Earl Township 2026 Roadwork Bid Package Summary
This is a bid package document issued by Earl Township in Berks County, Pennsylvania, for roadwork projects scheduled for 2026. The project involves placement of 9.5mm leveling course (approximately 1,806 tons), 9.5mm wearing course overlay (approximately 3,609 tons), 4-inch 25mm base course (approximately 734 square yards), base repair (approximately 388 square yards), and milling work (approximately 3,085 square yards) across seven roads including Sunset Hill Road, Terrace Road, Hauseman Road, Grims Mill Road, Pond Road, Kristine Avenue, and Laura Court. An alternate bid for 260 square yards of paving fabric (Petromat 4598 by Propex) is also included. Bid proposals must be submitted via PennBID by 2:00 p.m. on Thursday, April 16, 2026, with bids opening and results posted online at approximately 3:00 p.m. the same day. A pre-bid review and inspection is mandatory and can be arranged by contacting the Earl Township Roadmaster at (610) 342-6590 between 7:00 a.m. and 3:00 p.m., Monday through Friday. Contract award or rejection will occur during the Earl Township Board of Supervisors meeting on Monday, April 20, 2026, at 7:00 p.m. at the Earl Township Municipal Building. All work must be completed by August 21, 2026, with liquidated damages assessed at $500.00 per calendar day for delays.
Bidders must submit a certified check or bid bond equal to ten percent (10%) of the bid amount, along with proof of PennDOT prequalification, workman's compensation affidavit, insurance certificate, CDL compliance certificate, public works employment verification form, and anti-collusion affidavit. The successful bidder must furnish a 100% performance bond and 100% payment bond within 20 days of contract award. Pennsylvania Prevailing Wage Rates apply to this contract. Work cannot begin until the replacement of seven culverts and seven inlet boxes and the 2-foot road widening on Sunset Hill Road is completed, with that culvert contract required to be finished by April 30, 2026. All bituminous paving work must comply with current PennDOT specifications (Publication 408), with the bituminous price adjustment clause applicable per Section 110.04. The municipality reserves the right to reject any or all bids or to award the contract based on the aggregate total for all like items, with future contract awards influenced by the quality of work performed on this project.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EARL TOWNSHIP
19 SCHOOLHOUSE ROAD
BOYERTOWN, PA 19512
BID DOCUMENTS
FOR
2026 ROAD WORK
BID PROPOSALS DUE: THURSDAY, APRIL 16, 2026 by 2:00 PM
VIA PENNBID
BID OPENING: THURSDAY, APRIL 16, 2026 AT 3:00PM
VIA PENNBID
BID AWARD: MONDAY, APRIL 20, 2026 AT 7:00PM
AT THE EARL TOWNSHIP BUILDING
INVITATION TO BIDDERS
Bid proposals will be received by the Earl Township Board of Supervisors until 2 pm, prevailing time, Thursday, April 16, 2026 via PennBID (https://pennbid.bonfirehub.com) only for the following scope of work:
2026 Roadwork – placement of ¾” 9.5mm Leveling Course (appx. 1,806 Tons) and 9.5mm
Wearing Course overlay (approx. 3,609 Tons) and 4” 25mm Base Course (appx. 734 SY), base repair (appx. 388 SY), milling (appx. 3,085 SY) and other work as specified in the Bid
Documents. An alternate bid for 260 SY of paving fabric is also included.
Bids will be opened via PennBID and results posted online at approximately 3 pm, prevailing time, Thursday April 16, 2026. The contract will be awarded or rejected, during the Earl
Township Board of Supervisors meeting held on Monday, April 20, 2026 at 7:00 p.m. at the Earl
Township Municipal Building, 19 Schoolhouse Road, Boyertown, PA 19512.
Contract documents are available through the PennBID system; Bids must be submitted on forms furnished by the Township and available on PennBID.
All work must be completed between by August 21, 2026. Liquidated damages apply at a rate of $500.00 per calendar day.
Pennsylvania Prevailing Wage Rates apply to this Contract.
A pre-bid review/inspection is required and can be arranged by contacting the Earl Township
Roadmaster at (610) 342-6590 between 7 am & 3 pm, Monday-Friday.
A certified check or bank draft, payable to Earl Township or a satisfactory bid bond executed by the bidder and acceptable sureties in an amount equal to ten percent (10%) of the bid shall be submitted with the bid. In addition, the following documents must be included with the bid package: proof of PennDOT prequalification, workman’s compensation affidavit, insurance certificate, CDL compliance certificate, public works verification form and anti-collusion affidavit.
A performance bond or certified check in the amount of 100% of the contract price as well as the payment bond shall be furnished by the successful bidder within 20 days after contract is awarded.
Earl Township reserves the right to reject any or all bids submitted or any part thereof or item therein that may not be in the public’s best interest. The Township also reserves the right to waive any defects, errors, omissions, irregularities or informalities in bids received.
Township of Earl
Janice Haller
Secretary-Treasurer https://pennbid.bonfirehub.com/
Earl Township 2026 Paving Locations
Base Bid
Leveling Course plus Wearing Course:
1. Sunset Hill Road – Approximately 2,910’ x 25’ (average) from Route 73 to Mountain Road; Road width varies from 22 to 27’.
