This is a construction document set comprising mechanical plans and specifications for Salt Lake County's HVAC upgrade project at the Christmas Box House youth services facility located at 3660 S. West Temple, Salt Lake City, Utah. The project involves the replacement of four rooftop HVAC units (RTUs) with new Trane variable air volume units equipped with variable speed supply fans, variable speed compressors, VAV controls, BACnet interface, powered exhaust, powered convenience outlets, and smoke detectors. RTU-1 and RTU-2 are Trane YZK150A3SBH models with 4,400 CFM and 4,300 CFM airflow respectively, while RTU-3 and RTU-4 are Trane YZK240A3SOM models with 6,600 CFM and 6,000 CFM airflow respectively. RTU-1 serves 10 VAV boxes, RTU-2 serves 13 VAV boxes, RTU-3 serves 12 VAV boxes, and RTU-4 serves 13 VAV boxes. The work includes removal of existing rooftop units, installation of new equipment with updated controls integration to an existing Alerton VLC-853 controller, gas pressure regulators for each unit rated at 230 CFH with 2 inlet PSI and 7-11 outlet inches water gauge, and comprehensive building automation system controls with alarm mapping and sequence of operations logic.
The scope of work requires a controls subcontractor approved by Salt Lake County to handle BACnet integration and programming updates. General installation requirements include rooftop unit demolition coordination with crane placement, utility preparation for reconnection, replacement or repair of roof curbs with compliance to roof manufacturer warranty requirements, gas pipe replacement with Schedule 40 black steel pipe and threaded joints, pressure testing of new gas sections at 3 PSI, factory startup services, owner staff training, seismic restraint design and installation, test and balance services, temporary heating and cooling maintenance between 65-76°F for offices and 68-76°F for living spaces during construction, and a one-year warranty on all labor and materials. The contractor must provide complete system startup, repair any project-induced building damage, remove all debris, and coordinate with a roofing contractor for membrane work and warranty compliance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHUTOFF VALVE, TYP.
REPLACE GAS PIPE TO ROOF PENETRATION.
SEE 2/MH001
PIPE CONDENSATE DOWN TO ROOF.
TERMINATE 2" ABOVE ROOF.
PROVIDE 2" TRAP.
PROVIDE FOAM GASKET AND
ANCHOR ROOFTOP UNIT TO CURB.
PROVIDE METAL ROOF CURB, TO EXTEND A MINIMUM OF 10"
ABOVE INSULATION. FLASH INTO EXISTING ROOFING.
ALL ROOF REPAIRS MUST MEET ROOF MANUFACTURER'S
WARRANTY REQUIREMENTS.
ROOFTOP UNIT
BACNET
MAP THE FOLLOWING POINTS FROM RTUS TO
CONTROL GRAPHIC PAGES:
RTU STATUS
RTU MODE
MIXED AIR TEMPERATURE
DISCHARGE AIR TEMPERATURE
COMPRESSOR STATUS
COMPRESSOR %
GAS HEAT %
ALARMS
RTU
EXISTING ALERTON VLC-853 CONTROLLER
UPDATE PROGRAMMING IN EXISTING CONTROLLER TO PROVIDE
THE FOLLOWING CONTROL POINTS TO EACH NEW RTU:
ENABLE/DISABLE UNIT
HEATING MODE / COOLING MODE
HEATING DISCHARGE AIR SETPOINT
COOLING DISCHARGE AIR SETPOINT
TO EXISTING VAV BOXES
RTU-1 HAS 10 VAV BOXES
RTU-2 HAS 13 VAV BOXES
RTU-3 HAS 12 VAV BOXES
RTU-4 HAS 13 VAV BOXES
ROOFTOP UNIT SEQUENCE OF OPERATIONS
A. ENABLE ROOFTOP UNITS TO RUN SUPPLY FANS CONTINUOUSLY. GENERATE
ALARM IF ROOFTOP UNIT STATUS DOES NOT MATCH COMMAND. MODULATE
FAN SPEED TO MAINTAIN DISCHARGE AIR PRESSURE AT SETPOINT.
B. POLL VAV BOXES CONNECTED TO EACH ROOFTOP UNIT. IF MAJORITY OF VAV
BOXES NEED HEATING, ENABLE HEATING MODE ON ROOFTOP UNIT. IF
MAJORITY OF VAV BOXES NEED COOLING, ENABLE COOLING MODE OF
ROOFTOP UNIT. IF VAV BOXES ARE SATISFIED OR SPLIT EVENLY BETWEEN
HEATING AND COOLING, ROOFTOP UNIT IN DEADBAND MODE SHALL PROVIDE
DISCHARGE AIR BETWEEN 68-72F.
