This is a Question and Answer document for federal contract opportunity USCGC NORTHLAND FY26 DS1, solicitation number 70Z08026QMECP0013(2).
The document addresses a contractor inquiry regarding the Consilium Salwico Fire Detection System Installation Kit (Part Number Q2401251-8, NSN 5998-01-F25-7076). The contractor seeks clarification on the components included in the installation kit, identification of Government Furnished Equipment (GFE) materials, and specifically whether installation cabling is provided as part of the kit or must be furnished and installed by the contractor. The answer directs the inquiring party to reference Table 6-2, CONTROL SYSTEM, FIRE SUPPRESSION GFE CONTENTS, contained in the document titled "270-WMEC_TN3060.0" for a comprehensive list of GFE contents and to determine cabling responsibilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 70Z08026QMECP0013(2) 0001 Amendment 1_KO SIGN.pdf | ||
| 270-WMEC_TN3060.0.pdf | ||
| Specification CGC NORTHLAND DS1 Rev-1.pdf | ||
| 70Z08026QMECP0013(2).pdf | ||
| CGC NORTHLAND DS1 FY26 Price Schedule 2.xlsx | XLSX spreadsheet | |
| Amendment 70Z08026QMECP001300001 Q_A.pdf | ||
| Amendment 1 70Z08026QMECP001300001.pdf | ||
| SPEC CGC NORTHLAND (WMEC 904) DS1 FY26.pdf | ||
| CGC NORTHLAND DS1 FY26 Price Schedule.xlsx | XLSX spreadsheet | |
| 70Z08026QMECP0013.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC NORTHLAND FY26 DS1
70Z08026QMECP0013(2)
Question and Answer
Question:
“Currently reviewing the installation requirements for the Consilium Salwico Fire Detection System Installation Kit (P/N Q2401251-8, NSN 5998-01-F25-7076): Could you please provide a list of the components included with this installation kit, or any available documentation identifying the materials supplied as GFE? Specifically, we are trying to determine whether installation cabling is included as part of the kit or if the contractor is expected to furnish and install new cabling.”
Answer:
Please refer to Table 6-2, CONTROL SYSTEM, FIRE SUPPRESSION GFE CONTENTS, in the attached document titled, “270-WMEC_TN3060.0”.