1--3- 1.4 Section 2 Document 3.0 Schedule of Values.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- SLCo FAC134341 Youth Services CBH HVAC Upgrade - CONST
- Issued by
- Utah
About this file
This is a Schedule of Values document for a construction project in Utah (FAC134341) involving a Youth Services Community Behavioral Health (CBH) HVAC upgrade. The project scope includes replacing 4 rooftop HVAC units. The document is structured to capture bid pricing across a base bid option and three alternate bid options (Alternate 1, Alternate 2, and Alternate 3), with additional columns for Alternates B and C. The schedule requires contractors to itemize costs across standard construction divisions including Payment & Performance Bond, Insurance & Builder's Risk, and Division 01-General Conditions, with all other work scope divisions to be specified by the bidding contractor. All values are to be entered as "$-0" placeholders pending actual bid submission through the Online Solicitation System (OSS).
The document emphasizes that the total bid amount for the base bid must match the total entered into the OSS, and the same requirement applies to each alternate bid total. Bidders are required to identify their company name on the form. No pricing information, contract term details, set-asides, or funding sources are reflected in this template document, as it serves as a blank schedule requiring contractor completion during the bidding process.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Section 2 - Document 3.0 | |||||||
| Schedule Of Values | |||||||
| Project: FAC134341 Youth Services CBH HVAC Upgrade | |||||||
| Divisions of Work | Base Bid | Alternate 1 | Alternate 2 | Alternate 3 | |||
| (Specify entire work scope; examples are listed below) | Alternate B | Alternate C | Total | ||||
| Payment & Performance Bond | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Insurance & Builder's Risk | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Division 01-General Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| Totals (Enter in OSS) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| The total for the base bid must be the same total that was entered into the Online Solicitation System (OSS). |
| The total for each alternate must be the same total that was entered into the Online Solicitation System (OSS) |
| Name of Company Bidding ________________________________ |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .