7--8- Plans- FAC134341 Youth Services CBH HVAC Upgrade.pdf

PDF 996 KB Posted

Attached to
SLCo FAC134341 Youth Services CBH HVAC Upgrade - CONST
Solicitation number
SLCo FAC134341 Youth Services CBH HVAC Upgrade - CONST
Issued by
Utah

About this file

This is a construction document set comprising mechanical plans and specifications for Salt Lake County's HVAC upgrade project at the Christmas Box House youth services facility located at 3660 S. West Temple, Salt Lake City, Utah. The project involves the replacement of four rooftop HVAC units (RTUs) with new Trane variable air volume units equipped with variable speed supply fans, variable speed compressors, VAV controls, BACnet interface, powered exhaust, powered convenience outlets, and smoke detectors. RTU-1 and RTU-2 are Trane YZK150A3SBH models with 4,400 CFM and 4,300 CFM airflow respectively, while RTU-3 and RTU-4 are Trane YZK240A3SOM models with 6,600 CFM and 6,000 CFM airflow respectively. RTU-1 serves 10 VAV boxes, RTU-2 serves 13 VAV boxes, RTU-3 serves 12 VAV boxes, and RTU-4 serves 13 VAV boxes. The work includes removal of existing rooftop units, installation of new equipment with updated controls integration to an existing Alerton VLC-853 controller, gas pressure regulators for each unit rated at 230 CFH with 2 inlet PSI and 7-11 outlet inches water gauge, and comprehensive building automation system controls with alarm mapping and sequence of operations logic.

The scope of work requires a controls subcontractor approved by Salt Lake County to handle BACnet integration and programming updates. General installation requirements include rooftop unit demolition coordination with crane placement, utility preparation for reconnection, replacement or repair of roof curbs with compliance to roof manufacturer warranty requirements, gas pipe replacement with Schedule 40 black steel pipe and threaded joints, pressure testing of new gas sections at 3 PSI, factory startup services, owner staff training, seismic restraint design and installation, test and balance services, temporary heating and cooling maintenance between 65-76°F for offices and 68-76°F for living spaces during construction, and a one-year warranty on all labor and materials. The contractor must provide complete system startup, repair any project-induced building damage, remove all debris, and coordinate with a roofing contractor for membrane work and warranty compliance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHUTOFF VALVE, TYP.

REPLACE GAS PIPE TO ROOF PENETRATION.

SEE 2/MH001

PIPE CONDENSATE DOWN TO ROOF.

TERMINATE 2" ABOVE ROOF.

PROVIDE 2" TRAP.

PROVIDE FOAM GASKET AND

ANCHOR ROOFTOP UNIT TO CURB.

PROVIDE METAL ROOF CURB, TO EXTEND A MINIMUM OF 10"

ABOVE INSULATION. FLASH INTO EXISTING ROOFING.

ALL ROOF REPAIRS MUST MEET ROOF MANUFACTURER'S

WARRANTY REQUIREMENTS.

ROOFTOP UNIT

BACNET

MAP THE FOLLOWING POINTS FROM RTUS TO

CONTROL GRAPHIC PAGES:

RTU STATUS

RTU MODE

MIXED AIR TEMPERATURE

DISCHARGE AIR TEMPERATURE

COMPRESSOR STATUS

COMPRESSOR %

GAS HEAT %

ALARMS

RTU

EXISTING ALERTON VLC-853 CONTROLLER

UPDATE PROGRAMMING IN EXISTING CONTROLLER TO PROVIDE

THE FOLLOWING CONTROL POINTS TO EACH NEW RTU:

ENABLE/DISABLE UNIT

HEATING MODE / COOLING MODE

HEATING DISCHARGE AIR SETPOINT

COOLING DISCHARGE AIR SETPOINT

TO EXISTING VAV BOXES

RTU-1 HAS 10 VAV BOXES

RTU-2 HAS 13 VAV BOXES

RTU-3 HAS 12 VAV BOXES

RTU-4 HAS 13 VAV BOXES

ROOFTOP UNIT SEQUENCE OF OPERATIONS

A. ENABLE ROOFTOP UNITS TO RUN SUPPLY FANS CONTINUOUSLY. GENERATE

ALARM IF ROOFTOP UNIT STATUS DOES NOT MATCH COMMAND. MODULATE

FAN SPEED TO MAINTAIN DISCHARGE AIR PRESSURE AT SETPOINT.

