Clarification Questions 70LCHS25RPFB00001-70LCHS25RPFB00002 2-14-25.xlsx

XLSX spreadsheet 64 KB Posted

Attached to
Student Support/Facilities Operation Maintenance Services
Solicitation number
70LCHS25RPFB00001
Issued by

About this file

This is a questions and answers document containing 99 industry questions and government responses related to two draft RFPs (70LCHS25RPFB00001 and 70LCHS25RPFB00002) for Student Support Services and Facilities Operations Maintenance Services at the Federal Law Enforcement Training Center in Charleston, SC. The questions seek clarification on various aspects including key personnel requirements, past performance submission requirements, pricing instructions, environmental submissions, site visit attendance limits, and specific technical details about facility operations.

Key clarifications provided by the government include: the requirements will be awarded as two separate single-award IDIQ contracts, up to 8 people can attend oral presentations, the contracts require separate proposal submissions, the wage determination to use is WD No. 2015-4427 Revision 29, and non-price factors are significantly more important than price with Factors 1-4 being of equal importance. Several responses indicate that sections of the RFP will be revised, including past performance requirements, key personnel designations, and environmental submission requirements. The government also clarified technical details about facility operations like grease trap cleaning frequency (every 90 days), elevator quantities (8 total), and shared liability threshold ($1,500).

View the file

Other files

File Type Posted
Exhibit H-5 Contractor Badge Application.pdf PDF
Attachment C-15 Dormitory Schedule Sample.xlsx XLSX spreadsheet
Attachment C-14 Preventive Maintenance Guide.pdf PDF
Section J Index_70LCHS25RPFB00001.pdf PDF
Attachment C-6 FTC-ADM-1A FLETC Purchase Requisition PR.xlsx XLSX spreadsheet
Attachment C-2 Buildings Hours of OperationRev.pdf PDF
Attachment C-10 Historical Data of Service CallsRev.pdf PDF
ATTACHMENT C-22 FLETC CHARLESTON FLEET VEHICLES AS OF 12-17-24.pdf PDF
Exhibit H-4 I-9 Form (1).pdf PDF
70LCHS25RPFB00002 Attachment 1B- Facility Maintenance Prior Experience Questions.pdf PDF
Attachment C-2 Sample Session Start Dated 1.pdf PDF
Attachment C-28 FTC-ADM-51.pdf PDF
Attachment C-5 Government Furnished Equipment-Property Updated 5-1-2024.pdf PDF
Section H 70LCHS25RFPB00001 Special Contract Requirements 2-27-25.pdf PDF
Exhibit E-2 Section E - Es QASP attachments.pdf PDF
Attachment C-37 FLETC Student Roster Format.xlsx XLSX spreadsheet
Attachment C-41 Class Party-Picnic Form.pdf PDF
Attachment C-16 OFF-CENTER LODGING SHUTTLE SCHEDULE REVISED.pdf PDF
Attachment C-19Driver Training DivisionVehicle Equipment Requ.pdf PDF
Section B 70LCHS25RPFB00001 2-26-25.xlsx XLSX spreadsheet
Attachment C-33 Role Player Eval Sheet.pdf PDF
Section B 70LCHS25RPFB00002 2-26-25.pdf PDF
Attachment C-39 Pre-Registration Package.pdf PDF
Attachment C-26FTCADM 82 Receiving Report.pdf PDF
Attachment C-18Bus Transportation Inclement Weather_TRAINING DAYS-.pdf PDF
Attachment C-10 FTC-ADM-46 Move Order Request.pdf PDF
Section B 70LCHS25RPFB00002 2-26-25.xlsx XLSX spreadsheet
Section I 70LCHS25RPFB00002 2-27-25.pdf PDF
Section L_70LCHS25RPFB00002 2-27-2025.pdf PDF
Exhibit H-4 I-9 Form.pdf PDF
Attachment C-21 Fire Arms Division-Ammunition Weapons Request.pdf PDF
Section K 70LCHS25RPFB00001 2-26-25.pdf PDF
Section F 70LCHS25RPFB00002 2-26-25.pdf PDF
Attachment C-11 Grounds Acreage 11-17-2023.xlsx XLSX spreadsheet
Attachment C-12GroundsMaintMapFLETCCharlComplex11-8-23R.pdf PDF
Attachment C-25FLETC Manual 70-09.J Firearms and Ammunition.pdf PDF
Attachment C-14 AIRPORT ARRIVAL and DEPARTURE SCHEDULE.pdf PDF
Attachment C-40 Sample Weekly Food Service Menu.pdf PDF
Attachment C-29 FTC-ADM-53a.pdf PDF
Attachment C-24 FLETC SOP CHS-SEM- 005.pdf PDF
Attachment C-27 FTC-ADM-37 Stock Issue Authorization.pdf PDF
SECTION C - FAC MAINT 70LCHS25RPFB00002 2-27-25 combined.pdf PDF
Attachment C-1 Buildings and StructuresREV.pdf PDF
Section G 70LCHS25RPFB00001 2-26-25.pdf PDF
Attachment C-4 Hours of Operations.pdf PDF
Attachment C-32 FTC-ADM-50.pdf PDF
Section A 70LCHS25RPFB00001 2-26-25.pdf PDF
Attachment C-7_Contractor Furnished Materials .pdf PDF
C-8 SOS B686-1 THRU B68and69 Mat Rooms Part 3.pdf PDF
Exhibit H-6 OSHA 300 300A Log Report Summary 12-12-2024- (1).pdf PDF
Show 40 more

Latest 50 of 202 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI

Request For Information
Project Title:It is unclear what to submit as part of Past Performance becasuse the L and M are not requiring the same information as part of the submission.
Solicitation No:Can the USG please update the L instructions and M evaluation criteria to clearly articulate the submission requirements.
No.DocumentLocationPageQuestionGovernment Response
1Section LL.9 Proposal Submission InstructionsL-5Can the government please confirm that it "intends to make one award without discussion with Offerors" for each of the contracts?Section L-9 & M-1: Notice to Offerors: The Government intends to award (2) Single Award, (IDIQ) contracts to include Firm-Fixed Price (FFP) and Other than Firm Fixed Price (OTFFP) CLINS resulting from this solicitation. The Government reserves the right to discuss submissions and/or ask clarification questions to contractors submitting a proposal if deemed in the Government’s best interest.
2Section LL.15 Phase II - Factor 3: Capability of Proposed Key PersonnelL-10Section M related to key personnel resumes, which currently states:

"At least two (2) resumes of each category shall be current personnel of the Prime Offeror."

