Price Schedule.xlsx

XLSX spreadsheet 122 KB Posted

Attached to
Controllable Pitch Propeller Blade Set and Monoblock Propeller Overhauls
Solicitation number
70Z08026R21602B00
Issued by

About this file

This is a detailed Price Schedule for a U.S. Coast Guard contract (Solicitation Number 70Z08026R21602B00) for the overhaul of monobloc propellers and Controllable Pitch Propeller (CPP) blade sets. The document outlines pricing for a base year and four option years, covering 21 different specifications groups for various vessel types including 65' WYTL, 140' WTGB, 160' WLIC, 225' WLB, and others. Each specification group includes line items for labor hours, materials, and contingency items such as replacing shipping containers and returning beyond economic repair (BER) propellers.

The pricing structure is consistent across base and option years, with estimated unit quantities ranging from 1 to 17 units per specification group. The contract is administered by the Department of Homeland Security's U.S. Coast Guard, specifically the Medium Endurance Cutter Product Line (MECPL). While the document shows placeholder pricing (with "X" and "$-0" values), it provides a comprehensive framework for potential propeller overhaul and replacement services across multiple vessel classes and propeller configurations. The solicitation appears to be structured to provide flexibility in addressing various propeller maintenance and replacement needs for the Coast Guard's fleet.

View the file

Other files

File Type Posted
70Z08021R21303B00_A00001.pdf PDF
Group 14 and 15_154 (FRC) Propeller Inspection Compliance Forms OVERHAUL and REPAIR R1 - 3-22-2023.pdf PDF
Group 14 and 15_PBPL_WPC-154_LH _ RH_NSN 2010-01-628-0276 and 2010-01-627-9761.pdf PDF
Group 10 and 11_IBCTPL_WLM-175 LH _ RH_NIIN 01F071222 and 01F071221.pdf PDF
Group 2 and 3_IBCTPL_WLIC-WLR 65-75_LH _ RH_NSN 2010-01-534-9095 and 2010-01-534-9089.pdf PDF
Propeller General Requirements for Overhaul and Repair.pdf PDF
Group 20 and 21_MECPL_270_RH _ LH_NSN 2010-01-119-3972 and 2010-01-120-2871.pdf PDF
Group 12 and 13_87 Propeller Inspection Compliance Forms (FINAL R1).pdf PDF
Group 7 and 8_IBCTPL_WLIC-160_LH _ RH_NSN 2010-01-036-7597 and 2010-01-037-7295.pdf PDF
70Z08026R21602B00_PROPELLER BLADES Solicitation.pdf PDF
Group 12 and 13_PBPL_WPB-87_LH _ RH_NSN 2010-01-459-0421 and 2010-01-457-0573.pdf PDF
Group 18 and 19_MECPL_210B_LH _ RH_NSN 2010-01-134-0378 and 2010-01-134-7238.pdf PDF
Group 16 and 17_MECPL_210A_LH _ RH_NSN2010-00-906-6010 and 2010-00-906-6009.pdf PDF
Group 4 and 5_IBCTPL_WLR-75F_RH _ LH_NSN 2010-01-501-5459 and 2010-01-501-5465.pdf PDF
Group 9_IBCTPL_WLB-225_NSN 2010-01-421-8904.pdf PDF
Group 6_IBCTPL_WTGB-140_NSN 2010-01-078-8216.pdf PDF
Group 1_IBCTPL_WYTL-65_NSN 2010-01-482-6135.pdf PDF
Price Schedule.xlsx XLSX spreadsheet
70Z08026R21602B00_Amendment 00002.pdf PDF
Propeller Diameter_Number of Blades.pdf PDF
70Z08021R21303B00_Amendment 00001.pdf PDF
70Z08026R21602B00_PROPELLER BLADES Solicitation.pdf PDF
Price Schedule_Propeller Blades.pdf PDF
Consolidated Specification_Propeller.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Year 70Z08026R21602B00

