6-ATTACHMENT 4-3 PWS PERMIT.pdf

PDF 254 KB Posted

Attached to
Cross Bar Ranch Wellfield Water Transmission Main - Utility Conflict (Project 07153)
Solicitation number
2026017
Issued by
Hillsborough County, Florida

About this file

This is a Notice of Permit Issuance from the Florida Department of Environmental Protection (FDEP) Southwest District issued to Tampa Bay Water for construction of water transmission infrastructure in Pasco County. The permit (No. 0030575-028-WC/M1) authorizes the relocation of approximately 500 linear feet of existing 60-inch diameter raw water transmission main across State Road 52 for the Cypress Creek Water Treatment Plant. The project is located approximately 1.7 miles west of the intersection of SR 52 and Ehren Cutoff and was designed by Nita Naik Sharma, P.E. of Wade Trim, Inc. The permit was issued on November 12, 2025, and is valid through November 11, 2030. The permitted operating maximum-day capacity of the plant (110,000,000 gallons per day) will not be affected by this relocation project. Construction must be supervised by a professional engineer registered in Florida and must comply with all applicable AWWA standards and FDEP rules regarding water system construction, testing, and disinfection.

The permittee must obtain system clearance from FDEP within 60 days of construction completion, including submission of the engineer's certification of construction completion, certified record drawings, two consecutive days of satisfactory bacteriological test results, and satisfactory pressure test documentation in accordance with AWWA standards. All products contacting potable water must conform to NSF International, AWWA standards, and FDA requirements. The permit includes provisions requiring the permittee to obtain all other necessary permits from other state, federal, and local agencies before commencing construction, including separate approval from the Water Management District or FDEP ERP Section if wetland areas are involved. The permittee must maintain records of all monitoring information and construction data for at least three years and allow authorized FDEP personnel access to the premises for inspection and sampling at reasonable times.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FLORIDA DEPARTMENT OF

Environmental Protection

Southwest District

13051 North Telecom Parkway #101 Temple Terrace, Florida 33637-0926

Ron DeSantis Governor

Jay Collins

Lt. Governor

Alexis A. Lambert Secretary

November 12, 2025

ELECTRONIC CORRESPONDENCE

In the matter of an Application for Permit by:

Charles Carden, DEP File No. 0030575-028-WC/M1 General Manager County: Pasco Tampa Bay Water Cypress Creek WTP 2575 Enterprise Road Clearwater, FL 33763 permitting@tampabaywater.org

NOTICE OF PERMIT ISSUANCE

Enclosed is Permit Number 0030575-028-WC/M1 to construct public water system component/effluent transmission water main, issued pursuant to Section 403.861(9), Florida Statutes.

This action is final and effective on the date filed with the Clerk of the Department unless a petition for an administrative hearing is timely filed under Sections 120.569 and 120.57, F.S., before the deadline for filing a petition. On the filing of a timely and sufficient petition, this action will not be final and effective until further order of the Department. Because the administrative hearing process is designed to formulate final agency action, the hearing process may result in a modification of the agency action or even denial of the application.

Petition for Administrative Hearing A person whose substantial interests are affected by the Department’s action may petition for an administrative proceeding (hearing) under Sections 120.569 and 120.57, F.S. Pursuant to Rules 28-106.201 and 28-106.301, F.A.C., a petition for an administrative hearing must contain the following information:

(a) The name and address of each agency affected and each agency’s file or identification number, if known;

(b) The name, address, any e-mail address, any facsimile number, and telephone number of the petitioner, if the petitioner is not represented by an attorney or a qualified representative; the name, address, and telephone number of the petitioner’s representative, if any, which shall be the address for service purposes during the course of the proceeding; and an explanation of how the petitioner’s substantial interests will be affected by the agency determination;

(c) A statement of when and how the petitioner received notice of the agency decision;

(d) A statement of all disputed issues of material fact. If there are none, the petition must so indicate;

(e) A concise statement of the ultimate facts alleged, including the specific facts that the petitioner contends warrant reversal or modification of the agency’s proposed action;

mailto:permitting@tampabaywater.org

Tampa Bay Water Cypress Creek WTP DEP File No. 0030575-028-WC/M1 Charles Carden, General Manager

(f) A statement of the specific rules or statutes that the petitioner contends require reversal or modification of the agency’s proposed action, including an explanation of how the alleged facts relate to the specific rules or statutes; and

(g) A statement of the relief sought by the petitioner, stating precisely the action that the petitioner wishes the agency to take with respect to the agency’s proposed action.

