This is a Work Specification Sheet (WSS) for maintenance and repair services on the U.S. Coast Guard 32-foot Transportable Port Security Boat (CG 32 TPSB) and its associated trailer.
The Coast Guard estimates eight boats and trailers will require maintenance and repair per period of performance, with an option to increase by two additional units. The contractor must complete all planned preventive maintenance and repairs within ten weeks from the conclusion of initial Pre-Operative Maintenance Testing, with the understanding that Condition Found Reports (CFRs) may extend timelines. The vessel specifications include two Yanmar 6LPA-STZC3 diesel engines rated at 315 horsepower each, two Mercruiser Bravo 1XR sterndrives, and a 150-gallon fuel tank capacity. Services are structured across seven Contract Line Item Numbers: CLIN 0001 covers operational tests and inspections; CLIN 0002 encompasses comprehensive maintenance and repair services including hull maintenance, transom replacement, fuel tank removal/inspection, limber holes, hull sheath replacement, bilge cleaning, trailer maintenance, dashboard refurbishment, and general welding; CLINs 0003 through 0006 are optional services for engine replacement, engine maintenance, sterndrive replacement, and sterndrive service respectively; and CLIN 0007 covers over-and-above work identified through approved CFRs. The contractor must provide qualified personnel including a maintenance supervisor with three years' boat or ship repair experience, certified marine machinery mechanics and marine electricians with minimum three years' experience, and must submit completed Maintenance Procedure Card cover sheets and quality assurance documentation upon completion. All contractor-furnished parts must be Original Equipment Manufacturer (OEM) only, with aftermarket parts prohibited. The contractor is limited to an 8% General and Administrative Fee for all Contractor Furnished Equipment (CFE) purchases, and must submit CFRs to the Contracting Officer's Representative no later than 15 calendar days after identifying deficiencies.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TRANSPORTABLE PORT SECURITY BOAT (CG 32 TPSB)
TRANSPORTABLE PORT SECURITY BOAT (CG 32
TPSB)
WORK SPECIFICATION SHEET (WSS)
(16 APRIL 2026)
TABLE OF CONTENTS
Item Page
Revisions Record 3
Introduction 4
General Requirements 6
Definitions and Acronyms 19
Government Furnished Equipment 20
CLIN 0001: Operational Tests and Inspection 21
CLIN 0002: Comprehensive Maintenance and Repair Services 23
CLIN 0003: Engine Replacement (Optional) 32
CLIN 0004: Engine Maintenance (Optional) 34
CLIN 0005: Sterndrive Replacement (Optional) 36
CLIN 0006: Sterndrive Service (Optional) 37
CLIN 0007: Over and Above Work 38
Deliverables 39
Revisions Record
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE
REV#
WORK
ITEM#
CHANGES MADE
4/1/2026 001 CLIN0001 Combined previous CLIN(s) 0001 and 0002 into a single CLIN.
4/6/2026 002 CLIN0002 Combined previous CLIN(s) 0003 – 0011 into a single CLIN.
Updated description: Hull Sheath Replacement to reflect as Hull Sheath
Refurbishment/Replacement.
4/6/26 003 CLIN00012-0015 Updated CLIN (s) 0012-0015 to reflect 0003-0006
4/6/26 003 CLIN003 Removed Battery GFE
4/6/26 008 CLIN008 Removed Exhaust Riser GFE
NOTE: All section and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
Introduction
1. SCOPE
1.1 Intent. The Contractor shall provide maintenance and repair for the USCG 32-TPSB and trailer utilized by the U. S. Coast Guard Port Security Units (PSU).
2. BACKGROUND
32ft TPSB’s are assigned to Port Security Units throughout the United States. Assets are routinely rotating in a maintenance and operational schedule. Deployed Units are accruing extremely high op tempo hours which has presented an obstacle for organizational and depot maintenance.
3. BOAT SPECIFICATIONS
Length Overall (LOA 32 FT 8 inches
Length, Boat on Trailer 38 FT 6 inches
Beam (including collar) 8 FT 6 inches
Fixed Height on trailer 12 FT 6 inches
Fully Outfitted Weight 9,700 lbs.
Boat Weight with Trailer 11,500 lbs.
Engines: Two Yanmar 6LPA-STZC3 diesel engines, 315 horsepower (HP)
Sterndrives Two Mercruiser Bravo 1XR sterndrive
Fuel Tank Capacity 150 gallons
General Requirements
1.1 Intent. The Coast Guard estimates 8 boats and trailers will require maintenance and repair per period of performance (PoP), with the option of increasing that by an additional 2 units per
PoP. In most instances, the USCG anticipates sending 2 boats to the vendor every 3 months.
The Contractor shall complete all planned preventive maintenance and repairs (or OVERHAUL?) at the Contractor’s facility within ten weeks from the conclusion of the initial Pre-Operative
Maintenance Testing. Additional work covered by Condition Found Reports (CFR) may extend that timeline to the right, depending on the nature of the CFR. Maintenance to be completed shall include all calendar and hourly-based maintenance as indicated by the CLIN, MPC and Maintenance Due
List.
1.2 MPC covers sheets. The Contractor shall submit completed MPC cover sheets for all work completed to the Contracting Officer’s Representative upon final delivery of the boat and trailer to the U.S. Coast Guard. The U.S. Coast Guard shall provide completed Maintenance Procedure
Cards examples for reference, if required.
2. REFERENCES
The below-listed documents form a part of this specification to the extent specified herein.
Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other
Government documents may be accessed – free of charge – as follows:
• MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
• Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
• Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws:: www.gpoaccess.gov
The Government is aware of the following internet web links where contractors may procure commercial specifications:
• American Welding Society (AWS): http://www.awspubs.com/index.php
• ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
• NFPA: http://www.nfpa.org http://www.assistdocs.com/search/search_basic.cfm http://www.uscg.mil/directives/default.asp http://www.gpoaccess.gov/ http://www.awspubs.com/index.php http://www.techstreet.com/ http://www.nfpa.org/
• SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
3. REQUIREMENTS
The Contractor shall provide qualified personnel to accomplish all tasks identified in this WSS, which shall include the following:
• Oversee qualification and program
• Submit reports as required
• Serve as liaison between Contractor, Contracting Officer’s
Representative (COR) and KO
3.1 QUALITY ASSURANCE:
• Serve as liaison between Contractor, Contracting Officer’s
Representative (COR) and KO
• Inspect government-owned equipment or materials in the possession of the contractor to ensure compliance with the contract or regulations or to prevent misuse
• Maintain Safety Record and continually work on improving safety policy and procedures within the facility
• Examine records, reports, and/or other documents to establish facts or detect discrepancies
• The Contractor shall establish and maintain a quality assurance program to ensure that all tasks are completed in accordance with the scope of work. The Quality Assurance Plan shall be submitted as part of the Contractor’s proposal.