B. POLL VAV BOXES CONNECTED TO EACH ROOFTOP UNIT. IF MAJORITY OF VAV

BOXES NEED HEATING, ENABLE HEATING MODE ON ROOFTOP UNIT. IF

MAJORITY OF VAV BOXES NEED COOLING, ENABLE COOLING MODE OF

ROOFTOP UNIT. IF VAV BOXES ARE SATISFIED OR SPLIT EVENLY BETWEEN

HEATING AND COOLING, ROOFTOP UNIT IN DEADBAND MODE SHALL PROVIDE

DISCHARGE AIR BETWEEN 68-72F.

C. IF IN HEATING MODE, RESET DISCHARGE AIR TEMPERATURE SETPOINT

FROM 72F TO 100F BASED ON AVERAGE HEATING DEMAND FROM

CONNECTED VAV BOXES.

D. IF IN COOLING MODE, RESET DISCHARGE AIR TEMPERATURE SETPOINT

FROM 70F TO 55F BASED ON AVERAGE COOLING DEMAND FROM

CONNECTED VAV BOXES.

E. MAP ALARM POINTS TO BUILDING AUTOMATION SYSTEM GRAPHICS PAGES.

F. SET MINIMUM AIRFLOWS ON VAV BOXES TO MAINTAIN MINIMUM AIRFLOWS

REQUIRED BY ROOFTOP UNITS.

G. RESET ROOFTOP UNIT DISCHARGE AIR PRESSURE SETPOINT TO MAINTAIN

THE MAXIMUM VAV BOX DAMPER AT 95%.

PROVIDE 1/2" TEST TEE

MINIMUM 10

STRAIGHT PIPE DIAMETERS

APPLIANCE CONNECTION

6" DIRT LEG

PAINT ALL GAS PIPE EXPOSED TO

WEATHER WITH GRAY EPOXY PAINT.

ALL PIPE, FITTINGS, ETC. DOWNSTREAM OF SHUT OFF VALVE SHALL BE NEW.

PROVIDE NEW SHUTOFF VALVE

CLOSE TO ROOF PENETRATION. IF

THERE IS AN EXISTING VALVE IN THIS

LOCATION, IT CAN REMAIN IF VERIFIED

TO BE IN GOOD WORKING ORDER.

SHEET NO:

SHEET TITLE:

DATEISSUES

PROJECT NO.:

DATE:

SCALE:

KEYPLAN

REVISION LIST# DATE

1/8" = 1'-0"

/1

/2

: 0 :1

P

M

SHEET INDEX, GENERAL

NOTES, ABBREVIATIONS,

DETAILS AND

SCHEDULES

MH001

3/17/2025

THE CHRISTMAS

BOX HOUSE

3660 S. WEST TEMPLE

SALT LAKE CITY, UTAH

ABBREVIATIONS

AH AIR HANDLER

AS AIR SEPARATOR

BHP BRAKE HORSE POWER

CFM CUBIC FEET PER MINUTE

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CV CONTROL VALVE

ET EXPANSION TANK

FT FEET

GAL GALLONS

GPM GALLONS PER MINUTE

HP HORSEPOWER

IN INCHES

P PUMP

PPG PROPYLENE GLYCOL

PSI POUNDS PER SQUARE INCH

RPM REVOLUTIONS PER MINUTE

VOLT/PH VOLTAGE / PHASE

W.G. WATER GAUGE

SHEET INDEX

# SHEET NAME

MH001 SHEET INDEX, GENERAL NOTES, ABBREVIATIONS, DETAILS AND SCHEDULES

MD101 ROOF MECHANICAL DEMOLITION PLAN

MH101 ROOF MECHANICAL REMODEL PLAN

SCALE: NONE

ROOFTOP UNIT INSTALLATION DETAIL

M. PRESSURE TEST NEW SECTIONS OF GAS PIPE AT 3 PSI FOR 15 MINUTES. PROVIDE WRITTEN RECORDS OF PRESSURE TEST AS WELL AS INVITING OWNER TO WITNESS TEST. PROVIDE RECORDS OF INLET AND OUTLET PRESSURES OF GAS PRESSURE REGULATORS.

L. STAGE WORK AND PROVIDE TEMPORARY HEATING/COOLING AS REQUIRED TO MAINTAIN INDOOR SPACES BETWEEN 65-76 FOR OFFICES AND

68-76 FOR LIVING SPACES DURING THE DURATION OF THE PROJECT.

K. A CONTROLS SUBCONTRACTOR WILL BE REQUIRED FOR THIS PROJECT TO PERFORM THE SCOPE OF WORK SHOWN AND MUST BE ONE OF THE

VENDORS APPROVED BY SALT LAKE COUNTY.

