Ref 2 Long Lead Time Material and Insurance Spares.xlsx

XLSX spreadsheet 151 KB Posted

Attached to
USCG Offshore Patrol Cutter (OPC) Industry Studies Request for Proposal
Solicitation number
70Z02320RAPC00500
Issued by

About this file

This document is a request for proposal from the United States Coast Guard for industry studies to support the Offshore Patrol Cutter acquisition program. The Coast Guard seeks proposals from shipbuilders to conduct studies on production and support strategies for the Offshore Patrol Cutter. Proposals are due by January 31, 2020 and are to be submitted electronically to OPC@uscg.mil. This is an unrestricted procurement using simplified acquisition procedures. Offerors may only submit one proposal as a prime contractor but may be subcontractors on multiple proposals. The studies will inform the Coast Guard's plans for production and in-service support of the Offshore Patrol Cutter to replace its aging fleet of Medium Endurance Cutters.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LLTM & Insur Spares Cover Sheet

USCG OFFSHORE PATROL CUTTER (OPC)
LONG LEAD TIME MATERIAL AND
INSURANCE SPARES

ATTACHMENT J-24

Prepared by:
COMMANDANT (CG-9125)
UNITED STATES COAST GUARD STOP 7828
2703 MARTIN LUTHER KING JR AVE SE
WASHINGTON DC 20593-7828

[P00016]

Distribution Statement A: Approved for public release; distribution is unlimited.

LLTM

LLTMSWBS NumberManufacturerCAGE CodeIn-Yard Need Date
(weeks before delivery)Lead Time
Propulsion Engines - MAN 16V 28 33D STC233Fairbanks Morse Engine8279611720
Main Propulsion Electric Motor235DRS PA44 450 HP @ 2800 RPM5EBC412620
Main Propulsion Electric Motor Variable Frequency Drive235DRS included above Hybrid Electric Drive5EBC411720
Reduction Gear Type ASL 100-E - 4.21:1241RenkD493410824
Controllable Pitch Propeller & Shafting System243Rolls Royce0730911123
Stern tube boss & Strut243Schoellhorn- Albrecht0MKF710824
Strut tube & leg castings243Schoellhorn- Albrecht0MKF711223
Valve Gate Remote Operator Actuator - FLG256W&O MIL-V-1189 Bronze8P1181439
Valve Swing CHK - FLG256W&O MIL-V-17547 Type A Class 2 Nickel-AL-Bronze8P1181439
Valve BTFY - Lug Type256W&O MIL-V-24624 / MIL-PRF-32307 Nickel-AL-Bronze8P1181439
Valve BTFY - Remote Operator256W&O MIL-V-24624 / MIL-PRF-32307 Nickel-AL-Bronze8P1181439
Valve Gate Remote Operator Actuator - FLG256W&O MIL-V-1189 Bronze8P1181439
Valve Pressure Reducing - FLG256W&O ASTM F1370 Bronze8P1181439
Valve BTFY - Remote Operator256W&O MIL-V-24624 / MIL-PRF-32307 Nickel-AL-Bronze8P1181439
Simplex Strainer - FLG256W&O MIL-S-16293 Bronze - Stainless Basket8P1181439
Duplex Eaton Model 50 - FLG256W&O Bronze - Stainless Basket8P1181439
Valve Gate Remote Operator Actuator - FLG256W&O MIL-V-1189 Bronze8P1181439
Duplex Eaton Model 50 - FLG256W&O Bronze - Stainless Basket8P1181439
SSDG MTU 12V4000MS24S 1250KVA at 1800 RPM310MTU7258213016
Valve Regulator Back Pressure521W&O Bronze8P1181439
Valve BTFY - Lug Type521W&O Mil -V-24624 Nickel-Aluminum-Bronze8P1181439
Valve Gate Electric Actuated - FLG521W&O Mil -V-1189, 803-2177917 Bronze8P1181439
Valve BTFY - Electric Motor Operator521W&O Mil -V-24624 Nickel-Aluminum-Bronze8P1181439
Valve Globe Hydraulic-Actuated Sprinkler Control w/ Test Fitting522W&O 803-6397408 Bronze8P11814316
