C-8 SOS B62-1 THRU B682 Part 2.pdf

PDF 1 MB Posted

Attached to
Student Support/Facilities Operation Maintenance Services
Solicitation number
70LCHS25RPFB00001
Issued by

About this file

This is a Schedule of Services document detailing the cleaning and maintenance requirements for multiple buildings at the Federal Law Enforcement Training Centers (FLETC) in Charleston, SC. The document specifies cleaning frequencies and tasks for various facilities including MAT Rooms, Boat Boarding Platforms, Classrooms, Tactical Training Simulators, Access Control Gate Guard Houses, Conference Center, MLEA Staff Offices, and other training facilities.

The schedule provides detailed cleaning requirements broken down by frequency (As Needed, Daily, 5/Week, 2/Week, 1/Week, 1/Month, 1/Quarter, 2/Year, 1/Year) for each building area including routine cleaning, floor care, restroom cleaning, glass cleaning, and exterior cleaning. Special requirements note that "Daily" services must be performed Sunday through Saturday, "5/Week" services Monday through Friday, and other frequencies have specific timing requirements. Many areas require disinfection, particularly in training rooms and high-contact surfaces. Building sizes range from small guard houses (16 sq ft) to larger facilities like the Indoor Firing Range (44,000 sq ft). The document includes specific requirements for specialized areas like mat rooms that must be cleaned after each class with vacuuming and disinfecting.

View the file

Other files

File Type Posted
Exhibit H-5 Contractor Badge Application.pdf PDF
Attachment C-15 Dormitory Schedule Sample.xlsx XLSX spreadsheet
Attachment C-14 Preventive Maintenance Guide.pdf PDF
Section J Index_70LCHS25RPFB00001.pdf PDF
Attachment C-6 FTC-ADM-1A FLETC Purchase Requisition PR.xlsx XLSX spreadsheet
Attachment C-2 Buildings Hours of OperationRev.pdf PDF
Attachment C-10 Historical Data of Service CallsRev.pdf PDF
ATTACHMENT C-22 FLETC CHARLESTON FLEET VEHICLES AS OF 12-17-24.pdf PDF
Exhibit H-4 I-9 Form (1).pdf PDF
70LCHS25RPFB00002 Attachment 1B- Facility Maintenance Prior Experience Questions.pdf PDF
Attachment C-2 Sample Session Start Dated 1.pdf PDF
Attachment C-28 FTC-ADM-51.pdf PDF
Attachment C-5 Government Furnished Equipment-Property Updated 5-1-2024.pdf PDF
Section H 70LCHS25RFPB00001 Special Contract Requirements 2-27-25.pdf PDF
Exhibit E-2 Section E - Es QASP attachments.pdf PDF
Attachment C-37 FLETC Student Roster Format.xlsx XLSX spreadsheet
Attachment C-41 Class Party-Picnic Form.pdf PDF
Attachment C-16 OFF-CENTER LODGING SHUTTLE SCHEDULE REVISED.pdf PDF
Attachment C-19Driver Training DivisionVehicle Equipment Requ.pdf PDF
Section B 70LCHS25RPFB00001 2-26-25.xlsx XLSX spreadsheet
Attachment C-33 Role Player Eval Sheet.pdf PDF
Section B 70LCHS25RPFB00002 2-26-25.pdf PDF
Attachment C-39 Pre-Registration Package.pdf PDF
Attachment C-26FTCADM 82 Receiving Report.pdf PDF
Attachment C-18Bus Transportation Inclement Weather_TRAINING DAYS-.pdf PDF
Attachment C-10 FTC-ADM-46 Move Order Request.pdf PDF
Section B 70LCHS25RPFB00002 2-26-25.xlsx XLSX spreadsheet
Section I 70LCHS25RPFB00002 2-27-25.pdf PDF
Section L_70LCHS25RPFB00002 2-27-2025.pdf PDF
Exhibit H-4 I-9 Form.pdf PDF
Attachment C-21 Fire Arms Division-Ammunition Weapons Request.pdf PDF
Section K 70LCHS25RPFB00001 2-26-25.pdf PDF
Section F 70LCHS25RPFB00002 2-26-25.pdf PDF
Attachment C-11 Grounds Acreage 11-17-2023.xlsx XLSX spreadsheet
Attachment C-12GroundsMaintMapFLETCCharlComplex11-8-23R.pdf PDF
Attachment C-25FLETC Manual 70-09.J Firearms and Ammunition.pdf PDF
Attachment C-14 AIRPORT ARRIVAL and DEPARTURE SCHEDULE.pdf PDF
Attachment C-40 Sample Weekly Food Service Menu.pdf PDF
Attachment C-29 FTC-ADM-53a.pdf PDF
Attachment C-24 FLETC SOP CHS-SEM- 005.pdf PDF
Attachment C-27 FTC-ADM-37 Stock Issue Authorization.pdf PDF
SECTION C - FAC MAINT 70LCHS25RPFB00002 2-27-25 combined.pdf PDF
Attachment C-1 Buildings and StructuresREV.pdf PDF
Section G 70LCHS25RPFB00001 2-26-25.pdf PDF
Attachment C-4 Hours of Operations.pdf PDF
Attachment C-32 FTC-ADM-50.pdf PDF
Section A 70LCHS25RPFB00001 2-26-25.pdf PDF
Attachment C-7_Contractor Furnished Materials .pdf PDF
C-8 SOS B686-1 THRU B68and69 Mat Rooms Part 3.pdf PDF
Exhibit H-6 OSHA 300 300A Log Report Summary 12-12-2024- (1).pdf PDF
Show 40 more

Latest 50 of 202 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment C-8

Schedule of Services Building No. 62-1 thru 62-5 Total SF: 2,500 each (Est.)

MAT Rooms & Locker Room

Frequency As

Needed Daily

5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X X Empty Ash Receptacles/Butt Cans X Clean Exercise Mats/Mat Rooms X X Low Dust X X High Dust X Odor Control X X

Floor Care:

Sweep/Dust Mop Floors X X Damp Mop X X Spray/Buff Strip/Wax/Buff Vacuum Seams of Mats X X Spot Clean Carpets Steam Clean Carpets Rest Room Cleaning:

Clean Walls/Partitions X Clean Urinals/Commodes X X Clean Mirrors X Clean Sinks/Lavatories X X Clean/ Floors X Clean Showers X X Service Dispensers (Soap, hand sanitizer, tissue, towels)

X X

Glass Cleaning:

Entrance Doors Interior Glass Exterior Glass Exterior Cleaning:

Policing Grounds X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday.

“1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday.

“1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.C.5.a.1.f.1 **Note – Mats should be cleaned after each class to include vacuuming and mopping/disinfecting.

Federal Law Enforcement Training Centers Charleston SC Solicitation 70LCHS25RPFB00002

Building No. 63-1, 63-3, 63-4, 63-6, 63-7, 63-9, 63-10, 63-12, 63-13, 63-15, 63-18,63-22, 63-23, 63-25, 63-26, 63-27, 63- 28, 63-29, 63-30 Boat Boarding Platforms Total SF: 13@ 924 sf Each

Frequency

As Needed

Daily

5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans Clean Venetian Blinds X Clean Upholstery X Low Dust X High Dust X X Floor Care:

Sweep/Dust Mop Floors X Damp Mop X Spray/Buff Strip/Wax/Buff Vacuum Carpet/Rugs X Spot Clean Carpets X Steam Clean Carpets Rest Room Cleaning:

Clean Walls/Partitions X Clean/Disinfect Urinals/Commodes X Clean Mirrors X Clean/Disinfect Sinks/Lavatories X Clean/Disinfect Showers X Clean/Disinfect Floors X Service Dispensers (Soap, hand sanitizer,tissue, towels)

X

Glass Cleaning:

Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:

Policing Grounds X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday.

“1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday.

“1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

Building No. 63-2, 63-5, 63-8, 63-11, 63-14, 63-24 Total SF: 5 @ 570 sf Each Classrooms

Frequency

As Needed

Daily

5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Clean Upholstery Low Dust X High Dust X

Floor Care:

Sweep/Dust Mop Floors X Damp Mop X Spray/Buff X Strip/Wax/Buff X Vacuum Carpet/Rugs Spot Clean Carpets Steam Clean Carpets Rest Room Cleaning:

Clean Walls/Partitions Clean Urinals/Commodes Clean Mirrors Clean Sinks/Lavatories Clean Showers Clean Floors Service Dispensers (Soap, hand sanitizer tissue, towels)

Glass Cleaning:

Entrance Doors Interior Glass Exterior Glass

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday.

“1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday.

“1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

Building No. 63-16, 63-17, 63-21 Tactical Training Simulators – Conex Total SF: 3 @ 1,440 sf Each

Needed

Daily

5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X X Empty Waste Containers X X Empty Ash Receptacles/Butt Cans X X Clean/Remove Training Simmunition Residue X X Low Dust High Dust

Floor Care:

Sweep/Dust Mop Floors X X Damp Mop X X Spray/Buff Strip/Wax/Buff Vacuum Carpet/Rugs Spot Clean Carpets Steam Clean Carpets Rest Room Cleaning:

Clean Walls/Partitions Clean/Disinfect Urinals/Commodes Clean Mirrors Clean/Disinfect Sinks/Lavatories Clean/Disinfect Showers Clean/Disinfect Floors Service Dispensers (Soap, tissue, towels) Glass Cleaning:

Entrance Doors X X Interior Glass X X Exterior Glass X X

Policing Grounds X X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday.

“1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday.

“1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

Building No. 63-22, 63-23 Total SF: 2 @ 924sf Each

Needed

Daily

5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning/Disinfecting:

Entrance Mats X X Empty Waste Containers X X Empty Ash Receptacles/Butt Cans X X Clean/Remove Training Simmunition Residue X X All areas listed below to Disinfect X X Low Dust High Dust Floor Care:

Sweep/Dust Mop Floors X X Damp Mop X X Spray/Buff Strip/Wax/Buff Vacuum Carpet/Rugs X X Spot Clean Carpets X X Steam Clean Carpets Rest Room Cleaning:

Clean Walls/Partitions X Clean/Disinfect Urinals/Commodes X Clean Mirrors X Clean/Disinfect Sinks/Lavatories X Clean/Disinfect Showers X Clean/Disinfect Floors X Service Dispensers (Soap, tissue, towels) X Glass Cleaning:

Entrance Doors X X Interior Glass X X Exterior Glass X X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday.

“1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday.

“1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

Disinfect: The contractor shall wipe down all solid, high contact surfaces using a disinfectant from the EPA-registered list of products identified as effective against Novel Coronavirus SARS-CoV-2 (see list), or other product containing the same active ingredient(s) at the same or greater concentration than those on the list. Contractor shall use the product in accordance with directions provided by the manufacturer..

Building No. 64 Total SF Indoor Firing Range 44,000 sf (Est.)

Needed

Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Clean Venetian Blinds X Low Dust X High Dust X

Floor Care:

Sweep/Dust Mop Floors X Damp Mop X Spray/Wax/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs Spot Clean Carpets Rest Room Cleaning:

Clean Walls/Partitions X Clean Urinals/Commodes X X Clean Mirrors X Clean Sinks/Lavatories X X Clean/ Showers X X Clean/Disinfect Floors X Service Dispensers (Soap, hand sanitizer, tissue, towels)

X X

Indoor Range Cleaning:

Sweep/Dust Mop Floors (Concrete) X Damp Mop (Concrete) X Vacuum Range (HEPA Vacuum) X Glass Cleaning:

Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:

Policing Grounds X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday.

“1/Wk” services are to be performed once per week, i.e., Monday “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A. *Interior Glass includes glass in range control tower.

Building No. 65 Total SF: 33,696 sf (Est.)

Physical Techniques Building

Frequency

As Needed

Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Odor Control X X Clean Venetian Blinds Low Dust X High Dust X Clean Ceiling Fans X Floor Care:

Sweep/Dust Mop Floors X Damp Mop X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs X Clean/Service Equipment X X Clean exercise mats/Mat Rooms X X Rest Room Cleaning:

Clean Walls/Partitions X Clean/Disinfect Urinals/Commodes X X Clean Mirrors X Clean/Disinfect Sinks/Lavatories X X Clean/Disinfect Showers X X Clean/Disinfect Floors X X Service Dispensers (Soap, hand sanitizer, tissue, towels)

X X

Glass Cleaning:

Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:

Policing Grounds X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday.

“1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday.

“1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

Note: Due to high volume of student activity all areas will need to be checked for cleanliness every two hours.

Building No. 169 Total SF: 600 sf (Est.)