The petition must be filed (received by the Clerk) in the Office of General Counsel of the Department at 3900 Commonwealth Boulevard, Mail Station 35, Tallahassee, Florida 32399-3000, or via electronic correspondence at Agency_Clerk@FloridaDEP.gov. Also, a copy of the petition shall be mailed to the applicant at the address indicated above at the time of filing.

Time Period for Filing a Petition

In accordance with Rule 62-110.106(3), F.A.C., petitions for an administrative hearing by the applicant and persons entitled to written notice under Section 120.60(3), F.S., must be filed within 14 days of receipt of this written notice. Petitions filed by any persons other than the applicant, and other than those entitled to written notice under Section 120.60(3), F.S., must be filed within 14 days of publication of the notice or within 14 days of receipt of the written notice, whichever occurs first. You cannot justifiably rely on the finality of this decision unless notice of this decision and the right of substantially affected persons to challenge this decision has been duly published or otherwise provided to all persons substantially affected by the decision. While you are not required to publish notice of this action, you may elect to do so pursuant Rule 62-110.106(10)(a), F.A.C.

The failure to file a petition within the appropriate time period shall constitute a waiver of that person's right to request an administrative determination (hearing) under Sections 120.569 and 120.57, F.S., or to intervene in this proceeding and participate as a party to it. Any subsequent intervention (in a proceeding initiated by another party) will be only at the discretion of the presiding officer upon the filing of a motion in compliance with Rule 28-106.205, F.A.C. If you do not publish notice of this action, this waiver may not apply to persons who have not received a clear point of entry.

Extension of Time Under Rule 62-110.106(4), F.A.C., a person whose substantial interests are affected by the Department’s action may also request an extension of time to file a petition for an administrative hearing. The Department may, for good cause shown, grant the request for an extension of time. Requests for extension of time must be filed with the Office of General Counsel of the Department at 3900 Commonwealth Boulevard, Mail Station 35, Tallahassee, Florida 32399-3000, or via electronic correspondence at Agency_Clerk@dep.state.fl.us, before the deadline for filing a petition for an administrative hearing. A timely request for extension of time shall toll the running of the time period for filing a petition until the request is acted upon.

Mediation Mediation is not available in this proceeding.

Judicial Review Once this decision becomes final, any party to this action has the right to seek judicial review pursuant to Section 120.68, F.S., by filing a Notice of Appeal pursuant to Florida Rules of Appellate Procedure 9.110 and 9.190 with the Clerk of the Department in the Office of General Counsel (Station #35, 3900 Commonwealth Boulevard, Tallahassee, Florida 32399-3000) and by filing a copy of the Notice of Appeal http://web2.westlaw.com/find/default.wl?ordoc=I0C7293C0912311DB8F8F8100D79B57CF&rp=%2ffind%2fdefault.wl&DB=1000006&DocName=FLSTS120%2E569&FindType=L&AP=&rs=WLW9.08&ifm=NotSet&fn=_top&sv=Split&mt=Florida&utid=4&vr=2.0&pbc=38B33E51

Tampa Bay Water Cypress Creek WTP DEP File No. 0030575-028-WC/M1 Charles Carden, General Manager accompanied by the applicable filing fees with the appropriate district court of appeal. The notice must be filed within 30 days from the date this action is filed with the Clerk of the Department.

EXECUTION AND CLERKING

Executed in Hillsborough County, Florida.

STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION

for Shannon Herbon Program Administrator Permitting & Waste Cleanup Program Southwest District

Enclosures: Permit No. 0030575-028-WC/M1

Utilities Separation Requirements

FILING AND ACKNOWLEDGMENT

FILED, on this date, pursuant to Section 120.52, F. S., with the designated Department Clerk, receipt of which is hereby acknowledged.