Valve Globe Hydraulic-Actuated Sprinkler Control w/ Test Fitting522W&O 803-6397408 Bronze8P11814311
Valve Globe Hydraulic-Actuated Sprinkler Control w/ Test Fitting522W&O 803-6397408 Bronze8P1181439
Valve Globe Hydraulic-Actuated Sprinkler Control w/ Test Fitting522W&O 803-6397408 Bronze8P1181439
Valve Solenoid Operated Pilot522CUNI8P1181439
Valve Ball Electric Motor Operated FLG528W&O 803 5001004 Bronze8P1181439
Valve Ball Electric Motor Operated FLG528W&O 803 5001004 Bronze8P1181439
Valve Ball Electric Motor Operated FLG528W&O 803 5001004 Bronze8P1181439
Valve Ball Electric Motor Operated FLG528W&O 803 5001004 Bronze8P1181439
Valve BTFY - Electric Motor Operator529W&O MIL-V-24624 Nickel-AL-Bronze8P1181439
Valve BTFY - Electric Motor Operator529W&O MIL-V-24624 Nickel-AL-Bronze8P1181439
Valve BTFY - Electric Motor Operator529W&O MIL-V-24624 Nickel-AL-Bronze8P1181439
Valve BTFY - Electric Motor Operator529W&O MIL-V-24624 Nickel-AL-Bronze8P1181439
Simplex Eaton Model 72 - FLG529W&O Bronze - Stainless Basket8P1181439
Valve BTFY - Electric Motor Operator529W&O MIL-V-24624 Nickel-AL-Bronze8P1181439
Valve BTFY - Electric Motor Operator529W&O MIL-V-24624 Nickel-AL-Bronze8P1181439
Valve Gate Electric Actuated FLG531W&O 803 2177917 Bronze8P1181439
Reverse Osmosis Plant531Separator Spares & Equipment, Aqua-Sep 25TPD-PW + 1.5TPD-TW69WR81294
Valve Electric Motor Operated Butterfly pressure class 200541W&O MIL-V-24624 Cres, Type 18P1181439
Valve Electric Motor Operated Butterfly pressure class 200541W&O MIL-V-24624 Cres, Type 18P1181439
Valve Electric Motor Operated Butterfly pressure class 200541W&O MIL-V-24624 Cres, Type 18P1181439
Valve Electric Motor Operated Butterfly pressure class 200541W&O MIL-V-24624 Cres, Type 18P1181439
Valve Ball Electric Motor Operated pressure class 200541W&O MIL-V-24624 Cres, Type 18P1181439
Valve Ball Electric Motor Operated pressure class 200541W&O MIL-V-24624 Cres, Type 18P1181439
Valve Ball Electric Motor Operated pressure class 200541W&O MIL-V-24624 Cres, Type 18P1181439
Valve Ball Electric Motor Operated pressure class 200541W&O MIL-V-24624 Cres, Type 18P1181439
Valve Ball Electric Motor 1/4 turn541Cres Milwaukee Valve /Nutorque 1003-010J-034w/E058P1181439
Valve Ball Electric Motor Operated pressure class 200541Cres Milwaukee Valve /Nutorque 1003-010J-034w/E058P1181439
Valve Ball Electric Motor Operated pressure class 200541W&O MIL-V-24624 Cres, Type 18P1181439
Valve Electric Motor Operated Ball - FLG542W&O 803-5001003 Cres8P1181439
Valve Electric Motor Operated Ball - FLG542W&O 803-5001003 Cres8P1181439
Valve Self Actuated Pressure Relief - FLG542W&O M-V-24332 Cres8P1181439
Valve Solenoid Actuator551W&O Bronze Aluminum Bronze8P1181439
Steering Gear System561RRMNA 2/10/16073097224
Steering System561Sperry Marine N G6MKG610924
Promas Rudder system- CSP 2800562RRMNA - 2/10/16073097224
Shipset of Fin Stabilizer - RRM Gemini 30565RRMNA - 2/10/160730911324
RRM TT1650 FP Thruster - 640KW - 4 Blade - NiAlBronxe568RRMNA 2/10/160730911323
Bow Thruster Motor568DRS 858 HP @ 1500 RPM5EBC411323
Bow Thruster Switches568DRS included above Hybrid Electric Drive5EBC411323
Valve Electric Motor Operated Full Port Ball FLG593W&O Mil V 24509 Bronze8P1181439
Valve Electric Motor Operated Full Port Ball FLG593W&O Mil V 24509 Bronze8P1181439