BASE YEAR

IBCT, 65' WYTL, NIIN 014826135, Specs Group 1
CLINEstimated (Est.) Number (No.) of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0001X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0001A200X=$ - 0X1=$ - 0
0001BCost of Materials, Not to Exceed (NTE)=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 65' WYTL PROPELLER
0001CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
0001DReturn Beyond Economic Repair (BER) propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
IBCT, 65-75' WLIC-WLR RH, NIIN 015349089, Specs Group2
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0002X=$ - 0X4=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0002A200X=$ - 0X4=$ - 0
0002BCost of Materials, NTE=X4=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 65-75' WLIC-WLR RH PROPELLER
0002CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X4=$ - 0
0002DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X4=$ - 0
IBCT, 65-75' WLIC-WLR LH, NIIN 015349-95, Specs Group 3
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0003X=$ - 0X4=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0003A200X=$ - 0X4=$ - 0
0003BCost of Materials, NTE=X4=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 65-75' WLIC-WLR LH PROPELLER
0003CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X4=$ - 0
0003DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X4=$ - 0
IBCT, 75' WLR RH, NIIN 015015459, Specs Group 4
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0004X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0004A225X=$ - 0X1=$ - 0
0004BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 75' WLR RH PROPELLER
0004CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
0004DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
IBCT, 75' WLR LH, NIIN 015015459, Specs Group 5
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0005X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0005A225X=$ - 0X1=$ - 0
0005BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 75' WLR PROPELLER
0005CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
0005DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
IBCT, 140' WTGB, NIIN 010788216, Specs Group 6
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0006X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0006A500X=$ - 0X1=$ - 0
0006BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 140' WTGB PROPELLER
0006CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
0006DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
IBCT, 160' WLIC RH, NIIN 010377295, Specs Group 7
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0007X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0007A250X=$ - 0X1=$ - 0
0007BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 160' WLIC RH PROPELLER
0007CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
0007DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
IBCT, 160' WLIC LH, NIIN 010367597, Specs Group 8
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0008X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0008A250X=$ - 0X1=$ - 0
0008BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 160' WLIC LH PROPELLER
0008CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
0008DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
IBCT, 225' WLB, NIIN 014218904, Specs Group 9
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0009X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0009A500X=$ - 0X1=$ - 0
0009BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 225' WLB PROPELLER
0009CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
0009DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
IBCT, 175' WLM LH, NIIN 01F071221, Spec Group 10
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0010X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0010A300X=$ - 0X1=$ - 0
0010BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 87' WPB RH PROPELLER
0010CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
0010DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
IBCT, 175' WLM RH, NIIN 01F071222, Spec Group 11
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0011X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0011A300X=$ - 0X1=$ - 0
0011BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 87' WPB LH PROPELLER
0011CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
0011DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
PB, 87' WPB TH, NIIN 14570573, Spec Group 12
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0012X=$ - 0X10=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0012A150X=$ - 0X10=$ - 0
0012BCost of Materials, NTE=X10=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 110' WPB RH PROPELLER
0012CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X6=$ - 0
0012DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X6=$ - 0
PB, 87' WPB LH, NIIN 14590421, Spec Group 13
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0013X=$ - 0X10=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0013A150X=$ - 0X10=$ - 0
0013BCost of Materials, NTE=X10=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 110' WPB LH PROPELLER
0013CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X6=$ - 0
0013DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X6=$ - 0
PB, 154' WPC RH, NIIN 16279761, Spec Group 14
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0014X=$ - 0X13=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0014A265X=$ - 0X13=$ - 0
0014BCost of Materials, NTE=X13=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 210'A RH CPP Blade Set
0014CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X13=$ - 0
0014DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X13=$ - 0
PB, 154' WPC LH, NIIN 16280276, Spec Group 15
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0015X=$ - 0X13=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0015A265X=$ - 0X13=$ - 0
0015BCost of Materials, NTE=X13=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 210'A LH CPP Blade Set
0015CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X13=$ - 0
0015DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X13=$ - 0
MEC, 210 A RH, NIIN 9066009, Spec Group 16
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0016X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0016A700X=$ - 0X1=$ - 0
0016BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 210'B RH CPP Blade Set
0016CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
0016DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
MEC, 210 A LH, NIIN 9066010, Spec Group 17
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0017X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0017A700X=$ - 0X1=$ - 0
0017BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 210'B LH CPP Blade Set
0017CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
0017DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
210 B RH, NIIN 11347238, Spec Group 18
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0018X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0018A709X=$ - 0X1=$ - 0
0018BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 270' RH CPP Blade Set
0018CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
0018DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
210 B LH, NIIN 11340378, Spec Group 19
CLINEst. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0019X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0019A709X=$ - 0X1=$ - 0
0019BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 270' LH CPP Blade Set
0019CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
0019DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
270 LH, NIIN 11193972 , Spec Group 20
CLINEst. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0020X=$ - 0X4=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0020A750X=$ - 0X4=$ - 0
0020BCost of Materials, NTE=X4=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 270' LH CPP Blade Set
0020CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X4=$ - 0
0020DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X4=$ - 0
270 LH, NIIN 11202871, Spec Group 21
CLINEst. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0021X=$ - 0X4=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
0021A750X=$ - 0X4=$ - 0
0021BCost of Materials, NTE=X4=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 270' LH CPP Blade Set
0021CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X4=$ - 0
0021DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X4=$ - 0

ESTIMATED TOTAL BASE YEAR $ - 0

OY1

70Z08026R21602B00

OPTION YEAR 1

IBCT, 65' WYTL, NIIN 014826135, Specs Group 1
CLINEstimated (Est.) Number (No.) of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1001X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1001A200X=$ - 0X1=$ - 0
1001BCost of Materials, Not to Exceed (NTE)=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 65' WYTL PROPELLER
1001CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
1001DReturn Beyond Economic Repair (BER) propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
IBCT, 65-75' WLIC-WLR RH, NIIN 015349089, Specs Group2
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1002X=$ - 0X4=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1002A200X=$ - 0X4=$ - 0
1002BCost of Materials, NTE=X4=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 65-75' WLIC-WLR RH PROPELLER
1002CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X4=$ - 0
1002DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X4=$ - 0
IBCT, 65-75' WLIC-WLR LH, NIIN 015349-95, Specs Group 3
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1003X=$ - 0X4=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1003A200X=$ - 0X4=$ - 0
1003BCost of Materials, NTE=X4=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 65-75' WLIC-WLR LH PROPELLER
1003CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X4=$ - 0
1003DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X4=$ - 0
IBCT, 75' WLR RH, NIIN 015015459, Specs Group 4
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1004X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1004A225X=$ - 0X1=$ - 0
1004BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 75' WLR RH PROPELLER
1004CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
1004DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
IBCT, 75' WLR LH, NIIN 015015459, Specs Group 5
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1005X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1005A225X=$ - 0X1=$ - 0
1005BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 75' WLR PROPELLER
1005CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
1005DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
IBCT, 140' WTGB, NIIN 010788216, Specs Group 6
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1006X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1006A500X=$ - 0X1=$ - 0
1006BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 140' WTGB PROPELLER
1006CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
1006DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
IBCT, 160' WLIC RH, NIIN 010377295, Specs Group 7
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1007X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1007A250X=$ - 0X1=$ - 0
1007BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 160' WLIC RH PROPELLER
1007CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
1007DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
IBCT, 160' WLIC LH, NIIN 010367597, Specs Group 8
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1008X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1008A250X=$ - 0X1=$ - 0
1008BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 160' WLIC LH PROPELLER
1008CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
1008DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
IBCT, 225' WLB, NIIN 014218904, Specs Group 9
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1009X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1009A500X=$ - 0X1=$ - 0
1009BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 225' WLB PROPELLER
1009CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
1009DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
IBCT, 175' WLM LH, NIIN 01F071221, Spec Group 10
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1010X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1010A300X=$ - 0X1=$ - 0
1010BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 87' WPB RH PROPELLER
1010CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
1010DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
IBCT, 175' WLM RH, NIIN 01F071222, Spec Group 11
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1011X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1011A300X=$ - 0X1=$ - 0
1011BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 87' WPB LH PROPELLER
1011CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
1011DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
PB, 87' WPB TH, NIIN 14570573, Spec Group 12
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1012X=$ - 0X10=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1012A150X=$ - 0X10=$ - 0
1012BCost of Materials, NTE=X10=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 110' WPB RH PROPELLER
1012CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X6=$ - 0
1012DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X6=$ - 0
PB, 87' WPB LH, NIIN 14590421, Spec Group 13
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1013X=$ - 0X10=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1013A150X=$ - 0X10=$ - 0
1013BCost of Materials, NTE=X10=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 110' WPB LH PROPELLER
1013CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X6=$ - 0
1013DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X6=$ - 0
PB, 154' WPC RH, NIIN 16279761, Spec Group 14
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1014X=$ - 0X15=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1014A265X=$ - 0X15=$ - 0
1014BCost of Materials, NTE=X15=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 210'A RH CPP Blade Set
1014CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X15=$ - 0
1014DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X15=$ - 0
PB, 154' WPC LH, NIIN 16280276, Spec Group 15
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1015X=$ - 0X15=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1015A265X=$ - 0X15=$ - 0
1015BCost of Materials, NTE=X15=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 210'A LH CPP Blade Set
1015CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X15=$ - 0
1015DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X15=$ - 0
MEC, 210 A RH, NIIN 9066009, Spec Group 16
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1016X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1016A700X=$ - 0X1=$ - 0
1016BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 210'B RH CPP Blade Set
1016CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
1016DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
MEC, 210 A LH, NIIN 9066010, Spec Group 17
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1017X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1017A700X=$ - 0X1=$ - 0
1017BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 210'B LH CPP Blade Set
1017CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
1017DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
210 B RH, NIIN 11347238, Spec Group 18
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1018X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1018A709X=$ - 0X1=$ - 0
1018BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 270' RH CPP Blade Set
1018CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
1018DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
210 B LH, NIIN 11340378, Spec Group 19
CLINEst. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1019X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1019A709X=$ - 0X1=$ - 0
1019BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 270' LH CPP Blade Set
1019CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
1019DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
270 LH, NIIN 11193972 , Spec Group 20
CLINEst. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1020X=$ - 0X4=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1020A750X=$ - 0X4=$ - 0
1020BCost of Materials, NTE=X4=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 270' LH CPP Blade Set
1020CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X4=$ - 0
1020DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X4=$ - 0
270 LH, NIIN 11202871, Spec Group 21
CLINEst. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1021X=$ - 0X4=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
1021A750X=$ - 0X4=$ - 0
1021BCost of Materials, NTE=X4=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 270' LH CPP Blade Set
1021CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X4=$ - 0
1021DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X4=$ - 0