November 12, 2025 Clerk Date

CERTIFICATE OF SERVICE

The undersigned duly designated deputy agency clerk hereby certifies that this Notice of Permit Issuance and all copies were mailed/electronically transmitted before the close of business on November 12, 2025, to those persons listed.

Copies Furnished to:

Nita Naik Sharma, P.E., Wade Trim, Inc, nsharma@wadetrim.com Andre Miller, Tampa Bay Water, amillers@tampabaywater.org James Brock, DEP SWD, james.brock@floridadep.gov Larisa Orekhova, DEP SWD, Larisa.Orekhova@floridadep.gov mailto:Ken.Herd@jacobs.com mailto:amillers@tampabaywater.org mailto:james.brock@floridadep.gov mailto:Larisa.Orekhova@floridadep.gov

ELECTRONIC CORRESPONDENCE

PERMITTEE: PWS ID NUMBER: 651-2230

Tampa Bay Water Cypress Creek WTP PERMIT NUMBER: 0030575-028-WC/M1 Charles Carden, General Manager DATE OF ISSUE: November 12, 2025 2575 Enterprise Road EXPIRATION DATE: November 11, 2030 Clearwater, FL 33763 COUNTY: Pasco permitting@tampabaywater.org PROJECT: Cross Bar Ranch Wellfield Water Transmission Main

This permit is issued under the provisions of Chapter 403, Florida Statutes (F.S.), and Florida Administrative Code (F.A.C.) Chapters 62-4, 62-550, 62-555 and 62-560. The above named permittee is hereby authorized to perform the work or operate the facility shown on the application and approved drawings, plans, and other documents attached hereto or on file with the Department and made a part hereof and specifically described as follows:

TO CONSTRUCT: A relocation of existing 60-inch diameter raw water transition main (TM) across State Road (SR) 52 for the Cypress Creek Water Treatment Plant.

PROPOSED CONSTRUCTION INCLUDES:

1. A relocation of approximately 500 linear feet of existing 60-inch diameter raw water transition main (TM).

The permitted operating maximum-day capacity of this plant, 110,000,000 gpd, will not be affected by this project.

IN ACCORDANCE WITH: preliminary design report, engineering drawings and related documents, prepared by Nita Naik Sharma, P.E., [Wade trim, Inc.].

LOCATION: The proposed pipeline is adjacent to existing Tampa Bay Water easement crossing SR 52, approximately 1.7 miles west of the intersection of SR 52 and Ehren Cutoff in Pasco County.

FLORIDA DEPARTMENT OF

Environmental Protection

13051 North Telecom Parkway #101 Temple Terrace, Florida 33637-0926

Ron DeSantis Governor

Jay Collins

Lt. Governor

Alexis A. Lambert Secretary mailto:permitting@tampabaywater.org

A. General Conditions

The permittee shall be aware of and operate under the Permit Conditions below. These applicable conditions are binding upon the permittee and enforceable pursuant to Chapter 403, Florida Statutes. [F.A.C. Rule 62-555.533(1)]

1. The terms, conditions, requirements, limitations and restrictions set forth in this permit, are "permit conditions" and are binding and enforceable pursuant to Sections 403.141, 403.727, or 403.859 through 403.861, F.S. The permittee is placed on notice that the Department will review this permit periodically and may initiate enforcement action for any violation of these conditions.

2. This permit is valid only for the specific processes and operations applied for and indicated in the approved drawings or exhibits. Any unauthorized deviation from the approved drawings, exhibits, specifications, or conditions of this permit may constitute grounds for revocation and enforcement action by the Department.

3. As provided in Subsections 403.087(6) and 403.722(5), F.S., the issuance of this permit does not convey any vested rights or any exclusive privileges. Neither does it authorize any injury to public or private property or any invasion of personal rights, nor any infringement of federal, state, or local laws or regulations. This permit is not a waiver of or approval of any other department permit that may be required for other aspects of the total project which are not addressed in this permit.

4. This permit conveys no title to land or water, does not constitute State recognition or acknowledgment of title, and does not constitute authority for the use of submerged lands unless herein provided and the necessary title or leasehold interests have been obtained from the State. Only the Trustees of the Internal Improvement Trust Fund may express State opinion as to title.