• The Quality Assurance Plan shall be tailored to the requirements of this contract. A quality system has been approved in accordance with ISO 9000 registrar is an acceptable alternative. Either case, the Contractor shall submit all required processes, instructions, licenses, certificates, standards and other information the KO/COR requires ensuring compliance with this requirement. The prime
Contractor is responsible for auditing and certifying that all consultants, subcontractors and suppliers are in compliance with these requirements.
• The Contractor shall ensure Quality Assurance Inspections and
Tests are accomplished in accordance with approved Coast Guard
Drawings, Technical Manuals, Maintenance Procedure Cards and http://shopping.netsuite.com/sspcmarketplace applicable Government and commercial standards and specifications called out in this SOW and each individual CLIN.
Each task shall have quality assurance check sheets developed and submitted to the COR as part of the Post Maintenance Report. The checklists shall contain, Date of action, action(s) taken, including
MPC numbers as applicable, QA review and sign off of each action, results of any test or inspections, digital pictures, and signature of the Representative.
3.2 PLANNER/ESTIMATOR: Overall coordination of projects and services assigned by their supervisor.
• Source costs with vendors as needed to complete estimating projects
• Have a thorough understanding of equipment capabilities to effectively price and schedule projects.
• Ensure all necessary parts/components to complete a job are present and/or available.
• Accepts reports and reviews data to make sure all essential information is present for estimating.
3.3 MAINTENANCE SUPERVISOR:
• Coordinate and supervise the work of employees in the maintenance and upkeep of boats and trailers.
• Maintain hull, mechanical, electrical, electronics and related systems.
• Perform the work of employees and other duties as required.
• Responsible for the safe and efficient operation of all equipment in the facility.
• Supervise other maintenance staff personnel to include scheduling, assigning and completion of all maintenance tasks and service orders.
• Minimum Qualifications
• 3 years’ experience in boat or ship repair as a supervisor or leadership position.
3.4 QUALIFIED MAINTENANCE PERSONNEL:
• Marine Machinery Mechanic o Shall be certified and have a minimum of 3 years of experience as a Marine Machinery Mechanic.
• Marine Electrician o Shall be certified and have a minimum of 3 years of experience as a Marine Electrician.
3.5 GOVERNMENT FURNISHED EQUIPMENT (GFE)
• Government shall furnish 32ft-TPSB and trailer. The below list is required for two boat and trailers.
• Any other required parts not identified as GFE shall be considered CFE. The Contractor is limited to an 8% General and
Administrative Fee for all purchases made under CFE.
• The Contractor shall ensure material and equipment for each boat/trailer are maintained as required in this contract.
• Requests for additional GFE shall be submitted on the Condition
Found Report at the beginning of each availability. Requests for additional GFE shall be submitted through the CG Representative to the COR.
• The Contractor may be required to provide parts and/or materials required in the performance of this work. This may occur when the Government has run out of stock material at the USCG
Warehouse. When the Contractor is required to provide CFE, the must provide copies of all quotes received by 3rd party Vendors.
• All GFE shall be stowed in a secured location at the contractor’s facility. All GFE shall be stored to protect from damage. All
GFE shall have limited access to only the personnel working on these assets.
3.6 CONTRACTOR FURNISHED EQUIPMENT (CFE)
• The Contractor shall provide all material and equipment not provided by the Government to meet the requirements of this contract. This shall include, but not be limited to the following: shop-stock items such as rags, wiring, grease, oil, common nuts and bolts, etc...
• Contractor shall provide crane service, forklift or other means for loading and off-loading boat and trailer at contractor’s facility.
• All listed MPC’s with parts associated in completing the MPC will be CFE unless specified in the consolidated list of government furnished property. MPC’s are to be used as a procedural reference and not to imply the U.S Coast Guard is supplying any parts/GFE other than listed in the government furnished property table.
• Contractor shall have the capability to provide transportation for the
32 TPSB and trailer to and from the local boat ramp or marina.
** Note: The manufacturer’s specifications: the trailer has a 13,800lb gross vehicle weight ratio (GVWR). Trailer weight is 1,800 lbs. and max net capacity is 12,000 lbs.
specific minimum experience levels may be waived at the discretion of the government if comparable experience can be proven.
3.7 FACILITY
• Contractor’s facility shall adhere to all Occupational Safety and
Health Administration (OSHA) standards. Facility will be utilized for asset storage and maintenance. The Contractor shall ensure sufficient quantities of material and equipment are maintained on hand to support the requirements of this contract.
• U.S. Coast Guard shall have access to facility for approved additional work when required.
• U.S. Coast Guard Representative shall coordinate with the
Contractor to access facility when required.
3.8 SECURITY
• Release of information generated for the USCG shall not be permitted without prior written consent from the Contracting
Officer.
• USCG assets shall be secured in a closed warehouse or inside a secured fenced-in enclosure, which limits access to only the personnel working on this asset.
• The Contractor shall stow all GFP and CFE inside the Contractor’s facility in the event of severe weather to prevent damage to the
GFP.
• Contractor and CG Representative or COR shall coordinate inspections and meetings when necessary.
3.9 CONTRACTING OFFICER REPRESENTATIVE INFORMATION
• The Contracting Officer will designate Government personnel to act as the Contracting Officer’s Representative (COR) to perform functions under the contract such as review and/or inspection and acceptance of services and other functions of a technical nature. The
Contracting Officer will provide a written notice of such designation to the Contractor. The designation letter will set forth the authorities and limitations of the COR under the contract. It shall emphasize that only the Contracting Officer has the authority to modify the terms of the contract/order. The COR is the point of contact through which the contractor can relay questions and problems of a technical nature to the Contracting Officer. If the contractor is unsure whether an effort is outside the scope of the contract, the contractor shall promptly notify the Contracting Officer in writing. Contractor and
CG Representative or COR shall coordinate inspections and meetings when necessary.
• Contractor, CG Representative or COR shall coordinate inspections and meetings when necessary.
• Kick-Off Meeting. The Contractor shall contact the COR no later than five business days after the date of award to schedule the Kick-
Off Meeting.
• Progress Meetings: The Contractor shall participate in progress meetings as requested by the Contracting Officer to discuss management and execution of the contract. Meetings may be in person or via teleconference, as the Contracting Officer deems necessary.
4: COAST GUARD DRAWINGS
Coast Guard Drawing 32-TPSB_100_001 Hull Structure
Coast Guard Drawing 32-TPSB_114_001 Fendering
Coast Guard Drawing 32-TPSB_123_001 Fuel Tank
Coast Guard Drawing 32-TPSB_167_1 Hull Structural Closures
Coast Guard Drawing 32- TPSB _150_1 Deck House Structure
Coast Guard Drawing 32- TPSB _233_2 Propulsion Diesel Engines, Main
Coast Guard Drawing 32- TPSB _256_2 Cooling Sea Water System
Coast Guard Drawing 32- TPSB _261_2 Fuel Service System
Coast Guard Drawing 32- TPSB _313_1 Batteries and Service Facilities
Coast Guard Drawing 32- TPSB _324_62 Switchgear and Panels Circuit Breakers
Coast Guard Drawing 32- TPSB _406_1 Grounding and Bonding
Coast Guard Drawing 32- TPSB _561_2 Steering System
Coast Guard Drawing 32-TPSB_631_001 Painting
Coast Guard Drawing 32-TPSB_910_1 Trailer
5: COAST GUARD PUBLICATIONS
Coast Guard Boaters Operator Handbook 16233.32a Ref 19 November 2015, Jan 2015, 32-Ft
Transportable Port Security Boat (TPSB) Operator’s Handbook
Surface Forces Logistics Center Standard Specification 0000 (SFLC STD Spec 0000), 2012, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC STD Spec 0740), 2012, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC STD Spec 6310), 2012, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 8635 (SFLC STD Spec 8635), 2012, Temporary Services
Coast Guard Technical Publication (TP) 6202b, Marine Diesel Engine - Model 6lp Series -
Service Manual
Coast Guard Technical Publication (TP) 6228, Stern drive Manual - Models Bravo One X and
XR
Coast Guard Technical Publication (TP) 6456, 32' TPSB Engine Controls - Model Ch7800
Coast Guard Technical Publication (TP) 6459, 32' TPSB Stabilized Seats
Coast Guard Technical Publication (TP) 6460, Steering Gear System - Tilt Helms
Coast Guard Technical Publication (TP) 6458, 32' TPSB Deck Covering
6: OTHER REFERENCES
Coast Guard Ready for Operations (RFO) SMTC TPSB GEN. IV Checklist
MIL-A-18001, May 2005, Anodes, Sacrificial Zinc Alloy (Commercially Accepted - ASTM
B418)
MIL-PRF-24647D, Feb 2005, Paint System, Anticorrosive and Antifouling, Ship Hull
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2004, Solvent Cleaning
ASTM International (ASTM) E797, 2005, Standard Practice for Measuring Thickness by Manual
Ultrasonic Pulse-Echo Contact Method
MIL-A-18001, May 2005, Anodes, Sacrificial Zinc Alloy (Commercially Accepted - ASTM
B418)
International Code Council (ICC) International Building Code (IBC), 2012, International
Building Code
CG 32-TPSB Boat Operator’s Handbook
International Code Council (ICC) International Fire Code (IFC), 2012, International Fire Code
National Fire Protection Association (NFPA) 70, 2011, National Electrical Code
DEFINITIONS AND ACRONYMS
“GFE“: Government-Furnished Equipment.
“CFE“: Contractor-Furnished Equipment.
“CLIN”: Contract Line Item Number
“CFR”: Condition-Found Report - Report submitted to the Contracting Officer’s Representative, either in written or electronic format, describing the condition(s) found while performing a task specified in the work item, such as an inspection.
“Coast Guard Representative/CG Representative”: All work items within the contract will be assigned to a Coast Guard Representative, who is appointed by the Contracting Officer. The
Representative’s duties are to monitor the assigned work items, to keep informed of how work is progressing, and to ensure that the specifications are being followed. The Representative will witness all tests, measurements and inspections as required.
report to the COR.
“KO”: Contracting Officer.
“COR”: Contracting Officer’s Representative – the person delegated by the KO as the representative for matters concerning performance of work; this includes correctness, timeliness, and quality of the Contractor’s work.
“ESD”: U.S. Coast Guard Electronic Support Detachment.
“Hazardous Waste (HW)”: Substances that are defined as hazardous, in accordance with 40
CFR Part 261.
“HM&E”: Hull, Mechanical and Electrical-Having to do with the boats hull or installed systems
(i.e.: Engine, outdrives, seats etc.). This does not include “electronics suite.”
“MDL”: Maintenance Due List – this is a comprehensive list of all depot and organizational-level maintenance due on a platform.
“MPC”: Maintenance Procedure Card – these cards precisely define the actual steps for performing the maintenance tasks in the MRL.
“OEM”: Original Equipment Manufacturer.
“OSHA”: Occupational Safety and Health Administration.
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED
PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM
DESCRIPTION
NIIN/PN QTY ESTIMATED
COST
($/UNIT)
8 YES ENGINE, YANMAR 01-599-6838 04 $50,000
8 NO FILTER,
SEPERATOR
01-565-5772 04 $1,000
10 YES STERN DRIVE 01-618-9465 04 $25,000
3 NO ARM, WIPER 01-632-6319 04 $100.00
3 NO BLADE, WIPER 01-617-6352 04 $25.00
4 NO TRANSOM
ASSEMBLY
01-584-2562 04 $12,000
7 NO STBD SHEATH 01-624-5321 02 $12,000
7 NO PORT SHEATH 01-623-7164 02 $12,000
7 NO BOW COVER 01-623-7170 02 $500.00
3 NO THROTTLE
CONTROL
01-626-6825 02 $1,000
8 NO TACHOMETER 01-621-8612 04 $600.00
3 NO HELM, 2.4L 01-508-9254 02 $1,400
3 NO STEERING WHEEL 01-626-6300 02 $100.00
3 NO LOCKSET 20-009-5414 01 $750.00
3 NO TRIM PUMP 01-303-5727 04 $4,000.
3 NO POWER ASSIST 01-617-7741 02 $3,000.
3 NO FAN, VENTILATING 01-582-7022 04 $400.00
13 NO JACK,HYDRAULIC 01-646-9829 02 $250.00
13 NO WINCH 01-646-9808 02 $200.00
13 NO AXLE 01-646-9857 04 $4,000
13 NO STRAP, TIE DOWNS 01-626-1372 08 $800.00
13 NO CHAFE PREVENTER 01-F14-3811 08 $200.00
3 NO LANYARD, CORD 01-497-5689 04 $50.00
3 NO DIMMER SWITCH, 01-626-9326 06 $600.00
3 NO LED LIGHT 01-626-5431 02 $200.00
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the Surface Forces Logistics Center or the
C4IT Service Center.
****Mandatory Turn-In (MTI), to be shipped to SFLC within 15 calendar days of receipt date coordinated with the COR.
CLIN 0001: Operational Tests and Inspection
1. Pre and Post Operational Test
Scope
This work item describes the requirements for the Contractor to conduct Pre and Post Operational tests for acceptance and completed work item requirements.
References
• Coast Guard Boat Operator Handbook 16233.32A Ref, 19 November 2015, Jan 2015, 32-FT
Transportable Port Security Boat (TPSB) Operator’s Handbook
Requirements
• Contractor shall operationally test the boat and trailer in the presence of the Coast Guard
Representative in accordance with OEM specifications and test procedures, upon arrival for acceptance and completion prior to final delivery to the U.S. Coast Guard.
• Contractor shall notify the CG Representative of the pending operational test at least 15 calendar days in advance.
• Contractor shall provide sufficient fuel to conduct underway operational test.
• Contractor shall provide boat crew with a minimum of 3 years of experience and current certification from a Coast Guard approved Boating Safety Course.
• Upon completion of successful operational test, Contractor shall completely defuel and dispose of all removed fuel in accordance with all State and Federal regulations.
Notes
• This work item will be completed on every boat.
2. Inspection
Scope
This work item describes the requirements for the Contractor to initiate inspection of a CG 32-TPSB and trailer. Upon completion of the operational tests, contractor shall complete the Ready for
Operations (RFO) inspection checklist with CG representative.
References
• Coast Guard Ready for Operations (RFO) SMTC TPSB GEN. IV Checklist
Requirements
• Contractor shall conduct the inspection in the presence of a CG Representative.
• All discrepancies will be documented on a Condition Found Report (CFR) for each of the identified equipment.
• Contractor shall submit CFRs to the COR no later than 7 calendar days from completion of inspection or 7 calendar days from when a deficiency is identified.
• This work item will be completed on every asset.
CLIN 0002: Comprehensive Maintenance and Repair Services
1. Hull Maintenance
This work item describes the requirements for the Contractor to perform preventive maintenance services for the CG 32-TPSB boat in accordance with the listed MPCs.
References
• Coast Guard Technical Publication (TP) 6202b, Marine Diesel Engine - Model 6lp Series -
Service Manual
• Coast Guard Technical Publication (TP) 6228, Stern drive Manual - Model Bravo One X and
XR
• Coast Guard Technical Publication (TP) 6456, 32' TPSB Engine Controls - Model Ch7800
• Coast Guard Technical Publication (TP) 6459, 32' TPSB Stabilized Seats
• Coast Guard Technical Publication (TP) 6460, Steering Gear System - Tilt Helms
• Coast Guard Technical Publication (TP) 6458, 32' TPSB Deck Covering
Requirements
• Contractor shall complete all planned preventive maintenance listed in Table 1 for each boat at the Contractor’s facility.
• Maintenance to be completed shall include all calendar and hourly-based maintenance as indicated by the Maintenance Procedure Card.
• Submit a CFR to the COR if additional repairs are required.
• Contractor furnished parts shall be Original Equipment Manufacturer (OEM) only.
Aftermarket parts are not authorized.
• List all parts used on the Post Maintenance Report.
• Contractor shall submit completed MPC cover sheets for all maintenance procedures accomplished to the CG Representative.
Task Table
Task # MPC # Title Task Description
01 32-TPSB_A62015.0 Propulsion Control Head (GFE) Replace
02 32-TPSB_A62013.0 Propulsion Control Cables Replace
03 32-TPSB_A62014.0 Sterndrive Shift Cables Replace
04 32-TPSB_K20009.0 Sterndrive Trim Pump (GFE) Replace
(Continue table as per original SOW)
2. Transom Replacement
This work item describes the requirements for the Contractor to remove both port and starboard engines, both sterndrives and replace transom assemblies to OEM specification.
References
• Coast Guard Drawing 32-TPSB_167_1 Hull Structural Closures
• Coast Guard Drawing 32-TPSB_233_2 Propulsion Diesel Engines, Main
• Coast Guard Drawing 32-TPSB_561_2 Steering System
• Coast Guard Commandant Instruction (COMDTINST) MI0360.3 (Series), Rev D, JAN 2015, Coatings and Color Manual
• Surface Forces Logistics Center Standard Specification 6310 (SFLC STD Spec 6310), 2012, Requirements for Preservation of Ship Structures
• Coast Guard Technical Publication (TP) 6202b, Marine Diesel Engine - Model 6lp Series -
Service Manual
• Coast Guard Technical Publication (TP) 6228, Stern drive Manual - Model Bravo One X and
XR
• Coast Guard Technical Publication (TP) 6456, 32' TPSB Engine Controls - Model Ch7800
Requirements
• Replace both port and starboard transom assembly to OEM specification.
• Inspect transom hull plating for corrosion and pitting; submit CFR.
• Replace all engine mounts (GFE), raw water/exhaust hoses, associated clamps & V-bands, and wiring harness (console to engines) with only OEM parts.
• Replace all fluids & filters with OEM.
• Submit completed MPC cover sheets for all maintenance procedures accomplished to the
COR upon delivery to the Coast Guard.
Task Table
Task # MPC # Title Task Description
01 32-TPSB_A15001.0 Engine (GFE) Remove/Install
02 32-TPSB_A15005.0 Test Engine Test
03 32-TPSB_A15001.0 Tach/Hour Meter (GFE) Replace
04 No MPC Engine Wiring Harness (CFE) Replace
Task # MPC # Title Task Description
05 32-TPSB_D83025.0 Alternator Install (GFE) Replace
3. Fuel Tank Removal/Inspection
This work item describes the requirements for the Contractor to remove the fuel tank for inspection, pressure test and reinstallation.
References
• Coast Guard Drawing 32-TPSB_167_1 Hull Structural Closures
• Coast Guard Drawing 32-TPSB-123-001 Fuel Tank
• Coast Guard Commandant Instruction (COMDTINST) MI0360.3 (Series), Rev D, JAN 2015, Coatings and Color Manual
• Surface Forces Logistics Center Standard Specification 6310 (SFLC STD Spec 6310), 2012, Requirements for Preservation of Ship Structures
• Coast Guard Technical Publication (TP) 6458, 32' TPSB Deck Covering
• Coast Guard Technical Publication (TP) 6459, 32' TPSB Stabilized Seats
Requirements
• Remove cockpit seating and access deck patch to allow removal of the fuel tank.
• Label and disconnect all lines and connections from fuel tank.
• Remove fuel tank, inspect entire fuel tank and hull plating underneath for corrosion, damage and pitting.
• Pressure test fuel tank to three psi for 10 minutes.
• Submit a CFR to the COR if additional repairs are required.
• Install removed fuel tank and reconnect all connections properly.
• Replace removed access patch and cockpit seating.
• Chase all threaded holes with thread tap; apply anti-seize compound to all threaded fasteners.
• Test all connections for leakage during operational test.
4. Limber Holes
This work item describes the requirements for the Contractor to inspect/enlarge existing limber holes to permit drainage of bilge water at the lowest intersections on each athwart ship stiffener and longitudinal stringer in the fuel tank area.
References
• Coast Guard Drawing 32-TPSB_167_1 Hull Structural Closures
• Coast Guard Drawing 32-TPSB-100-001 Hull Structure
• Coast Guard Commandant Instruction (COMDTINST) MI0360.3 (Series), Rev D, JAN 2015, Coatings and Color Manual
• Surface Forces Logistics Center Standard Specification 6310 (SFLC STD Spec 6310), 2012, Requirements for Preservation of Ship Structures
• Coast Guard Technical Publication (TP) 6458, 32' TPSB Deck Covering
Requirements
• While fuel tank is removed, inspect all existing limber holes located on each athwart ship stiffener and longitudinal stringer in the fuel tank area.
• Holes must be at a minimum ½” diameter located in the lower third of the vertical structure.
• Install limbers holes per minimum ½” diameter in the lower third of the vertical structure to permit drainage of bilge water as required.
• Submit a CFR to the COR if additional repairs are required.
5. Hull Sheath Replacement
This work item describes the requirements for the Contractor to remove both port and starboard sheaths, inspect bladders and floatation foam for damage, clean exposed hull, apply two-part epoxy barrier primer, clean and reinstall sheaths.
References
• Coast Guard Drawing 32-TPSB_167_1 Hull Structural Closures
• Coast Guard Drawing 32-TPSB-114-001 Fendering
• Coast Guard Drawing 32-TPSB-631-001 Painting
• Coast Guard Commandant Instruction (COMDTINST) MI0360.3 (Series), Rev D, JAN 2015, Coatings and Color Manual
• Surface Forces Logistics Center Standard Specification 6310 (SFLC STD Spec 6310), 2012, Requirements for Preservation of Ship Structures
• Coast Guard Technical Publication (TP) 6458, 32' TPSB Deck Covering
Requirements
• Remove port and starboard sheaths, inspect and remove bladders and floatation foam for damage.
• Mechanically clean or media blast to near white finish, apply two coats of two-part epoxy barrier prime.
• Clean sheath tracks, chase all threaded holes with thread tap, apply anti-seize compound to all threaded fasteners.
• Replace both port and stbd sheaths and bladders, inflate to manufacturer’s specifications and check for leakage.
• Submit a CFR to the COR if additional repairs are required.
• If GFE is provided, repaint hull numbers using WING stencil kit and paint.
Task Table
Task # MPC # Title Task Description
1 32-TPSB_B14003.0 Sponson Replace
2 32-TPSB_B14007.0 Bow/Cover (GFE) Replace
6. Bilge Cleaning and Inspection
This work item describes the requirements for the Contractor to clean and inspect the vessel’s bilge system.
References
• Coast Guard Drawing 32-TPSB_167_1 Hull Structural Closures
• Coast Guard Drawing 32-TPSB_150_1 Deck House Structure
• Coast Guard Drawing 32-TPSB_191_1 Flotation Foam
• Coast Guard Commandant Instruction (COMDTINST) MI0360.3 (Series), Rev D, Jan 2015, Coatings and Color Manual
• Coast Guard Boaters Operator Handbook 16233.32A Ref 19 November 2015, Jan 2015, 32-
FT Transportable Port Security Boat (TPSB) Operator’s Handbook
• Coast Guard Technical Publication (TP) 6458, 32' TPSB Deck Covering
• Surface Forces Logistics Center Standard Specification 0000 (SFLC STD Spec 0000), 2012, General Requirements
• Surface Forces Logistics Center Standard Specification 0740 (SFLC STD Spec 0740), 2012, Welding and Allied Processes
• Surface Forces Logistics Center Standard Specification 6310 (SFLC STD Spec 6310), 2012, Requirements for Preservation of Ship Structures
• Surface Forces Logistics Center Standard Specification 8635 (SFLC STD Spec 8635), 2012, Temporary Services
• MIL-PRF-24647D, Feb 2005, Paint System, Anticorrosive and Antifouling, Ship Hull
• SSPC Surface Preparation Specification No.1 (SSPC-SP 1), 2004, Solvent Cleaning
• ASTM E797, 2005, Standard Practice for Measuring Thickness by Manual Ultrasonic Pulse-
Echo Contact Method
Requirements
• Remove all interferences, clean and inspect all bilge locations, reinstall buoyancy foam as per drawings.
• Furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces.
• Upon completion of work, remove all installed protective measures, inspect for contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
• Submit a CFR to the COR if repairs are required.
Bilge Locations Table
Location
Anchor Locker
Forward Stowage Locker
Forward Deck
Main Deck
Engine Room
Aft Buoyancy Chamber
7. Trailer Maintenance
This work item describes the requirements for the Contractor to perform preventive maintenance services for the CG 32-TPSB trailer in accordance with the listed MPCs.
References
• Coast Guard Drawing 32-TPSB_910_1 Trailer
Requirements
• Complete all planned preventive maintenance on each trailer at the Contractor’s facility.
• Maintenance to be completed shall include all calendar and hourly-based maintenance as indicated by the Maintenance Procedure Card.
• Contractor furnished parts shall be Original Equipment Manufacturer (OEM) only.
• Submit completed MPC cover sheets for all maintenance procedures accomplished to the
COR.
Task Table
Task # MPC # Title Task Description
01 MSR_HB0508.0 32TPSB Winch & Strap Assembly Replace (GFE for Winch)
02 MSR_HB0521.0 32TPSB Trailer Hub Components Replace
03 MSR_HB0516.0 32TPSB Trailer Calipers Replace
04 MSR_HB0515.0 32TPSB Trailer Brake Pads Replace
05 MSR_HB0514.0 32TPSB Trailer Brake Rotor Replace
06 MSR_HB0504.0 32TPSB Trailer Suspension Axle Replace (GFE)
07 MSR_HB0506.0 32TPSB Tongue Jack Replace (GFE)
8. Dashboard Refurbishment
This work item describes the requirements for the Contractor to disassemble the entire dashboard, including all aluminum and plastic panels, all gauges, switches, electronics. Remove vinyl wrap from all surfaces. Prep, prime and repaint surface. Fabricate new aluminum and plastic panels for reinstallation.
References
• Coast Guard Drawing 32-TPSB_167_1 Hull Structural Closures
• Coast Guard Drawing 32-TPSB_150_1 Deck House Structure
• Coast Guard Drawing 32-TPSB-631-001 Painting
• Coast Guard Commandant Instruction (COMDTINST) MI0360.3 (Series), Rev D, JAN 2015, Coatings and Color Manual
• Surface Forces Logistics Center Standard Specification 6310 (SFLC STD Spec 6310), 2012, Requirements for Preservation of Ship Structures
• Coast Guard Technical Publication (TP) 6458, 32' TPSB Deck Covering
Requirements
• Remove all components from the dashboard including all electronics equipment, switches panels, gauge panels, throttles, etc.
• Remove all vinyl covering from the dashboard.
• Clean all electrical connection and terminals.
• Fabricate all replacement aluminum panels including all plastic gauge panels, prep panels and dash for AWLGRIP coatings.
• All prep work and coating procedures to be performed to standard listed in the AWLGRIP application guide, Edition 18.
• Recoating of the panels and dash structure will be a three-part application consisting of etch primer D6600/3300, 545 grey anti-corrosive primer, and a final topcoat of jet black
AWLGRIP with flattening agent.
• Reassemble all dashboard components with new fasteners, new gasket material and blue
Loctite applied to all fasteners.
• Test all dashboard components for proper operation.
9. General Welding
This work item describes the requirements for the Contractor to provide general welding listed in table 1.
References
• Coast Guard Technical Publication (TP) 4934, SWBS 074, Mar 2015, Small Boat Diagrams for Hot work
• Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
• Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
• Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Requirements
• Provide general welding, including fabrication, brazing, inspection, plate renewal, crack repair, overlay, and associated processes on Coast Guard vessels and equipment in accordance with TP 4934 and SFLC Std Spec 0740.
• Prepare and coat all new and disturbed exterior and interior surfaces, as applicable, to match existing adjacent surfaces in accordance with SFLC Std Spec 6310.
• Contractor shall submit CFRs to the COR no later than 15 calendar days after receiving notification of a deficiency. Condition Found Reports shall be broken down into Work item, parts, and labor at a minimum.
Task Table
Task Description
Fabricate two replacement flag staffs and weld to cabin top
Remove corrosion, clad weld port and stbd cabin top behind curtain snaps. Resurface to original specification.
Remove corrosion, clad weld 04 gun mounts and resurface to original specifications.
Remove corrosion, clad weld 50 Cal gun mount x 2
Remove corrosion, clad weld 240 Cal gun mount x 2
(Image 5) 240 Cal gun mount x 2
CLIN 0003 (Optional): Engine Replace
1.1 Intent. Engines will be removed and replaced in CLIN 0003. Coast Guard reserves the right to remove and replace both engines with GFE. This work item describes the requirements for the
Contractor to replace each/both port and starboard engines and perform preventive maintenance services for the CG 32-TPSB boat in accordance with the below listed MPC’s. All required fluids are considered CFE.
1.2 Government-furnished property and Equipment.
• CG 32-TPSB
• Two Yanmar engine (GFE)
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 6202b, Marine Diesel Engine - Model 6lp Series -
Coast Guard Technical Publication (TP) 6228, Stern drive Manual - Model Bravo One X and XR
Coast Guard Technical Publication (TP) 6456, 32' TPSB Engine Controls - Model Ch7800
Coast Guard Technical Publication (TP) 6459, 32' TPSB Stabilized Seats
3.1 Planned maintenance. The contractor shall replace port and starboard with GFE tachometers, all engine mounts, hoses, clamps and wiring harness (console to engines) with only OEM parts, which are considered CFE. Submit a CFR to the COR if additional repairs are required.
3.1.1 Labor and material. The Contractor shall provide all labor and material, except for specified Government Furnished Equipment (GFE), to complete each task identified in the GFE
Table and indicated on the Maintenance Procedure Cards (MPC).
