Clarification Questions 70LCHS25RPFB00001-70LCHS25RPFB00002 1-329.pdf

PDF 968 KB Posted

Attached to
Student Support/Facilities Operation Maintenance Services
Solicitation number
70LCHS25RPFB00001
Issued by

About this file

This document is a set of clarification questions and responses for two federal contract opportunities (70LCHS25RPFB00001 and 70LCHS25RPFB00002) for Student Support and Facilities Operation Maintenance Services at the Federal Law Enforcement Training Center in Charleston, South Carolina. The government plans to award two single-award, Indefinite Delivery Indefinite Quantity (IDIQ) contracts with Firm-Fixed Price (FFP) and Other than Firm Fixed Price (OTFFP) Contract Line Item Numbers (CLINs), set aside as a competitive 8(a) procurement with a small business size standard of $47.0 million. The period of performance includes one base year through September 30, 2025, with four one-year option periods.

The solicitation covers comprehensive services including student support (dormitory operations, dining facility, student transportation, janitorial services, recreation services, warehouse and post office support, and training support) and facility-based services (facility and grounds maintenance, equipment cleaning and movement). Key procurement details include a two-phase submission process with Phase 1 ending March 6, 2025 at 12:00 P.M. ET, oral presentations, past performance evaluations, and a requirement for detailed pricing submissions. The government will evaluate technical factors, past performance, and price, with non-price factors being significantly more important than price. Potential offerors must submit detailed resumes for key personnel, demonstrate relevant experience, and provide comprehensive pricing information across various service categories.

View the file

Other files

File Type Posted
Section I 70LCHS25RPFB00002 Revised 4-8-25.pdf PDF
FLETC Charleston SPCC Plan 2023.pdf PDF
Site Visit Rosters.pdf PDF
Sol_70LCHS25RPFB00001_Amd_0006.pdf PDF
Clarification Questions 1-497.pdf PDF
Sample Role Player Schedule.xlsx XLSX spreadsheet
70LCHS25RFPB00002 Section C Facilities Maintenance.pdf PDF
Section I 70LCHS25RPFB00001 Revised 4-8-25.pdf PDF
Section C Student Support.pdf PDF
SF30 70LCHS25RPFB00001 Amendment 0005.pdf PDF
Clarification Questions 70LCHS25RPFB00001-70LCHS25RPFB00002 1-420.pdf PDF
Section M 70LCHS25RPFB00002 3-27-25.pdf PDF
Section I 70LCHS25RPFB00001 Revised 3-28-25.pdf PDF
Section L 70LCHS25RPFB00001 3-27-2025.pdf PDF
Section M 70LCHS25RPFB00001 3-27-25.pdf PDF
Section L 70LCHS25RPFB00002 3-27-2025.pdf PDF
Section I 70LCHS25RPFB00002 Revised 3-28-25.pdf PDF
Clarification Questions 70LCHS25RPFB00001-70LCHS25RPFB00002 1-347.pdf PDF
Section I 70LCHS25RPFB00001 Revised 3-14-25.pdf PDF
SF 30 70LCHS25RPFB00001 Amendment 0004.pdf PDF
Section L_70LCHS25RPFB00001 3-14-2025.pdf PDF
Section B 70LCHS25RPFB00001 3-14-25.pdf PDF
Section L_70LCHS25RPFB00002 3-14-2025.pdf PDF
Section M 70LCHS25RPFB00001 3-10-25.pdf PDF
Section L_70LCHS25RPFB00002 3-10-20251.pdf PDF
Section I 70LCHS25RPFB00002 Revised 3-10-25.pdf PDF
Section B 70LCHS25RPFB00002 3-10-25 .pdf PDF
Exhibit I-3 Personnel Resume Format 3-7-25.pdf PDF
Section C Intro and General Requirements for Student Support Services 3-10-25.pdf PDF
SF 1449 (11_2021).pdf PDF
Section B 70LCHS25RPFB00001 3-10-25.pdf PDF
SF30 70LCHS25RPFB00001 Amendment 0003.pdf PDF
SECTION C - INTRO and GENERAL REQTS JANITORIAL_FAC MAINT_GOUNDS MAINTENANCE_ENVIRO-SAFETY 3-10-25.pdf PDF
Section M 70LCHS25RPFB00002 3-10-251.pdf PDF
Section L_70LCHS25RPFB00001 3-10-2025.pdf PDF
Section I 70LCHS25RPFB00001 Revised 3-10-25.pdf PDF
Section I 70LCHS25RPFB00001 Revised 3-5-25.pdf PDF
SF 30 Amendment 0001.pdf PDF
Attachment C-10 Historical Data of Service Calls Oct-Dec 2024 updated .pdf PDF
Section M 70LCHS25RFPB0001 3-5-25.pdf PDF
SF-30 Amendment 0001.pdf PDF
Section L_70LCHS25RPFB00002 3-5-2025.pdf PDF
Clarification Questions 70LCHS25RPFB00001-70LCHS25RPFB00002 1-288.pdf PDF
Section C.5.B Transportation Amend 0002 3-5-25 .pdf PDF
Section M 70LCHS25RFPB00002 3-5-25.pdf PDF
Section I 70LCHS25RPFB00002 Revised 3-5-25 .pdf PDF
Section L_70LCHS25RPFB00001 3-5-2025.pdf PDF
Section B 70LCHS25RPFB00002 Amed 0002 3-5-25 .pdf PDF
Section I 70LCHS25RPFB00001 Revised 3-5-25 .pdf PDF
SF 30 Amendment 0002.pdf PDF
Show 40 more

Latest 50 of 163 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Federal Law Enforcement Training Centers Charleston SC 70LCHS25RPFB00001/70LCHS25RPFB00002 Clarification Questions

1 Section L L.9 Proposal Submissio n Instruction s

L-5 Can the government please confirm that it "intends to make one award without discussion with Offerors" for each of the contracts?

Section L-9 & M-1:

Notice to Offerors:

The Government intends to award (2) Single Award, (IDIQ) contracts to include Firm-Fixed Price (FFP) and Other than Firm Fixed Price (OTFFP) CLINS resulting from this solicitation. The Government reserves the right to discuss submissions and/or ask clarification questions to contractors submitting a proposal if deemed in the Government’s best interest.

2 Section L L.15 Phase II - Factor 3:

Capability of Proposed Key Personnel

L-10 Section M related to key personnel resumes, which currently states:

"At least two (2) resumes of each category shall be current personnel of the Prime Offeror."

We respectfully request clarification on whether the government would consider revising this requirement to allow the inclusion of resumes from personnel of the entire Offeror team, including teaming

This verbiage has been removed partners and subcontractors.

Expanding this requirement to encompass the full Offeror team would allow us to leverage a broader pool of highly qualified and experienced personnel who are collectively positioned to meet and exceed the government’s requirements.

3 Section L L.15 Phase II - Factor 3:

Capability of Proposed Key Personnel

L-11 Can the government please clarify the key personnel for each contract?

Please see revised Section L.15:

"The Offeror shall submit resumes that describe the specific, relevant experience and availability of key personnel in providing services described in section C.6 of each

PWS".

4 Section L L.15 L-11 Can the government please clarify if the same resumes can be used for key personnel positions that overlap with each contract?

The Government will not accept the same resume(s) for key personnel positions to overlap with each contract

5 Section M M.2 Basis of Award

M-1 After reviewing Section M, we understand that this acquisition will be conducted using a Best Value tradeoff methodology, with both price and non-price factors considered. We would like to request clarification on the following:

1. Relative Importance of Non-Price Factors: Could the government confirm the relative importance or weight assigned to Factors 1 through 4 (Demonstrated Prior Experience, Oral Presentation, Capability of Proposed Key Personnel, and Past Performance)?

Are these factors considered equal in importance, or is one given more emphasis?

2. Non-Price vs.

Price Factors:

Please see revised Section M.2. For this solicitation, the evaluation factors are:

All "Non-Price/Cost" factors when combined, are significantly more important than Cost/Price. Factors 1, 2, 3 and 4 are of equal importance.

While we understand that price will be evaluated for reasonableness and completeness, could you clarify how price is weighted relative to non-price factors?

For example, does the government prioritize technical excellence over cost, or is there a specific balance intended?

3. Oral Presentations:

For the oral presentation (Factor 2), could the government provide additional insight into its weight compared to the other non-price factors?

6 Section M Factor 4:

Past Performan ce

M-2 Can the government please confirm that Offers are to provide up to four (4) projects and two (2) additional projects per each teaming partner?

Please see revised Section M

7 Section C (Student Support)

68 Student Support Services Section C is missing content after C.5.E. Can the government provide scope for C.5.F, C.5.G, C.6 and C7?

This has been corrected and uploaded to

SAM.GOV

8 Section L L.17 Factor 5:

Price Proposal Instruction s

L-12 The government states "While certified cost and pricing data is not required, other than certified cost and pricing data is required". Can the government please clarify this statement?

Please see revised Section L.15

9 Section M Can the government please confirm that Offers can have 5 people attend the site visit and not a "Maximum of 1 individual per company"?

Up to 5 people can attend the site visit

Section L L.14 Oral Presentati on

L-8 Upon reviewing the requirements for oral presentations, we noticed that the government allows up to five

(5) individuals to participate for 180 minutes when bidding on one task and for 240 minutes when bidding on

Up to 8 can be present for the Oral Presentation both tasks.

We respectfully request that the government consider allowing more individuals to participate in the oral presentations for offerors bidding on both tasks. Given the complexity and scope of preparing for both tasks, increasing the number of participants would allow us to present a more comprehensive and detailed demonstration of our approach.

This adjustment would enable subject matter experts and key personnel to address task-specific aspects directly, thereby providing the government with greater assurance of our ability to meet or exceed the requirements.

Would the government consider revising the participant limit for offerors bidding on both tasks to 7-8 individuals? We believe this adjustment would better align the oral presentation process with the scope and objectives of the solicitation.

Section L L.6 Pre- Proposal Conferenc e

L-3 We would like to request additional clarification on the structure of the site visit, particularly given that the solicitation encompasses two distinct tasks and not all attendees may be bidding on both.

Does the government plan to divide the site visit into groups or hold separate sessions to address the unique aspects of the two tasks?

If the government does not plan to break out by task, will there

The governmet will divide the site visits into groups based on task.

The site visit will be multiple days. Offerors will receive dates upon receiving their Advisory Letters.

be separate discussions or presentations for each task during the site visit?

Would the government consider extending the site visit to multiple days or offering an additional session to provide more tailored information for each task?

We are seeking these details to ensure our team can maximize the value of the site visit and adequately prepare for the discussions specific to the tasks we plan to bid on.

Section B Supplies or Services and Price

Sol. No.

70LCHS25RPFB

00002, Item Numbers X006 and X008. Are we to insert unit pricing for these Item Numbers or are our unit rates locked in by the hours and NTE amounts (i.e., for X006, $750,000/35,00

All CLINS shall be priced to reach a total contract price for Section B for the Base Year and each option Year

0 hours = $21.43/hour)?

Section B Supplies or Services and Price

Sol. No.

70LCHS25RPFB

00001, Item Numbers X009, X010, X011 and X013. Are we to insert unit pricing for these Item Numbers or are our unit rates locked in by the hours and NTE amounts?

Insert your unit pricing.

It does not have to equal the NTE amount.

The NTE amount is the annual amount that the government feels it will need for this service.

This amount may be increased, if the need exceeds the total NTE amount

Section C (Student Support)

Intro and General Requireme nts

C-42 Under Firing Range Pick-up, it is noted that the Student Support Services Contractor is to “clean weapons cleaning room, making sure surface areas are free of grease, oil, solvents, trash, and other foreign materials. Refill lead soap dispensers when empty”.

Judging by Attachment C-8, Part 2, this appears to be a requirement for the Facilities Operations Maintenance Contractor instead. Can the Government

Rangemasters are required to clean up after each class departs so it is ready for the next class; this is not for the janitorial staff to accomplish. The janitorial staff normally only cleans common use areas such as public restrooms, lobby areas and staff office areas at the indoor range.

clarify the janitorial/custod ial requirements for each contract as there are additional overlap throughout?

Section C (Student Support)

Intro and General Requireme nts

C- 44-

Are the items listed under Firearms Equipment and Supplies (as well as targets, drums, and batteries) all Government furnished? If not, which ones are to be provided by the Contractor?

All range materials are supplied by the government

Section G.13 & Section L L-12 Sect. G.13 and Sect. L, page L-

12. These sections note Rev. 27 of two different Wage Determinations whereas the Attachment H-2 is for 2015-4427, Rev. 29. Please clarify the applicable Wage Determination.

See revised Section G.13 and L.17 to reflect the correct Wage Determination to be 2015-4427, Revision 29

Section L Key Personnel L-15

L-10 This section notes that “at least two (2) resumes of each category shall be current personnel of the Prime Offeror”.

This provides an

This verbiage has been unfair advantage to the incumbent contractor and subjects the Government to a possible protest.

Given that it is well understood that any new contractor will likely hire incumbent staff to satisfy first right of refusal requirements, please consider eliminating this requirement.

Section L & Section M Key Personnel L-15

L-11 & M-

These sections call for resumes for Dorm Manager, Dining Hall Manager, and Chef. These positions do not seem relevant to the Facilities Operations Maintenance Solicitation

70LCHS25RPFB

00002, and these sections should be clarified as such.

Please see revised Section L.15

Section L & Section M L-11 & M-

This section calls for a page limit of five (5) pages whereas Sect. M, page M- 3 calls for a six

(6) page limit.

Please clarify.

Section L and M

Section L L-12 This page notes that questions are due on Feb.

03 and yet the site visit is not until Feb. 06.

This is highly unusual to expect contractors to have all questions in hand prior to a site visit and an unfair advantage to the incumbent.

Please consider revising the due date for questions until at least several days after the 6th.

Tentative Dates have been updated on Draft Announcement

Section M M-4 This section notes that “if the offeror proposed teaming partner(s) or subcontractor(s) in response to this RFP, the offeror shall provide two (2) additional past performance questionnaires for each teaming partner(s) and/or subcontractor(s) for contracts entered into by the federal government, agencies of state and local

Please see revised Section L and Section M Past Performance requirements governments, and/or commercial customers”.

With these additional past performance requirements, please consider adding an additional two

(2) pages to the document length for each subcontractor.

Otherwise, there will not be enough room to adequately describe subcontractor past performance.

Section M M-4 This section notes that “if the offeror proposed teaming partner(s) or subcontractor(s) in response to this RFP, the offeror shall provide two (2) additional past performance questionnaires for each teaming partner(s) and/or subcontractor(s) for contracts entered into by the federal government, agencies of state and local governments, Please see revised Section M Past Performance and/or commercial customers”.

Please change the word “questionnaires ” to “references”.

Attachments C-2 & C-4 What is the difference between these two attachments?

They both seem to cover hours of operation.

They are applicable to both solicitations

Attachment C-6 Government Equipment List.

What is the difference between the three provided sheets within the spreadsheet

No difference. They're just a list of the equipment that we have onsite

Attachments C-5 & C-6 Governme nt Equipment List

What is the difference between these two attachments?

They both seem to cover Government Furnished Equipment and Property?

No difference. They're just a list of the equipment that we have onsite

Attachment C-7 Contractor Furnished Materials and Supplies

Are we to assume that this list is applicable only to

70LCHS25RPFB

00001 since Attachment C-9 apparently covers

70LCHS25RPFB

00002?

That is correct

Attachments C-8 Schedules of Service, Parts 1 & 2

The heading on these documents is

70LCHS25RPFB

00002. Please confirm these schedules are exclusively for this Solicitation only

That is correct

Attachments C-8 Schedules of Service, Parts 1 & 2

Under Special Requirements under several of the locations, it is mentioned that “additional dormitory service requirements are described in Section C- 5.B.5.b”. This is not the case.

Where are the dormitory service requirements addressed?

This reference has been corrected; attachment C-35 has the schedule of services listed for the dormitories under the student services contract. The dormitory staff is responsible for their own janitorial/housekeeping service

Attachment C-9 Contractor Furnished Materials and Supplies

The heading on this document is

70LCHS25RPFB

00002. Please confirm these materials and supplies are needed exclusively for this Solicitation only.

That is correct

Attachment C-10, Historical Service Call Data

This data is for December 2024 only and a significant holiday month.

Please provide more

See revised Attachment C-10 representative and longer duration data of at least 3-months, preferably even longer

Attachment C-12, Grounds Maintenance Map

Please clarify differences between the areas marked in white, black, light green, and dark green

The areas on green mark the areas that are FLETC property to be maintained

Attachment C-13, Grounds Maintenance Map, JBS Weapons Station

Please clarify differences between the dotted line areas that are not shaded and those shaded in green.

The shaded green areas mark the areas that will need to be maintained

Attachment C-42, Government Property List

What is the difference between the three provided sheets within the spreadsheet

No difference. They're just a list of the equipment that we have onsite

All RFP Attachments and Exhibits

When the government issues the final RFP, we request that the Attachments and Exhibits are segregated by contract (i.e., they are associated with either Student Services Solicitation #

70LCHS25RPFB

00001 or Facilities Maintenance

Each solicitation will have its own RFP with applicable documents

Solicitation #

70LCHS25RPFB

00002).

Section B The description for CLINs 0007AN and 1007AL through 7007AL appear to be incomplete.

Please provide the entire description for each of these CLINs.

Spreadsheets have been updated

#70LCHS25RFPB00001

Section B

Student Services

Will the Total Evaluated Price include all 0006 subCLINs? For example, offerors are to provide pricing for 0006A through 0006G and all of these will be included in the Total Evaluated Price.

All CLINS shall be priced to reach a total contract price for Section B for the Base Year and each option Year

#70LCHS25RFPB00001

Section B

Student Services

Please confirm that offerors are not required to provide a unit price or total amount for CLIN 0006 for 1 LS and that we should only provide pricing for the subCLINs (0006A through 0006G).

All CLINS shall be priced to reach a total contract price for Section B for the Base Year and each option Year

#70LCHS25RFPB00001

Section B

Student Services

Which column for CLIN 0007 will be included in the Total Evaluated Price

All CLINS shall be priced to reach a total contract price for Section B for the Base

(Daily Rate Per Meal, Minimum Monthly Charge, or Maximum Monthly Charge)?

Year and each option Year

#70LCHS25RFPB00001

Section B

Student Services

Please confirm offerors are required to complete the daily rate per meal, minimum monthly charge, and maximum monthly charge for all subCLINs in CLIN 0007.