Insurance Spares

CLINsItem / ModelManufacturerCAGE Code
4003Propulsion Engines - MAN 16V 28 33D STCFairbanks Morse Engine82796
4003Main Propulsion Electric MotorDRS PA44 450 HP @ 2800 RPM5EBC4
4003Main Propulsion Electric Motor Variable Frequency DriveDRS included above Hy- brid Electric Drive5EBC4
4003Reduction Gear Type ASL 100-E - 4.21:1RenkD4934
4003Controllable Pitch Propel- ler & Shafting SystemRolls Royce7309
4003Stern tube boss & StrutSchoellhorn- Albrecht0MKF7
4003Strut tube & leg castingsSchoellhorn- Albrecht0MKF7
4003Valve Gate Remote Oper- ator Actuator - FLGW&O MIL-V-1189 Bronze8P118
4003Valve Swing CHK - FLGW&O MIL-V-17547 Type A
Class 2 Nickel-AL-Bronze8P118
4003Valve BTFY - Lug TypeW&O MIL-V-24624 / MIL- PRF-32307 Nickel-AL-
Bronze8P118
4003Valve BTFY - Remote OperatorW&O MIL-V-24624 / MIL- PRF-32307 Nickel-AL-
Bronze8P118
4003Valve Gate Remote Oper- ator Actuator - FLGW&O MIL-V-1189 Bronze8P118
4003Valve Pressure Reducing - FLGW&O ASTM F1370 Bronze8P118
4003Valve BTFY - Remote OperatorW&O MIL-V-24624 / MIL- PRF-32307 Nickel-AL-
Bronze8P118
4003Simplex Strainer - FLGW&O MIL-S-16293 Bronze
- Stainless Basket8P118
4003Duplex Eaton Model 50 - FLGW&O Bronze - Stainless Basket8P118
4003Valve Gate Remote Oper- ator Actuator - FLGW&O MIL-V-1189 Bronze8P118
4003Duplex Eaton Model 50 - FLGW&O Bronze - Stainless Basket8P118
4003SSDG MTU 12V4000MS24S 1250KVA at 1800 RPMMTU72582
4003Valve Regulator Back PressureW&O Bronze8P118
4003Valve BTFY - Lug TypeW&O Mil -V-24624 Nickel- Aluminum-Bronze8P118
4003Valve Gate Electric Actu- ated - FLGW&O Mil -V-1189, 803-
2177917 Bronze8P118
4003Valve BTFY - Electric Motor OperatorW&O Mil -V-24624 Nickel- Aluminum-Bronze8P118
4003Valve Globe Hydraulic- Actuated Sprinkler Control w/ Test FittingW&O 803-6397408 Bronze8P118
4003Valve Globe Hydraulic- Actuated Sprinkler Control w/ Test FittingW&O 803-6397408 Bronze8P118
4003Valve Globe Hydraulic- Actuated Sprinkler Control w/ Test FittingW&O 803-6397408 Bronze8P118
4003Valve Globe Hydraulic- Actuated Sprinkler Control w/ Test FittingW&O 803-6397408 Bronze8P118
4003Valve Solenoid Operated PilotCUNI8P118
4003Valve Ball Electric Motor Operated FLGW&O 803 5001004 Bronze8P118
4003Valve Ball Electric Motor Operated FLGW&O 803 5001004 Bronze8P118
4003Valve Ball Electric Motor Operated FLGW&O 803 5001004 Bronze8P118
4003Valve Ball Electric Motor Operated FLGW&O 803 5001004 Bronze8P118
4003Valve BTFY - Electric Motor OperatorW&O MIL-V-24624 Nickel-
AL-Bronze8P118
4003Valve BTFY - Electric Motor OperatorW&O MIL-V-24624 Nickel-
AL-Bronze8P118
4003Valve BTFY - Electric Motor OperatorW&O MIL-V-24624 Nickel-
AL-Bronze8P118
4003Valve BTFY - Electric Motor OperatorW&O MIL-V-24624 Nickel-
AL-Bronze8P118
4003Simplex Eaton Model 72 - FLGW&O Bronze - Stainless Basket8P118
4003Valve BTFY - Electric Motor OperatorW&O MIL-V-24624 Nickel-
AL-Bronze8P118
4003Valve BTFY - Electric Motor OperatorW&O MIL-V-24624 Nickel-
AL-Bronze8P118
4003Valve Gate Electric Actu- ated FLGW&O 803 2177917 Bronze8P118
4003Reverse Osmosis PlantSeparator Spares & Equipment, Aqua-Sep 25TPD-PW + 1.5TPD-TW69WR8
4003Valve Electric Motor Op- erated Butterfly pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
4003Valve Electric Motor Op- erated Butterfly pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
4003Valve Electric Motor Op- erated Butterfly pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
4003Valve Electric Motor Op- erated Butterfly pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
4003Valve Ball Electric Motor Operated pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
4003Valve Ball Electric Motor Operated pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
4003Valve Ball Electric Motor Operated pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
4003Valve Ball Electric Motor Operated pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
4003Valve Ball Electric Motor 1/4 turnCres Milwaukee Valve
/Nutorque 1003-010J- 034w/E058P118
4003Valve Ball Electric Motor Operated pressure class 200Cres Milwaukee Valve
/Nutorque 1003-010J- 034w/E058P118
4003Valve Ball Electric Motor Operated pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
4003Valve Electric Motor Op- erated Ball - FLGW&O 803-5001003 Cres8P118
4003Valve Electric Motor Op- erated Ball - FLGW&O 803-5001003 Cres8P118
4003Valve Self Actuated Pres- sure Relief - FLGW&O M-V-24332 Cres8P118
4003Valve Solenoid ActuatorW&O Bronze Aluminum Bronze8P118
4003Steering Gear SystemRRMNA 2/10/167309
4003Steering SystemSperry Marine N G6MKG6
4003Promas Rudder system- CSP 2800RRMNA - 2/10/167309
4003Shipset of Fin Stabilizer - RRM Gemini 30RRMNA - 2/10/167309
4003RRM TT1650 FP Thruster

