CGC NORTHLAND DS1 FY26 Price Schedule 2.xlsx
XLSX spreadsheet 21 KB Posted
- Attached to
- USCGC NORTHLAND DS1 FY26
- Solicitation number
- 70Z08026QMECP0013
About this file
This is a pricing schedule for dockside maintenance and repair services for the USCGC NORTHLAND (WMEC-270A) during Fiscal Year 2026. The schedule outlines 25 definite line items and multiple option items covering comprehensive vessel maintenance work including seawater heat exchanger cleaning and hydro testing, main diesel engine exhaust piping commercial cleaning, ship service diesel generator servicing, lube oil heat exchanger maintenance, chill water and potable water system cleaning, compressed air system inspection and hydro testing, fin stabilizer inspection and repair, sewage and grey water system maintenance, deck plating renewal in multiple spaces, fire and smoke detection system renewal, and auxiliary seawater system valve replacement. The work is scheduled for performance between August 3, 2026 and September 27, 2026.
The pricing schedule includes unit pricing for labor (with a composite labor rate line item), material handling fees, travel and per diem, and a five-day laydays provision. The contract allows for over-and-above growth work to be issued via contract modification using established labor rates and material markup/handling fee percentages, with estimates provided for 1,258 labor hours and $48,540 in material costs. All pricing fields are currently blank with $0.00 values, indicating this is a template for contractor submission. The solicitation (70Z08026QMECP0013) has been reopened for resubmission due to the addition of a work item, requiring all contractors to submit complete revised offers using Specification CGC NORTHLAND DS1 Rev-1 and this updated pricing schedule.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: |
| USCGC NORTHLAND (WMEC-270A) DOCKSIDE AVAILABILITY FY2026 |
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Flexible Couplings, Renew | JOB | 1 | ||
| D-002 | Seawater Heat Exchangers, Clean, Inspect And Hydro | JOB | 1 | ||
| D-003 | Main Diesel Engine, MDE, Exhaust Piping, Commercial Clean | JOB | 1 | ||
| D-004 | Ship Service Diesel Generator, SSDG, Exhaust Piping, Commercial Clean | JOB | 1 | ||
| D-005 | Lube Oil Heat Exchangers; Clean, Inspect And Hydro | JOB | 1 | ||
| D-006 | Chill Water System, Clean and Flush | JOB | 1 | ||
| D-007 | Potable Water Pneumatic Tanks, Clean and Inspect | JOB | 1 | ||
| D-008 | Hot Water Accumulator Tanks, Clean and Inspect | JOB | 1 | ||
| D-009 | Compressed Air Receivers and System Valves, All, Clean, Inspect, Hydro and Lift | JOB | 1 | ||
| D-010 | Fin Stabilizers (General), Inspect and Repair | JOB | 1 | ||
| D-011 | Appleton FB 20-21 Single Point Davit (SPD), Inspect and Service | JOB | 1 | ||
| D-012 | Sewage Discharge and Transfer Pumps, Renew | JOB | 1 | ||
| D-013 | Grey Water Holding Tanks, Clean and Inspect | JOB | 1 | ||
| D-014 | Sewage Holding Tanks, Clean, Inspect and Repair | JOB | 1 | ||
| D-015 | Sewage Piping, Clean and Flush | JOB | 1 | ||
| O-016 | Tanks, Grey Water Holding, Preserve, Partial | JOB | 1 | ||
| D-017 | Tanks (Sewage Holding), Preserve, Partial | JOB | 1 | ||
| D-018 | Padeyes, Inspect and Test | JOB | 1 | ||
| D-019 | Temporary Services, Heating and Cooling | JOB | 1 | ||
| D-020 | Emergency Diesel Generator Raw Water Pump, Replace | JOB | 1 | ||
| D-021 | Deck Plating (Bosn’s Workshop and Focsle), Renew | JOB | 1 | ||
| D-022 | Deck Plating (Auxiliary Machinery Space 1), Renew | JOB | 1 | ||
| D-023 | Auxiliary Sea Water System Valves, Renew | JOB | 1 | ||
| D-024 | Air Compressor System Piping, Renew | JOB | 1 | ||
| D-025 | Fire and Smoke Detection System, Renew | JOB | 1 | ||
| O-00A | Composite Labor Rate | Hour | 0 | ||
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | JOB | |||
| O-00Z | Laydays | Day | 5 | ERROR:#REF! | |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 | ||||
| Over and Above/Growth Work | |||||
| The Labor Rates and Material Markup/Handling Fee will be used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The values shown are an estimate only and may be exceeded at the unit prices offered. The total extended price for both CLINs below are being used solely for the purposes of evaluating price. | |||||
| **Fill in the sections highlighted below: | |||||
| OA/G-001 | Over and Above/Growth Labor Rate | Hour | 1,258 | $0.00 | |
| OA/G-002 | Over and Above/Growth Material Markup/Handling Fee | $48,540.00 | Percent | $0.00 | |
| Total Evaluated Price of Over and Above/Growth | $0.00 |