040920 REV Eastport_PRICE PROPOSAL FORM_pja.pdf

PDF 140 KB Posted

Attached to
Design/Build Construction of Eastport Family Housing Development, Perry, ME
Solicitation number
70Z04720REASPOR00
Issued by

About this file

This document outlines a solicitation for a design-build construction project. The U.S. Coast Guard Shore Infrastructure Logistics Center intends to award a firm-fixed-price contract to construct a minimum of four and maximum of eight single-family housing units on approximately 75 acres of undeveloped Coast Guard-owned land in Perry, Maine. The project includes one base item and three option items. Base Item 0001 involves the design and construction of a minimum of two three-bedroom units, two four-bedroom units including one ADA-accessible unit, and a maintenance shed. Option Items 0001 through 0003 provide for the construction of additional housing units. Base Item 0002 allotts $250,000 for utility services and materials, with the potential for equitable adjustment if costs differ. Offerors should provide total pricing for all items on the price proposal form. The solicitation number is 70Z04720REASPOR00.

View the file

Other files

File Type Posted
Final Amendment 0006.pdf PDF
Final Amendment 0005.pdf PDF
Final Amendment 0004.pdf PDF
Eastport1.zip ZIP file
Heavy Wage Determination.pdf PDF
Appendix I O M Pt 2EquipEnrollment.xlsx XLSX spreadsheet
Amendment Form 4 Pages.pdf PDF
Residential Wage Determination.pdf PDF
Appendix J O M Pt3 SAMJobPlan.pdf PDF
J.6 Site_Pics.pdf PDF
J.7 House Pics.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Appendix F - Govt-Design_Review-xx-xx-2012.pdf PDF
Appendix B -ElectDeliv-Sept2012.pdf PDF
Appendix P_BSD-135_Ice Dams.pdf PDF
_6841069_Eastport Housing-Final RFP.pdf PDF
Appendix D - Design Narrative-Sept2012.pdf PDF
Appendix K -Exterior Wall Detail.pdf PDF
Attachment B USCG Eastport Housing Site Development Report.pdf PDF
USCG_Survey_Report_PerryME.pdf PDF
USCG Eastport Housing Site Development Report final_costs removed.pdf PDF
Full_PDF_Final-Draft_Eastport_EA_07192019.pdf PDF
Attachment A_Site Photos.pdf PDF
Appendix N-Individual Space Criteria Sheets.pdf PDF
Appendix R_PMDS_Eastport_ReCap_FamilyHousing.pdf PDF
Appendix A-ComputerGenDrwgs-Sept2012.pdf PDF
Appendix L- HERS Report (NOT USED).pdf PDF
70Z04720REASPOR00 RFP.pdf PDF
Residential Wages.pdf PDF
Appendix Q_Radon tipsheet.pdf PDF
Appendix E - Industry Standards for Const Docs-Sept2012.pdf PDF
Heavy Wages.pdf PDF
Appendix G- DS(1) Design Submission Transmittal Form.pdf PDF
Appendix C -FDCC File Naming-SEP 2014.pdf PDF
Appendix M- LEED for HOMES.pdf PDF
Appendix O_ Roof Design.pdf PDF
Appendix H-OandM-Part1UniformaMeansSAMSCorrelationCrosswalk Table1.pdf PDF
Appendix S_Typical_Metal Bldg Section.pdf PDF
021320 Pre Solicitation.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE PROPOSAL FORM

SECTION B

PROJECT NO. 6841069

SOLICITATION NO. 70Z04720REASPOR00

Base Item 0001: Design-build USCG Family Housing Project in Perry, ME. The proposed development includes, but is not limited to, the design and construction of a minimum of two, (2) 3-bedroom single family housing units, two (2) 4-bedroom single family housing units with one that meets ADA accessibility requirements and a maintenance/storage shed. The proposed site development shall include a concept layout of all 8 single family housing units to include associated access roads, driveways, sidewalks, individual wells, individual septic systems, storm water drainage system, electrical distribution system, telecommunications system and other supporting utilities. The layout of the four base units shall be configured at a distance as far away from Shore Road as practicable. This site shall also be configured or landscaped so that the maintenance shed screened from the main road, The contractor shall perform the work in accordance with this specification and as shown on the

Government-accepted, Contractor-originated drawings. The project scope includes three (3) option items that include all supervision, labor, tools, materials, transportation, equipment and other services necessary to construct the following:

Design Cost:

Construction Cost:

Total Base Item 0001:

Total Base Item 0001 shall be deemed to include all costs required for the specified work to be completed in accordance with the plans and specifications.

BASE ITEM 0002: Allotment to provide all utility services and materials in accordance with

Specification 01110, Paragraph 1.9 (New Utility Services). Base Item 0002 will be negotiated and incorporated into the contract via a modification at a later date. An equitable adjustment will be made to the Contractor in the event this effort’s total cost is above $250,000. A credit will be due back to the

Government in the event this efforts total cost is less than $250,000.00.

Total Base Item 0002 $250,000.00

Option Item 0001: Two (2) 3 Bedroom Single Family Housing Units Provide all labor, material, equipment, mobilization, demobilization, permitting, construction support, quality control services, and ancillary items required for site development and construction related to constructing two single family housing units.

Total Option Item 0001:

Option Item 0002: One (1) 3 Bedroom Single Family Housing Unit

Provide all labor, material, equipment, mobilization, demobilization, permitting, construction support, quality control services, and ancillary items required for site development and construction related to constructing one single family housing unit.

Total Option Item 0002

Option Item 0003: One (1) 3-Bedroom Single Family Housing Unit

Provide all labor, material, equipment, mobilization, demobilization, permitting, construction support, quality control services, and ancillary items required for site development and construction related to constructing one single family housing unit.

Total Option Item 0003

TOTAL PRICE (Base Items 1 and 2, and Option Items 1, 2, and 3): $ _________________

The price shall be evaluated in accordance with FAR 52.217-4 Evaluation of Options Exercised at Time of

Contract Award (June 1988)

File details come from the government source that posted it. Updated .