Group 1_IBCTPL_WYTL-65_NSN 2010-01-482-6135.pdf

PDF 320 KB Posted

Attached to
Controllable Pitch Propeller Blade Set and Monoblock Propeller Overhauls
Solicitation number
70Z08026R21602B00
Issued by

About this file

This is a Statement of Work (SOW) defining requirements for the overhaul and repair of U.S. Coast Guard 65-foot Light Harbor Tug right-hand propellers to A-condition (serviceable status). The work item covers a single propeller type (NSN: 2010-01-482-6135, P/N: 4B56Dx46P-RH) that will be government-furnished property issued by the USCG Surface Forces Logistics Center (SFLC) in Baltimore, Maryland.

The contractor must perform comprehensive inspections, repairs, and overhaul per ISO 484/2 Class II standards and Coast Guard Drawing 65B-WYT-4400-3. Key inspection requirements include arrival inspection, visual preservation inspection, geometrical and dimensional measurements (blade radius, pitch, thickness, track, and fairness), surface finish surveys, and nondestructive dye penetrant testing. Surface finish specifications require 63 micro inches or better on blade surfaces from 0.2 radius to tip, and 125 micro inches or better on fillets and hubs. Authorized repairs must follow ISO 484/2 Class II tolerances, with critical restrictions on welding between the 0.2 and 0.25 radii requiring prior Contracting Officer (KO) approval. The contractor must perform single-plane balancing per MIL-STD-167-1A with residual imbalance calculated using the formula U = 4000W/N². Final work includes stamping propellers with repair facility name, completion date, serial number, material type, and weight. All inspections and measurements must be documented in an Open and Inspect Report and Final Inspection Report. Photography is required throughout the process, and Coast Guard SFLC Quality Assurance inspection must be scheduled with 10-calendar day advance notice prior to preservation and packaging.

View the file

Other files

File Type Posted
70Z08021R21303B00_A00001.pdf PDF
Propeller General Requirements for Overhaul and Repair.pdf PDF
Group 14 and 15_154 (FRC) Propeller Inspection Compliance Forms OVERHAUL and REPAIR R1 - 3-22-2023.pdf PDF
Group 10 and 11_IBCTPL_WLM-175 LH _ RH_NIIN 01F071222 and 01F071221.pdf PDF
Group 20 and 21_MECPL_270_RH _ LH_NSN 2010-01-119-3972 and 2010-01-120-2871.pdf PDF
Group 16 and 17_MECPL_210A_LH _ RH_NSN2010-00-906-6010 and 2010-00-906-6009.pdf PDF
Group 4 and 5_IBCTPL_WLR-75F_RH _ LH_NSN 2010-01-501-5459 and 2010-01-501-5465.pdf PDF
Group 12 and 13_87 Propeller Inspection Compliance Forms (FINAL R1).pdf PDF
Group 9_IBCTPL_WLB-225_NSN 2010-01-421-8904.pdf PDF
Group 6_IBCTPL_WTGB-140_NSN 2010-01-078-8216.pdf PDF
Group 7 and 8_IBCTPL_WLIC-160_LH _ RH_NSN 2010-01-036-7597 and 2010-01-037-7295.pdf PDF
Group 2 and 3_IBCTPL_WLIC-WLR 65-75_LH _ RH_NSN 2010-01-534-9095 and 2010-01-534-9089.pdf PDF
Group 14 and 15_PBPL_WPC-154_LH _ RH_NSN 2010-01-628-0276 and 2010-01-627-9761.pdf PDF
Group 18 and 19_MECPL_210B_LH _ RH_NSN 2010-01-134-0378 and 2010-01-134-7238.pdf PDF
Group 12 and 13_PBPL_WPB-87_LH _ RH_NSN 2010-01-459-0421 and 2010-01-457-0573.pdf PDF
Price Schedule.xlsx XLSX spreadsheet
70Z08026R21602B00_PROPELLER BLADES Solicitation.pdf PDF
70Z08026R21602B00_Amendment 00002.pdf PDF
Propeller Diameter_Number of Blades.pdf PDF
70Z08021R21303B00_Amendment 00001.pdf PDF
Price Schedule.xlsx XLSX spreadsheet
Price Schedule_Propeller Blades.pdf PDF
70Z08026R21602B00_PROPELLER BLADES Solicitation.pdf PDF
Consolidated Specification_Propeller.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

24599_065_1225_Rev -

Work Item 1: Propeller, Overhaul, 65 WYTL

1. SCOPE

1.1 Intent – This work item defines the requirements to inspect and overhaul U.S. Coast Guard 65’ Light

Harbor Tug right-hand propellers to a serviceable, A-condition.

1.2 Government furnished property (GFP). The listed items are property of and managed by the United

States Coast Guard (USCG) Surface Forces Logistics Center (SFLC), Baltimore MD and will be issued to the contractor as issuance of a contract or contract delivery order.