2. Terrace Road –Approximately 2,916’ x 23’ (average) from Route 73 to Pond; Road width varies with portions at 21’ and others at 28’.
3. Hauseman Road
a. Approximately 1,467’ x 23’ - from Colebrookdale Twp Line to Pond Road
b. Approximately 648’ x 23’ from Colebrookdale Twp Line to Sawmill Road
4. Grims Mill Road – 833’ x 23’ from Pond Road to Colebrookdale Township Line
5. Pond Road – 2,261’ x 22’ (average) from Grims Mill Road to Route 73; Road width varies 20’ to
24’
6. Kristine Avenue – Approximately 1,464’ x 25’ (average) from Terrace Road to Cul-de-Sac (50’
Radius); Road width ranges from 24’ to 28’.
7. Laura Court – 726’ x 25’ (average) from Terrace Road to Cul-de-Sac (50’ Radius)
Base Repair:
1. Pond Road total 86 SY
- #1 – 4’ x 27’
- #2 - 10’ x 60’
2. Sunset Hill Road - total 93 SY
- #1 – 8’ x 84’
- #2 – 4’ x 22’
3. Laura Court – 209 SY
-#1 57’ x 30’ area to be investigated and base repair done in this area
Base Course Installation & Temporary Paving Removal
1. Sunset Hill Road
a. Remove 2” depth temporary paving and 2” stone base along recent 2’ road widening (534 SY)
b. Remove 2” depth temporary paving and 2” stone base along 7 new inlet boxes and over 7 culvert pipes (200 SY).
c. Install 4” compacted depth Superpave Base Course, 25mm in above removal areas
(734 SY)
Milling:
1. Kristine Ave – 7’ wide along curbline, both sides of road, tapered from 0” to 1-1/2” and around cul-de-sac bulb (rolled curb on this street) - 2616 SY
2. Laura Court – 7’ wide along curbline (233’ section) and around outer edge cul-de-sac bulb curb
(315’) (rolled curb on this street) – 469 SY
Alternate Bid 1
Laura Court, Install 260 SY Paving fabric - Petromat 4598 by Propex (1-800-621-1273) or approved equal.
MS-944 02-01 PROPOSAL & CONTRACT (THIS PROPOSAL INCLUDES
(WHEN EXECUTED) INSTRUCTIONS TO BIDDERS)
A. DEPOSIT OF PROPOSALS.
Bids shall be submitted via PennBID for EARL TOWNSHIP
“2026 Roadwork” Municipality Name and Type for Letting of
April 16, 2026 JANICE HALLER
Date Secretary
Sealed Proposals will be received on or before
2:00 P.M., on April 16, 2026 via PennBID 19 SCHOOLHOUSE RD
Time Address
Bids will be opened on PennBID and posted approximately BOYERTOWN, PA 19512
3:00 P. M. on the above Bid Due Date. Proposals must be submitted via PennBID.
1. The contractor proposes to furnish and deliver all materials (including Form TR-465 Daily Bituminous Mixture
Certification) and to do and perform all work in the bid for the following project as more specifically set forth in the
Schedule of Prices (Attachment), in accordance with drawings and specifications on file at the Earl Township Municipal
Building at the above address as well as the supplements and special requirements contained herein and/or attached hereto and current PennDOT specifications (Publication 408), except (a) volumetric testing of bituminous paving materials is not required (Sec. 409). Bidders need to be prequalified by PennDOT (Sec. 102.01).
2. If designated as the successful bidder, the contractor may begin work on the date specified in the notice to proceed, or as otherwise provided in the special requirements, and will complete all work on or before August 21, 2026. If all work is not completed on time, liquidated damages will be assessed at the rate of $_500.00 per additional calendar day.
3. Accompanying this proposal is a certified check or bid Bond in the amount of 10% of the bid made payable to the municipality as a proposal guarantee which, it is understood, will be forfeited in case the contractor fails to comply with the requirement of the proposal.
B. PROPOSAL OF: _____________________________________________________________________________ Name of Contractor
Address
CONTRACTOR’S CERTIFICATION
It is hereby certified as follows:
1. The only person(s) interested in this proposal as principal(s) is (are): ________________________________
2. None of the above persons are employees of the municipality.
3. This proposal is made without collusion with any other person, firm, or corporation.
4. All plans and specifications referred to above and the site of the work have been examined by the contractor.
The contractor understands that the quantities indicated herein are approximate and are subject to change as may be required; and that all work is payable on the basis of the unit prices listed on the Schedule of Prices (Attachment
1).
- 1 -
5. The contractor will comply with all requirements of the laws and implementing regulations of the Commonwealth of
Pennsylvania and the United States relating to human relations, equal opportunity and non-discrimination in employment, and will pay to workmen employed in the performance of the contract the wages to which they may be entitled.
6. The contractor will provide the municipality with a 100% performance bond, conditioned upon the faithful performance of the contractor in accordance with the plans, specifications and conditions thereof, and a 100% payment bond conditioned on the prompt payment of all material furnished and labor supplied or performed in the prosecution of the work, in accordance with the Public Work’s Contractors’ Bond Law of 1967; These items shall be submitted within 20 days of notice of award.
7. The contractor, with the bid submission, shall include a dually signed copy of the project specifications, an affidavit accepting the provisions of the Workmen’s Compensation Act of 1915, as amended, an insurance certificate, an anti-collusion affidavit, a public works employment verification form, CDL compliance certificate and proof of PennDOT prequalification.
8. “The parties agree that the relationship between the Contractor and Earl Township is one of independent contractor and not the employer/employee and that the individual employees of the Contractor who will be performing the work pursuant to this contract are not employees of Earl Township. Contractor hereby certifies, represents and warrants to the Township that all persons performing any aspect of the work pursuant to this Contract who are required to have commercial driver’s license are subject to a program for drug and alcohol testing in accordance with the Omnibus Transportation Employee
Testing Act of 1991 and the federal regulations adopted pursuant thereto.”
Contractor
WITNESSED OR ATTESTED BY:
BY:______________________________________
Title (Seal)
Title
SEAL
TO BE EXECUTED ONLY IN THE EVENT THE ABOVE PROPOSAL IS ACCEPTED
ACCEPTED ON:_______________________________________
Date
Municipality
ATTESTED BY:
________________________________________ BY:_______________________________________ Title Title
- 2 -
ATTACHMENT #1 (page 1 of 3)
County: Berks Municipality: Earl Township Project No.: 2026 Road Work T
H
IS
P O
R T
IO
N
T O
B E
C O
M P
L E
T
D
Y
T H
M U
N
IC
IP
A
L
IT
LOCATION OF WORK
Sunset hill Road, Terrace Road, Hauseman Road, Grims Mill Road, Pond Road, Kristine Avenue, Laura Court in Earl Township, Berks County; Hauseman Road in Colebrookdate Township, Berks
County. All ADTs < 1000.
DESCRIPTION OF WORK:
As indicated below and in Attachments. Follow PADOT Pub. 408.
ESCALATOR CLAUSE:
Per Pub. 408 Section 110.04 Current Edition. Bituminous Price Adjustment applies to this contract.
Contractor required to supply Form CS-1-PA when applicable. Bid index is March 2026
SCHEDULE OF PRICES
1.Item
No.
2. Approx.
Quantities
3.
Units
4.*Description 5. Unit
Price
6. Total
Tons
SY
Sunset Hill Road (2910’ long x 25’ wide)
From Route 73 to Mountain Road
Mill paving notch, sweep and apply tack coat, pave Superpave, HMA overlay Wearing Course, PG-64S-22, 0.3 to 3.0 million ESAL’s, 9.5 mm mix, 1.5” minimum compacted depth, SRL-L, and seal joints.
Place 3/4" leveling 9.5mm 0.3 – 3.0 ESALS, PG-64-22, SRL "L"
Base Repair - Excavate (mill as directed) and remove areas to be repaired to a depth of 4". Compact subgrade and place and compacted to 4"
Superpave Base Course 25mm 0.3 – 3.0 million ESALS PG-64-22 to grade. Seal joints per Pub. 408.
Remove existing 2” temporary paving and 2” stone base and replace with
4” Superpave Base Course 25mm 0.3 – 3.0 million ESALs PG-64-22 to grade.
Terrace Road (2916’ long x 23’ wide) from Route 73 to Pond
Place 3/4" leveling 9.5mm 0.3 – 3.0 million ESALS, PG-64-22, SRL "L"
Hauseman Road (1467’ long x 23’ wide) from Twp Line to Pond
Hauseman Road (648’ long x 23’ wide) from Twp Line to Sawmill
Only
Put
Pricing
On
PennBID
Pricing
Sheet
Only
Put
Pricing
On
PennBID
Pricing
Sheet
*DESCRIPTION
Must include ADT on Wearing surfaces.
USE OF CUTBACK ASPHALT IS PROHIBITED BETWEEN MAY 1st
AND OCTOBER 31st EXCEPT AS NOTED IN BULLETIN NO. 25.
ATTACHMENT #1 (page 2 of 3)
H
IS
P O
R T
IO
N
T O
M P
L E
T
T
N
IC
IP
A
L
Contractor required to supply Form CS-1-PA when applicable. Bid index is March 2026
SCHEDULE OF PRICES
1.Item
No.
2. Approx.
Quantities
3.
Units
4.*Description 5. Unit
Grims Mill Road (833’ long x 23’ wide) from Pond to Twp Line
Pond Road (2261’ x 22’) from Route 73 to Grims Mill Road
Place 3/4" leveling 9.5mm 0.3 – 3.0 ESALS, PG-64-22, SRL "L"
Kristine Ave (1464’ long x 25’ wide) from Terrace Rd to End
Curbline Milling, 7’ wide, 0 to 1-1/2” taper
Laura Court (726’ long x 25’ wide) from Terrace Rd to End
Curbline Milling, 7’ wide, 0 to 1-1/2” taper
Pricing
On
PennBID
Pricing
Sheet
Only
Put
Pricing
On
PennBID
Pricing
Sheet
*DESCRIPTION
Must include ADT on Wearing surfaces.
ATTACHMENT #1 (page 3 of 3)
H
IS
P O
R T
IO
N
T O
M P
L E
T
T
N
IC
IP
A
L
Contractor required to supply Form CS-1-PA when applicable. Bid index is March 2026
SCHEDULE OF PRICES
1.Item
No.
2. Approx.
Quantities
3.
Units
4.*Description 5. Unit
ALTERNATE BID #1
Paving fabric shall be Petromat 4598 by Propex (1-800-621-1273) or approved equal.
Pricing
On
PennBID
Pricing
Sheet
Only
Put
Pricing
On
PennBID
Pricing
Sheet
*DESCRIPTION
Must include ADT on Wearing surfaces.
Attachment 1-A
SPECIFICATIONS AND SPECIAL PROVISIONS TO CONTRACT MS-944
CONTAINS IMPORTANT INFORMATION FOR THE CONTRACTOR(S)
The Prime Contractor(s) and subcontractors must comply with all of the following provisions:
TRAFFIC CONTROL
- Traffic Control and Safety Devices to be provided by the Contractor(s) in compliance with the current MUTCD, PennDOT Publication 212 and Publication 213.
- Roadways may be closed to through traffic, however, school buses, emergency vehicles and residents in the work area must be able to pass through during work hours.
GENERAL
- A pre-bid meeting is mandatory and can be scheduled by contacting Township Roadmaster Brad McIlvee at (610) 342-
6590 between the hours of 7:00 a.m. and 3:00 p.m. Monday through Friday.
- Work may not begin until the replacement seven culverts and seven inlet boxes and 2’ road widening on Sunset Hill Road is completed. Culvert contract includes 2” temporary pavement restoration along widening and culverts and is required to be completed by April 30, 2026. Roadwork may begin upon receipt of Notice to Proceed.
- Work to be completed on or before August 21, 2026. After 8/21/26, liquidated damages apply at $500/day.
- The Contractor(s) shall notify the Municipality and public five (5) calendar days prior to the start of the project.
- Prevailing wages apply to this project.
- Delivery tickets shall be submitted for all materials.
- Submit Bill of Lading for each shipment of bituminous material per Section 702.1(c) of PENNDOT Spec. Form 408.
- CS-4171 Certificate of Compliance and/or TR-465 Daily Bituminous Mixture Certification is required for all materials.
- Final Completion Certificate & Notice of Completion required
- Contractor(s) is (are) responsible for defects that occur within one year of applications.
- Municipality will inspect the project.
- Municipality reserves the right to limit work completed.
- Municipality reserves the right to procure material which best suits their requirements after all bids & items are reviewed.
- Municipality reserves the right to make an award on the basis of the aggregate total for all like items on which quotations are received.
- Future award of Contracts will be based on quality of work as determined by the Municipality.
- Pennsylvania Prevailing Wage Rates apply to this Contract.
- Completion of NON-COLLUSION AFFIDAVIT required.
- Contractor(s) shall be PENNDOT prequalified and must supply proof of prequalification with the bid package.
- Contractor(s) to supply proof of CDL Drug and Alcohol Compliance.
- The successful bidder(s) must provide a 100% Performance Bond and a 100% Payment Bond within 20 days of the award of the contract.
-Notice to Proceed will be the date of contract acceptance.
- Contractor(s) must complete and submit CS-1PA, Price Adjustment of Bituminous Material if applicable.
- Where Contract references current PennDOT specifications (Publication 408) or PennDOT Specifications Form 408, the latest version applies.
- Contractor’s equipment may not leave project location until the contracted work has been completed.
- Incidental preparation and clean up required by Contractor. (Project Construction Materials)
- Township is responsible for replacing permanent paving markings.
- Township is responsible for obtaining any necessary storm sewer inlet box or manhole risers.
- 4 -
County: Berks Municipality: Earl Township Project No.: 2025 Road Work
Attachment 1-A
SPECIFICATIONS AND SPECIAL PROVISIONS TO CONTRACT MS-944
CONTAINS IMPORTANT INFORMATION FOR THE CONTRACTOR(S)
BITUMINOUS PAVING
- Complete all testing in accordance with PENNDOT Specifications Form 408 Section 409 except volumetric testing.
- Tack Coat is required per Section 460 / 409 of PennDOT Specifications Form 408 and is incidental to paving.
- Bituminous Seal on all abutting pavement, manholes, inlets and curbs required after wearing course.
- Saw cut or Milled Paving Notch per RC-28M is required and incidental to paving.
- Existing driveways shall be transitioned to maintain positive drainage along roadway gutterline and sufficient access to property as necessary.
- Milling of driveway notches is to be done as directed by the Township Roadmaster and in a fashion that maintains the shoulder slope and provides a smooth transition from the driveways to the shoulder and shall be considered incidental to the contract.
- Any needed milling around existing inlet boxes in areas where lane milling is not proposed shall be considered incidental to the contract.
- Roadway is to be power broomed by the Contractor prior to start of paving.
- Contractor to remove all excess material from the project site.
- Roadway cross-slope shall match existing unless otherwise directed by Township inspector. Minimum cross-slope to be
¼” per foot and if existing cross-slope does not meet this, then leveling course shall be utilized to achieve said grade.
-Scratch/leveling course to be placed at discretion of appointed inspector(s).
-Scratch/leveling course must be compacted with a pneumatic tired roller.
- Paving must be done in two passes.