ESTIMATED TOTAL OPTION YEAR 1 $ - 0

OY2

70Z08026R21602B00

OPTION YEAR 2

IBCT, 65' WYTL, NIIN 014826135, Specs Group 1
CLINEstimated (Est.) Number (No.) of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2001X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2001A200X=$ - 0X1=$ - 0
2001BCost of Materials, Not to Exceed (NTE)=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 65' WYTL PROPELLER
2001CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
2001DReturn Beyond Economic Repair (BER) propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
IBCT, 65-75' WLIC-WLR RH, NIIN 015349089, Specs Group2
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2002X=$ - 0X4=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2002A200X=$ - 0X4=$ - 0
2002BCost of Materials, NTE=X4=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 65-75' WLIC-WLR RH PROPELLER
2002CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X4=$ - 0
2002DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X4=$ - 0
IBCT, 65-75' WLIC-WLR LH, NIIN 015349-95, Specs Group 3
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2003X=$ - 0X4=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2003A200X=$ - 0X4=$ - 0
2003BCost of Materials, NTE=X4=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 65-75' WLIC-WLR LH PROPELLER
2003CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X4=$ - 0
2003DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X4=$ - 0
IBCT, 75' WLR RH, NIIN 015015459, Specs Group 4
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2004X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2004A225X=$ - 0X1=$ - 0
2004BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 75' WLR RH PROPELLER
2004CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
2004DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
IBCT, 75' WLR LH, NIIN 015015459, Specs Group 5
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2005X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2005A225X=$ - 0X1=$ - 0
2005BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 75' WLR PROPELLER
2005CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
2005DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
IBCT, 140' WTGB, NIIN 010788216, Specs Group 6
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2006X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2006A500X=$ - 0X1=$ - 0
2006BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 140' WTGB PROPELLER
2006CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
2006DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
IBCT, 160' WLIC RH, NIIN 010377295, Specs Group 7
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2007X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2007A250X=$ - 0X1=$ - 0
2007BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 160' WLIC RH PROPELLER
2007CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
2007DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
IBCT, 160' WLIC LH, NIIN 010367597, Specs Group 8
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2008X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2008A250X=$ - 0X1=$ - 0
2008BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 160' WLIC LH PROPELLER
2008CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
2008DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
IBCT, 225' WLB, NIIN 014218904, Specs Group 9
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2009X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2009A500X=$ - 0X1=$ - 0
2009BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 225' WLB PROPELLER
2009CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
2009DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
IBCT, 175' WLM LH, NIIN 01F071221, Spec Group 10
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2010X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2010A300X=$ - 0X1=$ - 0
2010BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 87' WPB RH PROPELLER
2010CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
2010DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
IBCT, 175' WLM RH, NIIN 01F071222, Spec Group 11
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2011X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2011A300X=$ - 0X1=$ - 0
2011BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 87' WPB LH PROPELLER
2011CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
2011DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
PB, 87' WPB TH, NIIN 14570573, Spec Group 12
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2012X=$ - 0X10=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2012A150X=$ - 0X10=$ - 0
2012BCost of Materials, NTE=X10=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 110' WPB RH PROPELLER
2012CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X6=$ - 0
2012DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X6=$ - 0
PB, 87' WPB LH, NIIN 14590421, Spec Group 13
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2013X=$ - 0X10=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2013A150X=$ - 0X10=$ - 0
2013BCost of Materials, NTE=X10=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 110' WPB LH PROPELLER
2013CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X6=$ - 0
2013DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X6=$ - 0
PB, 154' WPC RH, NIIN 16279761, Spec Group 14
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2014X=$ - 0X15=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2014A265X=$ - 0X15=$ - 0
2014BCost of Materials, NTE=X15=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 210'A RH CPP Blade Set
2014CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X15=$ - 0
2014DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X15=$ - 0
PB, 154' WPC LH, NIIN 16280276, Spec Group 15
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2015X=$ - 0X15=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2015A265X=$ - 0X15=$ - 0
2015BCost of Materials, NTE=X15=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 210'A LH CPP Blade Set
2015CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X15=$ - 0
2015DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X15=$ - 0
MEC, 210 A RH, NIIN 9066009, Spec Group 16
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2016X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2016A700X=$ - 0X1=$ - 0
2016BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 210'B RH CPP Blade Set
2016CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
2016DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
MEC, 210 A LH, NIIN 9066010, Spec Group 17
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2017X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2017A700X=$ - 0X1=$ - 0
2017BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 210'B LH CPP Blade Set
2017CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
2017DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
210 B RH, NIIN 11347238, Spec Group 18
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2018X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2018A709X=$ - 0X1=$ - 0
2018BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 270' RH CPP Blade Set
2018CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
2018DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
210 B LH, NIIN 11340378, Spec Group 19
CLINEst. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2019X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2019A709X=$ - 0X1=$ - 0
2019BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 270' LH CPP Blade Set
2019CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
2019DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
270 LH, NIIN 11193972 , Spec Group 20
CLINEst. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2020X=$ - 0X4=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2020A750X=$ - 0X4=$ - 0
2020BCost of Materials, NTE=X4=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 270' LH CPP Blade Set
2020CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X4=$ - 0
2020DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X4=$ - 0
270 LH, NIIN 11202871, Spec Group 21
CLINEst. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2021X=$ - 0X4=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
2021A750X=$ - 0X4=$ - 0
2021BCost of Materials, NTE=X4=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 270' LH CPP Blade Set
2021CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X4=$ - 0
2021DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X4=$ - 0