5. This permit does not relieve the permittee from liability for harm or injury to human health or welfare, animal, or plant life, or property caused by the construction or operation of this permitted source, or from penalties therefore;

nor does it allow the permittee to cause pollution in contravention of Florida Statutes and Department rules, unless specifically authorized by an order from the Department.

6. The permittee shall properly operate and maintain the facility and systems of treatment and control (and related appurtenances) that are installed and used by the permittee to achieve compliance with the conditions of this permit, as required by Department rules. This provision includes the operation of backup or auxiliary facilities or similar systems when necessary to achieve compliance with the conditions of the permit and when required by Department rules.

7. The permittee, by accepting this permit, specifically agrees to allow authorized Department personnel, upon presentation of credentials or other documents as may be required by law and at reasonable times (reasonable time may depend on the nature of the concern being investigated), access to the premises where the permitted activity is located or conducted to:

a. Have access to and copy any records that must be kept under conditions of the permit;

b. Inspect the facility, equipment, practices, or operations regulated or required under this permit; and

c. Sample or monitor any substances or parameters at any location reasonably necessary to assure compliance with this permit or Department rules.

8. If, for any reason, the permittee does not comply with or will be unable to comply with any condition or limitation specified in this permit, the permittee shall immediately provide the Department with the following information:

a. A description of and cause of noncompliance; and

b. The period of noncompliance, including dates and times; or, if not corrected, the anticipated time the noncompliance is expected to continue, and steps being taken to reduce, eliminate, and prevent recurrence of the noncompliance. The permittee shall be responsible for any and all damages which may result and may be subject to enforcement action by the Department for penalties or for revocation of this permit.

9. In accepting this permit, the permittee understands and agrees that all records, notes, monitoring data and other information relating to the construction or operation of this permitted source which are submitted to the Department may be used by the Department as evidence in any enforcement case involving the permitted source arising under the Florida Statutes or Department rules, except where such use is prescribed by Sections 403.111 and 403.73, F.S. Such evidence shall only be used to the extent it is consistent with the Florida Rules of Civil Procedure and appropriate evidentiary rules.

10. The permittee agrees to comply with changes in Department rules and Florida Statutes after a reasonable time for compliance; provided, however, the permittee does not waive any other rights granted by Florida Statutes or Department rules. A reasonable time for compliance with a new or amended surface water quality standard, other than those standards addressed in Rule 62-302.500, shall include a reasonable time to obtain or be denied a mixing zone for the new or amended standard.

11. This permit is transferable only upon Department approval in accordance with Rule 62- 4.120 and 62-730.300, F.A.C., as applicable. The permittee shall be liable for any non-compliance of the permitted activity until the transfer is approved by the Department.

12. This permit or a copy thereof shall be kept at the work site of the permitted activity.

13. This permit also constitutes:

a. Determination of Best Available Control Technology (BACT)

b. Determination of Prevention of Significant Deterioration (PSD)

c. Certification of compliance with State Water Quality Standards (Section 401, PL 92-500)

d. Compliance with New Source Performance Standards

14. The permittee shall comply with the following:

a. Upon request, the permittee shall furnish all records and plans required under Department rules. During enforcement actions, the retention period for all records will be extended automatically unless otherwise stipulated by the Department.

b. The permittee shall hold at the facility or other location designated by this permit records of all monitoring information (including all calibration and maintenance records and all original strip chart recordings for continuous monitoring instrumentation) required by the permit, copies of all reports required by this permit, and records of all data used to complete the application for this permit. These materials shall be retained at least three years from the date of the sample, measurement, report, or application unless otherwise specified by Department rule.

c. Records of monitoring information shall include:

i. the date, exact place, and time of sampling or measurements;

ii. the person responsible for performing the sampling or measurements;

iii. the dates analyses were performed;

iv. the person responsible for performing the analyses;

v. the analytical techniques or methods used;

vi. the results of such analyses.

15. When requested by the Department, the permittee shall within a reasonable time furnish any information required by law which is needed to determine compliance with the permit. If the permittee becomes aware the relevant facts were not submitted or were incorrect in the permit application or in any report to the Department, such facts or information shall be corrected promptly.