My signature signifies that I have read and understand the above conditions and special provisions to this contract, and by being authorized by this company to act as their authorized representative, and on their behalf hereby agree to adhere to any and all of the provisions pertaining to this contract.
Contractor’s Representative Date Municipality’s Representative Date
______________________________________________ _____ EARL TOWNSHIP_ _
Company Municipality
- 5 -
MS-944S PAYMENT BOND Attachment 3
KNOW ALL MEN BY THESE PRESENTS, that we as PRINCIPAL and a corporation incorporated under the laws of the State of as SURETY, are held and firmly bond unto the , in the full and just sum of
($ )dollars, lawful money of the United States of America, to be paid to the said or its assigns, to which payment well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the above bounden Principal has entered into a contract with the above municipality hereinafter called Obligee, bearing even date herewith, for the improvement of a certain section of highway or bridge in said Municipality consisting of:
for approximately the sum of: ($ ) dollars.
NOW, THEREFORE, the condition of this obligation is such that if the above bounden PRINCIPAL shall and will promptly pay or cause to be paid in full all sums of money which may be due by contract or otherwise, to any individual, firm, partnership, association or corporation, for all material furnished or labor supplied or performed in the prosecution of the work, whether or not the said for material or labor entered into and became component parts of the work and for rental of the equipment used and services rendered by public utilities in, or in connection with the prosecution of such work, then this obligation to be void, otherwise to remain in full force and effect.
The PRINCIPAL and SURETY, hereby, jointly and severally, agree with the Obligee herein that any individual firm, partnership, association or corporation, which has performed labor or furnished material in the prosecution of the work as provided, and any public utility which has not been paid in full therefor, may sue in assumpsit on this Payment Bond in his, their, or its own name and may prosecute the same to final for such sum or sums as maybe justly due him, them or it, and have execution thereon.
Provided, however, that the Obligee shall not be liable for the payment of any costs of expenses of such suit.
RECOVERY by any individual, firm, partnership, association or corporation hereunder shall be subject to the provisions of the “Public Works Contractors’ Bond Law of 1967", Act No. 385, approved December 20, 1967,P.L. 869, which Act shall be incorporated herein and made a part hereof, as fully and completely as though its provisions were fully and at length herein recited.
It is further provided that any alterations which may be made in the terms of the contract or in the work to be done or materials to be furnished or labor to be supplied or performed under it or the giving by the Obligee of any extension of time for the performance of the contract or any other forbearance on the part of either the Obligee or the Principal to the other, shall not in any way release the PRINCIPAL and the SURETY or SURETIES of any such alteration, extension of forbearance being hereby waived.
IN WITNESS WHEREOF, the said PRINCIPAL and SURETY have duly executed this Bond under seal this day of ,20 .
PLACE
HERE
WITNESS:
CONTRACTOR
TITLE:
BY:
TITLE:
PLACE
HERE
WITNESS:
SURETY COMPANY
TITLE: TITLE:
AFFIDAVIT RE
Attachment 4
ACCEPTING PROVISIONS OF THE WORKMEN’S COMPENSATION ACT
State of )
) ss:
County of ) he has being duly sworn according to law deposes and says that they have it has accepted the provisions of the Workmen’s Compensation Act of 1915 of the Commonwealth of Pennsylvania, with has his its supplements and amendments, and have insured their liability thereunder in accordance with the terms of said its
Act with .
(SURETY COMPANY)
( TYPE OR PRINT) CONTRACTOR
BY
SIGNATURE
Sworn to and subscribed before me this day of A.D. 20 .
SIGNATURE
My Commission Expires ( DATE )
- 9 -
D-7126 ( 7-09 )
ANTI-COLLUSION AFFIDAVIT
County Berks
Municipality Earl Township
Project Number 2026 Road Work
State of Fed. Project No.
( If Applicable )
County of
The undersigned deponent deposes and says that he is the ____________________ of the Company; that he is authorized to make this affidavit on behalf of said company in compliance with section 102.06 (e) of Department Specifications, Publication 408, as amended and that the said company has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with such contract.
(Contractor)
BY
Sworn to and subscribed before me the undersigned notary public this day of , .
Notary Public
My Commission expires
- 10-
Rev 2/15 PSATS CDL Program Form Contractor
Contractor’s Statement of Compliance with
CDL Testing Program Requirements
Due to the nature of the work that this contractor may perform for this employer, this contractor must use employees who perform safety-sensitive functions for which a Commercial
Driver’s License (CDL) is typically required. Section 49 CFR 382.301(c)(2) of the federal CDL regulations requires that, prior to the first time an employer uses a CDL employee employed by another entity (i.e., a contractor to whom the township is awarding a contract), and every six months of the contract, this employer must certify that any CDL employees used by each contractor remain covered by a qualified CDL drug and alcohol testing program.
An original signed copy of this form must be permanently retained by the employer with this contract and a new form received every 6 months of the contract’s duration.
If the contractor is not participating in a qualified CDL drug and alcohol testing program at the time of the awarding of the contract, or at any six-month re-certification point, then all the contractor’s CDL employees must obtain a negative result on a pre-employment drug test before beginning (or continuing) contracted work for this employer.
Contractor Name__________________________________________________________________________
By signing here, I, as the contractor’s authorized representative, verify that the contractor named above is a current participant in the below identified CDL testing program conforming to 49 CFR Part 40.