ESTIMATED TOTAL OPTION YEAR 2 $ - 0

OY3

70Z08026R21602B00

OPTION YEAR 3

IBCT, 65' WYTL, NIIN 014826135, Specs Group 1
CLINEstimated (Est.) Number (No.) of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3001X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3001A200X=$ - 0X1=$ - 0
3001BCost of Materials, Not to Exceed (NTE)=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 65' WYTL PROPELLER
3001CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
3001DReturn Beyond Economic Repair (BER) propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
IBCT, 65-75' WLIC-WLR RH, NIIN 015349089, Specs Group2
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3002X=$ - 0X4=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3002A200X=$ - 0X4=$ - 0
3002BCost of Materials, NTE=X4=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 65-75' WLIC-WLR RH PROPELLER
3002CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X4=$ - 0
3002DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X4=$ - 0
IBCT, 65-75' WLIC-WLR LH, NIIN 015349-95, Specs Group 3
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3003X=$ - 0X4=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3003A200X=$ - 0X4=$ - 0
3003BCost of Materials, NTE=X4=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 65-75' WLIC-WLR LH PROPELLER
3003CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X4=$ - 0
3003DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X4=$ - 0
IBCT, 75' WLR RH, NIIN 015015459, Specs Group 4
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3004X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3004A225X=$ - 0X1=$ - 0
3004BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 75' WLR RH PROPELLER
3004CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
3004DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
IBCT, 75' WLR LH, NIIN 015015459, Specs Group 5
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3005X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3005A225X=$ - 0X1=$ - 0
3005BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 75' WLR PROPELLER
3005CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
3005DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
IBCT, 140' WTGB, NIIN 010788216, Specs Group 6
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3006X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3006A500X=$ - 0X1=$ - 0
3006BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 140' WTGB PROPELLER
3006CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
3006DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
IBCT, 160' WLIC RH, NIIN 010377295, Specs Group 7
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3007X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3007A250X=$ - 0X1=$ - 0
3007BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 160' WLIC RH PROPELLER
3007CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
3007DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
IBCT, 160' WLIC LH, NIIN 010367597, Specs Group 8
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3008X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3008A250X=$ - 0X1=$ - 0
3008BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 160' WLIC LH PROPELLER
3008CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
3008DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
IBCT, 225' WLB, NIIN 014218904, Specs Group 9
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3009X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3009A500X=$ - 0X1=$ - 0
3009BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 225' WLB PROPELLER
3009CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
3009DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
IBCT, 175' WLM LH, NIIN 01F071221, Spec Group 10
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3010X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3010A300X=$ - 0X1=$ - 0
3010BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 87' WPB RH PROPELLER
3010CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
3010DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
IBCT, 175' WLM RH, NIIN 01F071222, Spec Group 11
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3011X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3011A300X=$ - 0X1=$ - 0
3011BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 87' WPB LH PROPELLER
3011CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
3011DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