J. PROVIDE TEST AND BALANCE SERVICES TO VERIFY AIRFLOWS OF ROOFTOP UNITS ARE CORRECT.

I. REMOVE ALL DEBRIS AT THE COMPLETION OF PROJECT AND REPAIR ANY DAMAGE CAUSED TO THE BUILDING AS A RESULT OF WORK ON THIS

PROJECT.

H. SEAL ALL NEW DUCT JOINTS.

G. PROVIDE SEISMIC RESTRAINTS ON NEW EQUIPMENT. DESIGN OF SEISMIC RESTRAINTS WILL BE PROVIDED AS A DEFERRED SUBMITTAL.

F. CONNECT TO EXISTING THERMOSTATS.

E. PROVIDE 1" FIBERGLASS DUCT LINER IN SUPPLY DUCT TRANSITIONS AND IN RETURN DUCT ELBOWS.

D. PROVIDE SCHEDULE 40 BLACK STEEL CONFORMING TO ASTM A53 WITH THREADED JOINTS FOR GAS PIPING.

C. PROVIDE FACTORY STARTUP SERVICES ON ALL EQUIPMENT. TRAIN OWNER'S MAINTENANCE STAFF ON THE OPERATION AND MAINTENANCE

ONCE SYSTEM ARE STARTED.

B. PROVIDE A ONE YEAR WARRANTY ON ALL LABOR AND MATERIAL PROVIDED FOR THIS PROJECT.

A. PROVIDE A COMPLETE OPERATING SYSTEM ON COMPLETION OF THIS PROJECT. INSTALL EQUIPMENT PER THE MANUFACTURER'S REQUIREMENTS AND THE REQUIREMENTS OF THESE DOCUMENTS. SCOPE OF WORK REQUIRED TO MEET THE INSTALLATION REQUIREMENTS ARE TO BE PART OF THE WORK OF THIS CONTRACT WHETHER OR NOT THEY ARE SPECIFCALLY SHOWN ON THESE CONTRACT DOCUMENTS.

GENERAL NOTES

NO SCALE

SCALE: NONE

RTU CONTROL SCHEMATIC

SCALE: NONE

GAS PRESSURE REGULATOR PIPING DETAIL

PROVIDE WITH VARIABLE SPEED SUPPLY FAN, VARIABLE SPEED COMPRESSORS, VAV CONTROLS, BACNET INTERFACE, POWERED EXHAUST, POWERED CONVENIENCE OUTLET, SMOKE DETECTOR

RTU-4 6000 20 11.6 VARIABLE AIR VOLUME 1 80/65 54.2/52.1 147.2 218 95 212 60 98 MODULATING 10:1 208/3 114 150 3,000 123 X 87 X 66 TRANE YZK240A3SOM

RTU-3 6600 20 11.6 VARIABLE AIR VOLUME 1 80/65 55.4/53.2 154.1 221.4 95 212 60 95 MODULATING 10:1 208/3 114 150 3,000 123 X 87 X 66 TRANE YZK240A3SOM

RTU-2 4,300 12.5 13.6 VARIABLE AIR VOLUME 0.75 80/65 55.1/53.7 101.6 139.2 95 166 60 100 MODULATING 10:1 208/3 81 110 2,900 123 X 87 X 66 TRANE YZK150A3SBH

RTU-1 4,400 12.5 13.6 VARIABLE AIR VOLUME 0.75 80/65 55.4/53.9 101.6 139.2 95 166 60 100 MODULATING 10:1 208/3 81 110 2,900 123 X 87 X 66 TRANE YZK150A3SBH

ENTERING AIR

TEMPERATURE (DB/WB)

LEAVING UNIT AIR

TEMPERATURE (DB/WB)

NET SENSIBLE COOLING

CAPACITY (MBH)

TOTAL COOLING

CAPACITY (MBH)

AMBIENT

TEMPERATURE (F)

OUTPUT

CAPACITY (MBH)

ENTERING AIR

TEMPERATURE (DB)

LEAVING AIR

TEMPERATURE (DB)

STAGES VOLT/PH MCA MOP

PLAN

CODE

AIRFLOW

(CFM)

NOMINAL COOLING

CAPACITY (TONS)

EER @AHRI AIRFLOW CONTROL

EXTERNAL STATIC

PRESSURE (IN W.G.)

COOLING HEATING ELECTRICAL

WEIGHT

(LB)

LENGTH X WIDTH X

HEIGHT (IN.)

