US36 Wildlife Crossings 30% Engineering Design Project
Solicitation number
RFP-332-26
Issued by
Boulder County, Colorado

About this file

This document presents the evaluation criteria established by Boulder County Procurement for the US-36 Wildlife Crossings 30% Engineering Design Project. The selection committee will evaluate proposals based on a 100-point scoring matrix with specific weightings assigned to five evaluation categories. Proposals will be assessed on information presented (20 points), ability to provide quality and timely products and services (20 points), qualifications and experience of the contractor and proposed subcontractors including three professional or project references per core team member (30 points), proposed staff list with rate sheets and anticipated hours per person (20 points), and proposed project completion timeline (10 points). The committee retains the discretion to request additional information from vendors or conduct interviews with one or more vendors prior to final selection.

The evaluation framework prioritizes contractor qualifications and experience most heavily at 30 points, followed equally by proposal quality and service delivery capability at 20 points each, staffing and rate structure at 20 points, and project timeline at 10 points. The selection committee will base final evaluation and selection on these criteria as presented in the submitted proposals, without establishing any set-asides or preference programs.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Boulder County Procurement 1325 Pearl Street

Boulder, CO 80302

Evaluation Criteria

The proposals will be reviewed by a selection committee. The committee may request additional information from vendors or request interviews with one or more vendors. Final evaluation and selection may be based on, but not limited to, any or all of the following:

• Information presented in proposal

• Ability of the contractor to provide quality and timely products and services

• Qualifications and experience of the contractor and proposed subcontractors including

3 professional or project references to call per core team member

• Proposed staff list, rate sheet and hours anticipated per person

• Proposed project completion timeline

A scoring matrix with the order and priority of criteria to be used by the county in its evaluation and selection process is shown below:

Description

Points

Information presented in proposal 20 Ability of the contractor to provide quality and timely products and services

Qualifications and experience of the contractor and proposed subcontractors including 3 professional or project references to call per core team member

Proposed staff list, rate sheet and hours anticipated per person 20 Proposed project completion timeline 10

Total Possible