C-8 SOS B686-1 THRU B68and69 Mat Rooms Part 3.pdf
PDF 2 MB Posted
- Solicitation number
- 70LCHS25RPFB00001
About this file
This is a Schedule of Services document (Attachment C-8) detailing cleaning and maintenance requirements for multiple buildings at the Federal Law Enforcement Training Centers in Charleston, SC under solicitation 70LCHS25RPFB00002.
The document provides detailed cleaning frequency schedules (as needed, daily, 5/week, 2/week, 1/week, monthly, quarterly, semi-annually, and annually) for various facilities including: Tactical Training Center (12,180 sf), VFR/FWA Building (5,600 sf), Driver Training Instructional Offices/Classrooms (5,200 sf), Raid House Neighborhood buildings (11,612 sf total), Range facilities (multiple 200-600 sf buildings), Pier Quebec buildings (2,000 sf), and MAT Rooms & Locker Room (2,500 sf each). Services include routine cleaning, floor care, restroom cleaning, glass cleaning, and exterior cleaning. The schedules specify requirements for tasks like waste removal, dusting, mopping, carpet care, sanitizing restrooms, and window cleaning. Special requirements include disinfection protocols using EPA-registered products effective against SARS-CoV-2 for high-touch surfaces in certain facilities.
View the file
Other files
Show 40 more
Latest 50 of 202 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment C-8
Schedule of Services Building No. 686 Total SF Tactical Training Center 12,180 sf (Est.)
Frequency As
Needed Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning:
Entrance Mats X Empty Waste Containers X X Empty Ash Receptacles/Butt Cans X Scotch guard/Clean Upholstery Low Dust X High Dust X
Floor Care:
Sweep/Dust Mop Floors X X Damp Mop X X Spray/Wax/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets Rest Room Cleaning:
Clean Walls/Partitions X Clean Urinals/Commodes X X Clean Mirrors X Clean Sinks/Lavatories X X Clean Showers X X Clean Floors X X Service Dispensers (Soap, hand sanitizer, tissue, towels)
X
Glass Cleaning:
Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:
Policing Grounds X
SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday.
“2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September.
Exact Requirements are outlined in C-5.A.
Federal Law Enforcement Training Centers Charleston SC Solicitation 70LCHS25RPFB00002
Building No. 700 Total SF 5,600ft² (Est.)
VFR/FWA
Frequency
As Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning:
Entrance Mats X X Empty Waste Containers X X Empty Ash Receptacles/Butt Cans X X Clean Venetian Blinds X X Low Dust X X High Dust X
Floor Care:
Sweep/Dust Mop Floors Damp Mop Spray/Wax/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs X X Spot Clean Carpets Steam Clean Carpets X Rest Room Cleaning:
Clean Walls/Partitions X X Clean/Disinfect Urinals/Commodes X X Clean Mirrors X X Clean/Disinfect Sinks/Lavatories X X Clean/Disinfect Showers X X Clean/Disinfect Floors X X Service Dispensers (Soap, hand sanitizer, tissue, towels)
X X
Glass Cleaning:
Entrance Doors X X Interior Glass X X Exterior Glass X Exterior Cleaning:
Policing Grounds X X
SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday.
“2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September.
Exact Requirements are outlined in C-5.A.
Building No. 705 Total SF: 5,200ft² (Est.)
Driver Training Instructional Offices/Classrooms
Frequency
As Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning:
Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Clean Venetian Blinds X Low Dust X High Dust X
Floor Care:
Sweep/Dust Mop Floors X Damp Mop X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs X Spot Clean Carpets X Steam Clean Carpets X Bay/Garage Area – Sweep Floors X Rest Room Cleaning:
Clean Walls/Partitions X Clean Urinals/Commodes X Clean Mirrors X Clean Sinks/Lavatories X Clean Showers X Clean Floors X Service Dispensers (Soap, hand sanitizer, tissue, towels)
X
Glass Cleaning:
Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:
Policing Grounds X
SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday.
