This is a 154 (FRC) Propeller Inspection Compliance Form used for documenting the inspection and testing of propellers for Coast Guard vessel class 154 WPC. The form serves as a standardized template for both initial and final inspections, with provisions for contractor inspector and USCG verification signatures throughout.

The inspection requirements encompass material composition verification per ABS 7 Section 10 Type 4; hub bore dimensional inspection including large end diameter (202.968 mm ±2%, -1.5%), hub length (550.00 mm ±2%, -1.5%), bore taper (1:20), helical groove depth, and blue fit testing at 85% minimum; surface finish measurements on all six blades (less than 3 micrometers Ra Class 1 from radius 0.2 outward) and hub/bore areas; and Class 1 static balancing per ISO 484/1. The form requires comprehensive geometric measurements across all six blades including blade radii (933.5 mm ±0.3%), local pitches at nine radii stations with ±2.0% tolerance, section pitches, mean pitch per blade (±1%), mean propeller pitch (±0.75%), blade section widths at four radius stations, and maximum thickness at eight prescribed stations (±3% tolerance with 1 mm minimum, ±1.5% with 1 mm minimum). Additional inspection data includes track deviation/rake measurements (±1% propeller diameter), blade center axis angular spacing (60.0° ±0.5°), edge condition assessment, and visual/dye penetrant surface inspection with defect documentation. The form specifies propeller identification markings in ¼" to ½" text including serial number, ship class 154 WPC, starboard/port designation, rotation direction, NSN, design diameter (1867 mm), design pitch at 0.7R (2449 mm), manufacturer information, actual weight, and material grade (ABS Grade 4). All inspection sections require dual sign-off by both contractor inspector and USCG representative, with a critical note that bore dimensional inspection failures must be reported to the Contracting Officer immediately upon discovery.

View the file

Other files

File Type Posted
70Z08021R21303B00_A00001.pdf PDF
Propeller General Requirements for Overhaul and Repair.pdf PDF
Group 10 and 11_IBCTPL_WLM-175 LH _ RH_NIIN 01F071222 and 01F071221.pdf PDF
Group 20 and 21_MECPL_270_RH _ LH_NSN 2010-01-119-3972 and 2010-01-120-2871.pdf PDF
Group 16 and 17_MECPL_210A_LH _ RH_NSN2010-00-906-6010 and 2010-00-906-6009.pdf PDF
Group 4 and 5_IBCTPL_WLR-75F_RH _ LH_NSN 2010-01-501-5459 and 2010-01-501-5465.pdf PDF
Group 12 and 13_87 Propeller Inspection Compliance Forms (FINAL R1).pdf PDF
Group 9_IBCTPL_WLB-225_NSN 2010-01-421-8904.pdf PDF
Group 6_IBCTPL_WTGB-140_NSN 2010-01-078-8216.pdf PDF
Group 7 and 8_IBCTPL_WLIC-160_LH _ RH_NSN 2010-01-036-7597 and 2010-01-037-7295.pdf PDF
Group 2 and 3_IBCTPL_WLIC-WLR 65-75_LH _ RH_NSN 2010-01-534-9095 and 2010-01-534-9089.pdf PDF
Group 14 and 15_PBPL_WPC-154_LH _ RH_NSN 2010-01-628-0276 and 2010-01-627-9761.pdf PDF
Group 18 and 19_MECPL_210B_LH _ RH_NSN 2010-01-134-0378 and 2010-01-134-7238.pdf PDF
Group 12 and 13_PBPL_WPB-87_LH _ RH_NSN 2010-01-459-0421 and 2010-01-457-0573.pdf PDF
Group 1_IBCTPL_WYTL-65_NSN 2010-01-482-6135.pdf PDF
Price Schedule.xlsx XLSX spreadsheet
70Z08026R21602B00_PROPELLER BLADES Solicitation.pdf PDF
70Z08026R21602B00_Amendment 00002.pdf PDF
Propeller Diameter_Number of Blades.pdf PDF
70Z08021R21303B00_Amendment 00001.pdf PDF
Price Schedule.xlsx XLSX spreadsheet
Price Schedule_Propeller Blades.pdf PDF
70Z08026R21602B00_PROPELLER BLADES Solicitation.pdf PDF
Consolidated Specification_Propeller.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rev (1) Page 1 of 18

154 (FRC) Propeller Inspection Compliance Forms

Initial Inspection: Final Inspection:

Propeller serial no: Date:

Contractor inspector name/title:

1. Material Composition (per ABS 7, Section 10, Type 4)

This section is not applicable to overhaul and repair.

Rev (1) Page 2 of 18

2. Hub Bore Inspection - NOTE: The bore dimensional inspection is a decision point. Report any failed measurement to the KO immediately upon finding.