We respectfully request clarification on whether the government would consider revising this requirement to allow the inclusion of resumes from personnel of the entire Offeror team, including teaming partners and subcontractors. Expanding this requirement to encompass the full Offeror team would allow us to leverage a broader pool of highly qualified and experienced personnel who are collectively positioned to meet and exceed the government’s requirements.This verbiage has been removed
3Section LL.15 Phase II - Factor 3: Capability of Proposed Key PersonnelL-11Can the government please clarify the key personnel for each contract?Please see revised Section L.15: "The Offeror shall submit resumes that describe the specific, relevant experience and availability of key personnel in providing services described in section C.6 of each PWS".
4Section LL.15L-11Can the government please clarify if the same resumes can be used for key personnel positions that overlap with each contract?The Government will

not accept the same resume(s) for key personnel positions to overlap with each contract 5 Section M M.2 Basis of Award M-1 After reviewing Section M, we understand that this acquisition will be conducted using a Best Value tradeoff methodology, with both price and non-price factors considered. We would like to request clarification on the following:

1. Relative Importance of Non-Price Factors: Could the government confirm the relative importance or weight assigned to Factors 1 through 4 (Demonstrated Prior Experience, Oral Presentation, Capability of Proposed Key Personnel, and Past Performance)? Are these factors considered equal in importance, or is one given more emphasis?

2. Non-Price vs. Price Factors: While we understand that price will be evaluated for reasonableness and completeness, could you clarify how price is weighted relative to non-price factors? For example, does the government prioritize technical excellence over cost, or is there a specific balance intended?

3. Oral Presentations: For the oral presentation (Factor 2), could the government provide additional insight into its weight compared to the other non-price factors?Please see revised Section M.2. For this solicitation, the evaluation factors are: All "Non-Price/Cost" factors when combined, are significantly more important than Cost/Price. Factors 1, 2, 3 and 4 are of equal importance.
6Section MFactor 4: Past PerformanceM-2Can the government please confirm that Offers are to provide up to four (4) projects and two (2) additional projects per each teaming partner?Please see revised Section M
7Section C (Student Support)68Student Support Services Section C is missing content after C.5.E. Can the government provide scope for C.5.F, C.5.G, C.6 and C7?This has been corrected and uploaded to SAM.GOV
8Section LL.17 Factor 5: Price Proposal InstructionsL-12The government states "While certified cost and pricing data is not required, other than certified cost and pricing data is required". Can the government please clarify this statement?Please see revised Section L.15
9Section MCan the government please confirm that Offers can have 5 people attend the site visit and not a "Maximum of 1 individual per company"?Up to 5 people can attend the site visit
10Section LL.14 Oral PresentationL-8Upon reviewing the requirements for oral presentations, we noticed that the government allows up to five (5) individuals to participate for 180 minutes when bidding on one task and for 240 minutes when bidding on both tasks.

We respectfully request that the government consider allowing more individuals to participate in the oral presentations for offerors bidding on both tasks. Given the complexity and scope of preparing for both tasks, increasing the number of participants would allow us to present a more comprehensive and detailed demonstration of our approach. This adjustment would enable subject matter experts and key personnel to address task-specific aspects directly, thereby providing the government with greater assurance of our ability to meet or exceed the requirements.

Would the government consider revising the participant limit for offerors bidding on both tasks to 7-8 individuals? We believe this adjustment would better align the oral presentation process with the scope and objectives of the solicitation.Up to 8 can be present for the Oral Presentation
11Section LL.6 Pre-Proposal ConferenceL-3We would like to request additional clarification on the structure of the site visit, particularly given that the solicitation encompasses two distinct tasks and not all attendees may be bidding on both.

Does the government plan to divide the site visit into groups or hold separate sessions to address the unique aspects of the two tasks?

If the government does not plan to break out by task, will there be separate discussions or presentations for each task during the site visit?

Would the government consider extending the site visit to multiple days or offering an additional session to provide more tailored information for each task?

We are seeking these details to ensure our team can maximize the value of the site visit and adequately prepare for the discussions specific to the tasks we plan to bid on.The governmet will divide the site visits into groups based on task. The site visit will be multiple days. Offerors will receive dates upon receiving their Advisory Letters.
12Section BSupplies or Services and PriceSol. No. 70LCHS25RPFB00002, Item Numbers X006 and X008. Are we to insert unit pricing for these Item Numbers or are our unit rates locked in by the hours and NTE amounts (i.e., for X006, $750,000/35,000 hours = $21.43/hour)?All CLINS shall be priced to reach a total contract price for Section B for the Base Year and each option Year
13Section BSupplies or Services and PriceSol. No. 70LCHS25RPFB00001, Item Numbers X009, X010, X011 and X013. Are we to insert unit pricing for these Item Numbers or are our unit rates locked in by the hours and NTE amounts?Insert your unit pricing. It does not have to equal the NTE amount. The NTE amount is the annual amount that the government feels it will need for this service. This amount may be increased, if the need exceeds the total NTE amount
14Section C (Student Support)Intro and General RequirementsC-42Under Firing Range Pick-up, it is noted that the Student Support Services Contractor is to “clean weapons cleaning room, making sure surface areas are free of grease, oil, solvents, trash, and other foreign materials. Refill lead soap dispensers when empty”. Judging by Attachment C-8, Part 2, this appears to be a requirement for the Facilities Operations Maintenance Contractor instead. Can the Government clarify the janitorial/custodial requirements for each contract as there are additional overlap throughout?Rangemasters are required to clean up after each class departs so it is ready for the next class; this is not for the janitorial staff to accomplish. The janitorial staff normally only cleans common use areas such as public restrooms, lobby areas and staff office areas at the indoor range.
15Section C (Student Support)Intro and General RequirementsC-44-45Are the items listed under Firearms Equipment and Supplies (as well as targets, drums, and batteries) all Government furnished? If not, which ones are to be provided by the Contractor?All range materials are supplied by the government
16Section G.13 & Section LL-12Sect. G.13 and Sect. L, page L-12. These sections note Rev. 27 of two different Wage Determinations whereas the Attachment H-2 is for 2015-4427, Rev. 29. Please clarify the applicable Wage Determination.See revised Section G.13 and L.17 to reflect the correct Wage Determination to be 2015-4427, Revision 29
17Section LKey Personnel L-15L-10This section notes that “at least two (2) resumes of each category shall be current personnel of the Prime Offeror”. This provides an unfair advantage to the incumbent contractor and subjects the Government to a possible protest. Given that it is well understood that any new contractor will likely hire incumbent staff to satisfy first right of refusal requirements, please consider eliminating this requirement.This verbiage has been removed
18Section L & Section MKey Personnel L-15L-11 & M-2These sections call for resumes for Dorm Manager, Dining Hall Manager, and Chef. These positions do not seem relevant to the Facilities Operations Maintenance Solicitation 70LCHS25RPFB00002, and these sections should be clarified as such.Please see revised Section L.15
19Section L & Section ML-11 & M-3This section calls for a page limit of five (5) pages whereas Sect. M, page M-3 calls for a six (6) page limit. Please clarify.Please see revised Section L and M
20Section LL-12This page notes that questions are due on Feb. 03 and yet the site visit is not until Feb. 06. This is highly unusual to expect contractors to have all questions in hand prior to a site visit and an unfair advantage to the incumbent. Please consider revising the due date for questions until at least several days after the 6th.Tentative Dates have been updated on Draft Announcement
21Section MM-4This section notes that “if the offeror proposed teaming partner(s) or subcontractor(s) in response to this RFP, the offeror shall provide two (2) additional past performance questionnaires for each teaming partner(s) and/or subcontractor(s) for contracts entered into by the federal government, agencies of state and local governments, and/or commercial customers”. With these additional past performance requirements, please consider adding an additional two (2) pages to the document length for each subcontractor. Otherwise, there will not be enough room to adequately describe subcontractor past performance.Please see revised Section L and Section M Past Performance requirements
22Section MM-4This section notes that “if the offeror proposed teaming partner(s) or subcontractor(s) in response to this RFP, the offeror shall provide two (2) additional past performance questionnaires for each teaming partner(s) and/or subcontractor(s) for contracts entered into by the federal government, agencies of state and local governments, and/or commercial customers”. Please change the word “questionnaires” to “references”.Please see revised Section M Past Performance requirements
