Amendment 70Z08026QMECP001300001 Q_A.pdf
PDF 51 KB Posted
- Attached to
- USCGC NORTHLAND DS1 FY26
- Solicitation number
- 70Z08026QMECP0013
About this file
This is a Questions and Answers document (Amendment 70Z08026QMECP001300001) for a federal contract opportunity. The document addresses a single inquiry regarding work item 20 and the location requirements for a potential cofferdam installation. According to the response, if a cofferdam is needed for work item 20, it must be positioned around the frame 193 sea chest connection. The cofferdam work is associated with a JP-5 pump located in pump room 4-186-0-J. The answer references CG Drawing 901-256-002 (section 13) as the primary source document for identifying the precise location of both the pump and its sea connection, which should be consulted for detailed placement specifications.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 70Z08026QMECP001300001 Q&A
Q: Regarding work item 20, please identify which opening will be needing a cofferdam.
A: The cofferdam (if needed) will need to be located around frame 193 sea chest connection. The pump is in the JP-5 pump room 4-186-0-J. CG Drawing 901-256-002 (section
13) gives a good location of the pump and sea connection.
File details come from the government source that posted it. Updated .