- 640KW - 4 Blade -

NiAlBronxeRRMNA 2/10/167309
4003Bow Thruster MotorDRS 858 HP @ 1500 RPM5EBC4
4003Bow Thruster SwitchesDRS included above Hy- brid Electric Drive5EBC4
4003Valve Electric Motor Op- erated Full Port Ball FLGW&O Mil V 24509 Bronze8P118
4003Valve Electric Motor Op- erated Full Port Ball FLGW&O Mil V 24509 Bronze8P118
4003202 Machinery Plant Con- trol and Monitoring System LLTM NGMSNGMS3956
4003252 PCS Equipment for Machinery Control Con- sole NGMS Enclosure 5NGMS3956
4003324 Switchboards
w/warranty 35032-29466 Trident Maritime Equip- ment Proposal Rev-KTrident Maritime Systems0V369
4003324 Load Centers - 8 Ea.
w/warranty 35032-29466 Trident Maritime Equip- ment Proposal Rev-KTrident Maritime Systems0V369
4003324 Electric Plant Control System 35032-29466
Trident Maritime Equip- ment Proposal Rev-KTrident Maritime Systems0V369
4003410 Install, Configure,OP Check Command and Control GFE and CFE Items NGMSNGMS3956
4003414 Combat System Data Distribtion System NGMS Material and Labor Quote Enclosure 5NGMS3956
4003415 Computing Network System NGMS Labor and Material Quote Enclosure 5NGMS3956
4003428 Integrated Bridge System NGMS Labor and Material Quote Enclosure 5NGMS3956
4003437 NGMS Test Proce- dures for Metering Sys- tems NGMS Enclosure 5NGMS3956
4003451 S-Band, ARPA Radar System, 30kW, 12 ft Open Array NGMS Quote En- closure 5NGMS3956
4003451 X-Band, ARPA Radar System, 12kW, 6.5 ft Open Array NGMS includ- ed with aboveNGMS3956
4003512 A/C Chiller Plants Trident Maritime Proposal 35032-29466 Rev-KTrident Maritime Systems0V369
5005Propulsion Engines - MAN 16V 28 33D STCFairbanks Morse Engine82796
5005Main Propulsion Electric MotorDRS PA44 450 HP @ 2800 RPM5EBC4
5005Main Propulsion Electric Motor Variable Frequen- cy DriveDRS included above Hy- brid Electric Drive5EBC4
5005Reduction Gear Type ASL 100-E - 4.21:1RenkD4934
5005Controllable Pitch Propel- ler & Shafting SystemRolls Royce7309
5005Stern tube boss & StrutSchoellhorn- Albrecht0MKF7
5005Strut tube & leg castingsSchoellhorn- Albrecht0MKF7
5005Valve Gate Remote Oper- ator Actuator - FLGW&O MIL-V-1189 Bronze8P118
5005Valve Swing CHK - FLGW&O MIL-V-17547 Type A
Class 2 Nickel-AL-Bronze8P118
5005Valve BTFY - Lug TypeW&O MIL-V-24624 / MIL- PRF-32307 Nickel-AL-
Bronze8P118
5005Valve BTFY - Remote OperatorW&O MIL-V-24624 / MIL- PRF-32307 Nickel-AL-
Bronze8P118
5005Valve Gate Remote Oper- ator Actuator - FLGW&O MIL-V-1189 Bronze8P118
5005Valve Pressure Reducing - FLGW&O ASTM F1370 Bronze8P118
5005Valve BTFY - RemoteW&O MIL-V-24624 / MIL-8P118
OperatorPRF-32307 Nickel-AL-

Bronze

5005Simplex Strainer - FLGW&O MIL-S-16293 Bronze
- Stainless Basket8P118
5005Duplex Eaton Model 50 - FLGW&O Bronze - Stainless Basket8P118
5005Valve Gate Remote Oper- ator Actuator - FLGW&O MIL-V-1189 Bronze8P118
5005Duplex Eaton Model 50 - FLGW&O Bronze - Stainless Basket8P118
5005SSDG MTU 12V4000MS24S 1250KVA at 1800 RPMMTU72582
5005Valve Regulator Back PressureW&O Bronze8P118
5005Valve BTFY - Lug TypeW&O Mil -V-24624 Nickel- Aluminum-Bronze8P118
5005Valve Gate Electric Actu- ated - FLGW&O Mil -V-1189, 803-
2177917 Bronze8P118
5005Valve BTFY - Electric Motor OperatorW&O Mil -V-24624 Nickel- Aluminum-Bronze8P118
5005Valve Globe Hydraulic- Actuated Sprinkler Control w/ Test FittingW&O 803-6397408 Bronze8P118
5005Valve Globe Hydraulic- Actuated Sprinkler Control w/ Test FittingW&O 803-6397408 Bronze8P118
5005Valve Globe Hydraulic- Actuated Sprinkler Control w/ Test FittingW&O 803-6397408 Bronze8P118
5005Valve Globe Hydraulic- Actuated Sprinkler Control w/ Test FittingW&O 803-6397408 Bronze8P118
5005Valve Solenoid Operated PilotW&O CUNI8P118
5005Valve Ball Electric Motor Operated FLGW&O 803 5001004 Bronze8P118
5005Valve Ball Electric Motor Operated FLGW&O 803 5001004 Bronze8P118
5005Valve Ball Electric Motor Operated FLGW&O 803 5001004 Bronze8P118
5005Valve Ball Electric Motor Operated FLGW&O 803 5001004 Bronze8P118
5005Valve BTFY - Electric Motor OperatorW&O MIL-V-24624 Nickel-
AL-Bronze8P118
5005Valve BTFY - Electric Motor OperatorW&O MIL-V-24624 Nickel-
AL-Bronze8P118
5005Valve BTFY - Electric Motor OperatorW&O MIL-V-24624 Nickel-
AL-Bronze8P118
5005Valve BTFY - Electric Motor OperatorW&O MIL-V-24624 Nickel-
AL-Bronze8P118
5005Simplex Eaton Model 72 - FLGW&O Bronze - Stainless Basket8P118
5005Valve BTFY - Electric Motor OperatorW&O MIL-V-24624 Nickel-
AL-Bronze8P118
5005Valve BTFY - Electric Motor OperatorW&O MIL-V-24624 Nickel-
AL-Bronze8P118
5005Valve Gate Electric Actu- ated FLGW&O 803 2177917 Bronze8P118
5005Reverse Osmosis PlantSeparator Spares & Equipment, Aqua-Sep 25TPD-PW + 1.5TPD-TW69WR8
5005Valve Electric Motor Op- erated Butterfly pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
5005Valve Electric Motor Op- erated Butterfly pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
5005Valve Electric Motor Op- erated Butterfly pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
5005Valve Electric Motor Op- erated Butterfly pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
5005Valve Ball Electric Motor Operated pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
5005Valve Ball Electric Motor Operated pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
5005Valve Ball Electric Motor Operated pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
5005Valve Ball Electric Motor Operated pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
5005Valve Ball Electric Motor 1/4 turnCres Milwaukee Valve
/Nutorque 1003-010J- 034w/E058P118
5005Valve Ball Electric Motor Operated pressure class 200Cres Milwaukee Valve
/Nutorque 1003-010J- 034w/E058P118
5005Valve Ball Electric Motor Operated pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
5005Valve Electric Motor Op- erated Ball - FLGW&O 803-5001003 Cres8P118
5005Valve Electric Motor Op- erated Ball - FLGW&O 803-5001003 Cres8P118
5005Valve Self Actuated Pres- sure Relief - FLGW&O M-V-24332 Cres8P118
5005Valve Solenoid ActuatorW&O Bronze Aluminum Bronze8P118
5005Steering Gear SystemRRMNA 2/10/167309
5005Steering SystemSperry Marine N G6MKG6
5005Promas Rudder system- CSP 2800RRMNA - 2/10/167309
5005Shipset of Fin Stabilizer - RRM Gemini 30RRMNA - 2/10/167309
5005RRM TT1650 FP Thruster