ITEM DESCRIPTION NATIONAL STOCK NUMBER (NSN)

PART NUMBER (P/N)

Propeller, Right-Hand (RH) NSN: 2010-01-482-6135

P/N: 4B56Dx46P-RH

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 65B-WYT-4400-3, Rev C, 65 FT WYTL All Classes Propeller

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes

OTHER REFERENCES

American Bureau of Shipbuilding (ABS) Rules for Survey After Construction 2021 - Guide for

Bronze and Stainless-Steel Propeller Castings, Part 7 Appendix 1, Section 10

ASTM E1417/E1417M, Dated 9/1/2021 – Standard Practice for Liquid Penetrant Testing

DOD-STD-2185 (SH) – Requirements for Repair and Straightening of Bronze Naval Ship

Propellers

International Standard ISO 484/2, Shipbuilding – Ship Screw Propellers – Manufacturing

Tolerances

MIL-STD-167-1A, Department of Defense Test Method Equipment, Mechanical Vibrations of

Shipboard Equipment

SAE-J-448A - Surface Texture Standard

3. REQUIREMENTS

3.1 General.

3.1.1 Inspection, repair and overhaul - general. All inspections, repairs and overhaul must be accomplished in accordance with the requirements set within this work item.

3.1.2 Workmanship. Upon completion of all work, all propellers must have a polished, professional finish and be free of dirt, grease, burrs, sharp edges, etc.

3.2 Inspections. Referring to the General Requirements work item for guidance, for each blade set received, the Contractor must accomplish the following inspections and submit an Open and Inspect

Report (OIR) on all of the following:

NOTE

The OIR must include all results from the inspections and measurements under 3.2 and follow-on paragraphs.

3.2.1 Arrival inspection.

3.2.2 Visual Preservation Inspection (VPI).

3.2.3 Visual and Technical Inspections (VTI). The Contractor must conduct all inspections required under paragraph 3.2.4 and follow-on paragraphs.

3.2.4 Geometrical/dimensional inspections. Prior to overhaul/repair, while using Coast Guard Drawing

65 WYTL 4400-3 as guidance, the Contractor must conduct the following inspections and measurements, recording all results and deviations outside of prescribed tolerances.

NOTE

ISO 484/2, Class II is the guiding document for the inspections and repairs to be made. Class II measurements and tolerances apply unless explicitly stated otherwise.

3.2.4.1 Blade radius length. Measure each blade radius length.

3.2.4.2 Section pitch. Measure the pitch of each blade at the following radii: 0.5, 0.6, 0.7, 0.8, 0.9, and

0.95.

3.2.4.3 Blade pitch average. Calculate the average blade pitch using the radii prescribed in the above paragraph.

3.2.4.4 Blade section widths. Measure each blade section width at the radii prescribed in 3.2.4.2.

3.2.4.5 Maximum blade thicknesses. Measure the maximum blade thicknesses at the radii prescribed in

3.2.4.2.

3.2.4.6 Blade track. Measure each blade track at the 0.95 radius for each blade.

3.2.4.7 Fairness. Conduct a fairing survey for each blade, noting all locations and deviations from the prescribed fairness and fairness rate of change tolerances.

3.2.4.8 Surface finish. Using SFLC Std Spec 0740 as guidance, conduct a surface finish survey for all blade surfaces, fillets and palms.

3.2.4.8.1 Blade surfaces from R 0.2 to the tip must have a finish of 63 micro inches or better.

3.2.4.8.2 Blade fillets and hubs must be 125 micro inches or better.

3.2.4.9 Surface inspections. Using SFLC Std Spec 0740 and ABS Part 7, Section 10, Table for acceptance criteria, conduct the following:

3.2.4.9.1 Surface inspection – visual. Conduct a visual inspection of each propeller as guidance; markup and report all discrepant physical condition findings on the form provided in Section 4.

3.2.4.9.2 Surface inspection – Nondestructive test (NDT). Conduct a dye penetrant inspection on all component surfaces, including the hubs.

3.2.4.9.3 Surface inspection reports. Markup and report all discrepant visual and NDT findings on the forms (blades) provided in Section 4 for each surface inspected.

NOTE

The Section 4 forms are provided for convenience and the Contractor may opt to use clearer forms in their submission.

3.3 Overhaul/repair. If a Change Request has been authorized and released by the KO, the Contractor must make all recommended repairs (or as amended by the KO) for the affected blade(s) in accordance with the following:

3.3.1 Tolerances. The repair tolerances must be in accordance with ISO 484/2, Class II in conjunction with Coast Guard Drawing 65 WYTL 4400-3.

3.3.2 Welding specifics.

3.3.2.1 Critical blade areas are described as the pressure face of a blade between the fillet and the .4 radius, starting at the leading edge encompassing 80% of the chord length taken at the 0.4 radius (see

Figure 1 of DOD-STD-2185).

WARNING!

Welding required between the 0.2 and 0.25 radii must not be taken without prior KO approval.

3.3.2.3 All welding performed must be documented on the visual inspection sheets for each blade; each weld must be dimensionally identified by location, length, width, and depth.

3.3.2.6 Provide photo documentation to the KO during in-process welding repairs and any discontinuities during dye penetrant inspection.