Yes

#70LCHS25RFPB00001

Section B

Student Services

Please confirm that offerors are not required to provide any pricing for the top level CLIN 0007 for 1 LS.

All CLINS shall be priced to reach a total contract price for Section B for the Base Year and each option Year

70LCHS25RPFB00001/70

LCHS25RPFB00002

Student Support Services

- C.3(7) // Facilities Management C.5.A.3

The listed Contractor Furnished Materials and Supplies overlaps. The following items are listed under Attachment C-7 and Attachment C-9. Paper Towels, Liquid Hand Soap for Dispensers, Hand Sanitizer Dispenser, Hand Sanitizer, Toilet Paper, Walk-off Mats, Disposable Cups for Water Coolers, Toilet

These are two separate requirements and shall be bid as such. Each section will need each item(s).

Paper Holders, Toilet Seat Covers, Soap Trays, Soap Dispensers, Soap Dispenser Refill Bags, 2XL Hand Sanitizer Touch Free Dispenser, 2XL- 27, Hand Sanitizer Refill Bags, Towel Bars, Shower Curtains, Shower Curtain Rods, Medicine Cabinets, Mirrors, Smoke Detectors, Door Stops, Tri-Flow Teflon Lubricant, Gym Wipes.

The overlap in materials creates confusion in the division of responsibility between the Student Support Services and Facility Operations Maintenance.

For example, what contractor would be responsible for replacing Walk-off Mats or refilling disposable cups for water coolers.

Can the USG please provide clarification as to which materials and supplies are required for Student Services and which are required for Facility Operations Maintenance.

Student Services

#70LCHS25RFPB00001

Section C Student Services C.1(c)(3)

This PWS Section States "The Contractor shall provide a qualified contract manager at all times (on call 24 hours a day) to administer all services described in the following specifications, receive any complaints concerning the contract requirements, and rectify the causes of the complaints."

Can the USG please clarify if the "Contract Manager" is the Project Manager referenced in C.4(a)(1). If the Contract Manager is an additional

Yes, the contract manager is also the Project Manager. This has been revised to reflect.

position is the Contract Manager considered contractor key or essential personnel?

Student Services

#70LCHS25RFPB00001

Section C Student Services C.6

The USG does not list an Environmental/S afety Manager in the contractor key and essential C.6 section.

However, section I.3502.215-70 lists an Environmental/S afety Manager as key personnel. Can the USG please clarify that an Environmental/S afety Manager is key personnel for the Student Services solicitation.

The Environmental/Safety Manager is a key position and Section C has been revised.

Student Services

#70LCHS25RFPB00001

Section C Student Services C.6.14

Can the USG please clarify that exterminators are required for the Student Services solicitation.

Yes this will be required

Student Services

#70LCHS25RFPB00001

Section C Student Services C.6.15

Can the USG please clarify that pest control personnel are required for the Student

Yes this will be required

Services solicitation.

Student Services

#70LCHS25RFPB00001

Section C Student Services C.5.B.1(b)

Directs the contractor to price the requirements of Transportation Services including the purchase, maintenance, and fuel cost of buses into Section B CLINS 0009, 1009, 2009, 3009, 4009, 5009, 6009, and 7009.

However, the CLIN X009 is Role Players T&M.

Can the USG please clarify if transportation services costs should be provided in the

CLIN X011

Transportation T&M CLIN or the Transportation

FFP CLIN X002?

See revised section B

Student Services

#70LCHS25RFPB00001

SECTION

C –

DESCRIPTI

ON /

SPECIFICA

TIONS /

STATEMEN

T OF

WORK

C.5.F and C.5.G

The Table of Contents (page C-1) for the Section C document for the Student Services Solicitation

#70LCHS25RFP

B00001 references C.5.F Dorm Services

They have been uploaded for review and C.F.G Food Services.

However, these sections are not included in the document. Can the USG provide these statements of work?

Facilities Maintenance

#70LCHS25RFPB00002

SECTION

C –

DESCRIPTI

ON /

SPECIFICA

TIONS /

STATEMEN

T OF

WORK

C.5.D.2

Section C-5.D.2 requests that Offeror submit a Environmental Preferability Submission with the following information "Offerors should include any relevant information pertaining to the past experience of their firm and/or key personnel in managing or performing one or more prior custodial contracts in an “environmentall y preferable” manner. This can mean being mindful of some or all of the following: the environmental preferability of products used, recycled content considerations, waste minimization, or

This will be part of the revised Demonstrated Prior Experience Submission support of recycling programs. This information should be included with the “Environmental Preferability Submission.”

There is no requirement in the Section L instructions to submit an Environmental Preferability Submission document. Can the USG please clarify the submission requirements for an Environmental Preferability Submission document?

Facilities Maintenance

#70LCHS25RFPB00002

SECTION

C- C-5.D.4 (l) Environme ntal Submissio ns, para 2

HAZARDO

US

MATERIAL

COMPLIA

NCE PLAN

Sub-paragraph

(b) states that "This plan shall be consistent with and further detail the approach contained in the offeror's proposal that resulted in the award of this contract and in compliance with the requirements stated in this clause." Can the

This will be part of the revised Demonstrated government please clarify if this means that the Hazardous Material Compliance Plan is a required subject in the Factor 2 Oral Presentation?

This is unclear as it is not mentioned in the Section L instructions.

Facilities Maintenance

#70LCHS25RFPB00002

SECTION

C- C-5.D.4 (l) Environme ntal Submissio ns, para 3

ENVIRON

MENTAL

PREFERAB

ILITY

SUBMISSI

ON

Sub-paragraph

(f) states that "Failure to address this shall result in a proposal being considered incomplete and, accordingly, may result in the Government excluding the proposal from further consideration."

Can the government please clarify if this means that the Waste Minimization and Recycling Strategy is a required subject in the Factor 2 Oral Presentation?

This is unclear as it is not mentioned in

This will be part of the revised Demonstrated the Section L instructions.

Facilities Maintenance

#70LCHS25RFPB00002

SECTION

C- C-5.D.4 (l) Environme ntal Submissio ns, para 3

ENVIRON

MENTAL

PREFERAB

ILITY

SUBMISSI

ON

Sub-paragraph

(h) states that "The proposal must demonstrate that products in each of the 5 above categories meet the following four (4) criteria:"

Can the government please clarify if this means that the four listed criteria under Chemical Products Mandatory Characteristics are a required subject in the Factor 2 Oral Presentation?

This is unclear as it is not mentioned in the Section L instructions.

No, this will not be a part of the Oral Presentation

Facilities Maintenance

#70LCHS25RFPB00002

SECTION

C- C-5.D.4 (l) Environme ntal Submissio ns, para 3

ENVIRON

MENTAL

PREFERAB

Sub-paragraph (p)(1) states that "While there is no minimum Mandatory threshold per se under this criterion, an offeror’s failure to address these

This will be part of the revised Demonstrated

ILITY

SUBMISSI

ON

considerations may result in elimination of its proposal from further consideration and, in any case, shall be deemed a proposal deficiency." Can the government please clarify if this means that these Waste Minimization and Recycling Strategies requirements are a required subject in the Factor 2 Oral Presentation?

This is unclear as it is not mentioned in the Section L instructions.

70LCHS25RPFB00001/70

LCHS25RPFB00002

C.6 Contractor Key and Essential Personnel Requireme nts;

Section I 3052.215-

Will the Government confirm that Key Personnel are identified in Section I, 3052.215-70;

and that all other Labor Categories listed in Solicitations Section C.6 are identified as Essential?

That is correct

Facilities Maintenance

#70LCHS25RFPB00002

Section C, C-5.D.2 Managem ent Responsib ilities and Section I Clause 3502.3052 .215-70

C-5.D.2

MANAGEMENT

RESPONSIBILITI

ES lists the following positions as key.

Environmental / Safety Manager Database Manager Environmental Coordinator Recycling Coordinator However, the Database Manager, Environmental Coordinator, and Recycling Coordinator are not Listed in Section I Contract Clauses 3502.3052.215-

70 KEY

PERSONNEL OR

FACILITIES as Key Personnel.

Can the USG Please clarify if the Database Manager, Environmental Coordinator, and Recycling Coordinator are key positions?

They are not key personnel only the Environmental Safety Manager

70LCHS25RPFB00001/70

LCHS25RPFB00002

Section I Contract Clauses I.3052.215 -70 - Key Personnel or Facilities

The Section I Document does not delineate the key personnel for the 2 separate contracts. It is unclear in I.3052.216-70 which Key Personnel are to be assigned to which contract.

Currently, the following key personnel are listed for both contracts:

Project Manager Alternate (Assistant) Project Manager Quality Assurance/Quali ty Control Manager Environmental/S afety Manager Facility Operations Manager Dormitory Manager Janitorial Services Manager Grounds Maintenance Supervisor Food Service Manager

Can the USG please provide a separate list of key personnel

Section I for the Student

Solicitation and Facilities Solicitation.

70LCHS25RPFB00002 Section J/ Exhibit E-1

The DRFP does not provide the the Section J, Exhibit E-1 Performance Requirements Summary. Can the USG please provide the PRS.

Please see revised Section J

70LCHS25RPFB00001/70

LCHS25RPFB00002

Section L.9

Section L.9 states that "If the Offeror intends to propose to both requirements, the Offeror is required to submit two (2) complete, distinct submissions, as well as indicate in each submission which requirement is being proposed."

However, the instructions for oral presentations in L.14 indicate

The government requests 2 separate proposals that there will be one presentation scheduled that could cover either one or both of the Student Services and Facilities Maintenance requirements.

Question: If an offeror is planning on responding to both the Student Services and the Facilities Maintenance requirements, can the government please clarify whether offerors are required to submit two entirely separate proposal submissions, inclusive of Factors 1, 3, 4, and 5? Or should both Student Services and the Facilities Maintenance responses in this case be packaged as one proposal submission?

70LCHS25RPFB00001/70

LCHS25RPFB00002

Section M Factor 4

The first line of the Factor 4 Past Performance

Past Performance for Sections L and M have been revised evaluation criteria states that "The evaluation of this factor is based on the demonstrated prior experience presented by the offeror, and how well it aligns with the requirements in the SOW."

Demonstrated experience is Phase I Factor 1, not Phase II Factor 4.

Question: Can the USG please update the Factor 4 Past performance (how well an Offeror does it) to remove the experience (what an Offeror does).

70LCHS25RPFB00001/70

LCHS25RPFB00002

Section L.16 and Section M Factor 4

The instructions in section L.16 do not mention past performance questionnaires and indicate that offerors should submit a 5-page maximum past performance write-up.

However, the evaluation criteria in section M Factor

Past Performance requirements have been revised. Please see revised Sections L and M

4 requires offerors to submit past performance questionnaires and provides a 6-page maximum for each.

Question: Can the government please clarify whether offerors are required to submit past performance questionnaires or past performance reference narratives as part of Offeror's submission for Phase II Factor 4?

70LCHS25RPFB00001/70

LCHS25RPFB00002

Section L.16 and Section M Factor 4

According to L.16 states "At a minimum, each reference shall include a contract number, dollar amount, period of performance, customer, location, and a current phone number and email for the current point-of-contact. It is the responsibility of the offeror to ensure the point-of-contact for each

Past Performance requirements have been revised. Please reference is available to be reached by phone during the days immediately following the past performance submission."

Question: L.16 appears to be requesting PPQ information and no narrative is requested. Can the USG please confirm that they are not requesting PP Narratives as part Offeror submission in response to L.16.

70LCHS25RPFB00001/70

LCHS25RPFB00002

Section M.2 Factor 4 and Section L.16 Phase II Factor 4

The instructions for Past Performance in Section L.16 and the evaluation criteria in M.2 Factor 4 do not have a direct correlation.

It is unclear what to submit as part of Past Performance becasuse the L and M are not requiring the same information as part of the submission.

Can the USG

Past Performance requirements have been revised. Please please update the L instructions and M evaluation criteria to clearly articulate the submission requirements.

70LCHS25RPFB00001/70

LCHS25RPFB00002

Section L.16 and Section M Factor 4

If the government includes the requirement for a past performance questionnaires, can the USG please confirm that these would be outside of any page restrictions for the Factor 4 proposal response.

Past Performance requirements have been revised. Please see revised Sections L and M

70LCHS25RPFB00001/70

LCHS25RPFB00002

Section L.15

Section L.15 Phase II - Factor 3: Capability of Proposed Key Personnel list:

Project Manager Deputy Project Manager Quality Assurance Manager Dorm Manager Dinning Hall Manager Chef

The Deputy Project Manager, Dining Hall Manager, and Chef position titles are not

Section I is the prevailing document for resumes. Please see revised Section I listed in Section I.3052.215-70 - Key Personnel or Facilities.

Additionally, these labor titles are not listed in the Statement of Work for the Student Support Services or the Facility Maintenance contracts.

Can the USG please provide the key personnel resumes required for each contract in the L.15 instructions.

Can the USG also please confirm which document is the prevailing document for submitting resumes - L.15 or Section I Clause 3052.215-70 as the documents do not match.

Student Services

#70LCHS25RFPB00001

Section L - Instruction s, Conditions and Notices to Bidders L.15 Phase II - Factor

Can the Government confirm that the Chef listed in L.15 Phase II is Head/Executive Chef listed in the Section C document for the Student

Section L

Solicitation

#70LCHS25RFP

B00001; C.6 Contractor Key and Essential Personnel Requirements (7) Head/Executive Chef?

70LCHS25RPFB00001/70

LCHS25RPFB00002

Section L - Instruction s, Conditions and Notices to Bidders L.15 Phase II - Factor

Can the government please confirm that there is no page limit on each Key Personnel resume, or a page limit on the total response to Factor 3?

No more than 5 pages for each resume

70LCHS25RPFB00001/70

LCHS25RPFB00002

Section L - Instruction s, Conditions and Notices to Bidders L.15 Phase II - Factor

The L-15 Factor 3 instructions state that offerors should "See Attachment 4 – Resume Template." That Attachment was not provided as part of the solicitation. Can the government confirm that offerors should actually use Exhibit I-3 as the template for proposal resumes? If not, can the government please provide the correct

Revised to reflect resume template attachment.

70LCHS25RPFB00001/70

LCHS25RPFB00002

Section L - Instruction s, Conditions and Notices to Bidders;

Section I/ L.15 Phase II - Factor 3 & Section I

In the Section I, 3052.215-70 Key Personnel or Facilities Position titles for a Quality Assurance / Quality Control Manager; the Section I, Position Quality Assurance / Quality Control Manager. The Student Support Services Section C.6 includes the labor category Quality Control Representative

(QCR).

Can the Government confirm that the Quality Control Representative (QCR) is intended to be the same as the Quality Assurance / Quality Control Manager and that resumes for the Quality Assurance / Quality Control Manager should be written to the qualifications of

Yes that is correct the Quality Control Representative

(QCR)?

70LCHS25RPFB00001/70

LCHS25RPFB00002

Section L - Instruction s, Conditions and Notices to Bidders L.13.2.a Advisory Down- Select Notificatio n

This section states "A due date for the Price Proposal and Past Performance:

this due date will be approximately two (3) weeks from the issuance of the Advisory Notice."

Please confirm if this is intended to state two weeks or three weeks.

Finalized Dates will be stated in the Final RFP

70LCHS25RPFB00001/70

LCHS25RPFB00002

Section L.17 Factor 5:

Price Proposal Instruction s, paragraph s 1 and 3

Since the company financial statements and the narrative regarding resources will not be used in proposal evaluation, can the government confirm that if the offeror provides their Internal Price Model showing a breakdown of the labor rates, hours, material costs, all overhead rates, and how these costs add up to the proposed price for each CLIN along with the Summary Worksheet showing the proposed price of each CLIN in Section B, that this satisfies the other than certified cost and pricing data and the detailed breakdown supporting price realism and reasonableness and the offeror is not required to provide a Pricing Narrative in the Adobe PDF document?

70LCHS25RPFB00001/70

LCHS25RPFB00002

Section L.17 Factor 5:

Price Proposal Instruction s, paragraph 5; Section G.13

DEPARTM

ENT OF

LABOR

WAGE

DETERMIN

ATION (S),

paragraph 1; Exhibit

The following 3 references to Wage Determinations are listed throughout the RFP under L.17, G.13, and Exhibit H-2, Section J: WD No.: 2015-4429, Revision 27, WD No.: 2015-4427, Revision 27. WD No.: 2015-4427, Revision 29 Can the government please confirm

WD No.: 2015-4427, Revision 29

H-2, Section J which Wage Determination and Revision Offerors should use?

70LCHS25RPFB00001/70

LCHS25RPFB00002

Sectin L.17 Factor 5:

Price Proposal Instruction s, paragraph 1; Section M - Evaluation Factor for Award

The Section L.17 Factor 5: Price Proposal instructions state in paragraph 2, "The detailed breakdown of your proposal is required in order to allow the Government to determine both price realism and price reasonableness.

" The Section L.5 instructions also state, "(d) Proposals that include unrealistically low labor rates, or that do not otherwise demonstrate cost realism, will be considered in a risk assessment and will be evaluated for award in accordance with that assessment."

However, the

Please see revised Section L and Section M Price Proposal Instructions

Section M.2 Factor 5: Price Proposal evaluation criteria do not include cost/price realism. Section M.2 states, "The Government will evaluate the total price, inclusive of all option periods with respect to accuracy, reasonableness and completeness based on information submitted in the Offeror’s price submission."

Would the Government confirm that proposals will be evaluated for accuracy/compl eteness, price reasonableness, and price realism?

70LCHS25RPFB00001/70

LCHS25RPFB00002

Section L.5 52.237-10

IDENTIFIC

ATION OF

UNCOMPE

NSATED

OVERTIME

(MAR

2015)

Can the government confirm that the requirement for L.5 52.237-10

IDENTIFICATION

OF

UNCOMPENSAT

ED OVERTIME

(MAR 2015)

should be included in the

Yes

Adobe PDF document per L.17?

70LCHS25RPFB00001/70

LCHS25RPFB00002

Section L.6

Section L.6(c ) states that firms are limited to 5 attendees.

However, Section L.6(e ) states that individuals are limited to a maximum of 1 attendee.

Can the USG please clarify the number of attendees allowed at the pre-proposal conference.

Please see revised Section L-6

70LCHS25RPFB00001/70

LCHS25RPFB00002

Section L.14.6.1

L.14.6 This section identifies topics that the "Government will consider" as part of the Oral Presentation.

This includes "Complying with Safety and Environmental requirements, weapon/ammun ition inventory and security, equipment issue/recovery, dorm maintenance and services, classroom maintenance

This will be part of final

RFP

and services, galley services and maintenance, student services and entertainment, fleet maintenance and general maintenance."

However, some of these services are only required as part of the solicitation for the Student Services solicitation, the Facilities Maintenance Solicitation, or a combination of both. Can the USG please clarify what oral presentation topics the Government will consider for companies responding to the Student Services solicitation, and which topics should be covered for companies responding to the Facilities Maintenance Solicitation?

70LCHS25RPFB00001/70

LCHS25RPFB00002

Section L.14.6.1

This paragraph mentions "galley services."

However, this requirement is not in either Section C document. Can the USG clarify what information they are requesting related to this topic?

70LCHS25RPFB00001/70

LCHS25RPFB00002

Attachme nt 1A and 1B

Can the USG please clarify if Offerors are expected to submit answers to questions in Attachment 1A and 1B in the document provided or if Offerors can copy and paste the questions into a proposal document with a cover sheet, TOC, and headers/footers on the Attachment 1A and 1B.

You can copy and paste into a proposal document with cover sheet, TOC and headers/footers with the subject attachment

70LCHS25RPFB00001/70

LCHS25RPFB00002

Section L Can the government please confirm if offerors can provide a Cover Page and Table of Contents for each Written Factor. Can the USG please confirm this would not be included in page count.

70LCHS25RPFB00001/70

LCHS25RPFB00002

Section L Factor 3:

Capability of Proposed Key Personnel;

Section I 3052.215- 70 Key Personnel or Facilities

Section L identifies the following Required Key Personnel labor categories which require resumes:

1. Project Manager

2. Deputy Project Manager

3. Quality Assurance Manager

4. Dorm Manager

5. Dining Hall Manager

6. Chef

However, Section I 3052.215-70 states "The Contractor shall submit a resume in the format shown in Section J, Exhibit I-3 on all key personnel with their proposal" and identifies these personnel as Key:

1. Project Manager

2. Alternate (Assistant) Project Manager

3. Quality Assurance / Quality Control Manager 4.

Environmental/S afety Manager

5. Facility Operations Manager

6. Dormitory Manager

7. Janitorial Services Manager

8. Grounds Maintenance Supervisor

9. Food Service Manager

Question 1: Can the USG please confirm what key personnel resumes are required for each submission (student services and facilities management).

Question 2: Can the USG please clarify the following LCAT are one and the same:

1. Project Manager and Contracts Manager

2. Alternate Program Manager and Deputy Program Manager

3. Chef and Head Executive

Chef

4. Quality Assurance Manager and Quality Assurance/Quali ty Control Manager

5. Dining Hall Manager and Food Services Manager

Attachment C8 Can the GOV provide the approximate square footage of carpeted areas per building that require annual steam cleaning?

Unknown. Information not available.

Section C (O&M) C- 5.B.5.e.7

C-53 Can the GOV please confirm that grease traps are required to be pumped on a weekly basis?

Grease traps will need to be cleaned every 90 days or more frequent if needed. Contractor responsible to monitor.

Section C (O&M) C-5.B.5.n C-73 Can the GOV please provide the qty, make, and model of elevators that are a part of this requirement?

There are 8 elevators located on the facility.

Specific information will be provided at a later date.

Section C (O&M) C-5.A.5.e C-32 Can the government please provide the size and type of materials of the auditorium curtains that are required to be dry cleaned?

The curtains have been removed. This is no longer a requirement.

This will be updated in the solicitation.

Can the government please update the inventory to capture all fire and life safety equipment (including special suppression systems) that is covered by the contractor?

Inventory has been updated.

Section C (O&M) C-5. C.5 C-87 Can the government please provide the type and quantity of trees that require pruning?

Due to the expansive nature of the facility, quantity is unknown.

There are multiple types of trees and differing maturity.

Noted are Palm, Oak, and Crepe Myrtle, which require pruning though there may be other types.

Attachement C-6 Can the government please provide the last year the 5-year storm drain cleaning, Site has not had storm drain cleaning wet or dry. This will be a requirement in the first year of contract.

both wet and dry, were performed?

Section L & M Can the government please indicate which personnel are Key Personnel and which are Essential Personnel so the contractor knows which resumes it must provide?

This information was answered in a previous question.

General Given the applicability of Executive Order 14055, which grants the right of first refusal to incumbent employees under the Service Contract Act (SCA), would the agency consider removing the resume requirement for Key Personnel positions covered by the SCA wage determination?

Since these positions are expected to be filled by incumbent staff, this adjustment could streamline the submission

The resume requirement will not be removed.

process while ensuring compliance.

General Does the government provide the contractor internet?

The government does not provide internet service to contractor offices.

Section C (O&M) C-5. C.5 C-85 Does the government provide mulch, fertilizer, and other landscaping materials?

No. Landscaping materials are the responsbility of the contractor.

Section C (O&M) C-5.B.5.j.4 C-65 Can the GOV please provide the qty, make, model, and kVA rating of UPS units that are a part of this requirement?

Unknown. Information not available.

Section C (O&M) C-39 Can the government please confirm if the contractor has a shared liability threshold? If so, what is the amount? The government says both 2,500 in C-57 and 1,501 throughout the document.

Shared liability is $1500

Section C (O&M) C-5.B.5.j.4 C-65 Can the GOV please provide the qty, make, model, and size (capacity) of any fuel tanks (gas, diesel, propane) that are a part of

Attachment will be provided with capacity, fuel type, and location.

this requirement?

Section C (O&M) C-5.B.5.j.4 C-65 Can the GOV please confirm which of the fuel storage tanks are underground and which are above ground?

All storage tanks are above ground.

Section C (O&M) C-5.B.5.j.4 C-65 Can the GOV please provide the last year in which above ground storage tanks with a capacity over 10,000 gallons were recertified by a professional engineer? If this is not a requirement, can the GOV please confirm this?

There are no fuel tanks over 10k gallons.

Section C (O&M) C- 5.B.5.k.E

C- 69-

Can the GOV please confirm which chemistry treatment tests for water are required to be performed monthly by a qualified independent water treatment specialist?

Required tests and ranges are listed in C.5- B-38-41

Attachment C8 Can the government please provide approximately how much furniture would require scotchgaurd?

Unknown. Information not available.