- 640KW - 4 Blade -

NiAlBronxeRRMNA 2/10/167309
5005Bow Thruster MotorDRS 858 HP @ 1500 RPM5EBC4
5005Bow Thruster SwitchesDRS included above Hy- brid Electric Drive5EBC4
5005Valve Electric Motor Op- erated Full Port Ball FLGW&O Mil V 24509 Bronze8P118
5005Valve Electric Motor Op- erated Full Port Ball FLGW&O Mil V 24509 Bronze8P118
5005202 Machinery Plant Con- trol and Monitoring System LLTM NGMSNGMS3956
5005252 PCS Equipment for Machinery Control Con- sole NGMS Enclosure 5NGMS3956
5005324 Switchboards
w/warranty 35032-29466 Trident Maritime Equip- ment Proposal Rev-KTrident Maritime Systems0V369
5005324 Load Centers - 8 Ea.
w/warranty 35032-29466 Trident Maritime Equip- ment Proposal Rev-KTrident Maritime Systems0V369
5005324 Electric Plant Control System 35032-29466
Trident Maritime Equip- ment Proposal Rev-KTrident Maritime Systems0V369
5005410 Install, Configure,OP Check Command and Control GFE and CFE Items NGMSNGMS3956
5005414 Combat System Data Distribtion System NGMS Material and Labor Quote Enclosure 5NGMS3956
5005415 Computing Network System NGMS Labor and Material Quote Enclosure 5NGMS3956
5005428 Integrated Bridge System NGMS Labor and Material Quote Enclosure 5NGMS3956
5005437 NGMS Test Proce- dures for Metering Sys- tems NGMS Enclosure 5NGMS3956
5005451 S-Band, ARPA Radar System, 30kW, 12 ft Open Array NGMS Quote En- closure 5NGMS3956
5005451 X-Band, ARPA Radar System, 12kW, 6.5 ft Open Array NGMS includ- ed with aboveNGMS3956
5005512 A/C Chiller Plants Trident Maritime Proposal 35032-29466 Rev-KTrident Maritime Systems0V369
6005Propulsion Engines - MAN 16V 28 33D STCFairbanks Morse Engine82796
6005Main Propulsion Electric MotorDRS PA44 450 HP @ 2800 RPM5EBC4
6005Main Propulsion Electric Motor Variable Frequen- cy DriveDRS included above Hy- brid Electric Drive5EBC4
6005Reduction Gear Type ASL 100-E - 4.21:1RenkD4934
6005Controllable Pitch Propel- ler & Shafting SystemRolls Royce7309
6005Stern tube boss & StrutSchoellhorn- Albrecht0MKF7
6005Strut tube & leg castingsSchoellhorn- Albrecht0MKF7
6005Valve Gate Remote Oper- ator Actuator - FLGW&O MIL-V-1189 Bronze8P118
6005Valve Swing CHK - FLGW&O MIL-V-17547 Type A
Class 2 Nickel-AL-Bronze8P118
6005Valve BTFY - Lug TypeW&O MIL-V-24624 / MIL- PRF-32307 Nickel-AL-
Bronze8P118
6005Valve BTFY - Remote OperatorW&O MIL-V-24624 / MIL- PRF-32307 Nickel-AL-
Bronze8P118
6005Valve Gate Remote Oper- ator Actuator - FLGW&O MIL-V-1189 Bronze8P118
6005Valve Pressure Reducing - FLGW&O ASTM F1370 Bronze8P118
6005Valve BTFY - Remote OperatorW&O MIL-V-24624 / MIL- PRF-32307 Nickel-AL-
Bronze8P118
6005Simplex Strainer - FLGW&O MIL-S-16293 Bronze
- Stainless Basket8P118
6005Duplex Eaton Model 50 - FLGW&O Bronze - Stainless Basket8P118
6005Valve Gate Remote Oper- ator Actuator - FLGW&O MIL-V-1189 Bronze8P118
6005Duplex Eaton Model 50 - FLGW&O Bronze - Stainless Basket8P118
6005SSDG MTU 12V4000MS24S 1250KVA at 1800 RPMMTU72582
6005Valve Regulator Back PressureW&O Bronze8P118
6005Valve BTFY - Lug TypeW&O Mil -V-24624 Nickel- Aluminum-Bronze8P118
6005Valve Gate Electric Actu- ated - FLGW&O Mil -V-1189, 803-
2177917 Bronze8P118
6005Valve BTFY - Electric Motor OperatorW&O Mil -V-24624 Nickel- Aluminum-Bronze8P118
6005Valve Globe Hydraulic- Actuated Sprinkler Control w/ Test FittingW&O 803-6397408 Bronze8P118
6005Valve Globe Hydraulic- Actuated Sprinkler Control w/ Test FittingW&O 803-6397408 Bronze8P118
6005Valve Globe Hydraulic- Actuated Sprinkler Control w/ Test FittingW&O 803-6397408 Bronze8P118
6005Valve Globe Hydraulic- Actuated Sprinkler Control w/ Test FittingW&O 803-6397408 Bronze8P118
6005Valve Solenoid Operated PilotW&O CUNI8P118
6005Valve Ball Electric Motor Operated FLGW&O 803 5001004 Bronze8P118
6005Valve Ball Electric Motor Operated FLGW&O 803 5001004 Bronze8P118
6005Valve Ball Electric Motor Operated FLGW&O 803 5001004 Bronze8P118
6005Valve Ball Electric Motor Operated FLGW&O 803 5001004 Bronze8P118
6005Valve BTFY - Electric Motor OperatorW&O MIL-V-24624 Nickel-
AL-Bronze8P118
6005Valve BTFY - Electric Motor OperatorW&O MIL-V-24624 Nickel-
AL-Bronze8P118
6005Valve BTFY - Electric Motor OperatorW&O MIL-V-24624 Nickel-
AL-Bronze8P118
6005Valve BTFY - Electric Motor OperatorW&O MIL-V-24624 Nickel-
AL-Bronze8P118
6005Simplex Eaton Model 72 - FLGW&O Bronze - Stainless Basket8P118
6005Valve BTFY - Electric Motor OperatorW&O MIL-V-24624 Nickel-
AL-Bronze8P118
6005Valve BTFY - Electric Motor OperatorW&O MIL-V-24624 Nickel-
AL-Bronze8P118
6005Valve Gate Electric Actu- ated FLGW&O 803 2177917 Bronze8P118
6005Reverse Osmosis PlantSeparator Spares & Equipment, Aqua-Sep 25TPD-PW + 1.5TPD-TW69WR8
6005Valve Electric Motor Op- erated Butterfly pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
6005Valve Electric Motor Op- erated Butterfly pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
6005Valve Electric Motor Op- erated Butterfly pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
6005Valve Electric Motor Op- erated Butterfly pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
6005Valve Ball Electric Motor Operated pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
6005Valve Ball Electric Motor Operated pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
6005Valve Ball Electric Motor Operated pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
6005Valve Ball Electric Motor Operated pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
6005Valve Ball Electric Motor 1/4 turnCres Milwaukee Valve
/Nutorque 1003-010J- 034w/E058P118
6005Valve Ball Electric Motor Operated pressure class 200Cres Milwaukee Valve
/Nutorque 1003-010J- 034w/E058P118
6005Valve Ball Electric Motor Operated pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
6005Valve Electric Motor Op- erated Ball - FLGW&O 803-5001003 Cres8P118
6005Valve Electric Motor Op-W&O 803-5001003 Cres8P118
erated Ball - FLG
6005Valve Self Actuated Pres- sure Relief - FLGW&O M-V-24332 Cres8P118
6005Valve Solenoid ActuatorW&O Bronze Aluminum Bronze8P118
6005Steering Gear SystemRRMNA 2/10/167309
6005Steering SystemSperry Marine N G6MKG6
6005Promas Rudder system- CSP 2800RRMNA - 2/10/167309
6005Shipset of Fin Stabilizer - RRM Gemini 30RRMNA - 2/10/167309
6005RRM TT1650 FP Thruster

