RFP_70Z02320RAPC00500_OPC Industry Studies (Amendment 0001).pdf
PDF 973 KB Posted
- Solicitation number
- 70Z02320RAPC00500
About this file
This is a request for proposal for offshore patrol cutter industry studies issued by the United States Coast Guard. The Coast Guard seeks proposals for industry studies to inform development of a request for proposal for detailed design and construction of offshore patrol cutters. Key deliverables include an assessment of the provided preliminary design information, cost and schedule estimates for design and construction, and a production management analysis. Proposals are due by January 31, 2020 and the Coast Guard intends to award multiple contracts. Offerors may only submit one proposal as a prime contractor but may be a subcontractor on multiple proposals. Access to certain design references restricted under international trafficking in arms regulations requires registration prior to receipt.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
70Z02320RAPC00500
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Washington DC 205930001
2703 MARTIN LUTHER KING JR AVE SE
USCG HEADQUARTERS (CG-912)
01/10/2020000001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
01/10/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The United States Coast Guard (USCG) is issuing Amendment 1 to Solicitation No.
70Z02320RAPC00500. Amendment changes as follows:
1. Section C, Statement of Work, Section 1.1, revised for clarification;
2. Section L.11, Proposal Volume Instructions, administrative section revised to reflect correct reference from "RFP, Section G.6" to "RFP, Section G.3" and
3. Provide updated Reference No. 2, Long Lead Time Material and Insurance Spares.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Nakenia S. Spruill
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
OPC Industry Studies 70Z02320RAPC00500/0001
Part I—The Schedule
Section B—Supplies or Services and Prices/Costs
B.1 CONTRACT LINE ITEM NUMBERS (CLINs)
CLIN PRICE_______________
CLIN 0001aa $__________________ Task 2.2.1 OPC Design Assessment
CLIN 0001bb $__________________ Task 2.2.2 Cost and Schedule Estimates
CLIN 0001cc $__________________ Task 2.2.3 OPC Production Analysis
CLIN 1001 $__________________
Task 2.2.4 Production Engineering Studies (Option Line Item)
Section C—Description of Specifications/Work Statement
Statement of Work USCG Offshore Patrol Cutter Industry Studies
CONTENTS
1. INTRODUCTION
2. INDUSTRY STUDIES
3. DELIVERABLES
4. SCHEDULE
5. GOVERNMENT FURNISHED PROPERTY
6. QUALITY ASSURANCE
7. SECURITY CLEARANCE
8. NOTES
1.0 Introduction.
The primary objective of this Industry Studies effort is to ensure the Offshore Patrol Cutter (OPC) Detailed Design & Construction (DD&C) Request for Proposal (RFP) establishes opportunities for a competitive environment. The DD&C RFP will be informed by these Industry Studies through the analysis and assessment of the technical effort, cost risks, and schedule risks associated with re-competing the OPC contract. The re-competed contract scope will be to complete the OPC Detail Design and to construct an initial OPC using that Detail Design, with options for constructing additional OPCs. Future contracts may be awarded to complete the OPC program of record which is up to 25 OPCs. The Government intends to provide hull form licenses for each OPC built under the DD&C contract. The full extent of OPC design standardization and other aspects of the terms and conditions for the DD&C RFP have yet to be determined and will be influenced through efforts required in this Statement of Work
(SOW).
The OPC as designed is approximately 360ft LOA and 4500LT and features the following:
• Helicopter aviation systems and a hangar to accommodate a helicopter and a small unmanned aircraft system
• Machinery plant control and monitoring system
• Electrical plant control system
• Command, Control, Communications, Computer, Cybersecurity, Intelligence (C5I) systems.
Wherever the terms C5ISR and C4ISR appear in this contract, its references or attachments, they shall be interpreted as C5I. The Contractor shall use the term C5I in Industry Study deliverables produced under this contract.
• Integrated Navigation System (INS) within an Integrated Bridge System (IBS)
• Navy-Type, Navy Owned (NTNO) combat system based on Navy Programs of Record.
1.1. References. References 2, 6, 7-2, 8, and 10 are not restricted by International Trafficking in Arms Regulations (ITAR) and will be made available via https://beta.sam.gov/. References 1, 3, 4, 5, and 7-1 are subject to ITAR restriction and will be made available to Offerors presenting evidence of ITAR compliance per the instructions set forth in Section L.8. References 1, 4, and 7-1 will be provided via email while References 3 and 5 will be provided as a DVD disk set sent by expedited shipping to Offerors presenting evidence of ITAR compliance per section L.8.
1.2. The following references will be available upon request via a Government contracts integrated data environment. This contract will require contractors to have access to export-controlled items as defined in the clause H-5 Export Controlled Items, all awardees must be ITAR compliant to receive Government Furnished Information (GFI) and other reference materials.