C. IF IN HEATING MODE, RESET DISCHARGE AIR TEMPERATURE SETPOINT
FROM 72F TO 100F BASED ON AVERAGE HEATING DEMAND FROM
CONNECTED VAV BOXES.
D. IF IN COOLING MODE, RESET DISCHARGE AIR TEMPERATURE SETPOINT
FROM 70F TO 55F BASED ON AVERAGE COOLING DEMAND FROM
CONNECTED VAV BOXES.
E. MAP ALARM POINTS TO BUILDING AUTOMATION SYSTEM GRAPHICS PAGES.
F. SET MINIMUM AIRFLOWS ON VAV BOXES TO MAINTAIN MINIMUM AIRFLOWS
REQUIRED BY ROOFTOP UNITS.
G. RESET ROOFTOP UNIT DISCHARGE AIR PRESSURE SETPOINT TO MAINTAIN
THE MAXIMUM VAV BOX DAMPER AT 95%.
PROVIDE 1/2" TEST TEE
MINIMUM 10
STRAIGHT PIPE DIAMETERS
APPLIANCE CONNECTION
6" DIRT LEG
PAINT ALL GAS PIPE EXPOSED TO
WEATHER WITH GRAY EPOXY PAINT.
ALL PIPE, FITTINGS, ETC. DOWNSTREAM OF SHUT OFF VALVE SHALL BE NEW.
PROVIDE NEW SHUTOFF VALVE
CLOSE TO ROOF PENETRATION. IF
THERE IS AN EXISTING VALVE IN THIS
LOCATION, IT CAN REMAIN IF VERIFIED
TO BE IN GOOD WORKING ORDER.
SHEET NO:
SHEET TITLE:
DATEISSUES
PROJECT NO.:
DATE:
SCALE:
KEYPLAN
REVISION LIST# DATE
1/8" = 1'-0"
/1
/2
: 0 :1
P
M
SHEET INDEX, GENERAL
NOTES, ABBREVIATIONS,
DETAILS AND
SCHEDULES
MH001
3/17/2025
THE CHRISTMAS
BOX HOUSE
3660 S. WEST TEMPLE
SALT LAKE CITY, UTAH
ABBREVIATIONS
AH AIR HANDLER
AS AIR SEPARATOR
BHP BRAKE HORSE POWER
CFM CUBIC FEET PER MINUTE
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CV CONTROL VALVE
ET EXPANSION TANK
FT FEET
GAL GALLONS
GPM GALLONS PER MINUTE
HP HORSEPOWER
IN INCHES
P PUMP
PPG PROPYLENE GLYCOL
PSI POUNDS PER SQUARE INCH
RPM REVOLUTIONS PER MINUTE
VOLT/PH VOLTAGE / PHASE
W.G. WATER GAUGE
SHEET INDEX
# SHEET NAME
MH001 SHEET INDEX, GENERAL NOTES, ABBREVIATIONS, DETAILS AND SCHEDULES
MD101 ROOF MECHANICAL DEMOLITION PLAN
MH101 ROOF MECHANICAL REMODEL PLAN
SCALE: NONE
ROOFTOP UNIT INSTALLATION DETAIL
M. PRESSURE TEST NEW SECTIONS OF GAS PIPE AT 3 PSI FOR 15 MINUTES. PROVIDE WRITTEN RECORDS OF PRESSURE TEST AS WELL AS INVITING OWNER TO WITNESS TEST. PROVIDE RECORDS OF INLET AND OUTLET PRESSURES OF GAS PRESSURE REGULATORS.
L. STAGE WORK AND PROVIDE TEMPORARY HEATING/COOLING AS REQUIRED TO MAINTAIN INDOOR SPACES BETWEEN 65-76 FOR OFFICES AND
68-76 FOR LIVING SPACES DURING THE DURATION OF THE PROJECT.
K. A CONTROLS SUBCONTRACTOR WILL BE REQUIRED FOR THIS PROJECT TO PERFORM THE SCOPE OF WORK SHOWN AND MUST BE ONE OF THE
VENDORS APPROVED BY SALT LAKE COUNTY.
J. PROVIDE TEST AND BALANCE SERVICES TO VERIFY AIRFLOWS OF ROOFTOP UNITS ARE CORRECT.
I. REMOVE ALL DEBRIS AT THE COMPLETION OF PROJECT AND REPAIR ANY DAMAGE CAUSED TO THE BUILDING AS A RESULT OF WORK ON THIS
PROJECT.
H. SEAL ALL NEW DUCT JOINTS.
G. PROVIDE SEISMIC RESTRAINTS ON NEW EQUIPMENT. DESIGN OF SEISMIC RESTRAINTS WILL BE PROVIDED AS A DEFERRED SUBMITTAL.
F. CONNECT TO EXISTING THERMOSTATS.
E. PROVIDE 1" FIBERGLASS DUCT LINER IN SUPPLY DUCT TRANSITIONS AND IN RETURN DUCT ELBOWS.
D. PROVIDE SCHEDULE 40 BLACK STEEL CONFORMING TO ASTM A53 WITH THREADED JOINTS FOR GAS PIPING.
C. PROVIDE FACTORY STARTUP SERVICES ON ALL EQUIPMENT. TRAIN OWNER'S MAINTENANCE STAFF ON THE OPERATION AND MAINTENANCE
ONCE SYSTEM ARE STARTED.
B. PROVIDE A ONE YEAR WARRANTY ON ALL LABOR AND MATERIAL PROVIDED FOR THIS PROJECT.
A. PROVIDE A COMPLETE OPERATING SYSTEM ON COMPLETION OF THIS PROJECT. INSTALL EQUIPMENT PER THE MANUFACTURER'S REQUIREMENTS AND THE REQUIREMENTS OF THESE DOCUMENTS. SCOPE OF WORK REQUIRED TO MEET THE INSTALLATION REQUIREMENTS ARE TO BE PART OF THE WORK OF THIS CONTRACT WHETHER OR NOT THEY ARE SPECIFCALLY SHOWN ON THESE CONTRACT DOCUMENTS.
GENERAL NOTES
NO SCALE
SCALE: NONE
RTU CONTROL SCHEMATIC
SCALE: NONE
GAS PRESSURE REGULATOR PIPING DETAIL
PROVIDE WITH VARIABLE SPEED SUPPLY FAN, VARIABLE SPEED COMPRESSORS, VAV CONTROLS, BACNET INTERFACE, POWERED EXHAUST, POWERED CONVENIENCE OUTLET, SMOKE DETECTOR
RTU-4 6000 20 11.6 VARIABLE AIR VOLUME 1 80/65 54.2/52.1 147.2 218 95 212 60 98 MODULATING 10:1 208/3 114 150 3,000 123 X 87 X 66 TRANE YZK240A3SOM
RTU-3 6600 20 11.6 VARIABLE AIR VOLUME 1 80/65 55.4/53.2 154.1 221.4 95 212 60 95 MODULATING 10:1 208/3 114 150 3,000 123 X 87 X 66 TRANE YZK240A3SOM
RTU-2 4,300 12.5 13.6 VARIABLE AIR VOLUME 0.75 80/65 55.1/53.7 101.6 139.2 95 166 60 100 MODULATING 10:1 208/3 81 110 2,900 123 X 87 X 66 TRANE YZK150A3SBH
RTU-1 4,400 12.5 13.6 VARIABLE AIR VOLUME 0.75 80/65 55.4/53.9 101.6 139.2 95 166 60 100 MODULATING 10:1 208/3 81 110 2,900 123 X 87 X 66 TRANE YZK150A3SBH
ENTERING AIR
TEMPERATURE (DB/WB)
LEAVING UNIT AIR
TEMPERATURE (DB/WB)
NET SENSIBLE COOLING
CAPACITY (MBH)
TOTAL COOLING
CAPACITY (MBH)
AMBIENT
TEMPERATURE (F)
OUTPUT
CAPACITY (MBH)
ENTERING AIR
TEMPERATURE (DB)
LEAVING AIR
TEMPERATURE (DB)
STAGES VOLT/PH MCA MOP
PLAN
CODE
AIRFLOW
(CFM)
NOMINAL COOLING
CAPACITY (TONS)
EER @AHRI AIRFLOW CONTROL
EXTERNAL STATIC
PRESSURE (IN W.G.)
COOLING HEATING ELECTRICAL
WEIGHT
(LB)
LENGTH X WIDTH X
HEIGHT (IN.)