- 640KW - 4 Blade -

NiAlBronxeRRMNA 2/10/167309
6005Bow Thruster MotorDRS 858 HP @ 1500 RPM5EBC4
6005Bow Thruster SwitchesDRS included above Hy- brid Electric Drive5EBC4
6005Valve Electric Motor Op- erated Full Port Ball FLGW&O Mil V 24509 Bronze8P118
6005Valve Electric Motor Op- erated Full Port Ball FLGW&O Mil V 24509 Bronze8P118
6005202 Machinery Plant Con- trol and Monitoring System LLTM NGMSNGMS3956
6005252 PCS Equipment for Machinery Control Con- sole NGMS Enclosure 5NGMS3956
6005324 Switchboards
w/warranty 35032-29466 Trident Maritime Equip- ment Proposal Rev-KTrident Maritime Systems0V369
6005324 Load Centers - 8 Ea.
w/warranty 35032-29466 Trident Maritime Equip- ment Proposal Rev-KTrident Maritime Systems0V369
6005324 Electric Plant Control System 35032-29466
Trident Maritime Equip- ment Proposal Rev-KTrident Maritime Systems0V369
6005410 Install, Configure,OP Check Command and Control GFE and CFE Items NGMSNGMS3956
6005414 Combat System Data Distribtion System NGMS Material and Labor Quote Enclosure 5NGMS3956
6005415 Computing Network System NGMS Labor and Material Quote Enclosure 5NGMS3956
6005428 Integrated Bridge System NGMS Labor and Material Quote Enclosure 5NGMS3956
6005437 NGMS Test Proce- dures for Metering Systems NGMS Enclosure 5NGMS3956
6005451 S-Band, ARPA Radar System, 30kW, 12 ft Open Array NGMS Quote En- closure 5NGMS3956
6005451 X-Band, ARPA Radar System, 12kW, 6.5 ft Open Array NGMS includ- ed with aboveNGMS3956
6005512 A/C Chiller Plants Trident Maritime Proposal 35032-29466 Rev-KTrident Maritime Systems0V369
7005Propulsion Engines - MAN 16V 28 33D STCFairbanks Morse Engine82796
7005Main Propulsion Electric MotorDRS PA44 450 HP @ 2800 RPM5EBC4
7005Main Propulsion Electric Motor Variable Frequen- cy DriveDRS included above Hy- brid Electric Drive5EBC4
7005Reduction Gear Type ASL 100-E - 4.21:1RenkD4934
7005Controllable Pitch Propel- ler & Shafting SystemRolls Royce7309
7005Stern tube boss & StrutSchoellhorn- Albrecht0MKF7
7005Strut tube & leg castingsSchoellhorn- Albrecht0MKF7
7005Valve Gate Remote Oper- ator Actuator - FLGW&O MIL-V-1189 Bronze8P118
7005Valve Swing CHK - FLGW&O MIL-V-17547 Type A
Class 2 Nickel-AL-Bronze8P118
7005Valve BTFY - Lug TypeW&O MIL-V-24624 / MIL- PRF-32307 Nickel-AL-
Bronze8P118
7005Valve BTFY - Remote OperatorW&O MIL-V-24624 / MIL- PRF-32307 Nickel-AL-
Bronze8P118
7005Valve Gate Remote Oper- ator Actuator - FLGW&O MIL-V-1189 Bronze8P118
7005Valve Pressure Reducing - FLGW&O ASTM F1370 Bronze8P118
7005Valve BTFY - Remote OperatorW&O MIL-V-24624 / MIL- PRF-32307 Nickel-AL-
Bronze8P118
7005Simplex Strainer - FLGW&O MIL-S-16293 Bronze
- Stainless Basket8P118
7005Duplex Eaton Model 50 - FLGW&O Bronze - Stainless Basket8P118
7005Valve Gate Remote Oper- ator Actuator - FLGW&O MIL-V-1189 Bronze8P118
7005Duplex Eaton Model 50 - FLGW&O Bronze - Stainless Basket8P118
7005SSDG MTU 12V4000MS24S 1250KVA at 1800 RPMMTU72582
7005Valve Regulator Back PressureW&O Bronze8P118
7005Valve BTFY - Lug TypeW&O Mil -V-24624 Nickel- Aluminum-Bronze8P118
7005Valve Gate Electric Actu- ated - FLGW&O Mil -V-1189, 803-
2177917 Bronze8P118
7005Valve BTFY - Electric Motor OperatorW&O Mil -V-24624 Nickel- Aluminum-Bronze8P118
7005Valve Globe Hydraulic- Actuated Sprinkler Control w/ Test FittingW&O 803-6397408 Bronze8P118
7005Valve Globe Hydraulic- Actuated Sprinkler Control w/ Test FittingW&O 803-6397408 Bronze8P118
7005Valve Globe Hydraulic- Actuated Sprinkler Control w/ Test FittingW&O 803-6397408 Bronze8P118
7005Valve Globe Hydraulic- Actuated Sprinkler Control w/ Test FittingW&O 803-6397408 Bronze8P118
7005Valve Solenoid Operated PilotCUNI8P118
7005Valve Ball Electric Motor Operated FLGW&O 803 5001004 Bronze8P118
7005Valve Ball Electric Motor Operated FLGW&O 803 5001004 Bronze8P118
7005Valve Ball Electric Motor Operated FLGW&O 803 5001004 Bronze8P118
7005Valve Ball Electric Motor Operated FLGW&O 803 5001004 Bronze8P118
7005Valve BTFY - Electric Motor OperatorW&O MIL-V-24624 Nickel-
AL-Bronze8P118
7005Valve BTFY - Electric Motor OperatorW&O MIL-V-24624 Nickel-
AL-Bronze8P118
7005Valve BTFY - Electric Motor OperatorW&O MIL-V-24624 Nickel-
AL-Bronze8P118
7005Valve BTFY - Electric Motor OperatorW&O MIL-V-24624 Nickel-
AL-Bronze8P118
7005Simplex Eaton Model 72 - FLGW&O Bronze - Stainless Basket8P118
7005Valve BTFY - Electric Motor OperatorW&O MIL-V-24624 Nickel-
AL-Bronze8P118
7005Valve BTFY - Electric Motor OperatorW&O MIL-V-24624 Nickel-
AL-Bronze8P118
7005Valve Gate Electric Actu- ated FLGW&O 803 2177917 Bronze8P118
7005Reverse Osmosis PlantSeparator Spares & Equipment, Aqua-Sep 25TPD-PW + 1.5TPD-TW69WR8
7005Valve Electric Motor Op- erated Butterfly pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
7005Valve Electric Motor Op- erated Butterfly pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
7005Valve Electric Motor Op- erated Butterfly pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
7005Valve Electric Motor Op- erated Butterfly pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
7005Valve Ball Electric Motor Operated pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
7005Valve Ball Electric Motor Operated pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
7005Valve Ball Electric Motor Operated pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
7005Valve Ball Electric Motor Operated pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
7005Valve Ball Electric Motor 1/4 turnCres Milwaukee Valve
/Nutorque 1003-010J- 034w/E058P118
7005Valve Ball Electric Motor Operated pressure class 200Cres Milwaukee Valve
/Nutorque 1003-010J- 034w/E058P118
7005Valve Ball Electric Motor Operated pressure class 200W&O MIL-V-24624 Cres,
Type 18P118
7005Valve Electric Motor Op- erated Ball - FLGW&O 803-5001003 Cres8P118
7005Valve Electric Motor Op- erated Ball - FLGW&O 803-5001003 Cres8P118
7005Valve Self Actuated Pres- sure Relief - FLGW&O M-V-24332 Cres8P118
7005Valve Solenoid ActuatorW&O Bronze Aluminum Bronze8P118
7005Steering Gear SystemRRMNA 2/10/167309
7005Steering SystemSperry Marine N G6MKG6
7005Promas Rudder system- CSP 2800RRMNA - 2/10/167309
7005Shipset of Fin Stabilizer - RRM Gemini 30RRMNA - 2/10/167309
7005RRM TT1650 FP Thruster