1.3. References prior to award. References 1, 2, 4 and 7-10 will be posted on https://beta.sam.gov/ in two groupings. Those references which are not restricted by International Trafficking in Arms Regulations (ITAR) will be provide in the unrestricted side, and those references which are subject to ITAR restrictions will be posted on the restricted side. A password to the restricted files will be provided to Offerors presenting evidence of ITAR compliance per the instructions set forth in Section L.8. References 3 and 5 will be provided as a DVD disk set sent by expedited shipping to Offerors presenting evidence of ITAR compliance per section L.8.
1. OPC Contract System Specification.
2. List of current Long Lead Time Materials (LLTM).
3. Selected Detail Design Deliverables for information only, including 2D Functional Design artifacts.
4. Notional Equipment Configuration List.
5. Selected Non-Proprietary Management Planning Deliverables for information only.
6. USCG Notional OPC Detail Design and Construction (DD&C) Schedule.
7. Placemat and template summarizing OPC Functional Design.
8. Current OPC Contract Section C Statement of Work (SOW), current OPC Detail Design SOW, and current OPC Construction SOW.
9. Reserved.
10. Current list of Government Furnished Equipment (GFE) and current list of Government Furnished Information (GFI).
2.0 Industry Studies Statement of Work.
2.1. Objective and Scope:
The primary objective of this Industry Studies effort is to ensure the DD&C RFP establishes opportunities for a competitive environment. Each Contractor awarded an Industry Study contract will perform studies and analyses addressing the topics outlined in Section 2.2 of this SOW. Contractor Industry Studies will assess relevancy, applicability, and suitability of the provided OPC technical data and references with regard to the Contractor’s proposed design and construction approach. Contractors will evaluate the referenced design artifacts and propose their most cost effective and schedule efficient plan to transition the Functional Design into a Production Design and to construct OPCs per the contract scope described above.
Industry Studies will address Competition, Design, Construction, Affordability and Schedule.
The Industry Studies are divided into two parts.
• Part 1: Design Assessment Studies, Cost and Schedule Estimates, and Production Management Analysis.
https://beta.sam.gov/
• Part 2: 3D Product Model Production Engineering Studies supporting Product Model planning and validation.
Part 1 provides the OPC Program with information sufficiently early in the process to inform Government OPC DD&C RFP development. Part 2 provides the OPC program with insight into industry practice pertaining to development of a 3D Product Model and selected product model examples.
2.2. Industry Studies Tasks:
The Contractor shall perform studies to provide recommended approaches and processes to complete DD&C of the OPC given the information provided in Section 1.2, References (1) through (10). The Contractor shall study these references as part of each task.
The Contractor shall prepare and deliver data in accordance with Section J-1 attachment titled “Industry Studies Contract Data Requirement List”, which includes the schedule for submitting each deliverable.
Part 1 studies shall be delivered as CDRL [01-1001-x.x]. Part 2 studies shall be delivered as CDRL [02- 1001-x.x].
All data shall be delivered electronically via the Coast Guard provided Independent Data Environment.
Throughout this SOW the following design definitions apply:
• Functional Design: 2D design artifacts such as a Topside Arrangement Drawing, piping system calculations, and one-line diagrams
• Transitional Design: Design model reflecting the Functional Design and space arrangements populated with equipment, components, and systems. The Transitional Design is used to generate the Production Design. This is typically provided as an integrated 3D computer model.
• Production Design: Artifacts necessary to build the ship such as CNC cut tapes, pipe spool details, foundation details, etc. These are outputs of the model developed during Transitional Design.
• 3D Product Model: This model includes the Transitional Design information along with logistics data such as: material, center of gravity, unit weight, production block, commercial or military standard, nominal size, dimensions, spool, reference drawing, nest file, manufacturer, OEM part number, shipyard part number or identifier, SWBS, ship system. It provides production and sustainment users with the ability to extract data for a particular component or system.
Part 1 Industry Study Tasks [01-1001-x.x]
2.2.1 OPC Assessment - The Contractor shall perform a high level assessment of the OPC Functional Design based on the information provided in Section 1.2, References (1) through (10).
2.2.1.1 DD&C Approach – The Contractor shall provide recommendations on the structure and strategy for DD&C to complete the OPC Detail Design and produce multiple OPCs at low risk.
Recommendations shall address block buys, Low Rate Initial Production (LRIP) grouping, timing of Critical Design Review/Production Readiness Review, DD&C RFP evaluation factors, and other production and contracting strategies. The Contractor shall describe the recommended approach and estimated work required during DD&C to develop a Transitional Design, Production Design, and 3D Product Model based on the Government-provided 2D Functional Design artifacts of reference (3). Discuss any logistics and manufacturing processes that could reduce the work involved in this design development effort.
2.2.1.2 Applicability of Government-provided design information (Preliminary) – The Contractor shall provide a preliminary recommendation of which documents in References (2) through (5), based on any identified risks in using these artifacts as provided. Recommendations shall indicate which references should be provided with the DD&C RFP as standardized formal guidance, provided with the DD&C RFP only for information, or be excluded from the OPC DD&C RFP and the resulting DD&C contract. This is intended to be a preliminary assessment to allow the Government time to incorporate findings pursuant to this assessment into the DD&C RFP. The final assessment will be a part of 2.2.1.7.
2.2.1.3 Hull Form and Structure - Review the hull form and hull structure design. Discuss any proposed revisions to those deliverables. Discuss the amount of work that will be required during DD&C to accomplish these recommended revisions and any associated risks with incorporating these revisions. Discuss any processes that could reduce the work involved in constructing the hull and structure.
2.2.1.4 Propulsion, Electrical, Auxiliary, and Control Systems – Review the design deliverables for the propulsion, electrical, and auxiliary systems. Discuss any proposed revisions to those deliverables. Discuss the amount of work that will be required during DD&C to accomplish these recommended revisions and any associated risks with incorporating these revisions.
• Review the propulsion plant including control system, shafting, propellers, engines, propulsion motors, reduction gears, and all necessary related calculations and arrangement drawings.
• Review the electrical design and plant configuration including control system, service power generating equipment, switchboards, power cabling, lighting systems, emergency electrical power systems, and all necessary related calculations and arrangement drawings.
• Review the auxiliary systems including heating, air conditioning, ventilation, refrigeration, seawater, potable water, chilled water, replenishment at sea systems, lube oil, hydraulics, fuel oil, anchor handling, firefighting, steering systems, aircraft launch and recovery, cutter boat launch and recovery, and all necessary related calculations and arrangement drawings.
2.2.1.5 C5I, Navigation, and Combat Systems - Review the design deliverables for command and control systems, navigation systems, communication management systems, exterior communications systems, interior communications systems, NTNO combat and Link systems, radars, and computer networks. Discuss any proposed revisions to those deliverables. Discuss the use of the C5I Production Facility with respect to C5I electronic light-off and integration.
Discuss the amount of work that will be required during DD&C to accomplish these recommended revisions and any associated risks with incorporating these revisions.
2.2.1.6 Systems Engineering and Design Integration – Assess the combined impacts and effects of the Contractor’s recommended substantive changes to the 2D Functional Design or changes to the notional Equipment Configuration List. This assessment will assist the USCG in determining which OPC design features and equipment should be standardized for the DD&C RFP.
Substantive changes affect: a) primary OPC dimensions, b) major equipment (propulsion, AC, Navigation, etc.), c) compartment relocation or resizing, or d) mechanical/electrical system relocation or resizing. Identify changes that will support producing multiple OPCs at the most economical price, while complying with OPC requirements. Prepare a report that assesses how the proposed substantive changes, when integrated, meets OPC contract requirements of references (1) and (8):
• Provide an OPC “placemat design template” as a revision to reference (7).
• Provide sufficient engineering data to illustrate design balance is maintained.
• Include any expected impact of any substantive changes with respect to:
o Hull form / Lines plan o Seakeeping Analysis o Intact Report and Damage Stability Analysis o Weights Report o Structural Assessment Drawings and Calculations o Machinery Arrangements Drawings (Including Uptake Space) o Notional Equipment Configuration List (reference (4)) o Resistance and Powering Analysis o Calculation of Surface Ship Endurance Fuel Requirements o Electric Plant Load Analysis (EPLA) o Electrical One-Line Diagram o Top Side Design Arrangements Drawings o Auxiliary Systems Diagram o General Arrangements o Compartment Arrangement Drawings o C5I Network Architecture, Navigation, Interior Communications and Exterior
Communications Systems
• Identify expected changes to the notional Equipment Configuration List based on expected equipment obsolescence or identified design incompatibilities. Specifically address main engines, generators, switchboards, and hull structure.
• Discuss life cycle impacts and provide a rough estimate of the life cycle cost impacts resulting from any proposed design changes or equipment changes. The estimate should address the impact of those changes on maintainability, operations and sustainability, commonality, system inherent reliability, and other life cycle factors.
• Discuss how the proposed design changes or equipment changes will impact the overall OPC design.
• Evaluate the proposed design changes and equipment changes for compatibility issues such as Space, Weight, Electromagnetic Interference, and other compatibility issues or compounding impacts.
• Identify design changes to enhance producibility for construction in the Contractor’s facilities.
2.2.1.7 Applicability of Government-provided design information (Final) – The Contractor shall include a final update to section 2.2.1.2 - Applicability of Government-Furnished Design Information,
2.2.1.8 Design Risk - Identify risks associated with updating and completing the Detail Design to support the proposed design changes, construction processes, and production capabilities while meeting contract requirements.
2.2.1.9 Periodic Meetings - The Contractor shall participate in an initial post-award (kickoff) meeting within two weeks after contract award (details will be provided by the Government at time of contract award). The Contractor will also be provided an opportunity for an executive level meeting with USCG officials following the kickoff meeting if the Contractor desires. The Government will prepare and provide minutes of the post award meeting.
The Contractor shall hold scheduled meetings to support tasks 2.2.1.1 through 2.2.1.8. Meetings will be held either as video teleconferences or in person. Notional meeting schedules are depicted in the Notional Schedule provided as Attachment J-4. One meeting may be conducted at Contractor’s facilities. The Contractor shall prepare and provide minutes of each meeting and provide copies of all information presented. The purpose of meetings is to allow Contractors to raise issues of general concern. Meetings will not be conducted after the final OPC DD&C RFP is issued.
