This is a Standard Form 30 (SF 30) Amendment of Solicitation/Modification of Contract issued by the United States Coast Guard, Sector Force Logistics Center (USCG-SFLC-CPD 1) in Norfolk, Virginia, dated July 10, 2026. The amendment number is 70Z08026QPBPL00410001, which amends solicitation 70Z08026QPBPL0041 originally dated June 24, 2026. The requisition number is 52000PR260025142.

The amendment's primary purpose is to provide responses to vendor questions regarding the solicitation. The summary of changes confirms that all other terms and conditions remain unchanged. Two specific questions and answers are addressed: (1) clarification that the WISS (Specification) represents the new format specification to which the contractor will perform work, replacing the previously used Standard Specification format; and (2) confirmation that the Equipment Protection Officer (EPO) of the cutter will run down all tank contents to the lowest practicable level prior to entering drydock, addressing vendor questions about tank offloading responsibilities. Offerors must acknowledge receipt of this amendment prior to the solicitation deadline through completion of items 8 and 15, acknowledgment on offer copies, or separate written/electronic communication referencing the solicitation and amendment numbers. The contractor is not required to sign and return the document to the issuing office.

View the file

Other files

File Type Posted
Attachment 1_Blank SOS Rev.xlsx XLSX spreadsheet
70Z08026QPBPL00410006.pdf PDF
70Z08026QPBPL00410005.pdf PDF
70Z08026QPBPL00410004_Amendment4.pdf PDF
70Z08026QPBPL00410003_Amendment3.pdf PDF
VCS v1.0 (OLIVER BERRY FY27).docx DOCX document
WISS v1.0 (OLIVER BERRY FY27).docx DOCX document
QA FORMS v1.0 (OLIVER BERRY).xlsx XLSX spreadsheet
70Z08026QPBPL00410002_Amendment2.pdf PDF
Request_for_Clarification.xlsx XLSX spreadsheet
Questions.docx DOCX document
70Z08026QPBPL0041_Sol.pdf PDF
Attachment 3_SOW Addendum.pdf PDF
Attachment 1_Blank SOS.xlsx XLSX spreadsheet
Attachment 2_Specifications.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

70Z080 CPD 1 - Norfolk, VA Commander, USCG-SFLC-CPD 1, 300 East Main Street, Suite Norfolk, VA, 23510, US

70Z080

70Z08026QPBPL00410001

Summary of Changes

Questions & Answers

Question 1: “Item 2: Various items refer to WISS specs which are defined under the Attachment 2 General Requirements. This section indicates the WISS applicable to this solicitation should be provided on SAM.gov but the document is not found there. Will USG provide?”

Answer: The WISS is the Specification to which the contractor will perform the work. It is a new format that we are using instead of the Standard Specification that we have used in the past.

Question 2: “Item 2: Spec contains note “Contents of each designated tank should be offloaded to the greatest extent practicable prior to the start of the contract unless designated for “No-Work”. Will USG clarify whether the tank contents will be offloaded to the greatest extent practicable prior to the start of the contract, and by whom?”

Answer: The EPO of the cutter will run down all tank contents to the lowest level that they can prior to entering Drydock.

Text52:
Text54: 1
TOTAL_NO_OF_PAGES: 2
CUST_PROJ_CODE:
DOCUMENT_NUMBER: 70Z08026QPBPL00410001
EFFECTIVE_DATE: 2026-07-10T07:21:49.000-04:00
REF_PR_NUM_T: 52000PR260025142
SOL_DOCUMENT_NUMBER: 70Z08026QPBPL0041
SOL_OPEN_BID_DATE: 2026-06-24T10:51:30.000-04:00
NO_OF_COPIES: 1
Check Box91: Yes
Check Box92: Off
MANUAL_EXTEND_FLAG: N
Check Box95: Yes
Check Box96: Off
Check Box97: Off
Check Box98: Off
Check Box99: Off
Check Box100: Off
Check Box101: Off
Text1: AMENDMENT CONTROL NUMBER :
HDR_DOCUMENT_NUMBER: 70Z08026QPBPL0041
Text134: SUMMARY OF CHANGES :
AMENDMENT_DESCRIPTION: AMEND-AMEND-The purpose of this amendment is to provide responses to vendor questions. All other terms and conditions remain unchanged.
Text2: Same As Issuing Office
AMD_ISSUING_OFFICE_LADDR:
AMD_ISSUING_OFFICE_LOCCODE:

File details come from the government source that posted it. Updated .