PB, 87' WPB TH, NIIN 14570573, Spec Group 12
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3012X=$ - 0X10=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3012A150X=$ - 0X10=$ - 0
3012BCost of Materials, NTE=X10=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 110' WPB RH PROPELLER
3012CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X6=$ - 0
3012DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X6=$ - 0
PB, 87' WPB LH, NIIN 14590421, Spec Group 13
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3013X=$ - 0X10=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3013A150X=$ - 0X10=$ - 0
3013BCost of Materials, NTE=X10=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 110' WPB LH PROPELLER
3013CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X6=$ - 0
3013DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X6=$ - 0
PB, 154' WPC RH, NIIN 16279761, Spec Group 14
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3014X=$ - 0X17=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3014A265X=$ - 0X17=$ - 0
3014BCost of Materials, NTE=X17=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 210'A RH CPP Blade Set
3014CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X17=$ - 0
3014DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X17=$ - 0
PB, 154' WPC LH, NIIN 16280276, Spec Group 15
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3015X=$ - 0X17=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3015A265X=$ - 0X17=$ - 0
3015BCost of Materials, NTE=X17=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 210'A LH CPP Blade Set
3015CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X17=$ - 0
3015DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X17=$ - 0
MEC, 210 A RH, NIIN 9066009, Spec Group 16
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3016X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3016A700X=$ - 0X1=$ - 0
3016BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 210'B RH CPP Blade Set
3016CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
3016DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
MEC, 210 A LH, NIIN 9066010, Spec Group 17
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3017X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3017A700X=$ - 0X1=$ - 0
3017BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 210'B LH CPP Blade Set
3017CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
3017DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
210 B RH, NIIN 11347238, Spec Group 18
CLINEst. Number No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3018X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3018A709X=$ - 0X1=$ - 0
3018BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 270' RH CPP Blade Set
3018CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
3018DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
210 B LH, NIIN 11340378, Spec Group 19
CLINEst. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3019X=$ - 0X1=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3019A709X=$ - 0X1=$ - 0
3019BCost of Materials, NTE=X1=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 270' LH CPP Blade Set
3019CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
3019DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X1=$ - 0
270 LH, NIIN 11193972 , Spec Group 20
CLINEst. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3020X=$ - 0X4=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3020A750X=$ - 0X4=$ - 0
3020BCost of Materials, NTE=X4=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 270' LH CPP Blade Set
3020CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X4=$ - 0
3020DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X4=$ - 0
270 LH, NIIN 11202871, Spec Group 21
CLINEst. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3021X=$ - 0X4=$ - 0
Est. No. of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal
3021A750X=$ - 0X4=$ - 0
3021BCost of Materials, NTE=X4=$ - 0
Total Unit Price=$ - 0Total CLIN Price=$ - 0
CONTINGENCY ITEMS, 270' LH CPP Blade Set
3021CReplace shipping containerUnit PriceEst. No. of UnitsTotal
=X4=$ - 0
3021DReturn BER propellerUnit PriceEst. No. of UnitsTotal
=X4=$ - 0

ESTIMATED TOTAL OPTION YEAR 3 $ - 0

OY4

70Z08026R21602B00

OPTION YEAR 4

IBCT, 65' WYTL, NIIN 014826135, Specs Group 1
CLINEstimated (Est.) Number (No.) of HoursLoaded Labor RateUnit PriceEst. No. of UnitsTotal

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .