7-Proposed Schedule of Values Form - 2 (G703 - 1992) - DRAFT.pdf
PDF 231 KB Posted
- Attached to
- Fairmont Plaza Development
- Solicitation number
- Not on record
- Issued by
- Wyoming County, Pennsylvania
About this file
This is an AIA Document G703-1992 Proposed Schedule of Values Form, a blank template used for construction payment applications related to the Fairmont Plaza Development project in Youngsville Borough, Warren County, Pennsylvania. The form is designed to track work completion, materials, and payment requests throughout the construction phase of the plaza development, which includes construction of the plaza structure and stage, pedestrian walkways, parking area, lighting and utilities installation, ADA access improvements, landscaping, project signage, and related site improvements. The document is a continuation sheet template with multiple line items for itemizing scheduled values and work progress, though no specific line items, quantities, dates, or award information are populated in this draft version.
The form contains column structures for tracking scheduled values, work completed in prior applications, current period work, materials stored, retainage calculations, and balance to finish, with all monetary values currently showing $0.00. As a blank draft form generated on October 30, 2017, this document serves as a template for contractors to complete payment applications during project execution. No pricing information, set-asides, funding sources, or contract terms are specified within this draft form itself, as it awaits completion with project-specific details and financial data.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A B C D E F H I
FROM
PREVIOUS
APPLICATION
(D + E)
THIS PERIOD
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
WORK COMPLETED
DESCRIPTION OF
WORK
TOTAL
COMPLETED AND
STORED TO DATE
(D + E + F)
MATERIALS
PRESENTLY
STORED
(NOT IN D OR E)
G
RETAINAGE
(IF VARIABLE
RATE)
BALANCE TO
FINISH
(C - G)
(G ÷ C)
ARCHITECT'S PROJECT NO:
AIA® Document G703™ – 1992
APPLICATION NO:
Continuation Sheet AIA Document, G702TM–1992, Application and Certification for Payment, or G736TM–2009, Project Application and Project Certificate for Payment, Construction Manager as Adviser Edition, containing Contractor's signed certification is attached.
In tabulations below, amounts are in US dollars.
Use Column I on Contracts where variable retainage for line items may apply.
APPLICATION DATE:
PERIOD TO:
ITEM
NO.
SCHEDULED
VALUE
AIA Document G703™ – 1992. Copyright © 1963, 1965, 1966, 1967,1970, 1978, 1983 and 1992 by The American Institute of Architects. All rights reserved. WARNING: This AIA ® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA ® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:05:31 on 10/30/2017 under Order No.1422830747 which expires on 05/18/2018, and is not for resale.
User Notes:
(3B9ADA23)
A B C D E F H I
FROM
PREVIOUS
APPLICATION
(D + E)
THIS PERIOD
WORK COMPLETED
DESCRIPTION OF
WORK
TOTAL
COMPLETED AND
STORED TO DATE
(D + E + F)
MATERIALS
PRESENTLY
STORED
(NOT IN D OR E)
G
RETAINAGE
(IF VARIABLE
RATE)
BALANCE TO
FINISH
(C - G)
(G ÷ C)
ITEM
NO.
SCHEDULED
VALUE
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
GRAND TOTAL $0.00 $0.00 $0.00 $0.00 $0.00 0.00% $0.00 $0.00
AIA Document G703™ – 1992. Copyright © 1963, 1965, 1966, 1967,1970, 1978, 1983 and 1992 by The American Institute of Architects. All rights reserved. WARNING: This AIA ® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA ® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:05:31 on 10/30/2017 under Order No.1422830747 which expires on 05/18/2018, and is not for resale.
User Notes:
(3B9ADA23)
G703