This is a Cost Schedule document for Environmental Mitigation, Assessment, and Remediation Services issued by the State of Nevada Purchasing Division on behalf of the Nevada Division of Environmental Protection (NDEP), Bureau of Corrective Actions. The document establishes the pricing framework for vendors providing environmental mitigation, assessment, and remediation services to the State of Nevada. The cost schedule requires vendors to propose billing rates for ten job classifications, including Program Director/Principal, Associate or Project Manager, Senior Engineer, Senior Hydrogeologist, Project Geologist, Project Engineering, Project Draftsperson, Field Technician, Administrative/Billing, and two additional positions to be specified by the vendor. All proposed rates are to remain in effect for the life of the contract.

The cost schedule addresses indirect costs and reimbursable expenses, including travel reimbursement in accordance with current fiscal year State and GSA guidelines. For main contractors, the document requests acceptance or rejection of a five percent management markup on both partnering sub-contractor invoices and outside service sub-contractor invoices. Vendors must also provide detailed equipment cost information for in-house or rented equipment on a per-day or per-unit basis, excluding vehicle usage. The document permits vendors to request additional indirect costs with specific details and cost breakdowns provided as attachments. Vendors must indicate whether cost sheets for equipment and other indirect costs are included with their proposals.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

70CNR-S3900

Cost Schedule Environmental Mitigation, Assessment, and Remediation Services

Vendor Name__________________________________________________________________

A. Proposed Billing Rates Total billing rate, with direct labor overhead multiplier built in. Rates to remain in effect for the life of the contract for positions noted below:

1. Program Director/Principal

2. Associate or Project Manager

3. Senior Engineer

4. Senior Hydrogeologist

5. Project Geologist

6. Project Engineering

7. Project Draftsperson

8. Field Technician

9. Administrative/Billing

10. (Other Job Title)

11. (Other Job Title)

C. Indirect Costs – To include but not be limited to the following:

1. Travel: Reimbursement for travel, including vehicle use /mileage, reimbursed per current FY State and GSA guidelines only.
Accept:

Yes No

2. Main Contractor Only: Management mark-up of 5% requested on partnering sub-contractor invoices.
Accept:
3. Main Contractor Only: Management mark-up of 5% requested on outside service sub-contractor invoices.
Accept:
4. Equipment: Provide a list of in-house or rented equipment cost per day or unit, excluding all vehicle usage.
Cost sheet included:

5. Other Indirect Cost Request: Provide specific details as attachment including a cost breakdown per day or unit.