2-Subcontractors Form.pdf
PDF 73 KB Posted
- Attached to
- Fairmont Plaza Development
- Solicitation number
- Not on record
- Issued by
- Wyoming County, Pennsylvania
About this file
This is a Proposed Subcontractors Form for the Fairmont Plaza Development project in Youngsville Borough, Warren County, Pennsylvania. The form requires the prime bidder to list all subcontractors that will perform work on the project and coordinate their activities. The form permits bidders to list multiple subcontractors for particular trades if uncertainty exists at the time bids are due. The document serves as an integral part of the bid submission and must be completed and submitted with the proposal. The form provides up to twenty line items (sections 2.01 through 2.20) for bidders to identify the work subject and corresponding subcontractor name.
The form itself contains no pricing information, set-asides, funding details, or other financial terms. It functions solely as a disclosure mechanism to establish the subcontracting team structure for the Fairmont Plaza development, which encompasses construction of a plaza, stage, pedestrian walkways, and parking area, along with installation of lighting, utilities, ADA access improvements, landscaping, project signage, and related site improvements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fairmont Plaza Warren County Youngsville, PA
PROPOSED SUBCONTRACTORS FORM
00 43 36 - 1
1 - 1
SECTION 00 43 36
PROPOSED SUBCONTRACTORS FORM
PARTICULARS
1.01 Herewith is the list of Subcontractors referenced in the bid submitted by:
(Attach additional form if necessary.)
1.02 (Bidder) ____________________________________
1.03 To (Owner): Youngsville Borough.
1.04 Dated ___________________ and which is an integral part of the Bid Form.
1.05 The following work will be performed (or provided) by Subcontractors and coordinated by us:
LIST OF SUBCONTRACTORS (IT IS ACCEPTABLE TO LIST MORE THAN ONE FOR A
PARTICULAR TRADE IF UNSURE AT TIME OF BIDS DUE.)
2.01 WORK SUBJECT....................................SUBCONTRACTOR NAME
2.02 _______________________________________________________
2.03 _______________________________________________________
2.04 _______________________________________________________
2.05 _______________________________________________________
2.06 _______________________________________________________
2.07 _______________________________________________________
2.08 _______________________________________________________
2.09 _______________________________________________________
2.10 _______________________________________________________
2.11 _______________________________________________________
2.12 _______________________________________________________
2.13 _______________________________________________________
2.14 _______________________________________________________
2.15 _______________________________________________________
2.16 _______________________________________________________
2.17 _______________________________________________________
2.18 _______________________________________________________
2.19 _______________________________________________________
2.20 _______________________________________________________
END OF FORM
File details come from the government source that posted it. Updated .