This is a Questions and Answers document addressing clarifications on the USCGC OLIVER BERRY Drydock solicitation (70Z08026QPBPL0041).
The document addresses three key inquiries from potential contractors. First, it clarifies that the WISS (Specification) referenced in Attachment 2 General Requirements represents a new specification format the government is implementing in place of the Standard Specification previously used, though contractors have raised concerns about its availability on SAM.gov. Second, regarding tank contents, the document confirms that the Engineering Plant Officer (EPO) of the cutter will reduce all tank contents to the lowest practicable level prior to entering drydock, answering contractor questions about offloading responsibility and timing. Third, the document confirms that the Oliver Berry solicitation contains no geographical restrictions on contractor participation. The underlying solicitation pertains to drydock services for USCGC OLIVER BERRY with a period of performance from December 8, 2026, through April 6, 2027, issued by the Department of Homeland Security US Coast Guard.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1_Blank SOS Rev.xlsx | XLSX spreadsheet | |
| 70Z08026QPBPL00410006.pdf | ||
| 70Z08026QPBPL00410005.pdf | ||
| 70Z08026QPBPL00410004_Amendment4.pdf | ||
| 70Z08026QPBPL00410003_Amendment3.pdf | ||
| 70Z08026QPBPL00410001_Amendment1.pdf | ||
| VCS v1.0 (OLIVER BERRY FY27).docx | DOCX document | |
| WISS v1.0 (OLIVER BERRY FY27).docx | DOCX document | |
| QA FORMS v1.0 (OLIVER BERRY).xlsx | XLSX spreadsheet | |
| 70Z08026QPBPL00410002_Amendment2.pdf | ||
| Request_for_Clarification.xlsx | XLSX spreadsheet | |
| 70Z08026QPBPL0041_Sol.pdf | ||
| Attachment 3_SOW Addendum.pdf | ||
| Attachment 1_Blank SOS.xlsx | XLSX spreadsheet | |
| Attachment 2_Specifications.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions “Item 2: Various items refer to WISS specs which are defined under the Attachment 2 General Requirements. This section indicates the WISS applicable to this solicitation should be provided on SAM.gov but the document is not found there. Will USG provide?”
The WISS is the Specification to which the contractor will perform the work. It is a new format that we are using instead of the Standard Specification that we have used in the past.
“Item 2: Spec contains note “Contents of each designated tank should be offloaded to the greatest extent practicable prior to the start of the contract unless designated for “No-Work”. Will USG clarify whether the tank contents will be offloaded to the greatest extent practicable prior to the start of the contract, and by whom?”
The EPO of the cutter will run down all tank contents to the lowest level that they can prior to entering Drydock.
Does the Oliver Berry solicitation have a geographical restriction?
No, it does not