Contractor’s Authorized Representative ________________________________________________________
Today’s Date ____/____/____
Signature of Authorized Representative ________________________________________________________
CDL Testing Program Name ________________________________________________________________
Testing Program Contact Person ____________________________________________________________
Testing Program Address __________________________________________________________________
Phone #: ( ) City ______________________________ State _____ Zip __________
Contact person confirms program conforms to 49 CFR Part 40? (_____) Yes (______) No
Contact person confirms list of contractor’s CDL employees covered in this program and that all drivers are qualified to driver under 49 CFR Part 382.301? (_____) Yes (______) No
Commonwealth of Pennsylvania
Public Works Employment Verification Form
Public Works Employment Verification Office Department of General Services Bureau of Procurement 6th floor, Forum Place 555 Walnut Street
Harrisburg, PA 17101-1914
717-346-8115 ra-gsgseverify.pa.gov
Instructions: Complete and return the form to the contracting Public Body prior to the award of the contract.
Business or Organization Name (Employer)
Address
City State Zip Code
Check One:
Contractor
Subcontractor
Contracting Public Body
Contract/Project No.
Project Description
Project Location
Date enrolled in E-Verify
As a contractor/subcontractor for the above referenced public works contract, I hereby affirm that as of the above date, our company is in compliance with the Public Works Employment Verification Act (‘the
Act’) through utilization of the federal E-Verify Program (EVP) operated by the United States
Department of Homeland Security. To the best of my/our knowledge, all employees hired post January
1, 2013 are authorized to work in the United States.
It is also agreed to that all public works contractors/subcontractors will utilize the federal EVP to verify the employment eligibility of each new hire within five (5) business days of the employee start date throughout the duration of the public works contract. Documentation confirming the use of the federal
EVP upon each new hire shall be maintained in the event of an investigation or audit.
I, , authorized representative of the company above, attest that the information contained in this verification form is true and correct and understand that the submission of false or misleading information in connection with the above verification shall be subject to sanctions provided by law.
Authorized Representative Signature Date of Signature
CERTIFICATE OF INSURANCE
NAME OF INSURED
ADDRESS
COVERAGE LIMITS OF LIABILITY EXPIRATION POLICY NO.
DATE
I. WORK.MEN'S State/Federal Statutory COMPENSATION Employer's Liability $I 00,000/$500,000/$100,000
Bodily Injury Property Damage
2. COMPREHENSfVE D Comprehensive Form Each Occurrence Each Occurrence COMMERCIAL D Premises- ($2,000,000 rcq 'd) ($ 1,000,000 req 'd)
GENERAL
LIABlLITY
Operations Explosion & Collapse Annual Aggregate Annual Aggregate
D Hazard ($2,000.000 re 'd ($1,000,000 re 'd D Underground Hazard D Products/ Completed
Operations Hazard D Contractural
Insurance D Broad Form Property
D Damage Independent Contractors
D Personal Injury Including Employees Each Occurrence Aggregate
($ 1,000,000 req 'd) ($1,000,000 rcq 'd)
3. AUTOMOTfVE D Comprehensive Form Each Person Each Occurrence LIABILITY D Owned ($500,000 req 'd) ($250,000 req 'd)
Hired OR D Non-Owned
Each Occurrence Combined Single ($1,000,000 req 'd) Limit of$1,000,000
4. EXCESS LIABILITY D Umbrella Form Each Occurrence ($5,000,000) D Other Than Umbrella
Form Annual Aggregate ($5,000,000)
5. OTHER-PROPERTY D Builders Risk Full Replacement Cost INSURANCE Installation Floater
Technicon Enterprises Inc. II Earl Township
Name (print):
Running Avg. of 5
%AC
Daily No. 1
Wearing Course
Specimen #1Test Results Pass #8
Plant:
Location:
Binder Course Base Course
Signature:
Title:
Publication 408, Section:
P.O. No.
Consigned to:
Material Class:
Plant Code:
Daily No. 2
County
PennDOT Maintenance
Municipality
Contractor S.R.
Group / P.O.C. No. ECMS No.
ESALS SRL PG Grade
Section
County
Date Shipped:
Daily No. 3
Daily AASHTO T209 Density:
Pass #200
Daily Avg.
Specimen #2 Specimen #1 Specimen #2
Air Voids VMA
CS-4171B (2-16) Formerly TR-465
CERTIFICATE OF COMPLIANCE
FOR DAILY BITUMINOUS MIXTURES
Please select the Payment factor percentage below, based on Pub 408 Sec.409.4(a) Table H:
Defective Pavement: The material as listed above shipped on this date does not conform to the certification tolerances for 100% pay as listed in Pub 408 Sec. 409.2(e) Table A. QC test results are being forwarded to the Inspector-In-Charge which indicate material must be removed and replaced or accepted at 50% CUP with District Executive approval in writing. Our records attesting to this statement are open for inspection by a Department Representative for not less than THREE years from the date of shipment.
Job Mix Formula: (Year-Number):
100% Payment Factor: The material as listed above shipped on this date conforms fully with the specification requirements of the Pennsylvania Department of Transportation. Our records, attesting to this statement, are open for inspection by a Department Representative for not less than THREE years from the date of shipment.
85% Payment Factor: The material as listed above shipped on this date does not conform to the certification tolerances for 100% pay as listed in Pub 408 Sec. 409.2(e) Table A. A reduced pay factor has been applied and QC test results are being forwarded to the Inspector-In-Charge. Our records attesting to this statement are open for inspection by a Department Representative for not less than THREE years from the date of shipment.
Tons Shipped:
MS-NCP
MUNICIPALITY
Name of Contractor
Performance of work as specified on the above numbered contract is completed and final pavement inspection has been made by the contractor and municipality in accordance with the terms of the contract awarded.
DATE OF AWARD
Both copies of this form to be filled by the Contractor-Municipality on completion of final pavement restoration
NOTICE OF COMPLETION
IN REFERENCE TO PROJECT #
Signature of Contractor
Signature of Municipality pavement restoration.
*DATE
period of one year from this date.
* The contractor is responsible for maintenance of permanent pavement repairs for a
By the affixing of my signature I hereby certify that final accordance with the above contract # and is hereby accepted inspection has been made and all work has been performed in
FINAL COMPLETION CERTIFICATE
THIS PORTION TO BE COMPLETED BY MUNICIPALITY
Authorized Agent for the Municipality by the municipality as completed.
� ����'���/� ����'���0��� �� �����,-�*
| � | 1����� | ||||||||
| �! | ��1�2�����"�� | ||||||||
| �)� | !��"3�����4�����" | ���"�'�5����������� �� | ���% � | �������.����������'��%6� | ����"6"���%� � | �������.����������'��%����� | ��6� | ��� | ��� ,3� |
3� ��7��� ��' 5��� ���
| 8(,(��������� | ���1�� | ����� 9�".� | %����� |
| �� | ����� | ��� :3:3� | |
| ��6���"���;����$11���� 7�� | ����;����$11����.����' |
5��� +*< 5��� +=<</�8,�:(�����������'��%� �������'��%
>?@AB?CDEB>C@EBFGCHIEJBKGAI@ALBJEJKMFBMANI@COAGP@BPAN
QRSSRTUVWXYZR[\VTT]̂X_WT̀W aVbWcYSVTYR[dWeRcfgThi]YĉjVbRcYaWYVklmlmnonp \WqVrR[p
������������ ������������� �������������� ������ ��� !������������" #����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
�] �̂ ]_!`̂ �_ `̂ ab_c�̀ d̂eb�� �f̂ d̀dega ĝ�h� _i�b# ̂ #�h jkllkmnopqrsktuommvwqxpmyp zo{p|rlomrkt}p~k|��m��vr|w�o{k|rzpro��������� up�o�kt�
������������ ������������� �������������� ������ ��� !������������" #����$%&'()$%*+, -./.010- 23454/ 2/6543 2-7588$%&'()$%*+, -./.0107 239577 2/6543 2-6539$:((;&:<=> 7./.010- 283511 20059- 27-59-$:((;&:<=> 7./.0107 288594 20059- 274590?@)&%>+&*ABC:(D:,<EF(%**1/GH))I+>)*J -./.010- 288569 231590 24-56/?@)&%>+&*ABC:(D:,<EF(%**1/GH))I+>)*J -./.0107 28751- 23/547 24456/?@)&%>+&*ABC:(D:,<EF(%**1/KGH))I+>)*J -./.010- 2845/8 23/5-6 246540?@)&%>+&*ABC:(D:,<EF(%**1/KGH))I+>)*J -./.0107 286531 230580 261540?@)&%>+&*ABC:(D:,<EF(%**10GH))I+>)*J -./.010- 28857/ 231563 24-588?@)&%>+&*ABC:(D:,<EF(%**10GH))I+>)*J -./.0107 28-544 23/574 244588?@)&%>+&*ABC:(D:,<EF(%**10KGH))I+>)*J -./.010- 287567 23/5-1 246537?@)&%>+&*ABC:(D:,<EF(%**10KGH))I+>)*J -./.0107 286510 230538 261537?@)&%>+&*ABC:(D:,<EF(%**13GH))I+>)*J -./.010- 28/566 231513 24/59/?@)&%>+&*ABC:(D:,<EF(%**13GH))I+>)*J -./.0107 283518 231564 24359/?@)&%>+&*ABC:(D:,<EF(%**18GH))I+>)*J -./.010- 281548 209541 241588?@)&%>+&*ABC:(D:,<EF(%**18GH))I+>)*J -./.0107 28/591 2315-8 240588?@)&%>+&*ABC:(D:,<EF(%**1-GH))I+>)*J -./.010- 281531 2095-7 279567?@)&%>+&*ABC:(D:,<EF(%**1-GH))I+>)*J -./.0107 28/58- 23158/ 24/567?@)&%>+&*ABC:(D:,<EF(%**17GH))I+>)*J -./.010- 239580 209531 276540?@)&%>+&*ABC:(D:,<EF(%**17GH))I+>)*J -./.0107 2815-6 2315/8 241540?@)&%>+&*ABC:(D:,<EF(%**14KGH))I+>)*J -./.010- 2-85-7 23-50/ 269544?@)&%>+&*ABC:(D:,<EF(%**14KGH))I+>)*J -./.0107 2-7513 2375/8 2905/4?@)&%>+&*ABC:(D:,<EF(%**14BGH))I+>)*J -./.010- 2-8500 23-5/1 269530?@)&%>+&*ABC:(D:,<EF(%**14BGH))I+>)*J -./.0107 2--579 237513 29/540L%:,>)&*F(%**/A*)),+>)*J -./.0108 23/56/ 203544 2--5-6L%:,>)&*F(%**/A*)),+>)*J -./.010- 23054/ 2085/4 2-7566L%:,>)&*GM:,)H>&:@@:,< /0./.0108 2885/0 20459/ 240513L%:,>)&*GM:,)H>&:@@:,< /0./.010- 28-5/0 20958/ 2485-3L%:,>)&*F(%**0A*)),+>)*J -./.0103 231519 2035/9 2-3506L%:,>)&*F(%**0A*)),+>)*J -./.010- 23-57/ 2085/6 2-9549L%:,>)&*F(%**3A*)),+>)*J -./.010- 28/54/ 2085/6 27-569L:()D&:N)&* -./.010/ 283543 234599 26/540L(%*>)&)&* -./.0108 230593 20/516 2-851/L(%*>)&)&* -./.010- 238576 20/503 2--59/@(CO')& -./.0108 2-8506 23-507 2695-8@(CO')& -./.010- 2-7506 23751/ 290509P++Q)&*AF+O@+*:>:+,J -./.0108 2885/3 238544 246591P++Q)&*AF+O@+*:>:+,J -./.010- 287513 238544 261561P++Q)&*AH=:,<()J -./.0108 23853- 200501 2-75--P++Q)&*AH(%>)RS:()J -./.0108 23453- 200501 2-95--H=))>$)>%(T+&U)&* 7./.0108 283519 2835/8 267503H=))>$)>%(T+&U)&* 7./.010- 28-510 28854/ 269543H:<,$%U)&*%,DV%,<%&* 4./-.0108 230530 20-560 2-65/8H:<,$%U)&*%,DV%,<%&* 4./-.010- 233586 20758/ 2-9569
�W �XWY!ZX�Y ZX[\Y]�ẐX_\�� �̀ X̂Ẑ_a[Xa�b� Yc�\# X#�b deffeghijklmenoiggpqkrjgsj tiujvlfiglenwjxevyzg{|plvq}iuevltjli~�������� oj�i�en�
������������ ������������� �������������� ������ ��� !������������" #����$%&'()*+&,'--+&. /010232/ 4/56/7 428652 497639$%&'()*+&,'--+&. /0102327 4/:697 42:621 4986:5$-+;<,'--+&. 7010232/ 47:657 4/=63: 413269/$-+;<,'--+&. 70102327 4516/9 4//68: 41356=5>+&&;??@A'('.B+& 7010232/ 4=7655 423695 4756/2>+&&;??@A'('.B+& 70102327 4=56=2 421658 478633>+&&;??@C&'(D+& 7010232/ 4=56/2 423695 479618>+&&;??@C&'(D+& 70102327 4=9613 421658 478698>+&&;??@E+FB;('F. 7010232/ 4=56// 422671 4786:7>+&&;??@E+FB;('F. 70102327 4=9619 42=6/= 453653>'*+GE;&H*+A'('.B+& 70102327 4=76=1 4156:: 4726=3>'*+GE;&H*+A'('.B+& 70102325 4=9625 4156:: 47/627>'*+$+--+& 70102327 4=9691 41869= 4756//>'*+$+--+& 70102325 4=:655 41869= 4786=:>&IF)D&'J+&F*;..1K.++(@-+.L 70102327 4/1689 43633 4/1689>&IF)D&'J+&F*;..2K.++(@-+.L 70102327 4/16:/ 43633 4/16:/>&IF)D&'J+&F*;..=K.++(@-+.L 70102327 4/26/= 43633 4/26/=M'(D@NA'*<0>'(-O(.-;**+& 5010232/ 4256=9 41/68= 4/1623M'(D@NA'*<0>'(-O(.-;**+& 50102327 4296/2 41761= 4/2677
�P �QPR!SQ�R SQTURV�SWQXU�� �YQWSWXZTQZ�[� R\�U# Q#�[
]̂__̂ àbcdef̂ghb̀ ìjdkc̀lc mbncoe_b̀êgpcq̂ors̀tuieojvbn̂oemcebwxyxyz{z| hc}b~̂g|
����������������� ������������� �������������� ���� �!��� "�����#������$ %���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
#̂ !�_̂ "̀a_#̀ !a_bc̀ d�ae_fc��!�g_eaefhb_h�i�!̀ j�c%!_%�i klmmlnopqrstluvpnnwxryqnzq {p|q}smpnslu~q�l}��n��ws}x�p|l}s{qsp��������� vq�p�lu�
����������������� ������������� �������������� ���� �!��� "�����#������$ %���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
#Y!�ZY["\Z#[!\Z] [̂_�\̀Zâ ��!�bZ̀\̀ac]Zc�d�![e�̂ %!Z%�d fghhgijklmnogpqkiirsmtliul vkwlxnhkingpylzgx{|i}~rnxs�kwgxnvlnk��������� ql�k�gp�
File details come from the government source that posted it. Updated .