23Attachments C-2 & C-4What is the difference between these two attachments? They both seem to cover hours of operation.They are applicable to both solicitations
24Attachment C-6Government Equipment List. What is the difference between the three provided sheets within the spreadsheetNo difference. They're just a list of the equipment that we have onsite
25Attachments C-5 & C-6Government Equipment ListWhat is the difference between these two attachments? They both seem to cover Government Furnished Equipment and Property?No difference. They're just a list of the equipment that we have onsite
26Attachment C-7Contractor Furnished Materials and SuppliesAre we to assume that this list is applicable only to 70LCHS25RPFB00001 since Attachment C-9 apparently covers 70LCHS25RPFB00002?That is correct
27Attachments C-8Schedules of Service, Parts 1 & 2The heading on these documents is 70LCHS25RPFB00002. Please confirm these schedules are exclusively for this Solicitation onlyThat is correct
28Attachments C-8Schedules of Service, Parts 1 & 2Under Special Requirements under several of the locations, it is mentioned that “additional dormitory service requirements are described in Section C-5.B.5.b”. This is not the case. Where are the dormitory service requirements addressed?This reference has been corrected; attachment C-35 has the schedule of services listed for the dormitories under the student services contract. The dormitory staff is responsible for their own janitorial/housekeeping service
29Attachment C-9 Contractor Furnished Materials and SuppliesThe heading on this document is 70LCHS25RPFB00002. Please confirm these materials and supplies are needed exclusively for this Solicitation only.That is correct
30Attachment C-10, Historical Service Call DataThis data is for December 2024 only and a significant holiday month. Please provide more representative and longer duration data of at least 3-months, preferably even longer
31Attachment C-12, Grounds Maintenance MapPlease clarify differences between the areas marked in white, black, light green, and dark greenThe areas on green mark the areas that are FLETC property to be maintained
32Attachment C-13, Grounds Maintenance Map, JBS Weapons StationPlease clarify differences between the dotted line areas that are not shaded and those shaded in green.The shaded green areas mark the areas that will need to be maintained
33Attachment C-42, Government Property ListWhat is the difference between the three provided sheets within the spreadsheetNo difference. They're just a list of the equipment that we have onsite
34All RFP Attachments and ExhibitsWhen the government issues the final RFP, we request that the Attachments and Exhibits are segregated by contract (i.e., they are associated with either Student Services Solicitation # 70LCHS25RPFB00001 or Facilities Maintenance Solicitation # 70LCHS25RPFB00002).Each solicitation will have its own RFP with applicable documents
35Section BThe description for CLINs 0007AN and 1007AL through 7007AL appear to be incomplete. Please provide the entire description for each of these CLINs.Spreadsheets have been updated
36#70LCHS25RFPB00001 Section BStudent ServicesWill the Total Evaluated Price include all 0006 subCLINs? For example, offerors are to provide pricing for 0006A through 0006G and all of these will be included in the Total Evaluated Price.All CLINS shall be priced to reach a total contract price for Section B for the Base Year and each option Year
37#70LCHS25RFPB00001 Section BStudent ServicesPlease confirm that offerors are not required to provide a unit price or total amount for CLIN 0006 for 1 LS and that we should only provide pricing for the subCLINs (0006A through 0006G).All CLINS shall be priced to reach a total contract price for Section B for the Base Year and each option Year
38#70LCHS25RFPB00001 Section BStudent ServicesWhich column for CLIN 0007 will be included in the Total Evaluated Price (Daily Rate Per Meal, Minimum Monthly Charge, or Maximum Monthly Charge)?All CLINS shall be priced to reach a total contract price for Section B for the Base Year and each option Year
39#70LCHS25RFPB00001 Section BStudent ServicesPlease confirm offerors are required to complete the daily rate per meal, minimum monthly charge, and maximum monthly charge for all subCLINs in CLIN 0007.Yes
40#70LCHS25RFPB00001 Section BStudent ServicesPlease confirm that offerors are not required to provide any pricing for the top level CLIN 0007 for 1 LS.All CLINS shall be priced to reach a total contract price for Section B for the Base Year and each option Year
4170LCHS25RPFB00001/70LCHS25RPFB00002 Student Support Services - C.3(7) // Facilities Management C.5.A.3The listed Contractor Furnished Materials and Supplies overlaps. The following items are listed under Attachment C-7 and Attachment C-9. Paper Towels, Liquid Hand Soap for Dispensers, Hand Sanitizer Dispenser, Hand Sanitizer, Toilet Paper, Walk-off Mats, Disposable Cups for Water Coolers, Toilet Paper Holders, Toilet Seat Covers, Soap Trays, Soap Dispensers, Soap Dispenser Refill Bags, 2XL Hand Sanitizer Touch Free Dispenser, 2XL-27, Hand Sanitizer Refill Bags, Towel Bars, Shower Curtains, Shower Curtain Rods, Medicine Cabinets, Mirrors, Smoke Detectors, Door Stops, Tri-Flow Teflon Lubricant, Gym Wipes.

