Panhandle_PSO_Pre-Proposal_Conference_Slides_Final.pdf
PDF 11 MB Posted
- Attached to
- WV Panhandle PSO Services
- Solicitation number
- 70RFP318RE3000001
About this file
Panhandle PSO Pre-Proposal Conference Slides Final
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contracts
Jessica Rodriguez, CS ‐ Jessica.rodriugez@hq.dhs.gov, 215.521.2276
Tom Schrank, CO ‐ thomas.schrank@hq.dhs.gov, 215‐521‐2257
Program Office
Lenora (Nora) Barbagello, COR ‐ lenora.m.barbagello@hq.dhs.gov, 215.521.2163
Todd Wanner, COR Supervisor, Todd.m.wanner@hq.dhs.gov, 215‐521‐2251
Shawn Brown, PSOPM, Shawn.M.Brown@hq.dhs.gov, 215‐521‐2141
Discuss the different members of the program office and contracts
CLINs ‐
P23‐ ESS CLIN encompasses both TS cleared and non TS cleared PSO services; an amendment needs to be issued to explicitly state so.
The CS will add statement as such.
Proposal Due Dates – Discuss the different due dates
Submission Methods – currently CD but will be amended to email
Discuss nuances to email issues ask if anyone has concerns.
Page Limitations (New Item ‐ Past Performance) – this is new based on lessons learned.
Discuss issues. This is not the place to discuss quality or other projects. Ask for feedback.
Discuss providing the best proposal i.e. proposing using the RFP as a template. Make sure all required information is provided and any other information is pertinent to the requirement/service. If additional services above those required, which are considered a benefit to the Government, will be provided state so and then provide the perceived benefit/cost/time savings etc.
Past Perf ‐ Discuss how we review Reviewing Past Performance
Past Project Form. / “scope”, “magnitude” and “complexity” (Individual vs Aggregate)
Past Performance Questionnaires/ CPARs etc /Quality
Attachment 3a – PPP Summary Sheet (New Item) this is a new sheet I created. This is not part of the template. Contractors may never see it again. ask for feedback.
Teaming Arrangement ‐ Sub/Prime Relationship Past and Present % of Work
Attachment 8 Supervision ‐ Supervision is prescribed. The minimum level of supervision is prescribed as stated in attachment 8 but offerors are permitted (encouraged) to propose additional supervision.
Staffing Plan ‐ Discuss the specific Staffing plan in this requirement as it is not part of the template RFP. Contractors should not expect to see it again.
Price Proposal Attachment 6 – TS PSO Sheet (New Item) ‐ Attachment 6 point out the non‐PSO positions tab and show them where supervision is located.
Also note that makes sure that vendors understand that supervisors will not be direct billed.
FAQ –
Discuss the incumbent notes/reasons for adding them etc.
File details come from the government source that posted it.