9. SEQUOIA (WLB 225B) DS FQ4 BGW 24ER0_BLANK revised.xls

XLS spreadsheet 74 KB Posted

Attached to
USCGC SEQUIOA Post MMA DS FY24
Solicitation number
70Z08524QIBCT0018
Issued by

About this file

This document is a Solicitation for the USCGC SEQUIOA Post MMA DS FY24 federal contract opportunity. The solicitation is for a contractor to provide dockside repairs and maintenance on the U.S. Coast Guard Cutter SEQUIOA (WLB 215), a 225-foot Seagoing Buoy Tender. The work includes fire prevention, compartment insulation, bulkhead and overhead preservation, circuit breaker inspection and maintenance, joiner door renewal, coatings inspection, and deck preservation. The solicitation is a 100% Small Business Set-Aside, and award will be made to the responsible offeror providing the best value based on technical, past performance, and price factors. Offerors must submit a written 60-day warranty statement, list of subcontractors, welders qualifications, property control system, NFPA certified chemists, competent person designation, and qualified sil-brazers. Past performance information is required. Proposals are due by 8 AM PST on June 6, 2024, and the anticipated award date is on or about June 19, 2024.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC SEQUOIA (WLB-225B) DOCKSIDE AVAILABILITY FY2024
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Fire Prevention RequirementsJOB$0.00
D-002Compartment Insulation, General, RenewJOB$0.00
D-003Compartment Bulkheads and Overheads, Partial PreserveJOB$0.00
D-004Molded Case Circuit Breakers, Inspect, Maintain & TestJOB$0.00
D-005Insulated Case Circuit Breakers, Inspect, Maintain & TestJOB$0.00
D-006Power Circuit Breakers, Inspect, Maintain & TestJOB$0.00
D-007Joiner Door, RenewJOB$0.00
D-008Independent Coatings Inspector, ProvideJOB$0.00
D-009Tenting, ProvideJOB$0.00
D-010Decks – Exterior (Buoy or Construction Deck), Preserve 100%JOB$0.00
O-00AComposite Labor RateHour4200
D-00BGFP ReportNSPEANSP
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00

&C(2/6/2024)

Rev-0 - Page &P of &N

CostEstimateBreakdowns

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
62Baltimore, MD
52Biloxi, MS
56Boston, MA
50Charleston, SC
60Corpus Christi, TX
51Hampton Roads
64Honolulu, HI
55Houston, TX
56Los Angeles, CA
55Median Rate
49Miami
50Narragansett Bay, RI
55New London, CN
45New Orleans
62NYNY
49Panama City, FL
60Philadelphia, PA
51Portland, ME
57Portland, OR
55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE

&C(09/28/2009) Page &P of &N

CostEstimateTemplate

File details come from the government source that posted it. Updated .