Section C (Student Support)

C-5.F, C- 5.G

C-68 Can the government provide the performance specification requirements for C.5.F (Dorm Services) and C.5.G (Food Services)? This content is missing from Section C.

This information has been added.

Section C (O&M) C- 5.B.5.e.5.c

C-51 Can the GOV please provide an inventory of building control systems (BAS, public address, security control) that are within the scope of this contract?

Security control system and public address systems are not in the scope of work. BAS systems are buildings 1,16,43,46,61,64,65,39 ,650,654,284/285.

Section C (O&M) C- 5.B.5.k.A

C-67 Can the government please provide the year the last Nondestricutive Chiller Tube Analysis (Eddy Current) was performed on both the condesnser and evaporator for each chiller?

Nondestructive chiller tube analysis will be due in first year of the contract.

Student Services Section B Food

CLINS

Can the USG please provide clarification on how the USG plans to order food services by CLIN. For example, if the USG is going to activate the

Food services will be ordered in accordance with student allocations generated by the monthly SASS report

CLIN for food services for the band of 150 - 299 personnel, does this also mean that the band below it is activated for 1 - 149 personnel?

Or is the USG only activating one CLIN at a time. Example:

USG orders CLIN for band 450 - 599 personnel. This also means that CLINS for band of 1-149; 150- 299; and 300- 449 are activated.

Student Services C.6(7) The Janitorial Services manager position requirements include "(d) experience in managing, planning, setting up, outfitting, and budgeting food services is mandatory and

(e) shall have a valid food service handling certificate, which is to remain current throughout the life of the contract.

See revised Section C.6(7)

Can the USG please clarify that C.6(7) requirements for the Janitorial Services Manager does not include (d) and (e) which has requirements related to food services.

Section L.11 Can the USG please clarify when the oral presentations are due?

Currently Oral presentations are going to be held from the 17th through the 24th. All Offerors should be required to submit oral presentations slide on the same date and time so as to not give an Offeror additional time over another to complete oral presentation decks.

Additionally, if one competitor is required to do oral presentations on the 17th and another on the 24th, it allows an Offeror to

Dates will be posted with finalized RFP and as part of advisory down select notifications have an unfair advantage over another by allowing them additional time to prepare.

1. Recommend the USG require Offerors to submit oral presentations on the same due date and 2. Hold oral presentations within a smaller window of time, preferably within 48 hours of each other.

Student Services Section C, C.4(a)1

Section C.4(a)1 states "During normal duty hours the Project Manager or designated Alternate shall be on site and available within 30 minutes notice to meet on the facility with the Government personnel designated by the Contracting Officer to discuss problem areas."

Does the student services solicitation require a Key Alternate Project

The designated alternate can be any other manager.

Manager? This position is not listed in Section C.6 Contractor Key and Essential Personnel Requirements.

If yes, can the USG please update Section C.6 to include the requirements for the student services Alternate Project Manager.

Section L Past Performan ce

We encourage the government to include in the solicitation for the FLETC III procurement language clarifying that the government will consider past performance of an offeror’s parent and sister companies, often referred to as affiliate past performance

(“APP”).

As a buyer of good and services, the government benefits from making clear that an offeror’s past performance citations may include the past performance of affiliates.

Crediting APP increases competition and makes available to the Government the broadest range of capabilities from an offeror’s enterprise. The procurement rules specifically endorse the Government

See revised Section L crediting an offeror with APP where the offeror’s proposal demonstrates that the resources of the affiliated company (e.g., workforce, management, facilities, or other resources) will be meaningfully contributed to contract performance.

See, e.g., GM– Bulltrack, B- 414591.6, B- 414591.7 (Comp. Gen.

Oct. 30, 2018).

As GAO held in the Bulltrack case:

However, an agency properly may consider the experience or past performance of an offeror’s affiliated companies where the firm’s proposal demonstrates that the resources of the affiliated company will affect the performance of the offeror….

The relevant consideration is whether the resources of an affiliated company - its workforce, management, facilities or other resources - will be provided or relied upon for contract performance, such that the parent or affiliate will have meaningful involvement in contract performance.

Indeed, a GAO decision found the Army Corps of Engineers unduly limited competition by issuing a solicitation that prohibited consideration of APP. In Iyabak Construction, LLC, B- 409196, 2014 CPD ¶ 62, 2014 WL 523829

(Comp. Gen.

Feb. 6, 2014), GAO held:

…the Corps’ explanation for the RFP’s experience and past performance restriction is that the agency encountered problems in the past when it considered the experience and past performance of affiliates. As recounted by the contracting officer, these problems concerned the acceptance by the agency of “general statements about availability of affiliate resources,” where the offerors “did not demonstrate any meaningful involvement by the affiliate or include any commitment that the affiliate would perform any part of the contract.” This explanation, however, does not address the protester’s position that it is unreasonable for the agency to refuse to consider the experience and past performance of affiliates where there are firm commitments for affiliates to participate meaningfully in contract performance.

Id. (citations omitted;

emphasis added).

The following is language from a government solicitation (“Model Language”) specifically addressing APP:

If applicable, Offerors may provide the experience or past performance of a parent or affiliated or predecessor company to an Offeror (including Joint Venture prime partner companies and/or a parent or affiliated company that is being otherwise proposed as a subcontractor on this effort) where the firm’s proposal demonstrates that the resources of the parent or affiliate or predecessor will affect the performance of the Offeror. The Offeror shall demonstrate that the resources of the parent or affiliate or predecessor company (its workforce, management, facilities or other resources) shall be provided or relied upon for contract performance such that the parent or affiliate or predecessor will have meaningful involvement in contract performance.

Accordingly, we respectfully request that the government include language like the Model Language in the FLETC III solicitation.

Facilities Maintenance

#70LCHS25RFPB00002

Section C.5.D.2 Key Personnel

In Section C.5.D.2 , Listed under Key Personnel with Environmentally Preferable Management there are positions listed:

a) Environmental/S afety Manager

b) Database Manager c) Environmental Coordinator

d) Recycling Coordinator

The Environmental/S afety Manager is the only position listed above that is listed as a Key Personnel in Section I, 3052.215-70.

Similarly, the Environmental/S afety Manager position is the only one of the above listed positions listed in Section C.6 Contractor Key and Essential Personnel Requirements.

Can USG advise if the Database…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .