Appendix G- DS(1) Design Submission Transmittal Form.pdf

PDF 200 KB Posted

Attached to
Design/Build Construction of Eastport Family Housing Development, Perry, ME
Solicitation number
70Z04720REASPOR00
Issued by

About this file

This transmittal form is used by a prime contractor to submit design documents to the U.S. Coast Guard for review on a construction project. It requires the contractor to identify the contract and project details, submittal number and type, documents included in the submittal, and certification that the submission complies with contract requirements. The government reviewer provides feedback and approval status on the submission.

The related federal opportunity is a solicitation by the U.S. Coast Guard Shore Infrastructure Logistics Center and Facilities Design and Construction Center to award a firm-fixed-price contract for the design/build construction of a family housing development in Perry, Maine. The project scope involves constructing between 4 to 8 single family homes on approximately 75 acres of Coast Guard-owned land. The solicitation includes one base item and three option items.

View the file

Other files

File Type Posted
Final Amendment 0006.pdf PDF
Final Amendment 0005.pdf PDF
Final Amendment 0004.pdf PDF
Eastport1.zip ZIP file
Heavy Wage Determination.pdf PDF
040920 REV Eastport_PRICE PROPOSAL FORM_pja.pdf PDF
Appendix I O M Pt 2EquipEnrollment.xlsx XLSX spreadsheet
Amendment Form 4 Pages.pdf PDF
Residential Wage Determination.pdf PDF
Appendix J O M Pt3 SAMJobPlan.pdf PDF
J.6 Site_Pics.pdf PDF
J.7 House Pics.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Appendix F - Govt-Design_Review-xx-xx-2012.pdf PDF
Appendix B -ElectDeliv-Sept2012.pdf PDF
Appendix P_BSD-135_Ice Dams.pdf PDF
_6841069_Eastport Housing-Final RFP.pdf PDF
Appendix D - Design Narrative-Sept2012.pdf PDF
Appendix K -Exterior Wall Detail.pdf PDF
Attachment B USCG Eastport Housing Site Development Report.pdf PDF
USCG_Survey_Report_PerryME.pdf PDF
USCG Eastport Housing Site Development Report final_costs removed.pdf PDF
Full_PDF_Final-Draft_Eastport_EA_07192019.pdf PDF
Attachment A_Site Photos.pdf PDF
Appendix N-Individual Space Criteria Sheets.pdf PDF
Appendix R_PMDS_Eastport_ReCap_FamilyHousing.pdf PDF
Appendix A-ComputerGenDrwgs-Sept2012.pdf PDF
Appendix L- HERS Report (NOT USED).pdf PDF
70Z04720REASPOR00 RFP.pdf PDF
Residential Wages.pdf PDF
Appendix Q_Radon tipsheet.pdf PDF
Appendix E - Industry Standards for Const Docs-Sept2012.pdf PDF
Heavy Wages.pdf PDF
Appendix C -FDCC File Naming-SEP 2014.pdf PDF
Appendix M- LEED for HOMES.pdf PDF
Appendix O_ Roof Design.pdf PDF
Appendix H-OandM-Part1UniformaMeansSAMSCorrelationCrosswalk Table1.pdf PDF
Appendix S_Typical_Metal Bldg Section.pdf PDF
021320 Pre Solicitation.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Form: DS(1)

DESIGN SUBMISSION

TRANSMITTAL LETTER

To:

US Coast Guard Facilities Design & Construction Center 5505 Robin Hood Road Suite K Norfolk, VA 23513-2431

Date: Contr. No.

From:

(Prime Contractor Firm Name)

Attn:

Project Name:

Project Number:

Submitted by:

(Prime Contractor Submitter’s Name)

Signature of Submitter Subm No: D-_______ New ___ Resubm. ___

We are forwarding the following for your review and concurrence. By submission of these documents we are certifying that we coordinated, reviewed and approve them as complying with the Contract Requirements.

COPIES DATE

DESCRIPTION

(Be specific: drawing numbers, specification paragraph numbers, type of calculations, etc.)

TYPE OF

SUBMITTAL

GOVERNMENT ACTION

DOR

APPROVED

Yes/No/NA

Date

Unacceptable Resubmit

Make Corrections

Noted & Resubmit

Acceptable Reviewer Date

Government Reviewer’s Comments:

Government Reviewer’s Name ___________________________________________ Signature:

File details come from the government source that posted it. Updated .