2.2.2 Cost and Schedule Studies - The Contractor shall identify the expected cost and schedule to complete OPC Detail Design, to construct an initial OPC, and to construct at least eight additional OPCs if exercised as options under the DD&C contract. These estimates shall be based on the OPC Assessment completed under task 2.2.1 of this SOW and incorporating the recommendations of 2.2.1.1. The OPC design approach recommended by the Contractor must be capable of meeting the technical requirements of the updated draft OPC Systems Specification and SOW, references (1) and (8), and the Contractor must be capable of constructing the OPC class to that proposed design.
2.2.2.1 Cost and Schedule to Complete Detail Design.
• Detail Design Cost - The Contractor shall provide a cost estimate for transitioning during DD&C the Functional Design into a Transitional Design, a Production Design, and a 3D Product Model in Fiscal Year 2020 dollars, to include non-recurring costs from the start of Detail Design through delivery of the initial OPC.
• Design Schedules - The Contractor shall develop two high-level schedules depicting the key efforts to transition the OPC Functional Design into a Transitional Design, a Production Design, and a 3D Product Model. These two schedules shall be visually similar to Attachment J-4. One (large-scale) design schedule shall be depicted in months, presenting the schedule from DD&C contract award through Production Readiness Review. A separate (medium-scale) design schedule shall be depicted in quarters, presenting the schedule from DD&C contract award to delivery of the initial OPC, and including a simplified depiction of the initial OPC construction schedule. Each schedule shall address all major milestones called out in section 040 of OPC Contract Section C (Reference (8)) applicable to the time frame presented.
• The Contractor shall identify possible affordability initiatives for managing Detail Design costs as well as overall life cycle cost, and document potential impact of those initiatives on both cost and schedule.
2.2.2.2 Cost and Schedule for OPC Construction – The Contractor shall provide the following cost and schedule estimates.
• The Contractor shall provide a table of notional cost estimates, in then-year dollars, for constructing an initial OPC plus the corresponding long lead time material price, based on Contractor’s Detail Design, and to accept options to construct an additional eight OPCs.
The table shall provide a separate estimated construction cost for each hull and the corresponding long lead time material price, excluding the design costs of section 2.2.2.1.
• The Contractor shall identify the cost estimate classification level represented by the table of cost estimates, using definitions in the SUPSHIP Operations Manual.
• The Contractor shall identify all cost assumptions made in the development of the estimates as well as the basis for those cost assumptions. Assumptions based on recent relevant deign experience of comparably sized ocean going vessels shall be noted. To the extent possible, the Contractor shall arrange the costs by Ship Work Breakdown System (SWBS) number.
• Construction Schedules - Using Microsoft Excel the Contractor shall develop a medium-scale graphic schedule (in quarters) depicting the proposed construction start date, delivery date, and significant events for an initial OPC based on Contractor’s Detail Design. The Contractor shall develop a separate small-scale graphic schedule (in quarters) depicting the proposed construction start dates and delivery dates for constructing at least an additional eight optional OPCs. The estimated start and completion date of each hull shall be listed, corresponding to the depicted design schedule of section 2.2.2.1 and recommendations of 2.2.1.1. If two OPCs are projected to start construction in a single year, they may show concurrent start dates if advantageous to the Contractor.
• The Contractor shall identify possible affordability initiatives for managing construction costs as well as overall life cycle cost, and document potential impact of those initiatives on both cost and schedule. The impact of block buys of OPCs as a cost reduction strategy shall be addressed in this section.
2.2.2.3 Cost and Schedule Risks - The Contractor shall provide the following risk assessments.–
• The Contractor shall provide a risk assessment of achieving the OPC Program’s previously established affordability target for production OPCs. That previous target was an average unit price of $310 million in FY-22 dollars for OPC-4 through OPC-9 including production and LLTM. It assumed that OPC-4 and OPC-5 would be awarded in FY21, OPC-6 and OPC-7 would be awarded in FY22, and OPC-8 and OPC-9 would be awarded in FY23. Contractor’s assessment shall compare that previous target against Contractor’s anticipated costs for constructing the next six OPC options immediately following construction of the Contractor’s first three OPCs under a DD&C contract.
• The risk assessment shall be based on the recommended approach in section 2.2.1 with respect to the references provided herein and shall support the Contractor’s proposed notional schedule.
• If the Contractor’s proposed schedule estimates OPC delivery dates which are later than the USCG notional OPC DD&C schedule in reference (6), the Contractor shall provide a separate cost and schedule risk assessment for accelerating production to achieve the USCG notional date for delivery of OPC-25.
2.2.3 OPC Production Analysis - The Contractor shall present a clear management strategy to construct an initial OPC and to accept options to construct additional OPCs up to the program of record. This study shall address cost, schedule, and technical development to ensure the success of the program, and shall be consistent with the assessment of section 2.2.1 and the schedules proposed in section 2.2.2.