The overlap in materials creates confusion in the division of responsibility between the Student Support Services and Facility Operations Maintenance.

For example, what contractor would be responsible for replacing Walk-off Mats or refilling disposable cups for water coolers.

Can the USG please provide clarification as to which materials and supplies are required for Student Services and which are required for Facility Operations Maintenance.These are two separate requirements and shall be bid as such. Each section will need each item(s).
42Student Services #70LCHS25RFPB00001Section C Student Services C.1(c)(3)This PWS Section States "The Contractor shall provide a qualified contract manager at all times (on call 24 hours a day) to administer all services described in the following specifications, receive any complaints concerning the contract requirements, and rectify the causes of the complaints." Can the USG please clarify if the "Contract Manager" is the Project Manager referenced in C.4(a)(1). If the Contract Manager is an additional position is the Contract Manager considered contractor key or essential personnel?Yes, the contract manager is also the Project Manager. This has been revised to reflect.
43Student Services #70LCHS25RFPB00001Section C Student Services C.6The USG does not list an Environmental/Safety Manager in the contractor key and essential C.6 section. However, section I.3502.215-70 lists an Environmental/Safety Manager as key personnel. Can the USG please clarify that an Environmental/Safety Manager is key personnel for the Student Services solicitation.The Environmental/Safety Manager is a key position and Section C has been revised.
44Student Services #70LCHS25RFPB00001Section C Student Services C.6.14Can the USG please clarify that exterminators are required for the Student Services solicitation.Yes this will be required
45Student Services #70LCHS25RFPB00001Section C Student Services C.6.15Can the USG please clarify that pest control personnel are required for the Student Services solicitation.Yes this will be required
46Student Services #70LCHS25RFPB00001Section C Student Services C.5.B.1(b)Directs the contractor to price the requirements of Transportation Services including the purchase, maintenance, and fuel cost of buses into Section B CLINS 0009, 1009, 2009, 3009, 4009, 5009, 6009, and 7009. However, the CLIN X009 is Role Players T&M.
Can the USG please clarify if transportation services costs should be provided in the CLIN X011 Transportation T&M CLIN or the Transportation FFP CLIN X002?See revised section B
47Student Services #70LCHS25RFPB00001SECTION C – DESCRIPTION / SPECIFICATIONS / STATEMENT OF WORK C.5.F and C.5.GThe Table of Contents (page C-1) for the Section C document for the Student Services Solicitation #70LCHS25RFPB00001 references C.5.F Dorm Services and C.F.G Food Services. However, these sections are not included in the document. Can the USG provide these statements of work?They have been uploaded for review
48Facilities Maintenance #70LCHS25RFPB00002SECTION C – DESCRIPTION / SPECIFICATIONS / STATEMENT OF WORK C.5.D.2Section C-5.D.2 requests that Offeror submit a Environmental Preferability Submission with the following information "Offerors should include any relevant information pertaining to the past experience of their firm and/or key personnel in managing or performing one or more prior custodial contracts in an “environmentally preferable” manner. This can mean being mindful of some or all of the following: the environmental preferability of products used, recycled content considerations, waste minimization, or support of recycling programs. This information should be included with the “Environmental Preferability Submission.”
There is no requirement in the Section L instructions to submit an Environmental Preferability Submission document. Can the USG please clarify the submission requirements for an Environmental Preferability Submission document?This will be part of the revised Demonstrated Prior Experience Submission
49Facilities Maintenance #70LCHS25RFPB00002SECTION C- C-5.D.4 (l) Environmental Submissions, para 2 HAZARDOUS MATERIAL COMPLIANCE PLANSub-paragraph (b) states that "This plan shall be consistent with and further detail the approach contained in the offeror's proposal that resulted in the award of this contract and in compliance with the requirements stated in this clause." Can the government please clarify if this means that the Hazardous Material Compliance Plan is a required subject in the Factor 2 Oral Presentation? This is unclear as it is not mentioned in the Section L instructions.This will be part of the revised Demonstrated Prior Experience Submission
50Facilities Maintenance #70LCHS25RFPB00002SECTION C- C-5.D.4 (l) Environmental Submissions, para 3 ENVIRONMENTAL PREFERABILITY SUBMISSIONSub-paragraph (f) states that "Failure to address this shall result in a proposal being considered incomplete and, accordingly, may result in the Government excluding the proposal from further consideration." Can the government please clarify if this means that the Waste Minimization and Recycling Strategy is a required subject in the Factor 2 Oral Presentation? This is unclear as it is not mentioned in the Section L instructions.This will be part of the revised Demonstrated Prior Experience Submission
51Facilities Maintenance #70LCHS25RFPB00002SECTION C- C-5.D.4 (l) Environmental Submissions, para 3 ENVIRONMENTAL PREFERABILITY SUBMISSIONSub-paragraph (h) states that "The proposal must demonstrate that products in each of the 5 above categories meet the following four (4) criteria:" Can the government please clarify if this means that the four listed criteria under Chemical Products Mandatory Characteristics are a required subject in the Factor 2 Oral Presentation? This is unclear as it is not mentioned in the Section L instructions.No, this will not be a part of the Oral Presentation
52Facilities Maintenance #70LCHS25RFPB00002SECTION C- C-5.D.4 (l) Environmental Submissions, para 3 ENVIRONMENTAL PREFERABILITY SUBMISSIONSub-paragraph (p)(1) states that "While there is no minimum Mandatory threshold per se under this criterion, an offeror’s failure to address these considerations may result in elimination of its proposal from further consideration and, in any case, shall be deemed a proposal deficiency." Can the government please clarify if this means that these Waste Minimization and Recycling Strategies requirements are a required subject in the Factor 2 Oral Presentation? This is unclear as it is not mentioned in the Section L instructions.This will be part of the revised Demonstrated Prior Experience Submission
5370LCHS25RPFB00001/70LCHS25RPFB00002C.6 Contractor Key and Essential Personnel Requirements; Section I 3052.215-70Will the Government confirm that Key Personnel are identified in Section I, 3052.215-70; and that all other Labor Categories listed in Solicitations Section C.6 are identified as Essential?That is correct
54Facilities Maintenance #70LCHS25RFPB00002Section C, C-5.D.2 Management Responsibilities and Section I Clause 3502.3052.215-70C-5.D.2 MANAGEMENT RESPONSIBILITIES lists the following positions as key.

Environmental / Safety Manager Database Manager Environmental Coordinator Recycling Coordinator However, the Database Manager, Environmental Coordinator, and Recycling Coordinator are not Listed in Section I Contract Clauses 3502.3052.215-70 KEY PERSONNEL OR FACILITIES as Key Personnel.

Can the USG Please clarify if the Database Manager, Environmental Coordinator, and Recycling Coordinator are key positions?They are not key personnel only the Environmental Safety Manager
5570LCHS25RPFB00001/70LCHS25RPFB00002Section I Contract Clauses I.3052.215-70 - Key Personnel or FacilitiesThe Section I Document does not delineate the key personnel for the 2 separate contracts. It is unclear in I.3052.216-70 which Key Personnel are to be assigned to which contract. Currently, the following key personnel are listed for both contracts:

Project Manager Alternate (Assistant) Project Manager Quality Assurance/Quality Control Manager Environmental/Safety Manager Facility Operations Manager Dormitory Manager Janitorial Services Manager Grounds Maintenance Supervisor Food Service Manager

Can the USG please provide a separate list of key personnel for the Student Services Solicitation and Facilities Solicitation.Please see revised Section I
5670LCHS25RPFB00002Section J/ Exhibit E-1The DRFP does not provide the the Section J, Exhibit E-1 Performance Requirements Summary. Can the USG please provide the PRS.Please see revised Section J
5770LCHS25RPFB00001/70LCHS25RPFB00002Section L.9Section L.9 states that "If the Offeror intends to propose to both requirements, the Offeror is required to submit two (2) complete, distinct submissions, as well as indicate in each submission which requirement is being proposed." However, the instructions for oral presentations in L.14 indicate that there will be one presentation scheduled that could cover either one or both of the Student Services and Facilities Maintenance requirements.
Question: If an offeror is planning on responding to both the Student Services and the Facilities Maintenance requirements, can the government please clarify whether offerors are required to submit two entirely separate proposal submissions, inclusive of Factors 1, 3, 4, and 5? Or should both Student Services and the Facilities Maintenance responses in this case be packaged as one proposal submission?The government requests 2 separate proposals
5870LCHS25RPFB00001/70LCHS25RPFB00002Section M Factor 4The first line of the Factor 4 Past Performance evaluation criteria states that "The evaluation of this factor is based on the demonstrated prior experience presented by the offeror, and how well it aligns with the requirements in the SOW." Demonstrated experience is Phase I Factor 1, not Phase II Factor 4.
Question: Can the USG please update the Factor 4 Past performance (how well an Offeror does it) to remove the experience (what an Offeror does).Past Performance for Sections L and M have been revised
5970LCHS25RPFB00001/70LCHS25RPFB00002Section L.16 and Section M Factor 4The instructions in section L.16 do not mention past performance questionnaires and indicate that offerors should submit a 5-page maximum past performance write-up. However, the evaluation criteria in section M Factor 4 requires offerors to submit past performance questionnaires and provides a 6-page maximum for each.
Question: Can the government please clarify whether offerors are required to submit past performance questionnaires or past performance reference narratives as part of Offeror's submission for Phase II Factor 4?Past Performance requirements have been revised. Please see revised Sections L and M
6070LCHS25RPFB00001/70LCHS25RPFB00002Section L.16 and Section M Factor 4According to L.16 states "At a minimum, each reference shall include a contract number, dollar amount, period of performance, customer, location, and a current phone number and email for the current point-of-contact. It is the responsibility of the offeror to ensure the point-of-contact for each reference is available to be reached by phone during the days immediately following the past performance submission." Question: L.16 appears to be requesting PPQ information and no narrative is requested. Can the USG please confirm that they are not requesting PP Narratives as part Offeror submission in response to L.16.Past Performance requirements have been revised. Please see revised Sections L and M
6170LCHS25RPFB00001/70LCHS25RPFB00002Section M.2 Factor 4 and Section L.16 Phase II Factor 4The instructions for Past Performance in Section L.16 and the evaluation criteria in M.2 Factor 4 do not have a direct correlation.

