The interior elevation tag should reference sheet I-203.
7) What set of drawings should the contractors use for bid? There is a 95% and a 100% set.
a. The Contractor shall use the 100% Drawing set for Bidding purposes.
File details come from the government source that posted it. Updated .