3.1.2 Contractor furnished parts. Contractor furnished parts shall be Original Equipment
Manufacturer (OEM) only. Aftermarket parts are not authorized for use in completion of any maintenance or repairs on the CG 32-TPSB. List all parts used on the Post Maintenance Report.
3.1.3 MPC changes. The Coast Guard reserves the right to make changes to allow for equipment updates, configuration changes or modifications to maintenance requirements as needed. The
Contractor will be provided with any changes and required implementation dates as they become available.
3.1.4 MPC covers sheets. The Contractor shall submit completed MPC cover sheets for all maintenance procedures accomplished to the COR upon delivery to the U.S. Coast Guard. The U.S. Coast Guard shall provide completed MPC examples for reference, if required.
Table 1- CG 32 TPSB Maintenance Due list
Task # MPC # TITLE Task
Description
1 32-TPSB_A15001.0 ENGINE (GFE) REM/INST
2 32-TPSB_A15005.0 TEST ENGINE TEST
3 32-TPSB_A15001.0 TACH/HOUR METER (GFE) REPLACE
4 NO MPC ENGINE WIRING HARNESS (CFE) REPLACE
5 32-TPSB_D83025.0 ALTERNATOR INSTALL (GFE) REPLACE
CLIN 0004 (Optional): Engine Maintenance
1.1 Intent. Engines will be removed and replaced in CLIN 0004. Coast Guard reserves the right to elect to have one or both original engines serviced. This work item describes the requirements for the Contractor to service both port and starboard engines and perform preventive maintenance services for the CG 32-TPSB boat in accordance with the below listed MPC’s. All required fluids are considered CFE.
This work item describes the requirements for the Contractor to perform preventive maintenance services for the CG 32-TPSB boat in accordance with the below listed MPC’s.
1.2 Government-furnished property.
Coast Guard Technical Publication (TP) 6202b, Marine Diesel Engine - Model 6lp Series -
Service Manual
Coast Guard Technical Publication (TP) 6228, Stern drive Manual - Model Bravo One X and XR
Coast Guard Technical Publication (TP) 6456, 32' TPSB Engine Controls - Model Ch7800
Coast Guard Technical Publication (TP) 6459, 32' TPSB Stabilized Seats
3.1 Planned maintenance. The Contractor shall complete all planned preventive maintenance on each boat at the Contractor’s facility. Maintenance to be completed shall include all calendar and hourly-based maintenance as indicated on the Maintenance Procedure Card. Submit a CFR to the
COR if additional repairs are required.
3.1.1 Labor and material. The Contractor shall provide all labor and material, except for specified Government Furnished Equipment (GFE), to complete each task identified for each
Maintenance Procedure Cards (MPC).
3.1.2 Contractor furnished parts. Contractor furnished parts shall be Original Equipment
Manufacturer (OEM) only. Aftermarket parts are not authorized for use in completion of any maintenance or repairs on the CG 32-TPSB. List all parts used on the Post Maintenance Report.
3.1.3 MPC changes. The Coast Guard reserves the right to make changes to allow for equipment updates, configuration changes or modifications to maintenance requirements as needed. The
Contractor will be provided with any changes and required implementation dates as they become available.
3.1.4 MPC covers sheets. The Contractor shall submit completed MPC cover sheets for all maintenance procedures accomplished to the COR upon delivery to the U.S. Coast Guard. The
Table 1- CG 32-TPSB Maintenance Due List
01 32-TPSB_A15003.0 100 HOUR ENGINE SERVICE SERVICE
02 32-TPSB_A15005.0 TEST ENGINE TEST
03 32-TPSB A51110.0 ENGINE COOLANT REPLACE
04 32-TPSB_A50004.0 DRIVE V-BELT REPLACE
05 32-TPSB_A50013.0 TIMING SYSTEM COMPONENT REPLACE
06 32-TPSB_A50501.0 ENGINE STARTER INSP/CLN
07 32-TPSB_A50508.0 START WIRE CONNECTOR INSP/CLN
08 32-TPSB_A51022.0 ENGINE S/W PUMP REPLACE
09 32-TPSB_A51114.0 ENGINE THERMOSTAT REPLACE
10 32-TPSB_A52005.0 TURBO AIR FILTER, STBD REPLACE
11 32-TPSB_A52007.0 EXHAUST SYSTEM INSPECT
12 32-TPSB_A53001.0 RACOR FUEL FILTER ELEMENT REPLACE
13 32-TPSB_A53012.0 FUEL CUT OUT VALVE CHECK
14 32-TPSB_A55005.0 ENG OIL/FILTER REPLACE
15 32-TPSB_L10022.0 ENGINE ANODES REPLACE
16 32-TPSB A52011.0 EXHAUST HOSE REPLACE
4. NOTES
CLIN 0005 (Optional): Sterndrive Replacement
1.1 Intent. Sterndrives will be removed and replaced in CLIN 0005. Coast Guard reserves the right to elect to have one or both sterndrives replaced with GFE. This work item describes the requirements for the Contractor to replace sterndrives and perform preventive maintenance services for the CG 32-TPSB boat in accordance with the below listed MPC’s. All required fluids are considered CFE.
This work item describes the requirements for the Contractor to perform preventive maintenance services for the CG 32-TPSB boat in accordance with the below listed MPC’s.
1.2 Government-furnished property and Equipment.
• Sterndrive
Coast Guard Technical Publication (TP) 6202b, Marine Diesel Engine - Model 6lp Series -
3.1 Planned maintenance. The Contractor shall replace each/both port and stbd outdrives.
Maintenance to be completed shall include all calendar and hourly-based maintenance as indicated by the Maintenance Procedure Card Submit a CFR to the COR if additional repairs are required.
3.1.1 Labor and material. The Contractor shall provide all labor and material, except for specified Government Furnished Equipment (GFE), to complete each task identified on the
Maintenance Procedure Cards (MPC). All fluids are considered CFE.
3.1.2 Contractor furnished parts. Contractor furnished parts shall be Original Equipment
Manufacturer (OEM) only. Aftermarket parts are not authorized for use in completion of any maintenance or repairs on the CG 32-TPSB. List all parts used on the Post Maintenance Report.
