7-PAGE 4 - FULL SIZE LOCATION MAP.pdf

PDF 1 MB Posted

Attached to
Cross Bar Ranch Wellfield Water Transmission Main - Utility Conflict (Project 07153)
Solicitation number
2026017
Issued by
Hillsborough County, Florida

About this file

This is a location map document for Tampa Bay Water's Cross Bar Ranch Wellfield Water Transmission Main project (Project 07153) in Florida. The map displays the full-size geographic layout of the project site, illustrating the utility conflict area where approximately 500 linear feet of 60-inch steel pipe will be constructed to transmit raw groundwater under/across State Road 52. The map shows the routing of the new transmission main crossing, the location of the existing pipe that will be replaced, and the connection points to Tampa Bay Water's existing transmission infrastructure. The document provides essential spatial reference for bidders to understand the project location, site boundaries, and the relationship between the new and existing pipeline systems.

The location map serves as a critical planning tool for contractors to assess the project site conditions, identify potential challenges related to the open cut and micro-tunneling construction methods, and understand the utility conflict mitigation requirements. By providing a comprehensive visual representation of the project area, the map enables bidders to accurately estimate labor, materials, equipment, and site logistics needed for the construction of the pipeline crossing and removal of the out-of-service portions of the existing pipeline.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .