Attachment C - Pricing Worksheet - Amend 003.xls
XLS spreadsheet 42 KB Posted
- Solicitation number
- 70Z02320RAPB02300
About this file
This pricing worksheet outlines options for a communication management system contract. The contractor would provide a communication management system including a red and black switching system, common end-user terminals, and communication management software for three Polar Security Cutters for the U.S. Coast Guard. The base period is for design and testing over nine months. Option CLIN 1001 is for the first system in year one and includes deliverables such as a bill of materials, technical manuals, software specifications, and technical reports. Option CLIN 1002 provides $5,000 for travel costs to support on-site technical assistance. Additional optional CLINs are listed to provide systems two and three in subsequent years two through five. The total evaluated price for the options is $5,000.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Worksheet
| Polar Security Cutter (PSC) Communication Management System (CMS) Pricing Sheet | |
| Requirements/Matieral/Services | Price |
| CLIN 0001 Design and Test (Base Period / 9 months) | |
| OPTIONS: | |
| CLIN 1001: Complete CMS for PSC Hull 1. If the Government exercises this option, it will be in year 1 of the period of performance. (Includes CDRLs below) | |
| Equipment, hardware, software, and other non-CDRL direct costs. Includes engineering and technical support direct costs. | |
| CDRL DI-001 BOM Sup/Log/Risk Mgmt | |
| CDRL DI-007 Tech Manuals/Acq-Develop | |
| CDRL DI-008 Software Product Specs | |
| CDRL DI-009 Scientific/Tech Reports | |
| Shipping/Delivery | |
| CLIN 1002 Travel. If the Government exercises this option, it will be in year 1 of the period of performance. | $5,000.00 |
| Travel Costs in support of on-site technical support (not to exceed) | |
| Note: If the Government exercises the option for CMS #2, it will be in year 2 or 3 of the period of performance. | |
| CLIN 2001AA Complete CMS for PSC Hull 2 in year 2. | |
| CLIN 2001AB Complete CMS for PSC Hull 2 in year 3. | |
| Equipment, hardware, software, and other non-CDRL direct costs (including shipping). | |
| Note: If the Government exercises the option for CMS #3, it will be in year 4 or 5 of the period of performance. | |
| CLIN 3001AA Complete CMS for PSC Hull 3 in year 4. | |
| CLIN 3001AB Complete CMS for PSC Hull 3 in year 5. | |
| Equipment, hardware, software, and other non-CDRL direct costs (including shipping). | |
| Total Evaluated Price: | $5,000.00 |
| The maximum number of CMS to be procured under this contract is three (3). |
&C&"-,Italic"&K002060RFP Amendment 003
File details come from the government source that posted it. Updated .