Attachment_8_-_Field_Level_Supervision_Exhibit,_Amendment_0002.xls

XLS spreadsheet 44 KB Posted

Attached to
WV Panhandle PSO Services
Solicitation number
70RFP318RE3000001
Issued by

About this file

Attachment 8 - Field Level Supervision Exhibit, Amendment 0002

View the file

Other files

File Type Posted
70RFP318RE3000001,_Amendment_0003.pdf PDF
Panhandle_recompete____Exhibit_10_(contractor_provided_equipment),_Amendment_0003.pdf PDF
Pricing_Schedule,_Amendment_0002.xlsx XLSX spreadsheet
Attachment_6_-_Price_Element_Breakdown,_Amendment_0002.xlsx XLSX spreadsheet
Attachment_5a_-_SPFPA_(FBI_-_Winchester),_Amendment_0002.pdf PDF
Attachment_1_-_SOW_(OCT_2016)__version_1_3,_Amendment_0002.pdf PDF
Panhandle_recompete____Exhibit_13_(Post_Exhibit,_Amendment_0002).xlsm XLSM spreadsheet
3._CONTRACT_CLAUSES,_Amendment_0002.pdf PDF
5._SOLICITATION_PROVISIONS,_Amendment_0002.pdf PDF
Q&A,_WV_PANHANDLE_PSO_-_70RFP318RE3000001,_Amendment_0002.pdf PDF
70RFP318RE3000001,_Amendment_0002.pdf PDF
Panhandle_recompete____Exhibit_9B_(Other_Special_Training),_Amendment_0002.pdf PDF
Attachment_5b_-_SPFPA_(Locations_other_than_FBI_Winchester),_Amendment_0002.pdf PDF
Attachment_10_-_PSO_Seniority_List,_Amendment_0002.xls XLS spreadsheet
Preproposal_Conf_Sign_In_Sheet.pdf PDF
01._SF30_70RFP318RE3000001,_A0001.pdf PDF
5._SOLICITATION_PROVISIONS,_Amendment_1.pdf PDF
Panhandle_PSO_Pre-Proposal_Conference_Slides_Final.pdf PDF
5._SOLICITATION_PROVISIONS.pdf PDF
2._SF1449_70RFP318RE3000001.pdf PDF
1._TABLE_OF_CONTENTS.pdf PDF
3._CONTRACT_CLAUSES.pdf PDF
4._SOW_Attachments.zip ZIP file
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Supervision

Field Level Supervision Exhibit
(This Spreadsheet must be completed and returned with your proposal/quote.)
1. In the spaces below, provide the number of full-time equivilant field level supervisors that will be assigned to this effort:
Area Supervisor:*THE MINIMUM AMOUNT OF SUPERVISION REQUIRED IS LISTED BELOW AND SHOULD BE INCLUDED HERE.
Site Supervisor:
Roving Supervisor:
Total # of Field Level Supervisors:
2. Complete the spreadsheet below to indicate the distrubition of supervisory hours by location.
Locations (List each Separately)Supervisor PostDays Supervisor at This LocationHours Per Day at This LocationTotal Supervisor Hours at Each Location for a 12 Month PeriodRemarks
ATF (WV0226)SS7.0024.008,760.00
IRS (WV0191)SS7.0024.008,760.00
FEMA (VA0713)SS7.0024.008,760.00
USCGAS2,080.00Dedicated Area supervisor/s assigned to the USCG sites. The dedicated supervisor/s shall work no less than 40 hours a week during normal agency business hours.
FBIAS2,080.00Dedicated Area supervior/s assigrned to the FBI sites. The dedicated supervisor/s shall work no less than 40 hours a week during normal agency business hours.
Grand Total
LEGEND:
Note: For purposes of completing this spreadsheet, the Contract Manager, Training Instructor, Quality Assurance Personnel and "Lead" PSOs are NOT considered field level supervisors:
Location: Locations are areas of operations/responsibilities that will be established to meet the field level supervision required by the Statement of Work. e.g. Building, Complex, Section of a City/Town, Geographic part of State
Supervisory Post: For each location, provide the number and type of supervisors that shall be provided. Use the following abbreviations: AS = Area Supervisor, SS = Site Supervisor (indicate the sites supervised), RS = Roving Supervisor (indicate the locations supervisied).
Days Supervisor at this Location: Use the following nomenclature(s):
"7 Days" - 7 days a week including Federal holidays
"M-F" - Monday through Friday excluding Federal Holidays
"SSH" - Saturdays, Sundays and Federal holidays
Total Supervisor Hours for a 12 Month Period: For each location provide the Supervisory hours that will be provided for a 12 month period.
Grand Total: Provide the summed total for Supervisory Hours provided for a 12 month period.
** The minimum number of Supervisors required for this effort are listed above. The number of Supervisors listed in this Field Level Supervision Exhibit is only the minimum number of Supervisors required for this effort; however, the Government anticipates that vendors will propose additional Supervisors (area, site specific or otherwise) as part of its plan to successfully manage this effort. **