3.3.2.6.1 Each photograph shall include the component serial number and date the photograph was taken.

3.3.2.6.2 Color photographs must be taken with a digital camera and the images provided electronically in

“jpg format” to the KO during:

3.3.3 Surface finish. Blade surfaces must be ground fair and polished to the following finishes in accordance with SAE-J-448A:

• Blade surfaces from 0.2R to tip – 63 micro inches Ra;

• Hub exterior surfaces – 125 micro inches Ra.

• Remove all high spots, burrs, abrasions, knicks, corrosion/oxidation, and foreign matter from the propeller keyways, glands, hub bores, flanges and mating surfaces.

• Chase and tap exposed threaded areas where necessary

3.3.4 Balancing. Each propeller must be single plane balanced in accordance with MIL-STD-167-1A, paragraph 5.2.2.2 and as follows:

NOTE

All balancing must be accomplished by means of balancing equipment that requires work piece rotation.

3.3.4.1 Prior to performing any balance tests, the Contractor must demonstrate the balance machine sensitivity using a weight determined by the following formula:

Ws = 0.1(U)/r

• Where, Ws = sensitivity weight

• U = residual unbalance tolerance;

• r = radial location of the weight.

NOTE

Weight addition/removal shall be easily detected and discernable to the balance machine operator.

Material removed to balance shall be taken from the suction face of the heavy blade(s).

For blades, the area from which metal is taken must not come from within 10 percent of the chord length adjacent to the leading or trailing edges.

Any material alterations effect must not exceed any dimensional/geometrical tolerances.

3.3.4.2 Document the final, actual unbalance amount for each blade set in the Final Inspection Report.

3.3.5 Residual imbalance. The residual imbalance in each component plane of correction must not exceed the value calculated via the following formula:

U = 4000W/N2

• Where, U = maximum allowable residual unbalance in oz.-in;

• W = weight of rotating part in pounds;

• N = maximum operating speed of unit.

3.4 Final nspection and report. The Contractor shall accomplish the following:

NOTE

Final inspections, tests and/or measurements that were not affected by repairs, and previously recorded in the OIR, are not required to be redone. However, the Final Inspection Report must include all the unaffected pre-repair data as post repair data.

3.4.1 In areas affected by repairs, again conduct the applicable inspections under 3.2.4 and follow-on paragraphs for the final inspections and tests.

3.4.2 Provide the final inspection and test results to the KO in the Final Inspection Report, including the final balancing data.

3.5 Stamping. Following all repairs, the Contractor must accomplish the following:

3.5.1 Each propeller must be stamped with the following information (minimum), updated where necessary if the stamping already exists:

a. Repair facility/company name

b. Repair completion date

c. Propeller serial number

f. RH

g. Material type

h. Weight

3.5.2 Stamping must be be at least 1/4” high, legible printing, or the same height of the existing stamping if only corrected stamping is required.

3.6 QA inspection.

3.6.1 Following KO acceptance and approval of the Final Inspection Report and prior to conducting any preservation, packing and packaging, the Contractor must schedule the Coast Guard SFLC QA inspection.

3.6.2 A copy of the Final Inspection Report must be provided to the Coast Guard QA Representative upon arrival for final inspection.

3.6.3 The KO must be given 10-calendar day advance notice ahead of desired inspection date.

3.7 Photography requirements. The Contractor shall provide photographs (.jpg format or similar) for the following evolutions:

3.7.1 During initial propeller receipt; photos must show the suction and pressure faces, fillets and hubs, plus four photographs of the shipping crate sides and top taken at 90° intervals.

3.7.2 Prior to damaged area repairs affecting remarkable cost and/or time; close-up views showing the affected areas before and after those repairs must be provided.

3.7.3 Pre-repair, failed NDT areas.

3.7.4 In-process repairs in areas requiring significant welding and/or machining.

3.7.5 Following final inspection and prior to preservation/packaging, photograph suction and pressure sides of blade(s), hub(s), surface texture/finish, including stamped markings.

3.7.6 Prior to packing, photograph each propeller showing strippable compound application and installed blade edge protection.

3.7.7 Prior to shipping, photograph all container markings.

4. NOTES

4.1 Post-repair/overhaul activities. Refer to the General Requirements work item, Section 5, for the preservation, packaging, packing, and shipping requirements.

4.2 Reference sources. Refer to General Requirements work item, Section 6, for referenced document sources.

4.3 Blade and hub image.

Pressure side _____ Suction side _____

5. Supplementary Requirements and Information

NOTE

This information is specific to the serviced components and supplements the

General Requirements work item. Where information between the General

Requirements work item and herein conflict, the information here takes precedence.

5.1 Markings example.

STOCK NUMBER 2010-01-482-6135

ITEM NAME PROPELLER, RH

PART NUMBER 4B56Dx46P-RH

SERIAL NUMBER See propeller markings

CONTRACT NUMBER As indicated on the contract

SHIPPING WEIGHT As determined by Contractor

CONDITION CODE CONDITION A

QUANTITY & UNIT OF ISSUE 1 - EA

COAST GUARD SFLC MATERIAL