This is a Question and Answer document containing 86 questions and responses related to solicitation 70Z03824RJ0000013 for Aircraft Maintenance Services and Depot Level Maintenance.

The Q&A clarifies several key points: resumes are only required for Key Personnel positions; contingent offer letters are not needed; the award will use Lowest Price Technically Acceptable (LPTA) procedures; pricing should be rounded to the nearest cent; safety plans can be the offeror's existing safety manual/policy; typical shift for On-Site Project Manager is 7:00-3:30pm; forklift and crane certification are required; the contractor must provide uniforms (typically t-shirts); phase-in allows 10 days to submit plan plus 2 days to reach full operational capability; and travel occurs approximately 1-2 times per year. Notable technical clarifications include: Mechanic III is for fabrication work while Mechanic II can work on all aircraft aspects and serves as lead for their area; Quality Control/Assurance is performed by military personnel; and the Senior Project Manager serves as Production Supervisor.

View the file

Other files

File Type Posted
REVISED A00007 - Attachment 2 - Terms and Conditions.pdf PDF
REVISED A00007 - Attachment 2 - Terms and Conditions - 70Z03824RJ0000013.pdf PDF
A00007 - Attachment 2 - Terms and Conditions - 70Z03824RJ0000013 (002).pdf PDF
A00007 - Attachment 3 - Statement of Work - 70Z03824RJ0000013.pdf PDF
A00006 - Attachment 2 - Terms and Conditions - 70Z03824RJ0000013.pdf PDF
A00005 Questions and Answers.pdf PDF
A00004 - Questions and Answers.pdf PDF
A00004 - Attachment 3 - Statement of Work - 70Z03824RJ0000013.pdf PDF
A00004 - Attachment 1 - AMS Schedule of Services - 70Z03824RJ0000013.xlsx XLSX spreadsheet
A00003 - Attachment 3 - Statement of Work - 70Z03824RJ0000013.pdf PDF
A00003 - ALC CBA Seniority List.pdf PDF
A00003 - Attachment 2 - Terms and Conditions - 70Z03824RJ0000013.pdf PDF
A00003 - Attachment 1 - AMS Schedule of Services.xlsx XLSX spreadsheet
A00002 - Attachment 3 - Statement of Work - 70Z03824RJ0000013.pdf PDF
A00002 - Attachment 2 - Terms and Conditions - 70Z03824RJ0000013.pdf PDF
A00002 - Questions and Answers - 70Z03824RJ0000013.pdf PDF
A00001 - Attachment 5 - CBA - 70Z03824RJ0000013.pdf PDF
Attachment 1 - AMS Schedule of Services.xlsx XLSX spreadsheet
Attachment 3 - SOW - 70Z03824RJ0000013.pdf PDF
Attachment 2 - Terms and Conditions - 70Z03824RJ0000013.pdf PDF
Attachment 6 - Non-Disclosure Form.pdf PDF
Attachment 5 - CBA - Solicitation 70Z03824RJ0000013.pdf PDF
Attachment 4 - Wage Determination - 70Z03824RJ0000013.pdf PDF
Attachment 7 - Past Performance Information Sheet - 70Z03824RJ0000013.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 3 (A00003) Solicitation 70Z03824RJ0000013 Questions and Answers

Q.No Applicable Document Page Number Paragraph Number Question Answer

1 Attachment 2 - Terms and Conditions 5 of 50 Factor C - Required

Certifications

Factor C – Required Certifications states “The offeror shall meet necessary certifications and standards for AS9110 certification, hazmat, and the applicable/compliance documents IAW Section 2.1 of “Attachment 3 – Statement of Work – 70Z03824RJ0000013.” Will the Government allow Offerors who do not currently possess the AS9110 certification to provide a plan on how they will achieve certification in the base year?

This has been updated. Please refer to A00003 - Attachment 2 - Terms and Conditions under Factor C - Required Certifications.

2 Attachment 3 - SOW 38 of 50 10.5 - Industrial Health Hazards

The SOW states, "...the Contractor shall conduct a worksite assessment prior to start of contractual work, identify employees for medical surveillance, and monitor exposure levels per OSHA standard. The Contractor shall provide a copy of the work assessment and quarterly monitoring reports to ALC SEHO at email D05-DG-ALC-SEHO@uscg.mil and copy the COR for Industrial Hygienist review."

Will the Government provide a copy of its latest SEHO reports to help the bidder gauge an appropriate overhead cost factor to apply for compliance to this SOW requirement?

This has been corrected. Please refer to A00003 - Attachment 3 - Statement of Work - Section 10.5 and 11.1.

SEHO does not have specific reports to provide. It is the Contractor's responsibility to meet OSHA Standards.

3 Attachment 3 -SOW 8-10 of 50

2.0 - Applicable Documents

2.1 Government Documents

2.2 Availability of Documents

Release of the following documents listed under this section in the SOW that provide specifications, standards or guidelines that shall be complied with in order to meet the requirements of the subject solicitation.

Please reference A00003 - Attachment 3 - Statement of Work - Section 2.2 for instructions on how to obtain these documents.

A00002 - Attachment 2 Terms and

Condition 4 of 55 Factor B - Staffing Approach

In this paragraph, revised language in Amendment 2 now states:

"Resumes for Key Personnel identified in the SOW and on Page 45 of the Terms and Conditions shall be provided to determine these personnel meet the qualifications of the SOW."

The original Terms and Conditions referenced both resumes and c ontingent offers of employment for Key Personnel.

However, the revised language does not explicitly mention contingent offer letters. Please confirm that contingent offer letters are still a requirement alongside resumes for Key Personnel?

Contingent offer letters demonstrate a commitment from proposed personnel, ensure alignment with SOW qualifications and availability, and mitigate risk by securing their contractual obligation to serve if awarded.

As stated in A00002 - Questions and Answers, NO contingent offers letters are needed. Please reference Factor B - Staffing Approach.

A00002 - Attachment 2 Terms and

Condition 4,5 of 55

Factor A - Management Approach

Factor B - Staffing Approach

Both Factor A and Factor B of the Technical Volume require recruitment and retention narratives.

"The description should include recruitment methods, retention incentives…" (Factor A) "The offeror shall provide an explanation that demonstrates to the Government how they plan to recruit new personnel if required, retain incumbent personnel, and minimize employee turnover." (Factor B) For the sake of page count, can the Offeror write this narrative for Factor A and reference it for Factor B?

No, please reference A00003 - Attachment 2 - Terms and Conditions - pages 3 and 4 under "Technical Acceptability".

A00002 - Attachment 2 Terms and

Condition 6 of 55 Clause 52.212-3

Clause 52.212-3 Offeror Representations and Certifications-Commercial Products and Commercial Services states that "The Offeror shall complete only paragraph (b) of this provision if the Offeror has completed the annual representations and certification electronically in the System for Award Management (SAM) accessed through https://www.sam.gov."

Which proposal volume should include this information?

The Government has updated this information. Please reference A00003 - Attachment 2 - Terms and Conditions to reflect this addition (page 2).

7 A00002 - Amendment 2 Attachment 3 SOW 13 of 50

4.2 On-Site Project Manager

(Junior) PDM Support

The SOW includes 4.2 On-Site Project Manager (Junior) PDM Support as a Key Personnel. However, the labor hours table under section 1.2.2 Required Services on Page 6 of 50 does not allocate any hours to this labor category. Should this position have hours allocated in the base year? Does the Government require one resume and Letter of Commitment for this labor category?

No, per A00003 - Attachment 1 - AMS Schedule of Services, the hours are listed as TBD (to be determined).

All key personnel require resumes. Please reference A00003 - Attachment 2 - Terms and Conditions - under Technical Acceptability - Factor B - Staffing Approach.

8 Attachment 1 - AMS Schedule of Services

ATTACHMENT specifically requires contractor to submit an hourly rate for the respective positions, and that rate is automatically extended “x 1912 hours” for evaluation and award purposes. This would suggest that the contractor is expected to recover their costs, etc. against a presumed billable year of 1912 hours.

However, “ATTACHMENT 5, COLLECTIVE BARGAINING AGREEMENT”, provides an actual productive work year of between 1848 and 1732 hours, based on the following;

•2080 hours = 52 weeks x 40 hours PAID less 88 hours for holidays (11 holidays x 8 hours) less 144 hours (5.54 x 26 weeks) -260 hours (10 x 26) PTO based on employee seniority.

Accordingly, pricing a “man-year” to account for the CBA’s required Holidays (Article 12) and Paid Time Off (Article 13 - Vacations/Down Time) results in an hourly rate, that when extended x 1912 hours, artificially inflates the contractor cost as employees will never be working (and accordingly the Contractor would never be billing) that many hours in a contract year.

Conversely, if Contractor hopes to recover their costs based on the 1912 hours target, Contractor would drastically “under-recover” because 1912 hours would never actually be billed in a year.

2080 hours = 52 weeks x 40 hours PAID less 88 hours for holidays (11 holidays x 8 hours) less 80 hours (historical average of PTO) = 1,912 (estimated hours). These are estimated hours. Pricing is at the offerors discretion. *Vacation time varies based on years of service and actual time taken. Per Attachment 5 - CBA, employees who leave can be paid out, employees can carry over one full year of leave, etc. There also could be a consistent change of employees within different positions, etc.

9 Attachment 1 - Schedule of Services Can Government explain why certain labor categories are identified at less than 1912 hours? (Examples: 24, 48, 120, 168, 240, 3600)

The hours listed on A00003 - Attachment 1 - AMS Schedule of Services, under 1,912 hours are actually CBA hours. Please reference A00003 - Attachment 3 - Statement of Work -Section 12.6.1 for an explantation.

10 Attachment 5 - CBA Government has identified CBA labor categories as “Non-CBA” positions. (Example: 0028 Aircraft Stripper 1 st Shift) Can Government explain why there CBA positions being represented as Non-CBA?

There are only two (2) NON-CBA positions which include the Senior Project Manager position which is a firm fixed monthly rate and the On-Site Project Manager (Junior) but this position will be an hourly. Please reference A00003 - Attachment 3 - Statement of Work -Section 12.6.1 for clarification on Contract Line Item Number (CLINs) that have CBA in the title.

11 Q & A A00002 Question #9

"The Key Personnel for this contract will be limited to the following: Senior Project Manager, Project Manager (Junior), Aircraft Mechanic III and Aircraft Mechanic II positions." Will Government confirm that ALL Mech III and ALL Mech II positions are considered Key Personnel?

Yes.

12 Attachment 2 - Terms and Conditions Page 2 Proposal Submission

Instructions

"All proposals received will be evaluated to determine fair and reasonable pricing to achieve the best value for the Government." Government's TECHNICAL ACCEPTABILITY language on Page 3 also identifies "Tradeoffs will not be made, and no additional credit will be given for exceeding requirements." With hope of clarifying any perceived inconsistencies, can Government confirm that Award will be made LPTA with no Tradeoffs?

Yes, this award will be done using LPTA (lowest priced technically acceptable) procedures. Please reference A00003 - Attachment 2 - Terms and Conditions - Page 5, under the title "Proposal Evaluation Method".

13 Attachment 3 - SOW Page 46 Section 12.6.1

The Contractor may charge up to fifty-six hours, in increments of no less than two (2) hours, per contract year per full time employee for Government directed shutdowns related to inclement weather, safety or administrative leave. Will Government confirm that those hours charged directly in the same manner as hours worked?

Yes, the offeror will invoice this in the same manner, however, it will be charged to the appropriate CBA CLINs on the schedule.