Training House, Pier Q

Needed

Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Clean Venetian Blinds Low Dust High Dust

Floor Care:

Sweep/Dust Mop Floors X Damp Mop Spray/Buff Strip/Wax/Buff Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets Rest Room Cleaning:

Clean Walls/Partitions Clean/Disinfect Urinals/Commodes Clean Mirrors Clean/Disinfect Sinks/Lavatories Clean/Disinfect Showers Clean/Disinfect Floors Service Dispensers (Soap, tissue, towels) Glass Cleaning:

Entrance Doors Interior Glass X Exterior Glass X Exterior Cleaning:

Policing Grounds X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday.

“1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday.

“1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

Building No. 202 Total SF Skills Enhancement Training Building 38,000 sf (Est.)

Needed

Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X X Empty Ash Receptacles/Butt Cans X Clean Venetian Blinds X Low Dust X High Dust X

Floor Care:

Sweep/Dust Mop Floors/Stairwells X Damp Mop X Spray/Wax/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs X Spot Clean Carpets Steam Clean Carpets Rest Room Cleaning:

Clean Walls/Partitions X Clean/Disinfect Urinals/Commodes X X Clean Mirrors X Clean/Disinfect Sinks/Lavatories X X Clean/Disinfect Showers X Clean/Disinfect Floors X Service Dispensers (Soap, hand sanitizer tissue, towels)

X X

Glass Cleaning:

Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:

Training Vehicles X X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday.

“1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday.

“1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

Building No. 230/Weapon Station Total SF: 800 sf (Est.)

FOSS Contractor Staff / Gun Cleaning Room

Needed

Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X X Empty Waste Containers X X Empty Ash Receptacles/Butt Cans X X Clean Venetian Blinds Low Dust X High Dust X

Floor Care:

Sweep/Dust Mop Floors X X Damp Mop X X Spray/Buff Strip/Wax/Buff Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets Rest Room Cleaning:

Clean Walls/Partitions Clean/Disinfect Urinals/Commodes Clean Mirrors Clean/Disinfect Sinks/Lavatories Clean/Disinfect Showers Clean/Disinfect Floors Service Dispensers (Soap, tissue, towels) Glass Cleaning:

Entrance Doors X X Interior Glass X Exterior Glass X Exterior Cleaning:

Policing Grounds X X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday.

“1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday.

“1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

Building No. 642A-C Total SF 16ft² ea. (Est.)

Access Control Gate Guard House(s)

Frequency

As Needed

Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X Wipe Down Walls X Wipe Down Countertops X Low Dust High Dust

Floor Care:

Sweep/Dust Mop Floors X Damp Mop X Spray/Buff Strip/Wax/Buff Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets Glass Cleaning:

Entrance Doors Interior Glass X Exterior Glass X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday.

“2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September.

Exact Requirements are outlined in C-5.A.

Building No. 642 Total SF 5,354 sf (Est.)

Visitor Control Center

Needed

Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers 2 Empty Ash Receptacles/Butt Cans 2 Clean Venetian Blinds X Low Dust X High Dust X

Floor Care:

Sweep/Dust Mop Floors 2 Damp Mop 2 Spray/Wax/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs X Spot Clean Carpets X Steam Clean Carpets X Rest Room Cleaning:

Clean Walls/Partitions 2 Clean/Disinfect Urinals/Commodes 2 Clean Mirrors 2 Clean/Disinfect Sinks/Lavatories 2 Clean/Disinfect Showers 2 Clean/Disinfect Floors 2 Service Dispensers (Soap, hand sanitizer, tissue, towels)

Glass Cleaning:

Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:

Policing Grounds X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

Building No. 650 Total SF Shipping & Receiving Building 1500ft² (Est.)

Needed

Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X X Empty Ash Receptacles/Butt Cans X Scotch guard/Clean Upholstery Low Dust X High Dust X

Floor Care:

Sweep/Dust Mop Floors X X Damp Mop X X Spray/Wax/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets Rest Room Cleaning:

Clean Walls/Partitions X Clean Urinals/Commodes X X Clean Mirrors X Clean Sinks/Lavatories X X Clean Showers X X Clean Floors X X Service Dispensers (Soap, hand sanitizer, tissue, towels)

X

Glass Cleaning:

Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:

Policing Grounds X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday.

“2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September.

Exact Requirements are outlined in C-5.A.

Building No. 654 Total SF: 1600 sf (Est.)

Conference Center

Frequency

As Needed

Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Clean Venetian Blinds X Low Dust X High Dust X

Floor Care:

Sweep/Dust Mop Floors X Damp Mop X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs X Spot Clean Carpets X Steam Clean Carpets X Rest Room Cleaning:

Clean Walls/Partitions X Clean/Disinfect Urinals/Commodes X Clean Mirrors X Clean/Disinfect Sinks/Lavatories X Clean/Disinfect Showers X Clean/Disinfect Floors X Service Dispensers (Soap, hand sanitizer, tissue, towels)

X

Glass Cleaning:

Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:

Policing Grounds X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday.

“1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday.

“1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

Building No. 654 Total SF: 9,453 sf (Est.)

MLEA Staff Offices

Frequency

As Needed

Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Clean Venetian Blinds X Low Dust X High Dust X

Floor Care:

Sweep/Dust Mop Floors/Stairwells X Damp Mop X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs X Spot Clean Carpets X Steam Clean Carpets X Rest Room Cleaning:

Clean Walls/Partitions X Clean/Disinfect Urinals/Commodes X Clean Mirrors X Clean/Disinfect Sinks/Lavatories X Clean/Disinfect Showers X Clean/Disinfect Floors X Service Dispensers (Soap, tissue, towels) X Glass Cleaning:

Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:

Policing Grounds X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

Building No. 677 Total SF Flying While Armed Training Venue 600 sf (Est.)

Needed

Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X X Empty Waste Containers X X Empty Ash Receptacles/Butt Cans X X Scotch guard/Clean Upholstery X Low Dust X High Dust X

Floor Care:

Sweep/Dust Mop Floors X X Damp Mop X X Spray/Wax/Buff Strip/Wax/Buff Vacuum Carpets/Rugs X X Spot Clean Carpets X Steam Clean Carpets X Rest Room Cleaning:

Clean Walls/Partitions Clean/Disinfect Urinals/Commodes Clean Mirrors Clean/Disinfect Sinks/Lavatories Clean/Disinfect Showers Clean/Disinfect Floors Service Dispensers (Soap, tissue, towels) Glass Cleaning:

Entrance Doors Interior Glass X X Exterior Glass X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday.

“2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September.

Exact Requirements are outlined in C-5.A.

Building No. 682 Total SF 2,925 sf (Est.)

Maritime Instructional Offices/Classroom

Needed

Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X All areas listed below to Disinfect X X Clean Venetian Blinds X Scotchguard/Clean Upholstery Low Dust X High Dust X Floor Care:

Sweep/Dust Mop Floors X Damp Mop X Spray/Wax/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs X Spot Clean Carpets X Steam Clean Carpets X Rest Room Cleaning/Disinfecting:

Clean Walls/Partitions X Clean/Disinfect Urinals/Commodes X Clean Mirrors X Clean/Disinfect Sinks/Lavatories X Clean/Disinfect Showers X Clean/Disinfect Floors X Service Dispensers (Soap, hand sanitizer, tissue, towels)

X

Glass Cleaning:

Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:

Policing Grounds X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday.

“2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September.

Exact Requirements are outlined in C-5.A.

SOS Bldg 62-1 thru 62-5
Frequency
Entrance Mats
Damp Mop
Clean Walls/Partitions
SOS Bldg 63-1 thru 63-30
Frequency
Entrance Mats
Damp Mop
Clean Walls/Partitions
Frequency
Frequency

Classrooms

SOS Bldg 63-22_63-23
Frequency
SOS Bldg 64
Frequency
SOS Bldg 65
Frequency
Entrance Mats
Damp Mop
Clean Walls/Partitions
SOS Bldg 169
Training House, Pier Q
Attachment C-8

Frequency

SOS Bldg 202
Frequency
SOS Bldg 230
FOSS Contractor Staff / Gun Cleaning Room
Attachment C-8

Frequency

SOS Bldg 642 A-C
Access Control Gate Guard House(s)
Frequency
SOS Bldg 642
Frequency
SOS Bldg 650
Frequency
SOS Bldg 654-A
Frequency
Entrance Mats
Damp Mop
Clean Walls/Partitions
SOS Bldg 654-B
Frequency
Entrance Mats
Damp Mop
Clean Walls/Partitions
SOS Bldg 677
Frequency
SOS Bldg 682
Frequency

File details come from the government source that posted it. Updated .