“1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday.
“1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.
Raid House Neighborhood
Building No. 1842 Building No. 1843 Building No. 1844 Building No. 1845 Building No. 1846 Building No. 1847 Estimated SF Total 11612ft²
Needed
Daily
5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning:
Entrance Mats X Empty Waste Containers X Clean Venetian Blinds X Low Dust X High Dust X
Floor Care:
Sweep/Dust Mop Floors X Damp Mop X Vacuum Carpet Steam Clean Carpet Rest Room Cleaning:
Clean Walls/Partitions N/A Clean/Disinfect Urinals/Commodes N/A Clean Mirrors N/A Clean/Disinfect Sinks/Lavatories N/A Clean/Disinfect Floors N/A Service Dispensers (Soap, hand sanitizer tissue, towels)
N/A
Glass Cleaning:
Entrance Doors X Interior Glass X Exterior Glass X
Policing Grounds X
SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.
Building No. Buildings Q1 and Q2 Total SF 2000 sf (Est.)
Pier Quebec
Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning:
Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Scotchguard/Clean Upholstery Low Dust High Dust
Floor Care:
Sweep/Blower Floors X Damp Mop Spray/Buff Strip/Wax/Buff Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets Rest Room Cleaning: (5 Port-O-Potties) Clean Walls/Partitions X X Clean Urinals/Commodes X X Clean Mirrors Clean Sinks/Lavatories Clean/Disinfect Showers Clean/Disinfect Floors Service Dispensers (Soap, hand sanitizer, tissue, towels)
Glass Cleaning:
Entrance Doors Interior Glass Exterior Glass Exterior Cleaning:
Policing Grounds X
SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday.
“1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday.
“1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.
Building No. FAD Range 1 Tower Total SF: 200 sf (Est.)
Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning:
Entrance Mats X X Empty Waste Containers X X Empty Ash Receptacles/Butt Cans X X Clean Venetian Blinds X Low Dust X High Dust X
Floor Care:
Sweep/Dust Mop Floors X X Damp Mop X X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets Glass Cleaning:
Entrance Doors X X Interior Glass X Exterior Glass X
SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday.
“2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.
Building No. FAD Range 3 Classroom Total SF: 600 sf (Est.)
Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning/Disinfecting:
Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Clean Venetian Blinds X All areas listed below to Disinfect X X Low Dust X High Dust X Floor Care:
Sweep/Dust Mop Floors X Damp Mop X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets Glass Cleaning:
Entrance Doors X Interior Glass X Exterior Glass X
SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday.
“2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.
Disinfect: The contractor shall wipe down all solid, high contact surfaces using a disinfectant from the EPA-registered list of products identified as effective against Novel Coronavirus SARS-CoV-2 (see list), or other product containing the same active ingredient(s) at the same or greater concentration than those on the list. Contractor shall use the product in accordance with directions provided by the manufacturer. Examples of solid, high contact or high touch surfaces include but are not limited to: handrails, door knobs, key cards, light switches, countertops, water faucets and handles, work surfaces, elevator buttons, sinks, toilets and control handles, restroom stall handles, toilet paper and other paper dispensers, door handles and push plates, water cooler and drinking fountain controls, ice machines, and common area phones. Disinfected surfaces should be allowed to air dry.
Building No. FAD Range 3 Tower Total SF: 200 sf (Est.)
Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning/Disinfecting:
Entrance Mats X X Empty Waste Containers X X Empty Ash Receptacles/Butt Cans X X Clean Venetian Blinds X All areas listed below to Disinfect X X Low Dust X High Dust X Floor Care:
Sweep/Dust Mop Floors X X Damp Mop X X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets Glass Cleaning:
Entrance Doors X X Interior Glass X Exterior Glass X
SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday.
“2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.
Disinfect: The contractor shall wipe down all solid, high contact surfaces using a disinfectant from the EPA-registered list of products identified as effective against Novel Coronavirus SARS-CoV-2, or other product containing the same active ingredient(s) at the same or greater concentration than those on the list. Contractor shall use the product in accordance with directions provided by the manufacturer. Examples of solid, high contact or high touch surfaces include but are not limited to: handrails, door knobs, key cards, light switches, countertops, water faucets and handles, work surfaces, elevator buttons, sinks, toilets and control handles, restroom stall handles, toilet paper and other paper dispensers, door handles and push plates, water cooler and drinking fountain controls, ice machines, and common area phones. Disinfected surfaces should be allowed to air dry.
Building No. FAD Range 4 Classroom Total SF: 600 sf (Est.)
Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning/Disinfecting:
Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Clean Venetian Blinds X All areas listed below to Disinfect X X Low Dust X High Dust X Floor Care:
Sweep/Dust Mop Floors X Damp Mop X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets Glass Cleaning:
Entrance Doors X Interior Glass X Exterior Glass X
SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday.
“2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.
Disinfect: The contractor shall wipe down all solid, high contact surfaces using a disinfectant from the EPA-registered list of products identified as effective against Novel Coronavirus SARS-CoV-2 (see list), or other product containing the same active ingredient(s) at the same or greater concentration than those on the list. Contractor shall use the product in accordance with directions provided by the manufacturer. Examples of solid, high contact or high touch surfaces include but are not limited to: handrails, door knobs, key cards, light switches, countertops, water faucets and handles, work surfaces, elevator buttons, sinks, toilets and control handles, restroom stall handles, toilet paper and other paper dispensers, door handles and push plates, water cooler and drinking fountain controls, ice machines, and common area phones. Disinfected surfaces should be allowed to air dry.
Building No. FAD Range 5 Classroom Total SF: 600 sf (Est.)
Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning/Disinfecting:
Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Clean Venetian Blinds X All areas listed below to Disinfect X X Low Dust X High Dust X Floor Care:
Sweep/Dust Mop Floors X Damp Mop X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets Glass Cleaning:
Entrance Doors X Interior Glass X Exterior Glass X
SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday.
“2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.
Disinfect The contractor shall wipe down all solid, high contact surfaces using a disinfectant from the EPA-registered list of products identified as effective against Novel Coronavirus SARS-CoV-2, or other product containing the same active ingredient(s) at the same or greater concentration than those on the list. Contractor shall use the product in accordance with directions provided by the manufacturer. Examples of solid, high contact or high touch surfaces include but are not limited to: handrails, door knobs, key cards, light switches, countertops, water faucets and handles, work surfaces, elevator buttons, sinks, toilets and control handles, restroom stall handles, toilet paper and other paper dispensers, door handles and push plates, water cooler and drinking fountain controls, ice machines, and common area phones. Disinfected surfaces should be allowed to air dry.
Building No. FAD Range 4 Tower Total SF: 200 sf (Est.)
Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning/Disinfecting:
Entrance Mats X X Empty Waste Containers X X Empty Ash Receptacles/Butt Cans X X Clean Venetian Blinds X All areas listed below to Disinfect X X Low Dust X High Dust X Floor Care:
Sweep/Dust Mop Floors X X Damp Mop X X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets Glass Cleaning:
Entrance Doors X X Interior Glass X Exterior Glass X
SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday.
“2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October.“2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.
Disinfect The contractor shall wipe down all solid, high contact surfaces using a disinfectant from the EPA-registered list of products identified as effective against Novel Coronavirus SARS-CoV-2, or other product containing the same active ingredient(s) at the same or greater concentration than those on the list. Contractor shall use the product in accordance with directions provided by the manufacturer. Examples of solid, high contact or high touch surfaces include but are not limited to: handrails, door knobs, key cards, light switches, countertops, water faucets and handles, work surfaces, elevator buttons, sinks, toilets and control handles, restroom stall handles, toilet paper and other paper dispensers, door handles and push plates, water cooler and drinking fountain controls, ice machines, and common area phones. Disinfected surfaces should be allowed to air dry.
Building No. FAD Range 5 Tower Total SF: 200 sf (Est.)
Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning/Disinfecting:
Entrance Mats X X Empty Waste Containers X X Empty Ash Receptacles/Butt Cans X X Clean Venetian Blinds X All areas listed below to Disinfect X X Low Dust X High Dust X Floor Care:
Sweep/Dust Mop Floors X X Damp Mop X X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets Glass Cleaning:
Entrance Doors X X Interior Glass X Exterior Glass X
SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday.
“2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday.
“1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.
Disinfect The contractor shall wipe down all solid, high contact surfaces using a disinfectant from the EPA-registered list of products identified as effective against Novel Coronavirus SARS-CoV-2, or other product containing the same active ingredient(s) at the same or greater concentration than those on the list. Contractor shall use the product in accordance with directions provided by the manufacturer. Examples of solid, high contact or high touch surfaces include but are not limited to: handrails, door knobs, key cards, light switches, countertops, water faucets and handles, work surfaces, elevator buttons, sinks, toilets and control handles, restroom stall handles, toilet paper and other paper dispensers, door handles and push plates, water cooler and drinking fountain controls, ice machines, and common area phones. Disinfected surfaces should be allowed to air dry.
Building No. FAD Range 6 Tower Total SF: 200 sf (Est.)
Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning/Disinfecting:
Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Clean Venetian Blinds All areas listed below to Disinfect X X Low Dust X High Dust X Floor Care:
Sweep/Dust Mop Floors X Damp Mop Spray/Buff Strip/Wax/Buff Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets Glass Cleaning:
Entrance Doors Interior Glass Exterior Glass
SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday.
“2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.
Disinfect: The contractor shall wipe down all solid, high contact surfaces using a disinfectant from the EPA-registered list of products identified as effective against Novel Coronavirus SARS-CoV-2, or other product containing the same active ingredient(s) at the same or greater concentration than those on the list. Contractor shall use the product in accordance with directions provided by the manufacturer. Examples of solid, high contact or high touch surfaces include but are not limited to: handrails, door knobs, key cards, light switches, countertops, water faucets and handles, work surfaces, elevator buttons, sinks, toilets and control handles, restroom stall handles, toilet paper and other paper dispensers, door handles and push plates, water cooler and drinking fountain controls, ice machines, and common area phones. Disinfected surfaces should be allowed to air dry.
Building No. FAD Range Restroom Total SF: 480 sf (Est.)
Frequency
As Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning/Disinfecting:
Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Clean Venetian Blinds All areas listed below to Disinfect X X Low Dust X High Dust X Floor Care:
Sweep/Dust Mop Floors X Damp Mop X Spray/Buff Strip/Wax/Buff Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets Rest Room Cleaning/Disinfecting:
Clean Walls/Partitions X Clean/Disinfect Urinals/Commodes X Clean Mirrors X Clean/Disinfect Sinks/Lavatories X Clean/Disinfect Showers X Clean/Disinfect Floors X Service Dispensers (Soap, hand sanitizer, tissue, towels)
X
Glass Cleaning:
Entrance Doors Interior Glass Exterior Glass Exterior Cleaning:
Policing Grounds X
SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October.”2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.
Disinfect: The contractor shall wipe down all solid, high contact surfaces using a disinfectant from the EPA-registered list of products identified as effective against Novel Coronavirus SARS-CoV-2, or other product containing the same active ingredient(s) at the same or greater concentration than those on the list. Contractor shall use the product in accordance with directions provided by the manufacturer. Examples of solid, high contact or high touch surfaces include but are not limited to: handrails, door knobs, key cards, light switches, countertops, water faucets and handles, work surfaces, elevator buttons, sinks, toilets and control handles, restroom stall handles, toilet paper and other paper dispensers, door handles and push plates, water cooler and drinking fountain controls, ice machines, and common area phones. Disinfected surfaces should be allowed to air dry.
Building No. FAD Range 4/5 Gun Cleaning Room Total SF: 600 sf (Est.)
Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning/Disinfecting:
Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Clean Venetian Blinds X All areas listed below to Disinfect X X Low Dust X High Dust X Floor Care:
Sweep/Dust Mop Floors X X Damp Mop X X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets Glass Cleaning:
Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:
Policing Grounds X X
SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday.
“2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.
Disinfect The contractor shall wipe down all solid, high contact surfaces using a disinfectant from the EPA-registered list of products identified as effective against Novel Coronavirus SARS-CoV-2, or other product containing the same active ingredient(s) at the same or greater concentration than those on the list. Contractor shall use the product in accordance with directions provided by the manufacturer. Examples of solid, high contact or high touch surfaces include but are not limited to: handrails, door knobs, key cards, light switches, countertops, water faucets and handles, work surfaces, elevator buttons, sinks, toilets and control handles, restroom stall handles, toilet paper and other paper dispensers, door handles and push plates, water cooler and drinking fountain controls, ice machines, and common area phones. Disinfected surfaces should be allowed to air dry.
Building No. Restroom Facility Total SF 1000 sf (Est.)
Pier Quebec
Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Space Cleaning:
Entrance Mats Empty Waste Containers Empty Ash Receptacles/Butt Cans Clean Venetian Blinds Scotchguard/Clean Upholstery Low Dust High Dust Floor Care:
Sweep/Blower Floors X Damp Mop X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs Spot Clean Carpets Rest Room Cleaning:
Clean Walls/Partitions X Clean/Disinfect Urinals/Commodes X Clean Mirrors X Clean/Disinfect Sinks/Lavatories X Clean/Disinfect Showers X Clean/Disinfect Floors X Service Dispensers (Soap, sanitizer, tissue, towels)
X
Glass Cleaning:
Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:
Policing Grounds X
SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday.
“2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September.
Exact Requirements are outlined in C-5.A.
Building No. 68 and 69 Total SF: 2,500 each (Est.)
MAT Rooms & Locker Room
Frequency As
Needed Daily
5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning:
Entrance Mats X Empty Waste Containers X X Empty Ash Receptacles/Butt Cans X Clean Exercise Mats/Mat Rooms X X Low Dust X X High Dust X Odor Control X X
Floor Care:
Sweep/Dust Mop Floors X X Damp Mop X X Spray/Buff Strip/Wax/Buff Vacuum Seams of Mats X X Spot Clean Carpets Steam Clean Carpets Rest Room Cleaning:
Clean Walls/Partitions X Clean Urinals/Commodes X X Clean Mirrors X Clean Sinks/Lavatories X X Clean/ Floors X Clean Showers X X Service Dispensers (Soap, hand sanitizer, tissue, towels)
X X
Glass Cleaning:
Entrance Doors Interior Glass Exterior Glass Exterior Cleaning:
Policing Grounds X
SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December.
“1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.C.5.a.1.f.1 **Note – Mats should be cleaned after each class to include vacuuming and mopping/disinfecting.
Federal Law Enforcement Training Centers Charleston SC Solicitation 70LCHS25RPFB00002
| SOS Bldg 686 |
| Frequency |
| SOS Bldg 700 |
| Frequency |
| Entrance Mats |
| Damp Mop |
| Clean Walls/Partitions |
| SOS Bldg 705 |
| Frequency |
| SOS Bldg 1842_1843_1844_1845_1846_1847 Raid Houses |
| Frequency |
| SOS Bldg Q1_Q2 Pier Quebec |
| Frequency |
| SOS FAD Range Towers and Classrooms |
| Frequency |
| Frequency |
| Frequency |
| Frequency |
| Frequency |
| Frequency |
| Frequency |
| Frequency |
| Frequency |
| Frequency |
| SOS Restroom Facility @ Pier Q |
| Frequency |
| SOS_Bldg_68 and 69 MAT Rooms |
| Frequency |
| Entrance Mats |
| Damp Mop |
| Clean Walls/Partitions |
File details come from the government source that posted it. Updated .