3.1.3 MPC changes. The Coast Guard reserves the right to make changes to allow for equipment updates, configuration changes or modifications to maintenance requirements as needed. The
Contractor will be provided with any changes and required implementation dates as they become available.
3.1.4 MPC covers sheets. The Contractor shall submit completed MPC cover sheets for all maintenance procedures accomplished to the COR upon delivery to the U.S. Coast Guard. The
1 32-TPSB_A46501.0 STERN DRIVE REPLACE PORT REM/INST
2 32-TPSB_A46501.0 STERN DRIVE REPLACE STBD REM/INST
CLIN 0006 (Optional): Sterndrive Service
1.1 Intent. Sterndrives will be removed and replaced in CLIN 0006. Coast Guard reserves the right to elect to have the original sterndrives serviced. This work item describes the requirements for the Contractor to service both sterndrives and perform preventive maintenance services for the
CG 32-TPSB boat in accordance with the below listed MPC’s. All required fluids are considered
CFE.
1.2 Government-furnished property and Equipment.
3.1 Planned maintenance. The Contractor shall complete all planned preventive maintenance on each boat at the Contractor’s facility. Maintenance to be completed shall include all calendar and hourly-based maintenance as indicated by the Maintenance Procedure Card. Submit a CFR to the
COR if additional repairs are required.
3.1.1 Labor and material. The Contractor shall provide all labor and material, except for specified Government Furnished Equipment (GFE), to complete each task identified in the Table
Maintenance Due List and per the Maintenance Procedure Cards (MPC). All fluids are considered
CFE.
3.1.2 Contractor furnished parts. Contractor furnished parts shall be Original Equipment
Manufacturer (OEM) only. Aftermarket parts are not authorized for use in completion of any maintenance or repairs on the CG 32-TPSB. List all parts used on the Post Maintenance Report.
3.1.3 MPC changes. The Coast Guard reserves the right to make changes to allow for equipment updates, configuration changes or modifications to maintenance requirements as needed. The
Contractor will be provided with any changes and required implementation dates as they become available.
3.1.4 MPC covers sheets. The Contractor shall submit completed MPC cover sheets for all maintenance procedures accomplished to the COR upon delivery to the U.S. Coast Guard. The
Description
1 32-TPSB_A44003.0
STERN DRIVE SERVICE
STBD & ,PORT
SERVICE
2 32-TPSB_A46511.0 STERN DRIVE GEAR OIL REPLACE
3 32-TPSB_A46527 STERN DRIVE WATER PASSAGES INSP/CLEAN
4 32-TPSB_K20007.0 STERN DRIVE TRIM PUMP FLUID REPLACE
5 32TPSB_A46507.0 STERNDRIVE/CONTINUITY INSPC/CLN
6 32-TPSB_L11019.0 STERN DRIVE ANODES REPLACE
CLIN 0007 (Optional): Over and Above Work
1.1 Intent. This will encompass all work required beyond that identified in CLINs 0001-0006 above. All work identified via submitted (and approved) Condition Found Reports (CFR) will fall under CLIN 0007. Contractor will be required to provide a written proposal that includes all labor hours required to perform this work, any parts or materials, to include the written quotes received by 3rd-party vendors for these items, and the appropriate fully-burdened labor rate, which will come from each period of performance identified in the Schedule of Supplies and
Services. Once a proposal has been reviewed and approved by the COR, the total agreed-upon price will not be subject to change without approval from the Contracting Officer. This may only occur if additional work is identified during the course of the CFR work being performed.
CLIN Item Description Deliverables
0001 Pre & Post Operational Test & Inspection;
Pre & Post Operational Testing shall consist of the Contractor shall operationally test the boat and trailer in the presence of the Coast Guard
Representative in accordance to (OEM) specifications and test procedures, upon arrival for acceptance and completion prior to delivery to the U.S. coast Guard. All, work items/maintenance due list have been completed using OEM parts and all equipment fully operational and tested. This test will be completed at the Contractor’s facility or local marina.
Inspections shall be conducted in the following manner: CG
Representative shall be present and validate the inspection.
This work item describes the requirements for the Contractor to initiate inspection of a CG 32-TPSB and trailer. Upon completion of the operational tests, contractor shall complete the Ready for Operations
(RFO) inspection checklist with CG representative. This inspection will be completed at the Contractor’s facility.
0002 Comprehensive Maintenance and Repair Services;
i) Hull Maintenance Refer to page 21 of TPSB WSS.
i) Transom Replacement Refer to page 22 of TPSB WSS.
i) Fuel Tank Removal/Inspection Refer to page 23 of TPSB
WSS.
i) Limber Holes Refer to page 24 of TPSB WSS.
i) Hull Sheath Replacement Refer to page 24 of TPSB WSS.
i) Bilge Cleaning and Inspection Refer to page 25 of TPSB
WSS.
i) Trailer Maintenance Refer to page 26 of TPSB WSS.
i) Dashboard Refurbishment Refer to page 27 of TPSB WSS.
i) General Welding Refer to page 28 of TPSB WSS.
0003 Engine Replacement (optional) Refer to page 30 of TPSB WSS.
0004 Engine Maintenance (optional) Refer to page 32 of TPSB WSS.
0005 Sterndrive Replacement (optional) Refer to page 34 of TPSB WSS.
0006 Sterndrive Maintenance (optional) Refer to page 36 of TPSB WSS.
0007 Over and Above Work Refer to page 38 of TPSB WSS.
This will encompass all work required beyond that identified in CLINs
0001-0006 above. All work identified via submitted (and approved)
Condition Found Reports (CFR) will fall under CLIN 0007. Contractor will be required to provide a written proposal that includes all labor hours required to perform this work, any parts or materials, to include the written quotes received by 3rd-party vendors for these items, and the appropriate fully-burdened labor rate, which will come from each period of performance identified in the Schedule of Supplies and
Services. Once a proposal has been reviewed and approved by the
COR, the total agreed-upon price will not be subject to change without approval from the Contracting Officer. This may only occur if additional work is identified during the course of the CFR work being performed.
Contractor shall submit CFRs to the COR no later than 15 calendar days after receiving notification of a deficiency.
The COR shall acknowledge receipt of the CFR submission via email and will have seven
(7) calendar days to review and validate the submission.