14 Attachment 1 - AMS Schedule of Services All tabs Per the FAR, if a CBA is in effect that rate takes precedence and should be paid to the employee. There seems to be a discrepancy between the CLINs listed in Attachment 1, for example, CLIN 0004 Aircraft Mech II – 2nd Shift and CLIN 0037 CBA/Aircraft Mech II – 2nd Shift. Please advise.

CLIN 0004 is the estimated hours needed for Aircraft Mechanic II-2nd Shift for the base period IAW CBA pricing. CLIN 0037 is the estimated hours needed for Aircraft Mechanic II that is for billing purposes IAW A00003 - Attachment 3 - Statement of Work - Section 12.6.1.

15 Attachment 1 - AMS Schedule of Services All tabs Several of the CBA/XX positions have titles that do not match the titles on the CBA. Please provide a crosswalk to the CBA job titles so that all Offerors are using the correct job titles and rates.

All of the titles match. Please provide an example.

A00002 – Attachment 2 -Terms and

Conditions - 70Z03824RJ0000013

Proposal Submission Instructions

The Proposal Submission Instructions state, " The onsite supervisor is the only position on the contract that will be Firm- Fixed price with a monthly rate ." This position title is not shown on the Attachment 1 - AMS Schedule of Services.

There is a Senior Project Manager is the job title referenced as FFP with a monthly rate and an Onsite Project Manager (Junior) with a T&M rate. Please review and revise documents as needed.

This has been corrected. Please reference A00003 - Attachment 2 - Terms and Conditions.

A00002 – Attachment 2 -Terms and Conditions - 70Z03824RJ0000013 &

Attachment 1 - AMS Schedule of Services 3 of 50 Price Evaluation

The Price Evaluation section states "Offerors pricing proposal shall be rounded to the nearest dollar and in U.S.

currency. Offerors should use Attachment Two (2) as their pricing volume. " Should Offerors show the "Est Amount" for each CLIN at the nearest dollar or should only Estimate XX Period Total be at the nearest dollar?

This should state "rounded to the nearest cent." Offerors should show the "Est Amount" for each CLIN at the nearest cent. Please reference A00003 - Attachment 2 - Terms and Conditions - Under Proposal Submission Requirements.

18 Attachment 1 - AMS Schedule of Services All tabs CLIN X054, Travel Please provide the Plug value for this CLIN or provide detailed historical information for the proceeding 5 years so that Offerors can estimate the values for this CLIN.

Offerors are not required to provide an estimate for this CLIN. Travel will be funded during the contract period of performance at time of travel. Please reference A00003 - Attachment 3 - Statement of Work- Section 16.0 - Travel Requirements.

19 A00002 - Attachment 3 Statement of Work Par 15.1 Phase In - FAR 52.222-17

NONDISPLACEMENT OF

QUALIFIED WORKERS clause

Assuming the Mechanic II and Mechanic III labor categories listed in Attachment 5 - CBA are the same as the Aircraft Mechanic II and Aircraft Mechanic III in Attachment 3 - Statement of Work 1.2.2 Required Services, Prime Offerors should not have to provide resumes for personnel (Aircraft Mechanic II and Aircraft III) listed under a CBA as they will have the right of first refusal of employment under this contract in positions for which the service employees are qualified. What is the government’s intent for the resume requirement, to not give the incumbent an unfair advantage? It is our belief the only resumes that should be required are for the Senior Program Manager and Junior Program Manager.

Resumes are only required for Key Personnel as listed in A00003 - Attachment 3 - Statement of Work - Section 5.2.1. The Government's resume requirement does not give the incumbent an unfair advantage.

20 Q & A A00002 Question #8

The Q&A document answers state: "What criteria will the Government use to determine price reasonableness? IAW with FAR 15.404-1(b)(2), Price Analysis, the Government may use various price analysis techniques and procedures to ensure a fair and reasonable price. Examples of such techniques are listed in FAR 15.404- 1(b)(2)(i)-(vii)." FAR 15.404 states (B) The prior price must be adjusted to account for materially differing terms and conditions, quantities and market and economic factors. For similar items, the contracting officer must also adjust the prior price to account for material differences between the similar item and the item being procured. Q: Will the source selection board utilize the economic value of labor outlined in Attachment 5, which includes the CBA rates, or does the government regard the SCA rates in Attachment 4 as a benchmark for assessing fair and reasonable pricing?

The Government is reserving/removing Attachment 4 from this solicitation. The source selection board will be utilizing Price Analysis Techniques and Procedures IAW with FAR 15.404-1(b)(2).

Attachment 1 - AMS Schedule of Services

CLINS 0036 - 0052 Can the government clarify the purpose of these CLINS and what additional fees these hours represent?

Please reference A00003 - Attachment 3 - Statement of Work - Section 12.6.1.

Attachment 2 - Terms and Conditions - 70Z03824RJ0000013 Past Performance Information

Sheet

The government provided no instruction regarding the Past Performance Questionnaire. Are offerors required to send the question to their customers? Please reference A00003 - Attachment 2 – Terms and Conditions, Instructions to Offerors – Commercial

Products and Commercial Services, Past Performance.

Attachment 2 - Terms and Conditions -

70Z03824RJ0000013

Factor B – Staffing Approach Bullets 1 and 4

Recommend the government combine bullets 1 and 4 to read: “The Government will evaluate how effectively and clearly the staffing plan demonstrates whether, and how, the offeror promotes diversity of perspective, experience, and background in contractor staffing to enable more effective communication and resilience in support of the contract requirements. Offerors shall submit their plan to recruit, train, and develop a diverse, high-performing workforce. The staffing plan, shall describe whether, and how, the offeror promotes diversity of perspective, experience, and background in contractor staffing to enable more effective communication and resilience in support of the contract requirements. The offeror shall state the anticipated benefits to the government, of their plan.”

No, please reference A00003 - Attachment 2 - Terms and Conditions - pages 3 and 4 under "Technical Acceptability".

Attachment 2 - Terms and Conditions -

70Z03824RJ0000013,

Factor A - Management Approach and

Factor B – Staffing Approach Bullet 3

To reduce redundancy within our proposal, request the Government delete "recruitment methods, retention incentives," from Factor A and rewrite the first sentence of Factor B, bullet 3 as follows: "The offeror shall provide their approach to recruiting new personnel (if needed), inclusive of recruitment methods; and retaining incumbent personnel, inclusive of retention incentives to minimize employee turnover.”

No, please reference A00003 - Attachment 2 - Terms and Conditions - pages 3 and 4 under "Technical Acceptability".

Attachment 2 - Terms and Conditions -

70Z03824RJ0000013, 52.212-1

FAR Clause 52.212-1 In which volume does the government require the clauses to be submitted?

This will be included in the "Technical Approach" volume as a seperate attachment. This SHALL NOT be included in the 40 page limit. The Government has updated this information. Please reference A00003 - Attachment 2 - Terms and Conditions to reflect this addition (page 2).

Attachment 2 - Terms and Conditions -

70Z03824RJ0000013,

Factor B - Staffing Approach

Since Aircraft Mechanic II and III positions are covered by either the AWD and or the CBA, why are resumes required for these positions? If resumes are required for the Aircraft Mechanic II and III positions, are offerors to provide a resume for each position? 8 Aircraft Mechanic II and 2 Aircraft Mechanic III resumes? If so, this appears to give the incumbant an advantage.

Resumes are only required for Key Personnel as listed in A00003 - Attachment 3 - Statement of Work - Section 5.2.1. The Government's resume requirement does not give the incumbent an unfair advantage.

Attachment 3 - Statement of Work 7.8 Vehicle Registration states: The Contractor shall ensure all Contractor-provided vehicles used in performance of this contract are registered with the USCG Base Elizabeth City, Command Security Office. Is the contractor currently providing, or required to provide vehicles in support of this effort?

The contrator is not providing any vehicles for this contract. This has been corrected. Please reference A00003 - Attachment 3 - Statement of work.

Attachment 2 - Terms and Conditions -

70Z03824RJ0000013

Bullet 9, page 2

Proposal Submission Instructions

Past Performance Information Sheet and A0002 Att 2. and

Q&A #7

Attachment 7 is designed for a single reference. Additionally, the Proposal Submission Instructions, Amd 002 states:

"One (1) copy of the Technical Approach Volume, one (1) copy of the Price Volume, and one (1) Past Performance Questionnaire shall be submitted." while the answer to Q&A #7 allows for "Past Performance references should include three (3)relevant contracts within the last five (5) year period." If offerors have more than 1 contract reference, does the government want all references (up to 3 contracts, each on a separate Attachment 7) to be combined into a single document titled "70Z03824RJ0000013 – Company Name – Past Performance Questionnaire" ?

Please reference A00003 - Attachment 2 – Terms and Conditions, Instructions to Offerors – Commercial Products and Commercial Services, Past Performance.

Attachment 2 - Terms and Conditions -

70Z03824RJ0000013 Page 2 Proposal Submission

Instructions

Does the Price Volume soley consist of Attachment 1 - AMS Schedule of Services, as a separate excel spreadsheet? Yes, please reference A00003 - Attachment 2 - Terms and Conditions - on Page 2 under section titled "Proposal Submission Requirements."

A00002 - Attachment 3 – Statement of Work

Pages 36, 37 and 50 Sections 10.2 and 11.1

Attachment 3, SOW 10.2 states “The contractor Safety Plan shall be submitted to the Contracting Officer at the time of proposal submission and approved by SEHO prior to start of contractual work.” Table in SOW 11.1 depicts the Safety Plan as being required “Upon Request”. Is the Safety Plan due at time of proposal submission?

Yes, the safety plan can be the offeror's safety manual or policy. IAW A00003 - Attachment 3 - Statement of Work - Section 11.1 refers to the Safety Plan being made availiable upon request for subsequent needs either prior to start of work or during the performance of the contract.

A00002 - Attachment 3 – Statement of

Work Sections 10.2 and 11.1 Is the Safety POC section to be completed after award?

Yes, this section should be completed after award.

A00002 - Attachment 3 – Statement of

Work Sections 8.0 and 11.0 SOW 8.1 states the contractor will provide a monthly report including Concerto Reports. Table in SOW 11.1 shows Concerto Reports as a daily requirement. Please clarify when Concerto Reports are due.

The Concerto Reports shall be provided on a daily basis. Please reference A00003 - Attachment 3 - Statement of Work - Section 8.1.

A00002 - Attachment 3 – Statement of Work Section 10.1.1 (last sentence) and 10.4

Section 10.1.1 states"See Section 4.22.4.1 for Contractor safety training requirements." The SOW does not have a Section 4.22.4.1. The SOW Safety Training section is 10.4 Training. Please revise the last sentence of SOW Section

10.1.1 to reflect Section 10.4 as the Safety Training section.

This has been corrected. Please reference A00003 - Attachment 3 - Statement of Work - Sections 10.1.1 and 10.4.

A00002 - Attachment 3 – Statement of

Work Section 10.4 Training Subsections within 10.4 are misnumbered. Please update. This has been corrected. Please reference A00003 - Attachment 3 - Statement of Work - Sections 10.1.1 and

10.4.

Attachment 2 - Terms and Conditions

Proposal Submission Instructions

The instruc ons require the following: •Font shall be twelve (12) point or larger, except for diagrams and drawings where impractical.

•Font in graphics and charts shall be no smaller than eight (8) point.

•Each page containing proprietary informa on should be so marked.

•Each page shall contain the following legend at the bo om of each sheet: This Document is Source Selec on

Sensitive Information IAW FAR 2.101 and 3.104. Will the Government allow no less than 8 point font in the headers(top) and footers (bottom) of each page?

The font size for the headers and footers should be no less than 12 point font. Please reference A00003 - Attachment 2 - Terms and Conditions under the title "Proposal Submission Requirements".

Attachment 2 - Terms and Conditions

Proposal Submission

Instructions

Does the government desire the offeror to round hourly billing rates to the nearest dollar with no values after the decimal place for cents?

This should state "rounded to the nearest cent." Offerors should show the "Est Amount" for each CLIN at the nearest cent. Please reference A00003 - Attachment 2 - Terms and Conditions - Under Proposal Submission Requirements.

Attachment 1 - AMS Schedule of Services Will the customer add formulas to Column F to ensure accurate extened pricing and lockdown each worksheet except for column E?

Offerors are only required to fill in Column E as there is a formula in Column F that will properly extend the pricing in Column F. This will not be locked down.

Attachment 1 - AMS Schedule of Services Is there a CLIN or mechanism for pricing Transition In and Out?

No.

39 Attachment 2 - Terms and Conditions Page 32 FAR Clause 52.222-43 RFP indicates FAR Clause 52.222-43 is incorporated (marked with a checkmark). As such should wages from the CBA that are effective Sept 16, 2025 be proposed for the base year and held constant/flat for each option period of the P.O.P?

Yes, pricing will be adjusted once the CBA is updated.

Attachment 3 - Statement of Work Page 41 Section 11.1

SOW List of Deliverables identifies SAFETY PLAN as being "due Upon Request". However, Section 10.2 identifies "The contractor Safety Plan shall be submitted to the Contracting Officer at the time of proposal submission and approved by SEHO prior to start of contractual work." While the SOW seems inconsistent, Instructions to Offerors does not identify Safety Plan delivery instructions. Please provide appropriate Contractor proposal direction surrounding Safety Plan.

The safety plan which can be the offeror's safety manual or policy must be reviewed at the time of proposal as previous stated in A00003 - Attachment 3 - Statement of Work - Section 10.2. Section 11.1 refers to the Safety Plan being made availiable upon request for subsequent needs either prior to start of work or during the performance of the contract.

41 Statement of Work 36 of 50 10.2 Safety Plan

There is a discrepancy between SOW Section 10.2 and the Instructions to Offerors regarding when the Safety Plan should be submitted. The SOW states at the time of proposal submission while the Instructions to Offerors is silent.

Can the government clarify that the Safety Plan will be required after contract award as a site visit will be needed in order to ensure a proper Safety Plan is submitted versus submitting it at the time of proposal submission?

The safety plan which can be the offeror's safety manual or policy must be reviewed at the time of proposal as previous stated in A00003 - Attachment 3 - Statement of Work - Section 10.2. Section 11.1 refers to the Safety Plan being made availiable upon request for subsequent needs either prior to start of work or during the performance of the contract.

42 Statement of Work 43 of 50 11.1 Deliverables Can the government please clarify what a Concerto Report is? The Concerto Report shows the status of the aircraft and where it is at at all times. Please reference A00003 -

Attachment 3 - Statement of Work - Section 8.1.

43 Statement of Work 47 of 50 14.0 Contract Ceiling Price Will the ceiling price be calculated assuming a possible 6-month extension after Option Period 4 or is the ceiling price inclusive of only the base and four option periods? Yes, all period of performances will be accounted for in the ceiling price which includes the possibility of a six

(6) month extension. Please reference A00003 - Attachment 2 - Terms and Conditions - FAR Clause 52.217-8.

44 Attachment 2 - Terms and Conditions 1 of 50 52.212-1 Instructions to

Offerors

Can the completion of FAR Provisions and Clauses for FAR 52.204-24 and 52.204-26 be provided as an Appendix to the Technical Volume and not count towards page count?

This will be included in the "Technical Approach" volume as a seperate attachment. The Government has updated this information. Please reference A00003 - Attachment 2 - Terms and Conditions to reflect this addition (page 2).

45 Attachment 2 - Terms and Conditions 2 of 50 52.212-1 Instructions to

Offerors

Is the Cover Page or Acronym list excluded from page count totals like the Table of Contents? Yes, the Cover Page is excluded from the page count, however, the acronym list is included. Please reference A00003 - Attachment 2 - Terms and Conditions - FAR Clause 52.212-1 under Proposal Submission Instructions for the list of items that are excluded from the page count.

46 Attachment 2 - Terms and Conditions 5 of 50 Past Performance

For the Past Performance Questionnaire, are only the completed Attachment 7 - Past Performance Information Sheets required to be submitted or does the government desire an additional write up of the past performance reference in addition to Attachment 7?

Please reference A00003 - Attachment 2 – Terms and Conditions, Instructions to Offerors – Commercial Products and Commercial Services, Past Performance.

A00002-Attachment 2 - Terms and Conditions - 70Z03824RJ0000013

Proposal Submission

Instructions Can the Government please confirm that Acronym/Abbreviation lists and cover pages are outside of page count for the Technical and Past Performance Questionnaire volumes?

The Cover Page is excluded from the page count, however, the acronym list is included. Please reference A00003 - Attachment 2 - Terms and Conditions - FAR Clause 52.212-1 under Proposal Submission Instructions for the list of items that are excluded from the page count.

A00002-Attachment 2 - Terms and Conditions - 70Z03824RJ0000013

Proposal Submission

Instructions Can the Government please confirm that 8 pt font for headers and footers is acceptable?

Please reference A00003 - Attachment 2 - Terms and Conditions under the title "Proposal Submission Requirements".

A00002-Attachment 2 - Terms and Conditions - 70Z03824RJ0000013

Section 52.212-3 Offeror Representations and

Certifications-Commercial Products and Commercial

Services

This section states, “The Offeror shall complete only paragraph (b) of this provision if the Offeror has completed the annual representations and certification electronically in the System for Award Management (SAM) accessed through https://www.sam.gov. If the Offeror has not completed the annual representations and certifications electronically, the Offeror shall complete only paragraphs (c) through (v) of this provision.” Can the Government please confirm that the applicable Representations and Certifications can be submitted via a separate document and are not to be included within any volume?

This will be included in the "Technical Approach" volume as a seperate attachment. The Government has updated this information. Please reference A00003 - Attachment 2 - Terms and Conditions to reflect this addition (page 2).

A00002-Attachment 2 - Terms and Conditions - 70Z03824RJ0000013 A00002-

Attachment 3 - Statement of Work -

70Z03824RJ0000013

4; 5 Factor A – Management

Approach; 1.2.1 Types of Work

Factor A-Management Approach states “The offeror must address how they will accomplish the requirements of the SOW. As the PWS consists of mainly position qualifications and position tasks which are addressed in the other Factors within the Technical volume, can the government please confirm that writing to the Types of Work (Programmed Depot Maintenance, Service Requests, and 6000/8000/9000 Series) in Section 1.2.1 will meet this requirement.

Please reference A00003 - Attachment 2 - Terms and Conditions - Factor A - Management Approach, as the requirements are clearly defined in this section.

A00002-Attachment 2 - Terms and Conditions - 70Z03824RJ0000013

Proposal Submission Instructions

Can the Government please confirm that a Cover Page is not included in the page count? The Cover Page is excluded from the page count. Please reference A00003 - Attachment 2 - Terms and Conditions - FAR Clause 52.212-1 under Proposal Submission Instructions for the list of items that are excluded from the page count.

52 Attachment 2 - Terms and Conditions 1 of 50 52.212-1 Instructions to

Offerors Can the Government please confirm that the Provisions and Clauses, and Representations and Certifications should be included in the Technical Volume and are not included in the page count?

This will be included in the "Technical Approach" volume as a seperate attachment. The Government has updated this information. Please reference A00003 - Attachment 2 - Terms and Conditions to reflect this addition (page 2).

A00002 - Attachment 3 - Statement of

Work - 70Z03824RJ0000013 36 of 50 10.2 Safety Plan

In this paragraph, language in Amendment 2 states:

"The contractor Safety Plan shall be submitted to the Contracting Officer at the time of proposal submission and approved by SEHO prior to start of contractual work. Non-conformance with this requirement could cause a delay in contract performance. The Contractor shall include a clause in all subcontracts requiring the subcontractors to comply with applicable safety provisions of this contract."

Whereas later in the same document on Page 42 of 50 under the Section 11.0 Deliverables, it is stated that the Item #10 "10.2 Safety Plan" is due "Upon request".

Does the Safety Plan needs to be provided with the proposal submission? If it is to be included in the Technical Volume, does it count against the 40 page limit?

The safety plan which can be the offeror's safety manual or policy must be reviewed at the time of proposal as previous stated in A00003 - Attachment 3 - Statement of Work - Section 10.2. Section 11.1 refers to the Safety Plan being made availiable upon request for subsequent needs either prior to start of work or during the performance of the contract.

A00002 - Attachment 2 - Terms and Conditions -

70Z03824RJ0000013

3, 38 of 50 Price Evaluation

Will the Government confirm whether the total period of performance to be bid, including all options and FAR 52.217-8, should be 60 months as indicated in FAR 52.217-9 or 66 months (1 base year + 4 option years 6 month extension period)?

Please reference A00003 - Attachment 2 - Terms and Conditions - FAR Clause 52.217-8.

55 Attachment 1 AMS Schedule of Services

The Description of Work (Skill classification) separates the position by what appears to be SCA and CBA positions.

Can the government please clarify if the offeror is to use the Attachment -4 Wage Determination or Attachment-5 CBA (wages and corresponding stipulated benefits) for purposes of developingwhen providing the Unit Price for the positions identified under CLIN 0002 through CLIN 0052?

The Government is reserving/removing Attachment 4 from this solicitation. Therefore, the offerors shall utilized Attachment 5 - CBA for the purpose of developing their unit price.

56 Att 3, SOW SOW 10.4.1 Contractor Furnished Safety Training and Licenses

This SOW references states in part: "...The safety training and certifications shall be performed off-site, on the company’s time, and using the company’s equipment." However, we believe the main intent is that we do not use government property. Request the Government revise the 2d sentence of SOW 10.4.1 to read: "The safety training and certifications shall be performed off-site, on the company’s time, using other than government equipment."

Please reference A00003 - Attachment 3 - Statement of Work - Section 10.4.2.

57 Att 2

Factor A - Management Approach and Factor B – Staffing Approach, bullets 1 and 4, pg 4 of 50

The Factor A bullet as well as the two Factor B bullets cited repeat the requests for information regarding the contractor's recruiting and retention process. As these bullets require the same information, request the government combine delete the requirement from Factor A and retain all staffing, and our approach to staffing in Factor B. Will the Government place all workforce and staffing requirements within Factor B?

No, please reference A00003 - Attachment 2 - Terms and Conditions - pages 3 and 4 under "Technical Acceptability".

58 Att 2 Factor B – Staffing Approach, bullets 1 and 4, pg 4 of 50

These bullets repeat the requests for information on diversity and the contractor's recruiting and retention process. As these bullets discuss and require the same information, request the government combine the two bullets into one within Factor B. Will the Government combine these two bullets into one?

No, please reference A00003 - Attachment 2 - Terms and Conditions - pages 3 and 4 under "Technical Acceptability".

Att 2 Factor B – Staffing Approach, bullets 1 ,2 and 3, pg 4 of 50

This bullet requests "...the offeror should detail their ability and approach to provide the labor categories required." Contractor ability and approach to provide the labor categories required is synanomous with Bullet 1: "The plan shall include the contractor’s plan to recruit, train, and develop a diverse, high-performing workforce and the anticipated benefits to the government." and Bullet 3: "explanation that demonstrates to the Government how they plan to recruit new personnel if required, ...". If the government is looking for something other than how the contract recruits, trains/develops, and retains its workforce, please clarify.

Please reference A00003 - Attachment 2 - Terms and Conditions - pages 4 under "Technical Acceptability".

Factor B - Staffing Approach.

60 Attachment 1 - AMS Schedule of Services Can the government provide the average seniority of CBA employees to determine vacation eligibility?

Please reference A00003 - ALC CBA Seniority List.

Attachment 2 - Terms and Conditions - 70Z03824RJ0000013 and Attachment 3 Satement of Work-70Z03824RJ0000013

Attachments 2 and 3 were revised to add "Project Manager (Junior)" however Attachment 3, paragraph 1.2.2 Required Services, does not depict a requirement for "Project Manager (Junior)" . Request the Government revise Att 3, Paragraph 1.2.2 to include the hours for Project Manager (Junior).

Corrections have been. Please reference A00003 - Attachment 1 - AMS Schedule of Services and A00003 - Attachment 3 - Statement of Work - Sections 1.2.2 and 4.2.

62 Attachment 1 - AMS Schedule of Services The Onsite Project Manager (Junior) position indicates that the Estimated QTY is TBD and the Unit of Issue is HR. Is the offeror only providing an estimated Unit Price for this position? If so, why is a resume required to be submitted? Yes. Please reference A00003 - Attachment 3 - Statement of Work - Section 5.1.1.

63 Attachment 3 - Statement of Work

16.1 The USCG reserves the right to request that traveling personnel are temporary employees and not current staffed full-time employees, as to not impact the production schedule. How often are contractor employees required to support travel requirements?

Historically once or twice a year but mostly on an as needed basis.

64 Statement of Work 13 of 50

4.2 On-Site Project Manager

(Junior) PDM Support

The core hours listed for the On-Site Project Manager (Junior) position are shown as 0600 to 2300. This would support a 18 hour work period. Is it the government's intent to state that this position could flex to night shift as well or is this an error? Please clarify the actual core hours required.

Typical shift is 7:00-3:30pm. Please reference A00003 - Attachment 3 - Statement of Work - Section 4.2.

64 Statement of Work 14 of 50

4.3.1.1 and all Aircraft Mechanic Assessments

Approximately how long will these exams take to complete and is there a required time limit to perform them in?

Additionally, will the examination be waived for individuals that may be promoted from within (i.e., KSA are already known) or will this be a requirement for all aircraft mechanic positions no matter their status (i.e., internal promotion)?

Tests usually range from 2 to 4 hours long and the Government reserves the right to waive these tests for internal promotions from within. Please reference A00003 - Statement of Work - Section 4.3.1.1.

66 Statement of Work 15 of 50

4.4.1 Aircraft Mechanic II

Qualifications

The Aircraft Mechanic II requires the possession of an Aviation Technical School certification or an Associate's Degree in Aviation Maintenance while an Aircraft Mechanic III does not require such education when an Aircraft Mechanic III is suppossed to be more experienced. Will the government consider revising or will it accept Aircraft Mechanic II resumes that are similiar to the Aircraft Mechanic III qualification so long as a Minimum of eight (8) years of related rotary mechanic experience or an equivalent combination of education and experience (e.g., vocational school/Associate +5 ears' related work, Bachelor, etc.) as acceptable?

Qualifications have been updated. Please reference A00003 - Attachment 3 - Statement of Work - Sections

4.3.1 and 4.4.1.

67 Statement of Work 16 of 50

4.5.1. Aircraft Mechanic I

(General) Qualifications

Can an FAA Airframe & Powerplant Certification count partially (e.g., 2 years) or for all years of experience requirements?

Yes, it can count partially, but not for all years of experience.

68 Statement of Work 28 of 50

7.2 Identification of Contractor

Employees

Due to safety issues, FOD hazards, and other issues will the government require all staff to be identified by the wearing of a standard company uniform or shirt to ensure proper identification of a Contractor employee or are there other government approved alternatives for company identification?

Yes, historically, the Contractor has provided their employees with a uniform (i.e. T-shirt).

69 Statement of Work 34 of 50 9.1.2 Equipment and Tools Will the government confirm if they will provide the necessary PAPR's for the Aircraft Stripper responsibilities or any other specialized equipment for any other positions outside of the Contractor's gas detection equipment? Please reference A00003 - Attachment 3 - Statement of Work - Section 9.1.2.

70 Statement of Work 39 of 50 10.7 Licenses and Certifications Outside of a forklift, can the government please provide a list of "other Support Equipment" that are currently being used or required of the incumbent contractor that will require special licensing or certification not provided by the government?

Forklift and Crane. Please reference A00003 - Attachment 3 - Statement of Work - Section 10.7.

71 Statement of Work 39 of 50 10.7 Licenses and Certifications

Although it states that "licensing, certification, and trainings shall be maintained off-site at the Contractor's expense" will the government allow for approved training time (at the COR's approval) to be billed in order to maintain these mandatory licenses and certifications offsite due to the fact that this is a Labor Hour contract and contractor employees can't train onsite?

Yes, there is a billable code allolated for this training.

72 Statement of Work 40 of 50

10.9.2 Environmental

Compliance

Outside of SEHO ALC EMR required trainings, can the government provide a list of trainings/certifications required by job function that are outside of those normal ALC trainings?

Forklift and Crane. Any employees working in the plating shop which is located in the machine shop must have HAZWOPER training. A link has been added within Section 10.9.2 of the Statement of Work. Please reference A00003 - Attachment 3 - Statement of Work - Section 10.7 and 10.9.2.

73 Collective Bargaining Agreement 10 of 22 Article 13 - Vacations/Down Time

Can the government please provide a current incumbent seniority list that identifies the current years of service supporting ALC awarded contracts that each anonymous incumbent staff member has in their experience? Please reference A00003 - ALC CBA Seniority List.

74 Attachment 3 - SOW Page 13 Section 4.2

"Core hours of the On-Site Project Manager (Junior) position will be 0600-2300." Does this mean the Government is requesting two (2) On-Site Project Manager Juniors, one for day shift and one for night shift?

No, typical shift is 0700 to 1530, however, the Government reserves the right to change this to a flex schedule between the hours of 0600-2300 as needed to complete the mission. Please reference A00003 - Attachment 3 - Statement of Work - Section 4.2.

75 Statement of Work 6 of 50 1.2.2 Required Services

There are four discrepancies between Attachment 1 - AMS Schedule of Services and the table listed in Section 1.2.2.

For 23080 - Aircraft Worker 1st Shift it lists 17,208 hours for base and all option periods; however, the Schedule of Services shows 19,120 hours. For 23040 - Aricraft Mechanic Helper 2nd Shift it lists 0 hours while the Schedule of Services lists it as 1,912 hours. For 19010 - Machine Tool Operator 2nd Shift it lists 19,120 hours while the Schedule of Services lists it as 21,032 hours. For 23380 - GSE Mechanic 1st Shift it lists 5,736 hours while the Schedule of Services lists it as 1,912 hours. Can the government please clarify the correct hours and ensure the two documents align?

Please reference A00003 - Attachment 1 - AMS Schedule of Services and A00003 - Attachment 3 - Statement of Work - Section 1.2.2.

76 Statement of Work 46 of 50 12.6.1 Closures and Delays

The SOW states "The Contractor may charge up to 24 hours, increments of no less than two (2) hours, per contract year per full time employee for Government directed shutdowns related to inclement weather, safety, or administrative leave." There is a discrepancy between this SOW statement and the Schedule of Services as the Schedule of Services only provides for 24 hours of time per FTE per contract year. Can the government please clarify which document is accurate and correct accordingly?

Please reference A00003 - Attachment 3 - Statement of Work - Section 12.6.1.

77 Statement of Work 46 of 50 12.6.1 Closures and Delays

The SOW states "The Contractor may charge up to 24 hours, increments of no less than two (2) hours, per contract year per full time employee for Government directed shutdowns related to inclement weather, safety, or administrative leave." Is this allotment of leave applicable for "planned" base closures due to USCG identified holidays such as the day after Thanksgiving or holidays designated by Executive Order where the Contractor cannot perform work or is this allotment for unplanned closures (e.g., inclement weather, facility issues, etc.)?

No, the day after Thanksgiving is a "planned" plant shutdown and employees should plan accordingly their use of leave. Please reference A00003 - Attachment 3 - Statement of Work - Section 12.6.1.

This section states “the USCG will provide all tooling and equipment required during the performance of this contract.”

Please confirm that equipment includes CBA, OSHA and other required PPE. If this is not accurate, please provide a CLIN where this cost would be captured.

A00002-Attachment 3 - Statement of Work -

70Z03824RJ0000013

28 7.2

This section states “the Contractor shall ensure all employees present a professional appearance appropriate for the position held.” Please confirm that the intent of this sentence is to require uniforms; at a minimum the requirements that match the CBA. If these are required, please advise as to how Offerors are to capture this cost. Is there a specific

CLIN?

Yes, the Contractor must provide uniforms (historically a T-Shirt). There will not be an additional CLIN added to the schedule for this cost.

Would the Government please provide the number of days that will be allocated for contract phase-in activities detailed in Section 15.1 of the SOW?

The contractor has 10 days to submit phase-in plan and once approved, then the contractor has 2 days to reach full operational capability. Please reference A00003 - Attachment 3 - Statement of Work - Section 15.1.

A00002 - Attachment 3 – Statement of

Work Sections 3.3, 10.4, and 10.7

Section 3.3 does not require all personnel to have a forklift truck and trailer, and pack mull license however, Section 10.4.2, Contractor Furnished Safety Training and Licenses, states: "Each employee must successfully complete the forklift, truck and trailer, and pack mull training and shall receive a license". Please clarify, do all employees require a forklift truck and trailer, and pack mull license? Please update the SOW as appropriate.

The only training/license should be for forklift and crane. Please reference A000003- Attachment 3 - Statement of Work - Sections 4.12.1, 10.4 and 10.7.1.

85 Attachment 1 AMS Price Schedule CLIN 0053 Onsite Project Manager (Junior) is a 'TBD' under the column Est. Qty. but is required under Key Personnel.

Can the government clarify why this unit price is TBD?

Corrections have been. Please reference A00003 - Attachment 1 - AMS Schedule of Services and A00003 - Attachment 3 - Statement of Work - Sections 1.2.2 and 4.2.

86 Attachment 3 SOW

5.1.1 List of Key

Personnel

The SOW does not identify Quality Control or a Production Supervisor as Key Personnel but instead identifies a Mechanic III / II requirement. Can the government clarify the Mechanic III/II positions and why they are key? Mechanic III is fabrication. Mechanic II is able to do work on everything pertaining to the aircraft and hold a lead position for their area. The Senior Project Manager is considered the company's Production Supervisor which monitors production. These key positions are chosen by Government officials. Quality Control/Quality Assurance is performed on site at ALC by military personnel.

Please reference A00003 - Attachment 3 - Statement of Work - Section 9.1.2.78

A00002-Attachment 3 - Statement of Work -

70Z03824RJ0000013

15.1

A00002-Attachment 3 - Statement of Work -

70Z03824RJ0000013

34/35 9.1.2

File details come from the government source that posted it. Updated .