B. Regulatory Section

1. All construction must be in accordance with this permit. Before commencing work on project changes for which a construction permit modification is required per 62-555.536(1), the permittee shall submit to the Department a written request for a permit modification. Each such request shall be accompanied by one copy of a revised construction permit application, the proper processing fee and one copy of either a revised preliminary design report or revised drawings, specifications and design data. [F.A.C. Rule 62-555.536].

2. Permitted construction or alteration of public water supply systems must be supervised during construction by a professional engineer registered in the State of Florida if the project was designed under the responsible charge of a professional engineer licensed in the State of Florida. The permittee must retain the service of a professional engineer registered in the State of Florida to observe that construction of the project is in accordance with the engineering plans and specifications as submitted in support of the application for this permit. [F.A.C. Rule 62-555.520(3)].

3. If prehistoric or historic artifacts, such as pottery or ceramics, stone tools or metal implements, dugout canoe remains, or any other physical remains that could be associated with Native American cultures, or early colonial or American settlement are encountered at any time within the project site area, the permitted project should cease all activities involving subsurface disturbance in the immediate vicinity of such discoveries.

The permittee, or other designee, should contact the Florida Department of State, Division of Historical Resources, Compliance and Review Section at 850.245.6333 or 800.847.7278, as well as the appropriate permitting agency office. Project activities should not resume without verbal and/or written authorization from the Division of Historical Resources and the permitting agency. In the event that unmarked human remains are encountered during permitted activities, all work shall stop immediately and the proper authorities notified in accordance with Section 872.05, Florida Statutes.

4. If delays will cause project completion to extend beyond the expiration date of this permit, the permittee shall submit to the Department a request to extend the expiration date of this permit including the appropriate processing fee. This request shall specify the reasons for the delay and shall be submitted to the Department for approval prior to the expiration date of this permit. Note that no specific construction permit shall be extended so as to remain in effect longer than five years. [F.A.C. Rule 62-555.536(4)]. {OPTIONAL}

5. In accordance with General Condition #11 of this permit, this permit is transferable only upon Department approval. Persons proposing to transfer this permit must apply jointly for a transfer of the permit within 30 days after the sale or legal transfer of ownership of the permitted project that has not been cleared for service by the Department using form, 62-555.900(8), Application for Transfer of a PWS Construction Permit along with the appropriate fee. [F.A.C. Rule 62-555.536(5)]

6. This permit satisfies Drinking Water permitting requirements only and does not authorize construction or operation of this new transmission main (TM) prior to obtaining all other necessary permits from other program areas within the Department, or required permits from other state, federal, or local agencies.

7. If gasoline contamination is found at the construction site, work shall be stopped and the proper authorities notified. With the approval of the Department, ductile iron pipe and fittings, and solvent resistant gaskets materials shall be used in the contaminated area. The ductile pipe shall be used in the contaminated area. The ductile iron pipe shall extend 100 feet beyond any solvent noted. Any contaminated soil that is excavated shall be placed on an impermeable mat, covered with waterproof covering, and held for disposal. If the site cannot be properly cleaned, then consultation with the Department is necessary prior to continuing with the project construction.

8. This permit does not constitute approval of construction on jurisdictional wetland areas; therefore such approval must be obtained separately from the Water Management District or from DEP ERP Section, as applicable, Permittee shall provide a copy of the permit approval to the Department if water main installation involves activities on wetlands.

C. Construction Standards

1. All products, including paints, which shall come into contact with potable water, either directly or indirectly, shall conform with National Sanitation Foundation (NSF) International, Water Chemicals Codex, Food Chemicals Codex, American Water Works Association (AWWA) Standards and the Food and Drug Administration, as provided in Rule 62-555.320(3), F.A.C.

2. Water supply facilities, including mains, pipe, fittings, valves, fire hydrants and other materials shall be installed in accordance with the latest applicable AWWA Standards and Department rules and regulations.

The system shall be pressure and leak tested in accordance with AWWA Standard C600 C603, or C605, as applicable, and disinfected in accordance with AWWA Standard C651-653, as well as in accordance with Rule 62-555.340, F.A.C.

3. The installation or repairs of any public water system, or any plumbing in residential or nonresidential facilities providing water for human consumption, which is connected to a public water system shall be lead free in accordance with Rule 62-555.322, F.A.C.

4. When any existing asbestos cement (AC) pipes are replaced under this permit, the permittee shall do so in accordance with the applicable rules of Federal Asbestos Regulation and Florida DEP requirements. For specific requirements applicable to AC pipes, the permittee should contact the Air and Waste Management section managers prior to commencing any such activities at 813.470.5700. Please be aware that a notification is required to be submitted to the Department for a regulated project.

5. Permittee shall ensure that there shall be no cross-connection with any non-potable water source in accordance with Rule 62-555.360, F.A.C.

6. The new or altered aboveground piping at the drinking water treatment plant shall be color coded and labeled as recommended in Section 2.14 of “Recommended Standards for Water Works, 1997 Edition”. [F.A.C. Rule 62-555.320(10)]

7. Permittee shall ensure that there shall be no cross-connection with any non-potable water source in accordance with Rule 62-555.360, F.A.C.

D. Operational Requirements

1. The current operational requirements for this water treatment plant are not changed by the project.

2. The supplier of water shall operate and maintain the public water system so as to comply with applicable standards in F.A.C. Rule 62-550 and 62-555.350.

2. The permittee shall have complete record drawings produced for the project in accordance with Rule 62- 555.530(4), F.A.C.

E. Monitoring Provisions

1. The current monitoring requirements for this water treatment plant are not changed by the project.

2. Permittee shall follow the guidelines of Chapters 62-550, 62-555, and 62-560, F.A.C., regarding public drinking water system standards, monitoring, reporting, permitting, construction, and operation.

F. Clearance Requirements

1. The permittee must instruct the engineer of record to request system clearance from the Department within sixty (60) days of completion of construction, testing and disinfecting the system. Bacteriological test results shall be considered unacceptable if the test were completed more than 60 days before the Department received the results. [F.A.C. Rule 62-555.340(2)(c)]

Permitted construction or alteration of a public water system may not be placed into service until a letter of clearance has been issued by this Department. [F.A.C. Rule 62-555.345]

2. Prior to placing this project into service, Permittee shall submit, at a minimum, all of the following to the Department for evaluation and approval for operation, as provided in Rules 62-555.340 and 62-555.345, F.A.C.:

a. the engineer’s Certification of Construction Completion and Request for Clearance to Place Permitted

PWS Components Into Operation {DEP Form 62-555.900(9)};

b. certified record drawings, if there are any changes noted for the permitted project.

c. two consecutive days of satisfactory bacteriological analytical results (see paragraph 3 below).

d. copy of a satisfactory pressure test of the process piping performed in accordance with AWWA Standards.

[F.A.C. Rule 62-555.320(21)(a)(1)]

3. The new facilities shall be cleaned, disinfected, and bacteriologically cleared in accordance with Chapter 62- 555, F.A.C. The bacteriological clearance data representative of the storage tank (two samples on consecutive days), the well discharge piping and water main (in accordance with the instructions for Bacteriological Sampling Locations shown below) and the untreated well water (two samples per day for 5 consecutive days collected at least six hours apart for each of the two wells) shall be submitted to the Department with the engineer's certification of construction completion. [Section 62-555.340 and 62- 555.315(6)(b), F.A.C.]

Bacteriological Sampling Locations: Copies of satisfactory bacteriological analyses taken from locations within the distribution system or water main extension to be cleared, in accordance with Rules 62-555.315 (6), 62-555.340 and 62-555.330, F.A.C. and American Water Works Association (AWWA) Standard C 651-92 as follows:

• The endpoint of the proposed addition;

• Any water lines branching off a main extension;

• Every 1,200 feet of water main;

• Each location shall be sampled on two separate days (at least 6 hours apart) with sample point locations and chlorine residual readings clearly indicated on the report and/or drawings.

• Bacteriological sample results will be considered unacceptable if the tests were completed more than 60 days before the Department receives the results.

In order to facilitate the issuance of a letter of clearance, the Department requests that all of the above information be submitted as one package.

Executed in Hillsborough County, Florida

STATE OF FLORIDA DEPARTMENT

OF ENVIRONMENTAL PROTECTION

for Shannon Herbon

Program Administrator Permitting & Waste Cleanup Program