7-FCE130309 Bid Tabulation.xls
XLS spreadsheet 27 KB Posted
- Solicitation number
- FCE130309 4610 Wasatch Hollow Outfall Redesign - CONST
- Issued by
- Salt Lake County, Salt Lake City, Utah
About this file
This is a bid tabulation document for Salt Lake County, Utah, for project FCE130309, the 4610 Wasatch Hollow Outfall Redesign, a general contracting project involving modifications to the Wood Hollow detention pond outlet structure located at 1499 S 1700 E, Salt Lake City, UT 84105. The scope of work includes modifying the existing outlet and overflow structure, installing a new overflow and outlet storm drain pipe routed through the park and connected to the existing system in 1700 S, and making improvements to internal outlet structure components including new gates and linkage. The bid tabulation was prepared by buyer Aaron Stone and revised on September 23, 2026.
Six contractors submitted bids for the project, with pricing structured as a base bid and an alternate. Evans Grading and Paving submitted the lowest total bid of $798,809.64, comprising a base bid of $708,794.64 and an alternate bid of $90,015.00. The remaining bids ranged from $1,002,985.68 (Jordan Valley Construction) to $1,260,261.00 (Vancon). The bid tabulation does not indicate the award determination, contract term, funding source, or other contractual details such as performance requirements or timeline specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4-ProjectManual.pdf | ||
| 5-Drawings.pdf | ||
| 3-00-43-13.pdf | ||
| 2-00-43-00.pdf | ||
| 1-00-41-00.pdf | ||
| 6-Addendum 1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SALT LAKE COUNTY | |||
| 2001 SO STATE ST - SLC - UT - 84115 | |||
| AGENCY BID TABULATION | |||
| Buyer: Aaron Stone | |||
| Revised 9/23/2026 | |||
| Description: FCE130309 4610 Wasatch Hollow Outfall Redesign | |||
| Vendor | Base Bid | Alternate 1 | Total |
| Evans Grading and Paving | $ 708,794.64 | $ 90,015.00 | $ 798,809.64 |
| Jordan Valley Construction | $ 773,813.52 | $ 229,172.16 | $ 1,002,985.68 |
| Spade Excavating | $ 908,047.98 | $ 267,205.02 | $ 1,175,253.00 |
| Cal Wadsworth | $ 999,440.94 | $ 78,140.04 | $ 1,077,580.98 |
| Lightning Ridge Excavation | $ 1,015,360.00 | $ 202,000.00 | $ 1,217,360.00 |
| Vancon | $ 1,120,261.00 | $ 140,000.00 | $ 1,260,261.00 |
Sheet2
Sheet3