7-I. CBI Form 3.pdf

PDF 294 KB Posted

Attached to
Flooring and Wallcovering Services
Solicitation number
269-2026-195
Issued by
Mecklenburg County, Charlotte City, North Carolina

About this file

This is a Subcontractor/Supplier Utilization Commitment form (CBI Form 3) required by the City of Charlotte, North Carolina for the Flooring and Wallcovering Services contract (Project 269.2026.195). The form must be submitted at the time of proposal opening and captures information regarding Minority/Women/Small Business Enterprises (M/W/SBEs) and other subcontractors and suppliers that proposers intend to utilize on the contract across all tiers. The contract encompasses as-needed systemwide flooring and wall covering services, including vinyl flooring, tile, carpet, rubber and linoleum, wood products, wallpaper, and related materials for facilities owned or operated by the City. Related services include installation, removal and reclamation, and recycling as requested. The City maintains over 180 buildings and 4.4 million square feet of office space, and selected vendors are expected to have adequate capacity to provide all-inclusive services as needed.

Proposers must list all M/W/SBEs intended for use on the contract, with only those currently certified with the City as of the proposal opening date receiving credit toward the contract goal. Within three business days of receiving a request from the City, proposers must submit a separate Letter of Intent (CBI Form 4) executed by both the M/W/SBE and the proposer for each listed subcontractor or supplier. Proposers must maintain the level of M/W/SBE participation stated in the contract throughout its duration and comply with specific procedures if terminating, replacing, or adding M/W/SBEs. All subcontractors and suppliers, regardless of certification status, must be registered with the City of Charlotte's vendor database. Failure to properly complete and submit CBI Form 3 with the proposal constitutes grounds for proposal rejection. The signature of an authorized official certifies compliance with all provisions of the CBI Policy and Administrative Procedures Manual.

View the file

Other files

File Type Posted
4-E. References Form.pdf PDF
5-A. Bonfire Guide.pdf PDF
8-H. Anti Lobby Cert.pdf PDF
1-J. Contract Exceptions.pdf PDF
2-G. Debarment Cert.pdf PDF
6-C. Sample Contract.pdf PDF
9-F. Pricing Information.xlsx XLSX spreadsheet
3-D. Proposal Submission Form.pdf PDF
10-B. 269.2026.195, RFP.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Version 06-2023

Project 269.2026.195 CBI FORM 3: Subcontractor / Supplier Utilization Commitment

This form MUST be submitted at the time of Proposal Opening. Copy this CBI Form 3 as needed.

Failure to properly complete and submit Form 3 with the Proposal constitutes grounds for rejection of the Proposal.

Per Section 3.5 of the CBI Administrative Procedures Manual, the Subcontractor/Supplier Utilization Commitment (CBI Form 3), captures information regarding the MWSBEs and other subcontractors and suppliers that the Proposer intends to use on the Contract FOR ALL TIERS.

M/W/SBEs must satisfy the requirements of Section 2 of the CBI Administrative Procedures Manual in order to count the work they intend to perform on the contract with its own current workforces towards the Contract Goal, and must list themselves below.

Proposer Name:

Project Name:

MWBE Goal: MBE Goal:

MSBE Goal: WBE Goal:

MWSBE Goal: SBE Goal:

List below all M/W/SBEs that you intend to use on this Contract. NOTE: You will only receive credit for M/W/SBEs that are currently certified with the City as of the Proposal Opening Date.

M/W/SBE Vendor Name

(Non-Hauling Services) Description of work / materials NIGP Code

CBI FORM 3: Subcontractor / Supplier Utilization Commitment

List below all non-M/W/SBEs (subcontractors and suppliers) that you intend to use on this Contract

Vendor Name Description of work / materials NIGP Commodity Code

Version 06-2023

Letters of Intent submitted upon notice from the City

Per Section 3.5 of the CBI Administrative Procedures Manual, within three (3) Business Days after receiving a request from the City

(or within such longer time as may be communicated by the City in writing), Proposers must submit a separate Letter of Intent (CBI

Form 4) for each M/W/SBE listed on CBI Form 3. Each Letter of Intent must be executed by both the M/W/SBE and the

Proposer. The City shall not count proposed M/W/SBE utilization for which it has not received a Letter of Intent by this deadline. The

Proposer is still obligated to pay the M/W/SBE the full amount listed on the Contract with the M/W/SBE regardless of what percentage is actually counted towards the M/W/SBE Goal.

Adding subcontractors or suppliers after submitting this form

Nothing in this certification shall be deemed to preclude you from entering into subcontracting arrangements after submission of this form. However, per the CBI Administrative Procedures Manual, you must comply with the following:

• You must maintain the level of M/W/SBE participation stated in the Contract throughout the duration of the Contract, except as specifically allowed in Section 5

• If you need to terminate or replace a M/W/SBE, you must comply with Section 5.3

• If the scope of work on the Contract increases, or if you elect to subcontract any portion of work not identified on this form as being subcontracted, then you must comply with Section 5.4

• A Letter of Intent (CBI Form 4) must also be submitted for each M/W/SBE you add subsequent to contract award.

All Subcontractors and Suppliers must be registered with the City of Charlotte.

Pursuant to the City’s Vendor Registration Policy, each subcontractor or supplier (non-MBE/SBE, WBEs, SBEs and MBEs) that you use on this contract must be registered in the City’s vendor database.

Signature

Your signature below indicates that the undersigned firm certifies and agrees that:

(a) It has complied with all provisions of the CBI Policy and Administrative Procedures Manual; and,

(b) Failure to properly document such compliance in the manner and within the time periods established by the CBI Policy and

Administrative Procedures Manual shall constitute grounds for rejection of your proposal.

Signature of Authorized Official Printed Name Title Submittal Date

File details come from the government source that posted it. Updated .