MANUFACTURER & MODEL NUMBER

ROOFTOP UNIT (RTU)

NOTES: 1. PROVIDE REGULATOR RATED FOR EXTERIOR INSTALLATION

REG-4 RTU-4 230 2 7-11 1

REG-3 RTU-3 230 2 7-11 1

REG-2 RTU-2 230 2 7-11 1

REG-1 RTU-1 230 2 7-11 1

PLAN

CODE

EQUIPMENT

SERVED

PEAK FLOW

RATE (CFH)

INLET PRESSURE

(PSIG)

OUTLET PRESSURE

(IN. WG)

NOTES

PRESSURE REGULATOR (REG)

05/20/25

CONSTRUCTION DOCUMENTS 05/20/2025

A

A2

A2

B

B

D2

D2

E

E

F

F

G4

G4

H6

H6

J

J

D

D

C

C

G

G

H

H

I

I

6.9

7.3

5.8

RA

RA

RB

RB

RD

RD

RE

RE

RG

RF

RH

RJ

RM

R2

R3

R4

R5

R6

R6

R7

R8

RTU(E)RTU(E)

RTU(E)

RTU(E)

SHEET NO:

SHEET TITLE:

DATEISSUES

PROJECT NO.:

DATE:

SCALE:

KEYPLAN

REVISION LIST# DATE

1/8" = 1'-0"

/1

/2

: 0 :1

P

M

ROOF MECHANICAL

DEMOLITION PLAN

MD101

3/17/2025

THE CHRISTMAS

BOX HOUSE

3660 S. WEST TEMPLE

SALT LAKE CITY, UTAH

KEYED NOTES

0' 4' 8' 16'6'SCALE: 1/8" = 1'-0"

ROOF MECHANICAL DEMOLITION PLAN

GENERAL DEMOLITION NOTES

A. REMOVE ROOFTOP UNITS FROM ROOF. COORDINATE CRANE PLACEMENT WITH OWNER.

B. PREPARE ALL UTILITIES FOR RE-CONNECTION TO NEW UNITS.

A2

A2

B

B

D2

D2

E

E

F

F

G4

G4

H6

H6

J

J

D

D

C

C

G

G

H

H

I

I

6.9

7.3

5.8

RA

RA

RB

RB

RD

RD

RE

RE

RG

RF

RH

RJ

RM

R2

R3

R4

R5

R6

R6

R7

R8

RTU-3RTU-4

RTU-1

RTU-2

REG-2

3/4" GAS

REG-1

3/4" GAS

REG-43/4" GAS REG-33/4" GAS

SHEET NO:

SHEET TITLE:

DATEISSUES

PROJECT NO.:

DATE:

SCALE:

KEYPLAN

REVISION LIST# DATE

1/8" = 1'-0"

/1

/2

: 0 :2

P

M

ROOF MECHANICAL

REMODEL PLAN

MH101

3/17/2025

THE CHRISTMAS

BOX HOUSE

3660 S. WEST TEMPLE

SALT LAKE CITY, UTAH

KEYED NOTES

GENERAL INSTALLATION NOTES

A. REPLACE CURBS AND REPAIR ROOFING USING A ROOFING CONTRACTOR THAT CARRIES THE WARRANTY

FOR ROOFING SYSTEM.

B. CURB ADAPTERS ARE ACCEPTABLE IN LIEU OF REPLACING CURBS. IF CURB ADAPTERS ARE USED, EXTEND

ROOFING MEMBRANE UP TO NEW ROOFTOP UNIT CONNECTION.

C. RECONNECT GAS, POWER, DUCT, AND CONTROLS CONNECTIONS TO NEW ROOF TOP UNITS. PROVIDE

SEISMIC BRACING FROM ROOFTOP UNITS TO CURBS.

D. REPAIR ANY ROOF DAMAGE THAT OCCURS AS A RESULT OF THIS PROJECT.

E. REPLACE BREAKERS AS REQUIRED TO MEET MANUFACTURERS OVER CURRENT PROTECTION

REQUIREMENTS.

F. WIRE SMOKE DETECTORS TO FIRE ALARM SYSTEM. PROVIDE RELAYS TO INTERLOCK ROOF TOP UNIT

CONTROLS WITH FIRE ALARM TO SHUTDOWN UNITS IN THE EVENT OF A SMOKE EVENT.

0' 4' 8' 16'6'SCALE: 1/8" = 1'-0"

ROOF MECHANICAL REMODEL PLAN

MH001 - SHEET INDEX, GENERAL NOTES, ABBREVIATIONS, DETAILS AND SCHEDULES
MD101 - ROOF MECHANICAL DEMOLITION PLAN
MH101 - ROOF MECHANICAL REMODEL PLAN