- 640KW - 4 Blade -

NiAlBronxeRRMNA 2/10/167309
7005Bow Thruster MotorDRS 858 HP @ 1500 RPM5EBC4
7005Bow Thruster SwitchesDRS included above Hy- brid Electric Drive5EBC4
7005Valve Electric Motor Op- erated Full Port Ball FLGW&O Mil V 24509 Bronze8P118
7005Valve Electric Motor Op- erated Full Port Ball FLGW&O Mil V 24509 Bronze8P118
7005202 Machinery Plant Con- trol and Monitoring System LLTM NGMSNGMS3956
7005252 PCS Equipment for Machinery Control Con- sole NGMS Enclosure 5NGMS3956
7005324 Switchboards
w/warranty 35032-29466 Trident Maritime Equip- ment Proposal Rev-KTrident Maritime Systems0V369
7005324 Load Centers - 8 Ea.
w/warranty 35032-29466 Trident Maritime Equip- ment Proposal Rev-KTrident Maritime Systems0V369
7005324 Electric Plant Control System 35032-29466
Trident Maritime Equip- ment Proposal Rev-KTrident Maritime Systems0V369
7005410 Install, Configure,OP Check Command and Control GFE and CFE Items NGMSNGMS3956
7005414 Combat System Data Distribtion System NGMS Material and Labor Quote Enclosure 5NGMS3956
7005415 Computing Network System NGMS Labor and Material Quote Enclosure 5NGMS3956
7005428 Integrated Bridge System NGMS Labor and Material Quote Enclosure 5NGMS3956
7005437 NGMS Test Proce- dures for Metering Sys- tems NGMS Enclosure 5NGMS3956
7005451 S-Band, ARPA Radar System, 30kW, 12 ft Open Array NGMS Quote En- closure 5NGMS3956
7005451 X-Band, ARPA Radar System, 12kW, 6.5 ft Open Array NGMS includ- ed with aboveNGMS3956
7005512 A/C Chiller Plants Trident Maritime Proposal 35032-29466 Rev-KTrident Maritime Systems0V369

image1.png image2.jpeg

File details come from the government source that posted it. Updated .