2.2.3.1 Engineering and Production Capacity. The Contractor shall describe the engineering organization, including manning levels, which will complete the Detail Design. The description shall include the location of personnel and subcontractors, and the communication plans to complete the OPC design.
• The Contractor shall submit an analysis of production capacity and demonstrate that the Contractor team either has the in-house production capacity and launch capabilities to ensure on-time delivery of the OPC or show how future planned investments or subcontracts will provide this capacity and capability.
• This analysis shall assess resourcing, to include materials, personnel, and training available to the Contractor team to meet the OPC delivery schedule. It shall identify the ideal annual production rate for the Contractor team with consideration of yard capacity, labor availability, and near- and long-term efficiency gains (learning curve).
Part 2 Industry Study Tasks [02-1001-x.x]
2.2.4 Production Engineering Studies – The Government may exercise options for Part 2 Industry Studies before the Government issues a separate RFP for DD&C of OPCs. The Government may conduct communication sessions with Contractors to review progress and collect feedback on Part 2 requirements up to the point the Government issues the final RFP for DD&C. Once the DD&C RFP is released, these communication sessions will cease.
Part 2 Industry Studies enable Contractors to establish processes for and commence development of an OPC Transitional Design. They also enable Contractors to establish elements of a 3D Product Model and processes permitting Government visualization of 3D Product Model examples.
2.2.4.1 3D Product Model Development Plan - The Contractor shall identify and document any intended 3D model computer applications, modeling plans, and modeling processes that will be used to develop the 3D Product Model.
2.2.4.2 Product Model Validation – The Contractor shall validate the proposed modeling process by producing a 3D model of the galley and the Operations Center.
2.2.4.3 3D Product Model Report and Lessons Learned - The Contractor shall provide a report detailing work performed under section 2.2.4.2, including lessons learned and recommendations for procedures for the Government to employ in conducting the 3D Product Model review during DD&C of the OPC. The report shall recommend the level of detail the Government should require within the 3D Product Model, and the extent to which the 3D Product Model should include Logistics Support Information. The report shall contain a description of the process followed to create Production Design work packages from the 3D Product Model.
3.0 Deliverables.
The Contractor shall provide the deliverables for each exercised Task in Contractor-selected electronic format compatible with Government review using either AutoCAD or Microsoft Office applications on a Windows 10 operating system, per Attachment J-1, Contract Data Requirements List (CDRL). If the source document is not available in MS Office format or AutoCAD searchable PDFs are allowable.
References to contract deliverables within this SOW are indicated with brackets, such as CDRL [02-1001-x.x].
The Government will acknowledge acceptance of each received deliverable. This acceptance does not indicate approval or concurrence with the recommendations in those CDRLs. Instead acceptance confirms that that all delivered files can be opened and reviewed using the software applications discussed above. Because these deliverables are considered recommendations to the Government supporting development of a DD&C RFP, the Government will not provide feedback to the contractor in terms of Compliance Comments or Design Concerns, and will not request Contractors to correct or update any deliverables.
If review of a deliverable indicates significant misunderstanding by the Contractor of Industry Studies requirements or references, and if that misunderstanding is likely to adversely affect deliverables still under development, the Government may at its option choose to discuss that perceived misunderstanding with the Contractor during status meetings described in section 2.2.1.9.
The Government will not share deliverables provided under this contract with other contractors.
Recommendations provided within Information Studies deliverables may inform the content and/or structure of the resulting DD&C RFP. Recommendations supported by one or more Contractor’s deliverables may be incorporated within the D&C RFP without attribution, consistent with established data rights.
4.0 Schedule.
Attachment J-1 provides the required delivery date for each Industry Study; however, the Contractor is encouraged to submit these studies ahead of required delivery dates when individually listed studies are complete.
5.0 Government Furnished Property.
None
6.0 Quality Assurance.
Quality Assurance will be in accordance with 52.246-4, Inspection of Services – Fixed Price.
7.0 Security Clearance.
Security clearances are not required for this project.
8.0 Notes.
None
(End of Section)
Section D—Packaging and Marking
D.1 PACKAGING OF DATA AND SUPPLIES
D.2 IDENTIFICATION MARKING OF PARTS
D.1 Data Packaging Language
All unclassified data to be shipped shall be prepared for shipment in accordance with best commercial practice and the language in Subsection D-2.
D.2 Markings of Data
All reports delivered by the Contractor to the Government under this contract shall prominently show the following on the cover of the report:
(1) Name and Business Address of the Contractor
(2) Contract Number
(3) CLIN No.
(4) CDRL No.
