7-6. RFP Wildlife Crossing Data Requirements.pdf

PDF 184 KB Posted

Attached to
US36 Wildlife Crossings 30% Engineering Design Project
Solicitation number
RFP-332-26
Issued by
Boulder County, Colorado

About this file

This file contains the Data Requirements document for Boulder County Parks & Open Space (BCPOS) related to the US-36 Wildlife Crossings 30% Engineering Design Project, a partnership between BCPOS, the Colorado Department of Transportation (CDOT), and Colorado Parks and Wildlife (CPW). The document establishes mandatory specifications for all data deliverables that contractors must meet with 100% compliance, with payment retention until full compliance is achieved. Contractors are required to deliver Geographic Information System (GIS) data compatible with ArcGIS as shapefiles or file geodatabase feature classes with complete metadata, using the NAD 1983 HARN State Plane Colorado North coordinate system in feet. Computer-Aided Design (CAD) deliverables must comply with Colorado State Plane North Zone projection and include detailed topography at one-foot contour intervals, utility locations, vegetation mapping, drainage structures, property boundaries, and spot elevations with specified accuracy standards of ±0.1 feet for vertical control and ±0.5 feet for planimetric features at a 95% confidence level. Electronic AutoCAD files must be provided in 2024 format or more recent, with properly organized layers, contour text labels, and comprehensive documentation of layer names and survey point descriptions.

Non-spatial data must be formatted with alphanumeric column headers containing no spaces, proper cell data formatting, consistent date formats, and unique identifiers for each record linked to spatial features; missing data must be represented using conventions such as -9999, NA, or NULL rather than zeros or blanks. All work product, including data, documentation, and materials developed by the contractor pursuant to the contract, becomes the exclusive property of Boulder County, and contractors are prohibited from selling, copying, modifying, distributing, or disclosing any confidential County data without written permission. Field work must conform to Boulder County and Colorado Department of Transportation laws and ordinances, with contractors responsible for traffic control including advanced warning signs and safety requirements when working in rights-of-way. Hard copy deliverables must include stamped and signed AutoCAD drawings on 11x17 sheets with layer descriptions, along with plot styles and comprehensive documentation of acronyms and conventions used throughout the design.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA REQUIREMENTS

Contractors are required to meet 100% compliance for all data deliverables. Payment will be retained until the data submitted is 100% compliant with the County’s requirements as detailed:

GEOGRAPHIC INFORMATION SYSTEM (GIS) DATA DELIVERABLE REQUIREMENTS:

If the contractor will be delivering GIS data to Boulder County Parks & Open Space (“BCPOS”), then BCPOS requires GIS specifications be met before delivering that GIS data.

Spatial Data:

1. The contractor will provide, to the best of their ability, high-accuracy locations of GIS features. Accuracy must be noted.

2. The GIS data being delivered by the contractor must be ArcGIS compatible as either a shapefile or file geodatabase feature class with complete metadata.

3. At a minimum, the spatial data must contain an attribute field to hold a unique identifier for each feature. This unique identifier must also be reflected in any non-spatial data (see below).

4. All static maps (e.g. PDF/JPG maps) being provided by the contractor must be georeferenced, when applicable.

5. All spatial or georeferenced data is required to be provided, by the contractor, in the following coordinate system:

Name: NAD 1983 HARN State Plane Colorado North FIPS 0501 Feet Unit: Foot US Projection: Lambert Conformal Conic Horizontal Datum: North American Datum 1983 HARN Vertical Datum: North American Vertical Datum 1988 Spheroid: GRS 1980 +

Non-Spatial Data:

1. Only include data in a data file; do not include figures or analyses.

2. Aggregate like data into fewer large files, rather than many small ones or separate tabs within a spreadsheet.

3. Column headers only use alphanumeric characters or underscores. Column headers do not include spaces. Use only the first row to identify a column header.

4. All cell data format type is formatted properly. Date fields should be in a consistent date format throughout the dataset.

5. Do not rely on special formatting for tables.

6. Do no hide columns or rows.

7. Do not use zeros or blanks to represent missing data. Common alternative conventions include: -9999, NA, or NULL.

8. Table must contain a unique identifier for each record in the table.

9. Tabular data linking to geospatial data must contain the foreign key or identifier for the spatial feature.

10. Metadata (information that includes data about the data) will accompany data file(s). It will be in a separate, associated word or text document, except in the case of Excel, where it should be included in an additional sheet within the workbook.

COMPUTER AIDED DESIGNS (CAD) DELIVERABLE REQUIREMENTS:

Project datum:

1. The contour interval shall be one (1) foot and vertical control shall be based on Colorado State Plane, North Zone projection, 1983 North American Datum (NAD 83). The horizontal control will be based on State Plane Colorado North FIPS 0501 1983 HARN.

2. All field work shall conform to the laws and ordinances of Boulder County and Colorado Department of Transportation. Traffic control will be the responsibility of the surveyor.

Minimum requirements shall be advanced warning signs for each direction of traffic and personnel shall wear orange vests when working in the right-of-way. When working in the roadway refer to the Manual of Uniform Traffic Control Devices for proper signage and flagging.

3. The survey shall include the following within the outlined survey limit line shown on each site exhibit (see Attachments B).

a. Topography, shown at one (1) foot contour intervals.

4. Roadway centerline, lane lines, edge of pavement and the roads’ rights-of-way easement, edge of gravel road grade, shoulder edge and or curb and gutter, flow lines of the roadside borrow ditches, flow lines of irrigation ditches, driveways including surface type, signs, property pins and found survey monuments, trails, concrete pads, any fixed horizontal items and grade breaks.

5. The spot elevations along the existing roadways centerline, manhole covers and pipe inverts, valve covers, inverts of inlets, culverts and pipes shall have an accuracy of +/- (0.10’) of true elevation.

6. All property and utility easements should be shown. Include positions, directions, types and sizes of visible and underground utilities within the survey limit line (e.g.

communication, gas, water, electric, and telephone).

a. Locate and describe the size and material type of all drainage structures (e.g.

ditches, swales, catch basins, culverts, etc.

b. Locate existing vegetation (all trees and shrubs) providing the spot with elevations of each at the ground level. All trees greater than three (3) inches in diameter shall be labeled. Location of shrub clumps and tree groupings can be combined at the drip line only if prior approval is acquired from Boulder County in writing.

c. Locate large trees (larger than 1 ft. diameter at tree base) with two (2) shots per tree, one (1) on the north and one (1) on the south side (or east and west).

d. Signposts, t-posts, or other vertical objects; positions, directions, types and sizes of visible utilities. All fixed vertical elements (buildings, benches, fences, etc.)

e. All property boundaries within the survey limit line.

7. Accuracy:

a. Control points and land corners shall have a horizontal accuracy of 1/50,000.

Vertical accuracy shall be a closure of +/- one-tenth foot (0.1') from beginning of project to the end.

b. Within the survey limit line, ninety five percent (95%) of the ground elevations determined from the data shall have accuracy with respect to true elevations of +/- one-half contour interval or better at a ninety five percent (95%) confidence level. No elevations shall deviate from the true elevations by more than one (1) contour interval.

c. Ninety five percent (95%) of all planimetric features located must be within +/-one half foot (0.5') of actual position on the ground at a ninety-five percent (95%) confidence level.

Construction Document Deliverables:

1. A hard copy of the AutoCAD drawing(s) plotted on "11x17" sheets, stamped and signed by the design professional.

2. A hard copy printout which shows layer names along with a description of the layer names used in all drawings.

Electronic AutoCAD Files:

1. Electronic drawing file in AutoCAD 2024 format or more recent AutoCAD (packaged with associated files such as fonts, images, ctb, etc.), contour lines shall have accurate z elevations. Contours shall have separate layers for the minor contours and five (5) foot contours (e.g. Contours-Minor and Contours-Major). The contour text labels must be on unique layers with similar names (e.g. Contours-Minor-txt and Contours-Major-txt).

2. The text and symbols shall be at a scale of 1”=40’. The file shall be in model space (not paper space) with 1' contours.

3. No forced colors or linetypes. Drawing entities must be created so that their color and linetype can be changed in the layer dialogue box.

4. All blocks created on layer zero with no forced colors or linetypes.

5. Create polylines with “line type gen” set “on”.

6. All lines consisting of multiple intersections must be continuous polylines except for lots, section lines, right-of-way lines or other data created by curves, bearings, etc.

7. Text must be on unique layers. No mixing of text and entities except for utilities where labels and line work are to be on the same layer.

8. Layers may contain only one (1) type of information, i.e. gas lines, layer may only have polylines showing location of gas lines, with no text or other information on the layer.

Layer naming must clearly describe the following: entity name, new or existing, above or underground. Use consistent naming conventions through the drawing layers.

9. All hatch layers should be named to end with the word “hatch” and be prefixed with the identical name as the layer representing the edge of the hatch. Use a separate name and layer for each type of hatch.

10. Create closed polygons for all sidewalks, curbing, driveways, and other surveyed entities.

11. Draw all utility lines both above ground and underground, with continuous polylines with no elevations (z coordinate zero).

12. Provide all AutoCAD Plot styles.

13. Survey point data files must have survey point descriptions in an understandable alpha description in both the provided survey data file and when viewed within AutoCAD.

Provide a list of commonly used acronyms, i.e. EOP=Edge of Pavement, “tel ped” or TR= telecommunications pedestal, etc. Provide a list of all of the layers utilized with a description.

All field work shall conform to the laws and ordinances of Boulder County and Colorado Department of Transportation. Traffic control will be the responsibility of the surveyor.

Minimum requirements shall be advanced warning signs for each direction of traffic and personnel shall wear orange vests when working in the right-of-way. When working in the roadway refer to the Manual of Uniform Traffic Control Devices for proper signage and flagging.

OWNERSHIP OF WORK PRODUCT:

All work product, property, data, documentation, information or materials conceived, discovered, developed or created by the selected Contractor pursuant to this bid and subsequent Contract will be owned exclusively by the County. To the extent possible, any Work Product will be deemed to be a work made for hire. The selected Contractor unconditionally and irrevocably transfers and assigns to the County all right, title and interest in and to any Work Product.

The selected Contractor will agree to keep confidential all County Data, and will agree not to sell, copy, modify, reproduce, republish, assign, distribute, data mine, search or disclose any such confidential information to any other person or entity without the County’s written permission, including metadata (e.g. aggregations of county data or analysis of county data content).

The Contractor shall not access County accounts or County Data, except in the event as required by the express terms of a written contract between the mutual Parties and/or at the express written request of the County. All data obtained by the Contractor in the performance of this solicitation resulting in a contract shall become and remain the property of the County. The Contractor shall not use any information collected in connection with the service issued from this solicitation for any purpose other than fulfilling a County contract for this RFP.

File details come from the government source that posted it. Updated .