MANUFACTURER & MODEL NUMBER
ROOFTOP UNIT (RTU)
NOTES: 1. PROVIDE REGULATOR RATED FOR EXTERIOR INSTALLATION
REG-4 RTU-4 230 2 7-11 1
REG-3 RTU-3 230 2 7-11 1
REG-2 RTU-2 230 2 7-11 1
REG-1 RTU-1 230 2 7-11 1
PLAN
CODE
EQUIPMENT
SERVED
PEAK FLOW
RATE (CFH)
INLET PRESSURE
(PSIG)
OUTLET PRESSURE
(IN. WG)
NOTES
PRESSURE REGULATOR (REG)
05/20/25
CONSTRUCTION DOCUMENTS 05/20/2025
A
A2
A2
B
B
D2
D2
E
E
F
F
G4
G4
H6
H6
J
J
D
D
C
C
G
G
H
H
I
I
6.9
7.3
5.8
RA
RA
RB
RB
RD
RD
RE
RE
RG
RF
RH
RJ
RM
R2
R3
R4
R5
R6
R6
R7
R8
RTU(E)RTU(E)
RTU(E)
RTU(E)
SHEET NO:
SHEET TITLE:
DATEISSUES
PROJECT NO.:
DATE:
SCALE:
KEYPLAN
REVISION LIST# DATE
1/8" = 1'-0"
/1
/2
: 0 :1
P
M
ROOF MECHANICAL
DEMOLITION PLAN
MD101
3/17/2025
THE CHRISTMAS
BOX HOUSE
3660 S. WEST TEMPLE
SALT LAKE CITY, UTAH
KEYED NOTES
0' 4' 8' 16'6'SCALE: 1/8" = 1'-0"
ROOF MECHANICAL DEMOLITION PLAN
GENERAL DEMOLITION NOTES
A. REMOVE ROOFTOP UNITS FROM ROOF. COORDINATE CRANE PLACEMENT WITH OWNER.
B. PREPARE ALL UTILITIES FOR RE-CONNECTION TO NEW UNITS.
A2
A2
B
B
D2
D2
E
E
F
F
G4
G4
H6
H6
J
J
D
D
C
C
G
G
H
H
I
I
6.9
7.3
5.8
RA
RA
RB
RB
RD
RD
RE
RE
RG
RF
RH
RJ
RM
R2
R3
R4
R5
R6
R6
R7
R8
RTU-3RTU-4
RTU-1
RTU-2
REG-2
3/4" GAS
REG-1
3/4" GAS
REG-43/4" GAS REG-33/4" GAS
SHEET NO:
SHEET TITLE:
DATEISSUES
PROJECT NO.:
DATE:
SCALE:
KEYPLAN
REVISION LIST# DATE
1/8" = 1'-0"
/1
/2
: 0 :2
P
M
ROOF MECHANICAL
REMODEL PLAN
MH101
3/17/2025
THE CHRISTMAS
BOX HOUSE
3660 S. WEST TEMPLE
SALT LAKE CITY, UTAH
KEYED NOTES
GENERAL INSTALLATION NOTES
A. REPLACE CURBS AND REPAIR ROOFING USING A ROOFING CONTRACTOR THAT CARRIES THE WARRANTY
FOR ROOFING SYSTEM.
B. CURB ADAPTERS ARE ACCEPTABLE IN LIEU OF REPLACING CURBS. IF CURB ADAPTERS ARE USED, EXTEND
ROOFING MEMBRANE UP TO NEW ROOFTOP UNIT CONNECTION.
C. RECONNECT GAS, POWER, DUCT, AND CONTROLS CONNECTIONS TO NEW ROOF TOP UNITS. PROVIDE
SEISMIC BRACING FROM ROOFTOP UNITS TO CURBS.
D. REPAIR ANY ROOF DAMAGE THAT OCCURS AS A RESULT OF THIS PROJECT.
E. REPLACE BREAKERS AS REQUIRED TO MEET MANUFACTURERS OVER CURRENT PROTECTION
REQUIREMENTS.
F. WIRE SMOKE DETECTORS TO FIRE ALARM SYSTEM. PROVIDE RELAYS TO INTERLOCK ROOF TOP UNIT
CONTROLS WITH FIRE ALARM TO SHUTDOWN UNITS IN THE EVENT OF A SMOKE EVENT.
0' 4' 8' 16'6'SCALE: 1/8" = 1'-0"
ROOF MECHANICAL REMODEL PLAN
| MH001 - SHEET INDEX, GENERAL NOTES, ABBREVIATIONS, DETAILS AND SCHEDULES |
| MD101 - ROOF MECHANICAL DEMOLITION PLAN |
| MH101 - ROOF MECHANICAL REMODEL PLAN |
File details come from the government source that posted it. Updated .