(5) Sponsor: Offshore Patrol Cutter Acquisition Program (CG-9322)
United States Coast Guard Washington, DC
(6) Appropriate Data Rights Marking where required by
FAR 52.227-14
Section E—Inspection and Acceptance
E.1 CLAUSES INCORPORATED BY REFERENCE (FAR 52.252-2) (FEB 1998)
E.2 INSPECTION AND ACCEPTANCE OF DATA
E.3 INSPECTION OF SERVICES
E.4 GOVERNMENT FURNISHED MATERIAL
E.1 Clauses Incorporated by Reference (FAR 52.252-2) (FEB 1998)
This contract incorporates the following clauses by reference with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text can be accessed electronically at the following Internet address: http://www.acquisition.gov
FAR Clause No. Title and Date 52.246-4 Inspection of Services – Fixed Price (AUG 1996)
E.2 Inspection and Acceptance of Data
Inspection and acceptance of all data shall be as specified on the attached Contract Data Requirements List(s), DD Form 1423.
E.3 Inspection of Services
Inspection and acceptance of all services performed under this contract will be in accordance with FAR 52.246-4 incorporated at Section E-1, “Clauses Incorporated by Reference”, as applicable.
Inspection and Acceptance shall be made at destination by the authorized Government representative.
Final acceptance of all deliverable and/or services performed as specified under each contract will be made in writing, at destination, by the authorized Government representative. Final acceptance of a deliverable represents it was submitted in compliance with contract requirements, and does not represent Government endorsement of, or agreement with the results or recommendations presented in the respective deliverable.
E.4 Government Furnished Information
Select sections of the Draft OPC System Specifications will be provided with the RFP. When information is provided by the Government, the Contractor's procedures shall include at least the following processes to ensure compliance with the Contract:
(1) Inspection for completeness and proper type;
(2) Identification and protection from improper use or disposition; and
(3) Process to ensure compliance with the contract.
Section F—Deliveries or Performance
F.1 CLAUSES INCORPORATED BY REFERENCE (FAR 52.252-2) (FEB 1998)
F.2 CLAUSES INCORPORATED IN FULL TEXT
F.3 PERIOD OF PERFORMANCE
F.4 PLACE OF PERFORMANCE
F.5 DEFINITION OF DAYS
F.6 DELIVERY SCHEDULE
F.7 DELIVERY INFORMATION
F.1 Clauses Incorporated by Reference
This contract incorporates the following clauses by reference with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text can be accessed electronically at the following Internet address:
http://www.acquisition.gov
FAR Clause No. Title and Date 52.242-15 Stop-Work Order (AUG 1989)
F.2 Clauses Incorporated in Full Text
FAR 52.217-9—OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within five (5) 5 days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least ten (10) days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 24 months.
(End of Clause)
F.3 Period of Performance
The Base Period of Performance is seven (7) months after award of contract. Option Period One (1) period of performance is fifteen (15) months after option exercise date. The Period of Performance for the overall effort shall not exceed 22 months.
F.4 Place of Performance
The place of performance is the Contractor’s facilities.
http://www.acquisition.gov/
F.5 Definition of Days
Wherever used, “days” means calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day. When used, "working day" excludes weekends and U.S. Federal holidays.
F.6 Delivery Schedule
In the event the Contractor anticipates or encounters difficulty in complying with the contract delivery schedule or date, it shall immediately notify, in writing, the Contracting Officer and Contracting Officer’s Representative (COR). The notice shall give the pertinent details;
however such notice shall not be construed as a waiver by the Government of any contract delivery schedule, or of any rights or remedies provided by law or under this contract.
F.7 Delivery Information
All data to be furnished under this contract shall be submitted electronically to the Government via an online repository. The link to the repository will be provided upon contract award. Delivery shall occur to the destination(s) and at the time(s) specified in Attachment J-1 the Contract Data Requirements List(s), DD Form 1423.
Section G—Contract Administration Data
G.1 CONTRACT ADMINISTRATION
G.2 AUTHORITY OF GOVERNMENT PERSONNEL
G.3 CONTRACTOR PERSONNEL
G.4 REQUEST FOR PAYMENT—INVOICING PROCEDURES
G.5 POST AWARD EVALUATION OF PAST PERFORMANCE
G.1 Contract Administration
The following individuals are the Contracting Officer (KO), Contract Specialist and the Contracting Officer’s Representative (COR) who will be administering the contract.
Contracting Officer (KO):
Name: Nakenia Spruill Phone: 202-475-3512 Email: Nakenia.S.Spruill@uscg.mil
Contract Specialist (KS):
Name: Kayode Adewole Phone: 202-475-3893 Email: Kayode.A.Adewole@uscg.mil
Contracting Officer’s Representative (COR):
Name: Thomas Huffman Phone: 202-475-3861 Email: Thomas.B.Huffman@uscg.mil
G.2 Authority of Government Personnel
(a) The Contracting Officer has the overall responsibility for administration of this contract.
The Contracting Officer, without right of delegation, is the only individual authorized to take actions on behalf of the Government to amend, modify or deviate from the contract terms, conditions, requirements, specifications, details and/or delivery schedules. If the Contractor makes any changes at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract to cover any increases in charges that may result.
The Contracting Officer has the authority to perform any and all post-award functions in administering and enforcing a proposed task order in accordance with its terms and conditions.
(b) The Contract Specialist (KS) is authorized to approve invoices, accept data deliverables, and serve as the primary point of contact during contract administration.
mailto:Nakenia.S.Spruill@uscg.mil mailto:Kayode.A.Adewole@uscg.mil mailto:Thomas.B.Huffman@uscg.mil
(c) The COR will represent the Contracting Officer in the administration of technical details within the scope of the contract. The COR is also responsible for the final inspection and acceptance of all contract deliverables and reports, and such other responsibilities as may be specified in the contract. The COR is not otherwise authorized to make any representations or commitments of any kind on behalf of the Contracting Officer or the Government. The COR does not have authority to alter the Contractor’s obligations or to change the contract specifications, price, terms or conditions. If, as a result of technical exchanges, it is determined that a change is necessary, a formal contract modification will be executed in writing and signed by the Contracting Officer.
G.3 Contractor Personnel
(a) Contractor’s Authorized Representative. The Contractor’s Authorized Representative shall act as the central point of contact with the Government for all contract and program-wide technical issues, and will represent the Contractor at all post-award status meetings. The Contractor’s authorized representative shall be responsible for resolution of issues, program management, and other contract support. The Contractor authorized representative is responsible for overall contract performance. The Contractor’s authorized representative is:
Name: [Name and Contact information to be completed at award] Address:
Email:
Telephone Number:
(b) Contract Administrator. The Contract Administrator serves as the Contracting Officer’s counterpart and primary point of contact with internal and external parties in relation to contract management, contract compliance and contract issues, and provides administration of the contract.
The Contractor’s Contract Administrator is:
Name: [Name and Contact information to be completed at award] Address:
(c) Responsible Official Who Can Receive Notification of an Improper Invoice and Answer Questions Regarding Invoices. The Contractor has designated the following official responsible for receiving notification of an improper invoice and answering questions regarding invoices:
Name: [Name and Contact information to be completed at award] Address:
G.4 Request for Payment—Invoicing Procedures
(a) A monthly request for payment is proper if it includes the items required by the clause at FAR 52.232-25, Prompt Payment [(a)(3)(i) through (a)(3)(ix)] and those items are accurate. If a request for payment does not include all the items required by the clause at FAR 52.232-25, Prompt Payment, or any information is inaccurate, then the request is not proper and shall be returned to the contractor with a statement of the reason(s) it is not proper.
(b) Each invoice shall contain the following information:
(1) Contract Number.
(2) Name of the Contract Specialist and Contracting Officer.
(3) Invoice Routing Code (IRC) provided in paragraph (c) below.
(4) Annotate on the invoice indicating that the contractor represents a Small
Business for accelerated payment purposes.
(5) Contract Line Item Number (CLIN)
(6) Sub Line item Number (SubCLIN)
(7) Date supplies provided or services performed
(c) The Coast Guard unique Invoice Routing Code (IRC) for this contract is: CG-9125.
(d) Each invoice must be submitted to the designated billing office via one of the following modes listed in descending order of preference:
(1) FINCEN Website invoice receipt form:
http://www.fincen.uscg.mil/centralinv/central_inv_contr.cfm
(2) Fax: 757-523-6900
(3) Mailed to:
Commercial Invoices U.S. Coast Guard Finance Center 1430A Kristina Way Chesapeake, VA 23326
(e) To facilitate processing, all proper invoices and any supporting information submitted electronically using the FINCEN web based invoice submission capability must be submitted as a single Adobe .pdf formatted file, or as otherwise specified in the contract.
(f) Supporting documentation along with a courtesy copy of the invoice shall also be e-mailed to the Contract Specialist and COR at the addresses in Section G.1.
(g) In accordance with the Prompt Payment Act, for the purposes of determining a payment due date and the date on which interest will begin to accrue if a payment is late, a proper invoice shall be deemed to have been received:
(1) On the later of:
(i) For invoices that are mailed or transmitted via facsimile, the date a proper invoice is actually received by the designated billing office and annotates the invoice with date of receipt at the time of receipt;
http://www.fincen.uscg.mil/centralinv/central_inv_contr.cfm
(ii) For invoices electronically transmitted by the contractor via web based submission, the date a transmission is received by the designated billing office, and receipt confirmation is provided to the designated recipient; or
(iii) The seventh day after the date on which the property is actually delivered or performance of the services is actually completed; unless—
(A) The agency has actually accepted the property or services before the seventh day in which case the acceptance date shall substitute for the seventh day after the delivery date; or
(B) A longer acceptance period is specified in the contract, in which case the date of actual acceptance or the date on which such longer acceptance period ends shall substitute for the seventh day after the delivery date.
(2) On the date placed on the invoice by the contractor, when the agency fails to annotate the invoice with date of receipt of the invoice at the time of receipt (such invoice must be a proper invoice); or
(3) On the date of delivery, when the contract specifies that the delivery ticket may serve as an invoice.
(h) Web-based submission by the contractor and receipt confirmation does not reflect Government review or acceptance of the invoice.
(i) Payment inquiries and status may be obtained - at the following website: -https://www.fincen.uscg.mil/secure/payment.htm.
G.5 Post Award Evaluation of Past Performance
Interim and final evaluations of performance of the Contractor shall be conducted on this contract in accordance with FAR 42.15. The final performance evaluation shall be completed at the time of completion of work, based on timely submission of required deliverables and the quality and clarity of the information presented. Interim and final evaluations will be submitted to the Contractor as soon as practicable. The Contractor will be permitted thirty (30) calendar days to review the document and to submit additional information or a rebutting statement.
http://www.fincen.uscg.mil/electron.htm http://www.fincen.uscg.mil/electron.htm
Section H—Special Contract Requirements
H.1 DISSEMINATION OF CONTRACT INFORMATION
H.2 INCORPORATION OF SECTION K BY REFERENCE
H.3 SMALL BUSINESS PROGRAMS
H.4 TECHNICAL INSTRUCTIONS
H.5 EXPORT CONTROLLED ITEMS
H.1 Dissemination of Contract Information
Under no circumstances shall the Contractor, or anyone acting on behalf of the Contractor, refer to the supplies, services, or equipment furnished pursuant to the provisions of this contract in any news release or commercial advertising without first obtaining explicit written consent to do so from the Contracting Officer. The Contractor agrees not to refer to awards in commercial advertising in such a manner as to state or imply that the product or service provided is endorsed or preferred by the Federal Government or is considered by the Government to be superior to other products or services.
H.2 Incorporation of Section K by Reference
In accordance with FAR 15.204-1(b), Part IV of the Uniform Contract Format shall not be physically included in the contract, but Section K, Representations, Certifications, and Other Statements of Offerors (as completed by the contractor) shall be deemed incorporated by reference in the contract.
H.3 Small Business Programs
The Contractor shall comply with the Electronic Subcontracting Reporting System (eSRS) found at www.esrs.gov which provides for electronic reporting to substitute for the SF 294 and SF 295.
H.4 Technical Instructions
(a) Performance of the work hereunder may be subject to written technical instructions signed by the Contracting Officer’s Representative specified in Section G of this contract. As used herein, technical instructions are defined to include the following:
(1) Directions to the Contractor which suggest pursuit of certain lines of inquiry, shift work emphasis, fill in details or otherwise serve to accomplish the contractual statement of work.
(2) Guidelines to the Contractor which assist in the interpretation of drawings, specifications or technical portions of work description.
(b) Technical instructions must be within the general scope of work stated in the contract. Technical instructions may not be used to: (1) assign additional work under the contract; (2) direct a change as defined in the "CHANGES" clause of this contract; (3) increase or decrease the contract price or estimated contract amount (including fee), as applicable, the level of effort, or the time required for contract performance; or (4) change any of the terms, conditions or specifications of the contract.
(c) If, in the opinion of the Contractor, any technical instruction calls for effort outside the scope of the contract or is inconsistent with this requirement, the Contractor shall notify the Contracting Officer in writing within ten (10) working days after the receipt of any such instruction. The Contractor shall not proceed with the work affected by the technical instruction unless and until the http://www.esrs.gov/
Contractor is notified by the Contracting Officer that the technical instruction is within the scope of this contract.
(d) Nothing in the foregoing paragraph shall be construed to excuse the Contractor from performing that portion of the contractual work statement which is not affected by the disputed technical instruction.
H.5 Export Controlled Items
(a) Definition. “Export-controlled items,” as used in this clause, means items subject to the Export Administration Regulations (EAR) (15 CFR Parts 730-774) or the International Traffic in Arms Regulations (ITAR) (22 CFR Parts 120-130). The term includes:
(1) “Defense items,” defined in the Arms Export Control Act, 22 U.S.C. 2778(j)(4)(A), as defense articles, defense services, and related technical data, and further defined in the ITAR, 22 CFR Part 120.
(2) “Items,” defined in the EAR as “commodities”, “software”, and “technology,” terms that are also defined in the EAR, 15 CFR 772.1.
(b) The Contractor shall comply with all applicable laws and regulations regarding export-controlled items, including, but not limited to, the requirement for contractors to register with the Department of State in accordance with the ITAR. The Contractor shall consult with the Department of State regarding any questions relating to compliance with the ITAR and shall consult with the Department of Commerce regarding any questions relating to compliance with the
EAR.
(c) The Contractor's responsibility to comply with all applicable laws and regulations regarding export-controlled items exists independent of, and is not established or limited by, the information provided by this clause.
(d) Nothing in the terms of this contract adds, changes, supersedes, or waives any of the requirements of applicable Federal laws, Executive orders, and regulations, including but not limited to—
(1) The Export Administration Act of 1979, as amended (50 U.S.C. App. 2401, et seq.);
(2) The Arms Export Control Act (22 U.S.C. 2751, et seq.);
(3) The International Emergency Economic Powers Act (50 U.S.C. 1701, et seq.);
(4) The Export Administration Regulations (15 CFR Parts 730-774);
(5) The International Traffic in Arms Regulations (22 CFR Parts 120-130); and
(6) Executive Order 13222, as extended.
(e) The Contractor shall include the substance of this clause, including this paragraph (e), in all subcontracts.
(End of clause)