70Z08026QPBPL00410006.pdf

PDF 665 KB Posted

Attached to
DRYDOCK: USCGC OLIVER BERRY DD FY27
Solicitation number
70Z08026QPBPL0041
Issued by

About this file

This is Amendment 6 to a solicitation for port engineer ship repair and maintenance services. The amendment, issued by Naval Station Norfolk, Virginia on August 11, 2026, addresses questions and answers regarding labor rate structures and foreseeable costs in the pricing template (Attachment 1-Blank Statement of Objectives).

The amendment clarifies three key bidding requirements: (1) offerors must use identical fully burdened composite labor rates for both CLIN O-00A (Composite Labor Rate) and CLIN OA/G-001 (Labor Rate) for open and inspect repairs work; (2) foreseeable costs calculations should reference the Port Engineer's homeport in Honolulu as the point of origin, with contractors entering either "0" if their drydock is located less than 50 miles or more than 150 miles from the homeport, or the total round-trip driving miles if located 51 to 149 miles away; and (3) the previously locked cell C43 in the Foreseeable Costs tab has been unlocked in the revised Attachment 1-Blank SOS to allow contractors to enter "0" when applicable. The hour and date for receipt of offers is not extended by this amendment. Offerors must acknowledge receipt of this amendment prior to the solicitation closing deadline through standard methods or risk rejection.

View the file

Other files

File Type Posted
Attachment 1_Blank SOS Rev.xlsx XLSX spreadsheet
70Z08026QPBPL00410005.pdf PDF
70Z08026QPBPL00410004_Amendment4.pdf PDF
70Z08026QPBPL00410003_Amendment3.pdf PDF
70Z08026QPBPL00410001_Amendment1.pdf PDF
VCS v1.0 (OLIVER BERRY FY27).docx DOCX document
WISS v1.0 (OLIVER BERRY FY27).docx DOCX document
QA FORMS v1.0 (OLIVER BERRY).xlsx XLSX spreadsheet
70Z08026QPBPL00410002_Amendment2.pdf PDF
Request_for_Clarification.xlsx XLSX spreadsheet
Questions.docx DOCX document
70Z08026QPBPL0041_Sol.pdf PDF
Attachment 3_SOW Addendum.pdf PDF
Attachment 1_Blank SOS.xlsx XLSX spreadsheet
Attachment 2_Specifications.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

70Z08026QPBPL00410006

Summary of Changes

QUESTIONS & ANSWERS

1. Attachment 1 includes both CLIN O-00A, "Composite Labor Rate," and CLIN OA/G-001, "Labor Rate," for Open and Inspect Repairs. The solicitation defines Inspect and Repair Work as additional work discovered during performance and states that such work will be negotiated through Change Requests, while Attachment 3 requires CRs to be priced using the CR composite labor rate designated in the Schedule. Please clarify whether offerors must enter the same fully burdened composite labor rate for O-00A and OA/G-001. If the rates may differ, please define the categories of work to which each rate will apply and identify which numbered work items are subject to OA/G-001.

ANSWER: Your labor rate will be the same.

2. The "Foreseeable Costs" tab references both the Contracting Officer's location in Norfolk, Virginia, and the Port Engineer's homeport. Please clarify the correct point of origin and confirm whether offerors proposing a Honolulu drydock should enter "$0" or include airfare for KO travel.

ANSWER: It states in the foreseeable costs: "Contractor will enter either (1) "0" if their dry dock is located less than 50 miles or more than 150 miles from the PE's homeport or (2) the total number of round trip driving miles if the contractor is located between 51 to 149 miles from PE's homeport." The PE is homeported in Honolulu.

3. In the Foreseeable cost tab, cell C43 is a locked cell. Yet the comment says "do not change this cell unless DDK is less than 50 diving miles from homeport. Then enter 0" Can you please unlock this cell so that we can enter 0?

ANSWER: See revised Attachment 1-Blank SOS.

Text52:
Text54: 1
TOTAL_NO_OF_PAGES: 2
CUST_PROJ_CODE:
DOCUMENT_NUMBER: 70Z08026QPBPL00410006
EFFECTIVE_DATE: 2026-08-11T15:29:09.000-04:00
REF_PR_NUM_T: 52000PR260025142
SOL_DOCUMENT_NUMBER: 70Z08026QPBPL0041
SOL_OPEN_BID_DATE: 2026-08-05T14:24:39.000-04:00
NO_OF_COPIES: 1
Check Box91: Yes
Check Box92: Off
MANUAL_EXTEND_FLAG: N
Check Box95: Yes
Check Box96: Off
Check Box97: Off
Check Box98: Off
Check Box99: Off
Check Box100: Off
Check Box101: Off
Text1: AMENDMENT CONTROL NUMBER :
HDR_DOCUMENT_NUMBER: 70Z08026QPBPL0041
Text134: SUMMARY OF CHANGES :
AMENDMENT_DESCRIPTION: AMEND-The purpose of this amendment is to respond to questions regarding Attachment 1-Blank SOS and provide a revised Attachment 1-Blank SOS unlocking a cell on the Foreseeables tab. All other terms and conditions remain the same.
Text2: Same As Issuing Office
AMD_ISSUING_OFFICE_LADDR: 70Z080 CPD 1 - Norfolk, VA

Commander, USCG-SFLC-CPD 1, 300 East Main Street, Suite 550 Norfolk, VA, 23510, US

AMD_ISSUING_OFFICE_LOCCODE: 70Z080

File details come from the government source that posted it. Updated .