Appendix_F_-_Govt-Design_Review-xx-xx-2012.pdf

PDF 279 KB Posted

Attached to
Design/Build Construction of Jonesport Housing Development, Harrington, Maine
Solicitation number
70Z04718RJNPTHG
Issued by

About this file

Appendix F

View the file

Other files

File Type Posted
Final_Amendment_0010.pdf PDF
Final_Amendment.pdf PDF
Final_Amendment_0008.pdf PDF
Attachment_K_Jonesport_Housing_NEPA_EA_(Final_-_Complete_Document)(Jan_2018).pdf PDF
Final_Amendment_0007.pdf PDF
_4490913_Final_Bookedmarked_Signed-April_2018.pdf PDF
JONESPORT_C101_10JULY17.dwg DWG drawing
JONESPORT_C100_10JULY17.dwg DWG drawing
Amendment_0006.pdf PDF
SBSP.pdf PDF
Amendment_0005.pdf PDF
Final_Amendment_0004.pdf PDF
Residential_WD.pdf PDF
Heavy_WD.pdf PDF
Extention_Amendment.pdf PDF
120117_Amendment_0002.pdf PDF
Appendix_N-Individual_Space_Criteria_Sheets.pdf PDF
Solicitation_JONESPORT_HOUSING_FBOPost.pdf PDF
Attachment_B_Mill_River_Road_Hydrogeologic_Report_FINAL_(1).pdf PDF
Attachment_G_Marshville_Road_Septic_Test_pits.pdf PDF
Appendix_B_-ElectDeliv-Sept2012.pdf PDF
Attachment_C__Marshville_Road_Hydrogeologic_Report_FINAL.pdf PDF
Appendix_O__Roof_Design.pdf PDF
Attachment_E_Mill_River_Road_Test_Pits.pdf PDF
Attachment_A_Final_Home_InspectReport_Marshville_Road_and_Mill_River_Rd_Harrington,_ME.pdf PDF
Appendix_J-_O&M_-_Part_3_SAM_Job_Plan.pdf PDF
Appendix_C_-FDCC_File_Naming-SEP_2014.pdf PDF
Appendix_D_-_Design_Narrative-Sept2012.pdf PDF
Attachment_D_Mill_River_Road_Septic_Test_Pit_Logs.pdf PDF
Appendix_H-_O&M_-_Part_1_Uniforma_Means_SAMS_Correlation_Crosswalk_Table1.pdf PDF
Appendix_P_BSD-135_Ice_Dams.pdf PDF
Appendix_A-ComputerGenDrwgs-Sept2012.pdf PDF
Appendix_Q_Radon_tipsheet.pdf PDF
Appendix_G-_DS(1)_Design_Submission_Transmittal_Form.pdf PDF
Appendix_K_-Exterior_Wall_Detail.pdf PDF
Attachment_H_3.3.a-c_Natural_Resources_353_Mill_River_Rd_FINAL_06-13-17.pdf PDF
Appendix_R_-_PMDS-STA_Jonesport_RecapitalizeFamilyHousing.pdf PDF
Appendix_E_-_Industry_Standards_for_Const_Docs-Sept2012.pdf PDF
Attachment_F_Marshville_Road_Septic_Test_Pit_Logs.pdf PDF
Attachment_J_Final_USCG_Harrington_HBMS_Report_2017-10-16.pdf PDF
Attachment_I_3.3.a-c_Natural_Resources_363_Marshville_Rd_FINAL_06-09-17.pdf PDF
Appendix_I-_O&M_-_Part_2_Equipment_Enrollment_Table2.pdf PDF
Appendix_M-_LEED_for_HOMES.pdf PDF
_4490913_Final_Bookedmarked_Revised-06Nov2017.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESIGN COORDINATION REVIEW COMMENTS

FACILITIES DESIGN & CONSTRUCTION CENTER

[Project Name, Location and SFRL#]

*Action code: c Concur with comments and will incorporate in next submittal If Contractor disagrees with comment or feels that further discussion is required, then Contractor shall contact the FDCC Project Manager and resolve the issue before proceeding with design. Resubmission of the design shall be based on the resolution reached between the Contractor and Government.

Comments by: Team Phone: Date:

xxxxxx (XX) xxxxxx (XX) xxxxxx (XX) xxxxxx (XX) xxxxxx (XX) xxxxxx (XX) xxxxxx (XX) xxxxxx (XX)

Civil Structural Architect Mechanical Electrical Construction

LEED

Telecomms

757.852.34xx 757.852.34xx 757.852.34xx 757.852.34xx 757.852.34xx

757. xxx-xxxx 757.852.34xx 757.xxx.xxxx xx-xx-2012

Project Title and Location Type of Review

Project No.:

Relocation of Sector Houston-Galveston 08-3047134 –Ellington Field 65%

Station Houston Phase 2 08-3101726 –Galena Park xxxxxxxx Design dated xx-xx-xx

Final

Cmt By:

Dwg No:

Cmt No

Comments Action Taken*

General xx 01 We do not consider these review comments to constitute a change to your contract. If, in your opinion, work beyond the scope of services is required, please contact XXXXXXXXX, Contract Specialist, at (757) 852- 34xx.

xx 02 The primary purpose of these review comments is to identify items that do not appear to be in compliance with the RFP requirements. It is not the intent of the review to provide a coordination review with other disciplines;

a code compliance review, etc. although potential conflicts or questions concerning code compliance may be included for the designer’s information/action. Compliance with the RFP specification 01158, 01159 and 01160 is required regardless of whether or not an RFP required item is shown on the drawings or if apparent non-compliance is not noted in

If Contractor disagrees with comment or feels that further discussion is required, then Contractor shall contact the FDCC Project Manager and resolve the issue before proceeding with design. Resubmission of the design shall be based on the resolution reached between the Contractor and Government.

review comments.

The review is largely limited to what has been submitted, recognizing that this is identified as being a XX% xxxxxxx submittal [and that the design is not complete or fully coordinated].

03 The contractor is required to comply with the RFP requirements regardless of whether or not a review a comment was made on what could be considered as an “unapproved” deviation from the RFP requirements. It is not the intent of the review to identify where the design exceeds RFP requirements, although comments may be made where it appears that there may be a misinterpretation of the RFP requirements.

Comments contained within cells with yellow fill are considered “critical” and shall be responded to within 7 calendar days.

Contractor should contact the FDCC Project Manager to arrange discussions with reviewers.

DRAWINGS

General

Civil

If Contractor disagrees with comment or feels that further discussion is required, then Contractor shall contact the FDCC Project Manager and resolve the issue before proceeding with design. Resubmission of the design shall be based on the resolution reached between the Contractor and Government.

Architectural

Plumbing

HVAC

Electrical

If Contractor disagrees with comment or feels that further discussion is required, then Contractor shall contact the FDCC Project Manager and resolve the issue before proceeding with design. Resubmission of the design shall be based on the resolution reached between the Contractor and Government.

File details come from the government source that posted it. Updated .