SEQUOIA (WLB 225B) DS FQ4 BGW 24ER1_BLANK.xls

XLS spreadsheet 71 KB Posted

Attached to
USCGC SEQUIOA Post MMA DS FY24
Solicitation number
70Z08524QIBCT0018
Issued by

About this file

This document appears to be a Pricing Schedule for a federal contract opportunity related to dockside repairs for the U.S. Coast Guard Cutter (CGC) SEQUIOA (WLB 215). The contract opportunity, solicitation number 70Z08524QIBCT0018, is for a 225' Seagoing Buoy Tender that requires recurring and emergent maintenance. The contract will be awarded to the responsible offeror whose proposal provides the best value to the government, with technical and past performance factors more important than price. The contract is set aside for 100% Small Business participation. Key requirements include submitting a written warranty statement, listing of subcontractors and qualifications, and providing relevant past performance information. Proposals are due by 8 AM PST on June 6, 2024, and the anticipated award date is on or about June 19, 2024. The Pricing Schedule provides detailed labor category and material pricing for various repair work items.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC SEQUOIA (WLB-225B) Post MMA DOCKSIDE AVAILABILITY FY2024
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Fire Prevention RequirementsJOB1$0.00
D-002Compartment Insulation, General, RenewJOB1$0.00
D-003Compartment Bulkheads and Overheads, Partial PreserveJOB1$0.00
D-004Molded Case Circuit Breakers, Inspect, Maintain & TestJOB1$0.00
D-005Insulated Case Circuit Breakers, Inspect, Maintain & TestJOB1$0.00
D-006Power Circuit Breakers, Inspect, Maintain & TestJOB1$0.00
D-007Joiner Door, RenewJOB1$0.00
O-00AComposite Labor RateHour3000
D-00BGFP ReportNSPEANSP
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00

&C(7/26/2024)

Rev-1 - Page &P of &N

CostEstimateBreakdowns

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
62Baltimore, MD
52Biloxi, MS
56Boston, MA
50Charleston, SC
60Corpus Christi, TX
51Hampton Roads
64Honolulu, HI
55Houston, TX
56Los Angeles, CA
55Median Rate
49Miami
50Narragansett Bay, RI
55New London, CN
45New Orleans
62NYNY
49Panama City, FL
60Philadelphia, PA
51Portland, ME
57Portland, OR
55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE

&C(09/28/2009) Page &P of &N

CostEstimateTemplate

File details come from the government source that posted it. Updated .