Inspection Requirement Measured Pass/Fail

Bore dimensional inspection (for comparison to Coast

Guard Drawing 154 WPC

245-304)

Large end dia: 202.968 mm

+2%, -1.5%

Hub length: 550.00 mm

+2%, -1.5%

Bore taper 1:20

Helical groove depth

(minimum):

Large end dia:

Hub length:

Calculated taper:

Measured groove depth (min.):

Blue fit Go/No-Go (85% minimum)

Draw

Contractor inspector (written/signature): /

USCG (written/signature): /

Rev (1) Page 3 of 18

3. Surface Finish – NOTE: As part of Section 5 of the compliance forms, a sketch or photograph showing excessive surface finish may be provided in lieu of filling in the below table.

Locations Required Measured

Blade 1 from radius 0.2 outward

<3 micrometers Ra (Class 1)

Blade 2 from radius 0.2 outward

Blade 3 from radius 0.2 outward

Blade 4 from radius 0.2 outward

Blade 5 from radius 0.2 outward

Blade 6 from radius 0.2 outward

Hub/bore <3 micrometers Ra (Class 1)

4. Balancing

Class 1 per ISO 484/1 (static balanced) SAT UNSAT

Rev (1) Page 4 of 18

5. Surface Inspection

Document ALL defects on the following sheets. For the dye penetrant inspection, highlight/annotate ALL defects that fall outside of the allowable parameters set by ABS Part 7, Section 10, Table 1. Provide two sheets, one per face and label pages 5a and 5b.

NOTE: Photographs may be inserted in place of these inspection forms provided the photos collectively encompass the entire propeller and adhere to the instructions for documenting/highlighting/annotating defects. The photographs must be labeled such that the blades, hub locations and defect locations are identifiable. See the following page for the hub diagram.

Pressure Face Suction Face

Rev (1) Page 5 of 18

6. Inspection Report Data

a. Propeller Blade Radii

Location Required Measured

Blade 1

933.5 mm +/- 0.3% (930.7 mm to 936.3 mm)

Blade 2

Blade 3

Blade 4

Blade 5

Blade 6

b. Local Pitches (measured over three equal segments) with +/- 2.0% pitch tolerance (ISO 484/2, Class 1) applied to the requirement.

Blade 1 Radius Segment 1

(mm)

LE

Segment 1 measurement

(mm)

Segment 2

(mm)

Segment 2 measurement

(mm)

Segment 3

(mm)

TE

Segment 3 measurement

(mm)

.3R

Ref 3077

-2% 3016 2426 1956

+2% 3139 2525 2036

.4R

Ref 2824

-2% 2767 2503 2259

+2% 2880 2606 2352

.5R

Ref 2637

-2% 2584 2478 2423

+2% 2690 2579 2522

.6R

Ref 2442

-2% 2393 2452 2502

+2% 2491 2552 2604

.7R

Ref 2405

-2% 2357 2387 2526

+2% 2453 2484 2629

.8R Ref 2319

-2% 2273 2271 2465

+2% 2365 2364 2566

.9R

Ref 2125

-2% 2082 2017 2200

+2% 2167 2099 2290

.95R

Ref 1962

-2% 1923 1799 1909

+2% 2001 1872 1987

Rev (1) Page 6 of 18

(mm)

LE

Segment 1 measurement

(mm)

Segment 2

(mm)

Segment 2 measurement

(mm)

Segment 3

(mm)

TE

Segment 3 measurement

Rev (1) Page 7 of 18

(mm)

LE

Segment 1 measurement

(mm)

Segment 2

(mm)

Segment 2 measurement

(mm)

Segment 3

(mm)

TE

Segment 3 measurement

Rev (1) Page 8 of 18

Blade 4

(mm)

LE

Segment 1 measurement

(mm)

Segment 2

(mm)

Segment 2 measurement

(mm)

Segment 3

(mm)

TE

Segment 3 measurement

Rev (1) Page 9 of 18

(mm)

LE

Segment 1 measurement

(mm)

Segment 2

(mm)

Segment 2 measurement

(mm)

Segment 3

(mm)

TE

Segment 3 measurement

Rev (1) Page 10 of 18

(mm)

LE

Segment 1 measurement

(mm)

Segment 2

(mm)

Segment 2 measurement

(mm)

Segment 3

(mm)

TE

Segment 3 measurement

c. Section Pitch

Radius Requirement

Measured (mm)

Blade 1 Blade 2 Blade 3 Blade 4 Blade 5 Blade 6

.3R 2451

(2414 – 2488)

.4R 2548

(2509 – 2586)

.5R 2544

(2505 – 2582)

.6R 2517

(2479 – 2555)

.7R 2471

(2434 – 2508)

.8R 2383

(2347 – 2418)

.9R 2141

(2109 – 2173)

.95R 1914

(1885 – 1943)

Rev (1) Page 11 of 18

d. Mean Pitch per Blade

Requirement mm Blade 1 Blade 2 Blade 3 Blade 4 Blade 5 Blade 6

Ref

-1%

+1%

e. Mean Propeller Pitch

Requirement (mm)

(+/- 0.75%)

Measured

(2353 – 2389)

Rev (1) Page 12 of 18

f. Blade Section Widths

Blade 1

Radius Requirement, full width, mm

Full width, measured .7R 756.1

(741.0 - 771.2)

.8R 692.3

(678.4 - 706.1)

.9R 533.3

(522.6 – 544.0)

.95R 373.6

(366.1 – 381.1) width, mm

Full width, measured width, mm

Full width, measured

Blade 4 width, mm

Full width, measured

Rev (1) Page 13 of 18 width, mm

Full width, measured width, mm

Full width, measured

Rev (1) Page 14 of 18

g. Maximum Thickness at Prescribed Stations (all units in mm with new manufacture tolerance of +3% (1 mm, min)/-1.5% (1 mm, min)

Blade 1 – thicknesses (Indicate MAX thickness measurement, only)

Radius (Xc mm, max point at design)

Design (mm) Measured (mm)

3R (353.90) 59.92

4R (379.70) 47.93

5R (402.23) 38.36

6R (379.86) 31.40

7R (415.85) 31.77

8R (380.77) 27.94

9R (293.37) 17.94

95R (205.51) 11.11

Blade 2 – thicknesses point at design)

Design (mm) Measured (mm)

3R (353.90) 59.92

4R (379.70) 47.93

5R (402.23) 38.36

6R (379.86) 31.40

7R (415.85) 31.77

8R (380.77) 27.94

Blade 3 – thicknesses point at design)

Design (mm) Measured (mm)

3R (353.90) 59.92

4R (379.70) 47.93

5R (402.23) 38.36

6R (379.86) 31.40

7R (415.85) 31.77

8R (380.77) 27.94

Rev (1) Page 15 of 18

Blade 4 – thicknesses point at design)

Design (mm) Measured (mm)

3R (353.90) 59.92

4R (379.70) 47.93

5R (402.23) 38.36

6R (379.86) 31.40

7R (415.85) 31.77

8R (380.77) 27.94

Blade 5 – thicknesses point at design)

Design (mm) Measured (mm)

3R (353.90) 59.92

4R (379.70) 47.93

5R (402.23) 38.36

6R (379.86) 31.40

7R (415.85) 31.77

8R (380.77) 27.94

Blade 6 – thicknesses point at design)

Design (mm) Measured (mm)

3R (353.90) 59.92

4R (379.70) 47.93

5R (402.23) 38.36

6R (379.86) 31.40

7R (415.85) 31.77

8R (380.77) 27.94

Rev (1) Page 16 of 18

h. Track Deviation/Rake

Note: ISO 484/2, Section 13 provides locations for measurement

Requirement

(Max deviation, +/- 1% propeller diameter)

Rake

Point A Measured Point B Measured Point C Measured

Blade 1

Blade 2

Blade 3

Blade 4

Blade 5

Blade 6

Max deviation between ANY two blades (max – min)

i. Edge conditions, smooth, not sharp edges – Acceptance of data presented in Section 6 herein fulfills this requirement?

Yes / No

j. Blade Center Axis Angular Spacing

Requirement Blade 1 & 2

Measured

Blade 2 & 3

Measured

Blade 3 & 4

Measured

Blade 4 & 5

Measured

Blade 5 & 6

Measured

Blade 6 & 1

Measured

60.0° +/- 0.5°

k. Propeller Hub Inspection - Acceptance of data presented in Section 2 herein fulfills this requirement?

l. Surface Finish of Blade, Hub and Bore Areas – Acceptance of data presented in Section 5 herein fulfills this requirement?

m. Balancing Data – Acceptance of data presented in Section 6 herein fulfills the requirement?

Rev (1) Page 17 of 18

n. Surface Inspection (Visual and 100 Percent Dye Penetrant) – Acceptance of data presented in Sections 4 and 5 herein fulfills this requirement?

o. Fairness – Indicate areas of unacceptable fairness. Provide two sheets, one per face and label pages 18a and

18b.

Pressure Face Suction Face

Rev (1) Page 18 of 18

7. Propeller Identification Markings

The following are marked in ¼” to ½” high text on all newly manufactured propellers (check beside each box when verified):

a. Serial number (provided by Contracting Officer)

b. Ship class – 154 WPC

c. Starboard or Port

d. Rotation direction (from aft looking forward)

e. National Stock Number (NSN)

f. Design diameter – 1867 mm

g. Design pitch at .7R – 2449 mm

h. Manufacturer name/date of manufacture

i. Actual propeller weight

j. Material grade – ABS Grade 4