It is unclear what to submit as part of Past Performance becasuse the L and M are not requiring the same information as part of the submission.

Can the USG please update the L instructions and M evaluation criteria to clearly articulate the submission requirements.Past Performance requirements have been revised. Please see revised Sections L and M
6270LCHS25RPFB00001/70LCHS25RPFB00002Section L.16 and Section M Factor 4If the government includes the requirement for a past performance questionnaires, can the USG please confirm that these would be outside of any page restrictions for the Factor 4 proposal response.Past Performance requirements have been revised. Please see revised Sections L and M
6370LCHS25RPFB00001/70LCHS25RPFB00002Section L.15Section L.15 Phase II - Factor 3: Capability of Proposed Key Personnel list:

Project Manager Deputy Project Manager Quality Assurance Manager Dorm Manager Dinning Hall Manager Chef

The Deputy Project Manager, Dining Hall Manager, and Chef position titles are not listed in Section I.3052.215-70 - Key Personnel or Facilities. Additionally, these labor titles are not listed in the Statement of Work for the Student Support Services or the Facility Maintenance contracts.

Can the USG please provide the key personnel resumes required for each contract in the L.15 instructions.

Can the USG also please confirm which document is the prevailing document for submitting resumes - L.15 or Section I Clause 3052.215-70 as the documents do not match.Section I is the prevailing document for resumes. Please see revised Section I
64Student Services #70LCHS25RFPB00001Section L - Instructions, Conditions and Notices to Bidders L.15 Phase II - Factor 3Can the Government confirm that the Chef listed in L.15 Phase II is Head/Executive Chef listed in the Section C document for the Student Services Solicitation #70LCHS25RFPB00001; C.6 Contractor Key and Essential Personnel Requirements (7) Head/Executive Chef?Please see revised Section L
6570LCHS25RPFB00001/70LCHS25RPFB00002Section L - Instructions, Conditions and Notices to Bidders L.15 Phase II - Factor 3Can the government please confirm that there is no page limit on each Key Personnel resume, or a page limit on the total response to Factor 3?No more than 5 pages for each resume
6670LCHS25RPFB00001/70LCHS25RPFB00002Section L - Instructions, Conditions and Notices to Bidders L.15 Phase II - Factor 3The L-15 Factor 3 instructions state that offerors should "See Attachment 4 – Resume Template." That Attachment was not provided as part of the solicitation. Can the government confirm that offerors should actually use Exhibit I-3 as the template for proposal resumes? If not, can the government please provide the correct resume template attachment.Revised to reflect Section I
6770LCHS25RPFB00001/70LCHS25RPFB00002Section L - Instructions, Conditions and Notices to Bidders; Section I/ L.15 Phase II - Factor 3 & Section IIn the Section I, 3052.215-70 Key Personnel or Facilities Position titles for a Quality Assurance / Quality Control Manager; the Section I, Position Quality Assurance / Quality Control Manager. The Student Support Services Section C.6 includes the labor category Quality Control Representative (QCR).
Can the Government confirm that the Quality Control Representative (QCR) is intended to be the same as the Quality Assurance / Quality Control Manager and that resumes for the Quality Assurance / Quality Control Manager should be written to the qualifications of the Quality Control Representative (QCR)?Yes that is correct
6870LCHS25RPFB00001/70LCHS25RPFB00002Section L - Instructions, Conditions and Notices to Bidders L.13.2.a Advisory Down-Select NotificationThis section states "A due date for the Price Proposal and Past Performance: this due date will be approximately two (3) weeks from the issuance of the Advisory Notice." Please confirm if this is intended to state two weeks or three weeks.Finalized Dates will be stated in the Final RFP
6970LCHS25RPFB00001/70LCHS25RPFB00002Section L.17 Factor 5: Price Proposal Instructions, paragraphs 1 and 3Since the company financial statements and the narrative regarding resources will not be used in proposal evaluation, can the government confirm that if the offeror provides their Internal Price Model showing a breakdown of the labor rates, hours, material costs, all overhead rates, and how these costs add up to the proposed price for each CLIN along with the Summary Worksheet showing the proposed price of each CLIN in Section B, that this satisfies the other than certified cost and pricing data and the detailed breakdown supporting price realism and reasonableness and the offeror is not required to provide a Pricing Narrative in the Adobe PDF document?Please see revised Section L
7070LCHS25RPFB00001/70LCHS25RPFB00002Section L.17 Factor 5: Price Proposal Instructions, paragraph 5; Section G.13 DEPARTMENT OF LABOR WAGE DETERMINATION (S), paragraph 1; Exhibit H-2, Section JThe following 3 references to Wage Determinations are listed throughout the RFP under L.17, G.13, and Exhibit H-2, Section J: WD No.: 2015-4429, Revision 27, WD No.: 2015-4427, Revision 27. WD No.: 2015-4427, Revision 29
Can the government please confirm which Wage Determination and Revision Offerors should use?WD No.: 2015-4427, Revision 29
7170LCHS25RPFB00001/70LCHS25RPFB00002Sectin L.17 Factor 5: Price Proposal Instructions, paragraph 1; Section M - Evaluation Factor for AwardThe Section L.17 Factor 5: Price Proposal instructions state in paragraph 2, "The detailed breakdown of your proposal is required in order to allow the Government to determine both price realism and price reasonableness." The Section L.5 instructions also state, "(d) Proposals that include unrealistically low labor rates, or that do not otherwise demonstrate cost realism, will be considered in a risk assessment and will be evaluated for award in accordance with that assessment." However, the Section M.2 Factor 5: Price Proposal evaluation criteria do not include cost/price realism. Section M.2 states, "The Government will evaluate the total price, inclusive of all option periods with respect to accuracy, reasonableness and completeness based on information submitted in the Offeror’s price submission."
Would the Government confirm that proposals will be evaluated for accuracy/completeness, price reasonableness, and price realism?Please see revised Section L and Section M Price Proposal Instructions
7270LCHS25RPFB00001/70LCHS25RPFB00002Section L.5 52.237-10 IDENTIFICATION OF UNCOMPENSATED OVERTIME (MAR 2015)Can the government confirm that the requirement for L.5 52.237-10 IDENTIFICATION OF UNCOMPENSATED OVERTIME (MAR 2015) should be included in the Adobe PDF document per L.17?Yes
7370LCHS25RPFB00001/70LCHS25RPFB00002Section L.6Section L.6(c ) states that firms are limited to 5 attendees. However, Section L.6(e ) states that individuals are limited to a maximum of 1 attendee.
Can the USG please clarify the number of attendees allowed at the pre-proposal conference.Please see revised Section L-6
7470LCHS25RPFB00001/70LCHS25RPFB00002Section L.14.6.1L.14.6 This section identifies topics that the "Government will consider" as part of the Oral Presentation. This includes "Complying with Safety and Environmental requirements, weapon/ammunition inventory and security, equipment issue/recovery, dorm maintenance and services, classroom maintenance and services, galley services and maintenance, student services and entertainment, fleet maintenance and general maintenance." However, some of these services are only required as part of the solicitation for the Student Services solicitation, the Facilities Maintenance Solicitation, or a combination of both. Can the USG please clarify what oral presentation topics the Government will consider for companies responding to the Student Services solicitation, and which topics should be covered for companies responding to the Facilities Maintenance Solicitation?This will be part of final RFP
7570LCHS25RPFB00001/70LCHS25RPFB00002Section L.14.6.1This paragraph mentions "galley services." However, this requirement is not in either Section C document. Can the USG clarify what information they are requesting related to this topic?Please see revised Section L
7670LCHS25RPFB00001/70LCHS25RPFB00002Attachment 1A and 1BCan the USG please clarify if Offerors are expected to submit answers to questions in Attachment 1A and 1B in the document provided or if Offerors can copy and paste the questions into a proposal document with a cover sheet, TOC, and headers/footers on the Attachment 1A and 1B.You can copy and paste into a proposal document with cover sheet, TOC and headers/footers with the subject attachment
7770LCHS25RPFB00001/70LCHS25RPFB00002Section LCan the government please confirm if offerors can provide a Cover Page and Table of Contents for each Written Factor. Can the USG please confirm this would not be included in page count.Yes
7870LCHS25RPFB00001/70LCHS25RPFB00002Section L Factor 3: Capability of Proposed Key Personnel; Section I 3052.215-70 Key Personnel or FacilitiesSection L identifies the following Required Key Personnel labor categories which require resumes:

1. Project Manager

2. Deputy Project Manager

3. Quality Assurance Manager

4. Dorm Manager

5. Dining Hall Manager

6. Chef

However, Section I 3052.215-70 states "The Contractor shall submit a resume in the format shown in Section J, Exhibit I-3 on all key personnel with their proposal" and identifies these personnel as Key:

1. Project Manager

2. Alternate (Assistant) Project Manager

3. Quality Assurance / Quality Control Manager

4. Environmental/Safety Manager

5. Facility Operations Manager

6. Dormitory Manager

7. Janitorial Services Manager

8. Grounds Maintenance Supervisor

9. Food Service Manager

Question 1: Can the USG please confirm what key personnel resumes are required for each submission (student services and facilities management).

Question 2: Can the USG please clarify the following LCAT are one and the same:

1. Project Manager and Contracts Manager

2. Alternate Program Manager and Deputy Program Manager

3. Chef and Head Executive Chef

4. Quality Assurance Manager and Quality Assurance/Quality Control Manager

5. Dining Hall Manager and Food Services ManagerPlease see revised Section I
79Attachment C8Can the GOV provide the approximate square footage of carpeted areas per building that require annual steam cleaning?Unknown. Information not available.
80Section C (O&M)C-5.B.5.e.7C-53Can the GOV please confirm that grease traps are required to be pumped on a weekly basis?Grease traps will need to be cleaned every 90 days or more frequent if needed. Contractor responsible to monitor.
81Section C (O&M)C-5.B.5.nC-73Can the GOV please provide the qty, make, and model of elevators that are a part of this requirement?There are 8 elevators located on the facility. Specific information will be provided at a later date.
82Section C (O&M)C-5.A.5.eC-32Can the government please provide the size and type of materials of the auditorium curtains that are required to be dry cleaned?The curtains have been removed. This is no longer a requirement. This will be updated in the solicitation.
83Can the government please update the inventory to capture all fire and life safety equipment (including special suppression systems) that is covered by the contractor?Inventory has been updated.
84Section C (O&M)C-5. C.5C-87Can the government please provide the type and quantity of trees that require pruning?Due to the expansive nature of the facility, quantity is unknown. There are multiple types of trees and differing maturity. Noted are Palm, Oak, and Crepe Myrtle, which require pruning though there may be other types.
85Attachement C-6Can the government please provide the last year the 5-year storm drain cleaning, both wet and dry, were performed?Site has not had storm drain cleaning wet or dry. This will be a requirement in the first year of contract.
86Section L & MCan the government please indicate which personnel are Key Personnel and which are Essential Personnel so the contractor knows which resumes it must provide?This information was answered in a previous question.
87GeneralGiven the applicability of Executive Order 14055, which grants the right of first refusal to incumbent employees under the Service Contract Act (SCA), would the agency consider removing the resume requirement for Key Personnel positions covered by the SCA wage determination? Since these positions are expected to be filled by incumbent staff, this adjustment could streamline the submission process while ensuring compliance.The resume requirement will not be removed.
88GeneralDoes the government provide the contractor internet?The government does not provide internet service to contractor offices.
89Section C (O&M)C-5. C.5C-85Does the government provide mulch, fertilizer, and other landscaping materials?No. Landscaping materials are the responsbility of the contractor.
90Section C (O&M)C-5.B.5.j.4C-65Can the GOV please provide the qty, make, model, and kVA rating of UPS units that are a part of this requirement?Unknown. Information not available.
91Section C (O&M)C-39Can the government please confirm if the contractor has a shared liability threshold? If so, what is the amount? The government says both 2,500 in C-57 and 1,501 throughout the document.Shared liability is $1500
92Section C (O&M)C-5.B.5.j.4C-65Can the GOV please provide the qty, make, model, and size (capacity) of any fuel tanks (gas, diesel, propane) that are a part of this requirement?Attachment will be provided with capacity, fuel type, and location.
93Section C (O&M)C-5.B.5.j.4C-65Can the GOV please confirm which of the fuel storage tanks are underground and which are above ground?All storage tanks are above ground.
94Section C (O&M)C-5.B.5.j.4C-65Can the GOV please provide the last year in which above ground storage tanks with a capacity over 10,000 gallons were recertified by a professional engineer? If this is not a requirement, can the GOV please confirm this?There are no fuel tanks over 10k gallons.
95Section C (O&M)C-5.B.5.k.EC-69-72Can the GOV please confirm which chemistry treatment tests for water are required to be performed monthly by a qualified independent water treatment specialist?Required tests and ranges are listed in C.5-B-38-41
96Attachment C8Can the government please provide approximately how much furniture would require scotchgaurd?Unknown. Information not available.
97Section C (Student Support)C-5.F, C-5.GC-68Can the government provide the performance specification requirements for C.5.F (Dorm Services) and C.5.G (Food Services)? This content is missing from Section C.This information has been added.
98Section C (O&M)C-5.B.5.e.5.cC-51Can the GOV please provide an inventory of building control systems (BAS, public address, security control) that are within the scope of this contract?Security control system and public address systems are not in the scope of work. BAS systems are buildings 1,16,43,46,61,64,65,39,650,654,284/285.
99Section C (O&M)C-5.B.5.k.AC-67Can the government please provide the year the last Nondestricutive Chiller Tube Analysis (Eddy Current) was performed on both the condesnser and evaporator for each chiller?Nondestructive chiller tube analysis will be due in first year of the contract.

Sheet1

Request For Information
Project Title:
Solicitation No:
No.DocumentLocationPageQuestion
1Could you please clarify whether the upcoming procurement opportunity will include FAR 52.216-6, Economic Price Adjustment? Considering the potential impacts of inflation and market fluctuations on long-term contracts, the inclusion of this clause could significantly mitigate risks for both the government and contractors. We believe it would ensure fair and equitable pricing over the contract duration, fostering stability and promoting a healthier marketplace.
2SOW(e) WarrantiesC-9"As part of the replacement program for certain structural systems, the Government will receive 1-year extended warranties on equipment and systems. Warranties begin on the date of beneficial occupancy for each building." Can the government confirm that this is not contractor provided?
3Can the government confirm that the Government carries the cost of dumpster rental and waste disposal.
4C-5.A-10Can the government confirm that Restoration Maintenance as part of the Marmoleum Flooring will be issued as a work order?
5Will the government accept a landscape organizational chart?
6Will the government consider making the organizational chart exempt from page count?
C-5.D-14Can the government provide the number of sewer lift stations?
Can the government provide the current PM schedule that is being utilized?
Can the government provide details on the building automation and control systems that are in place?
Can the government provide details on the size and quantity of waste and/or recycling dumpsters at Joint Base Charleston?
Can the government provide the number of recycling dumpsters at building 675?
Can the government provide a table/timeline of deliverables?
Can the government please confirm that the FLETC Express Store is run by FLETC and that the contractor is not responsible for the operations of the convenient store?
Can the government please provide historical data on the usage of pool chemicals?
Can the government confirm that bed bug extermination and cost associated with remediation is paid for by FLETC? If not, can the government please provide historical information and cost data associated with this?
Section LL.9 Proposal Submission InstructionsL-5Can the government please confirm that it "intends to make one award without discussion with Offerors" for each of the contracts?
SAM.gov schedule vs Draft RFP schedule
Can the government please clarify the key personnel for each contract?
Section LL.15L-11Can the government please clarify if the same resumes can be used for key personnel positions that overlap with each contract?
Section MM.2 Basis of AwardM-1After reviewing Section M, we understand that this acquisition will be conducted using a Best Value tradeoff methodology, with both price and non-price factors considered. We would like to request clarification on the following:

1. Relative Importance of Non-Price Factors: Could the government confirm the relative importance or weight assigned to Factors 1 through 4 (Demonstrated Prior Experience, Oral Presentation, Capability of Proposed Key Personnel, and Past Performance)? Are these factors considered equal in importance, or is one given more emphasis?

2. Non-Price vs. Price Factors: While we understand that price will be evaluated for reasonableness and completeness, could you clarify how price is weighted relative to non-price factors? For example, does the government prioritize technical excellence over cost, or is there a specific balance intended?

3. Oral Presentations: For the oral presentation (Factor 2), could the government provide additional insight into its weight compared to the other non-price factors?

Section MFactor 4: Past PerformanceM-2Can the government please confirm that Offers are to provide up to four (4) projects and two (2) additional projects per each teaming partner?
Section C (Student Support)68Student Support Services Section C is missing content after C.5.E. Can the government provide scope for C.5.F, C.5.G, C.6 and C7?
Section LL.17 Factor 5: Price Proposal InstructionsL-12The government states "While certified cost and pricing data is not required, other than certified cost and pricing data is required". Can the government please clarify this statement?
Section M
Can the offeror use teaming partner past performance?
Site Visit 1 person vs 5

image1.jpeg